ST PROGRESS REPORT









SECOND PROGRESS REPORT





PR 2 01 / 07 / 2010 - 31 / 12 / 2010









Index: 0684R2



Project

Province of Limburg (partner 2)

Partner:

Sustainable flood management strategies for cross border river

Project title:

basins

Priority: 2: Environment and risk prevention

Sub-theme: Natural and technological risks (including climate change)



This part of the report provides a synthetic overview of the progress report. Information is inserted

automatically, either by transferring data from other parts of the report or through automatic



Colour Code Fields to be filled by PP Fields automatically filled







Please return the completed form by 25th of February by post and e-mail to:



Euregio Maas-Rijn

FLOOD-WISE (room W0.88)

Liesbeth Panis

Po Box 5700

NL - 6202 MA Maastricht

Tel +31 43 389 8834

Fax +31 43 389 8099

E-mail Floodwise@prvlimburg.nl

-1-

3. Project Partner control confirmation

Based on our examination, we confirm the following:



1. For this report the total paid and confirmed expenditure amounts to € 0.00

2. The rules listed in the subsidy contract have been observed, including, but not limited to rules

eligibility of expenditure (Article 56 of Regulation (EC) No 1083/2006, Article 7 of Regulation (EC)

No 1080/2006, Article 48 to 53 of Regulation (EC) No 1828/2006, relevant national and internal

the partners and rules laid down in the latest version of the INTERREG IVC programme manual).

3. The costs reported in this report refer to activities paid from the date of approval by the Monitoring

Committee to the end of the reporting period. Costs reported under the component „preparation

were incurred between 1 January 2007 and the date on which the first version of the application form

approved by the Monitoring Committee has been submitted. They were paid out by the end date of

reporting period.

4. Receipts and payments are accurately recorded in the project‟s accounting system, expenditure in

currency other than the Euro was correctly converted, assets are properly recorded and amounts are

correctly reflected in demands for payment. Any revenues generated were deducted from the eligible

expenditure. The necessary audit trail exists for all activities, providing evidence in the form of

invoices and payment records. In case of staff costs, administration costs, the necessary evidence

the form of timesheets, listings of costs or formula descriptions and cost calculations.

5. Services, supplies and works have been procured on the basis of proper call for tenders in

European, national, internal or other relevant rules, sound controls have been exerted over the

tenders and all tenders have been fully evaluated before the final decision has been made on the

provider, supplier or works contractor.

6. Progress made has been fully and fairly reflected in the report. There is evidence that the reported

have taken place, delivery of services and goods, and works are in progress or have been

expenditure exclusively refers to activities listed in the latest approved version of the application form

completed at the latest by the end of the approved finalisation month.

7. The partners have complied with Community rules and policies including publicity, information, equal

opportunities, protection of environment, state aid, competition and public procurement.

8. The control work has been documented in a control report (incl. a control checklist), which is based

serving as minimum requirements.



I hereby confirm that I / the company is independent from the project‟s activities and financial

management and authorized to carry out the control in respect of control requirements valid in the EU-

Member State/Norway on whose territory the Project Partner is located.





Place,



Date,



Name and title of the controller,



Signature of the controller,







Official stamp

-2-

4. Project Partner's signature

By signing the printable summary of the progress report, the Project Partner officially validates

the entire document, i.e. also the parts which are submitted only electronically to the SSC and

confirms that the information and documentation included and annexes give a correct

description of the implementation of the project. The Project Partner also confirms that the

activity and financial information included in the progress report exclusively relate to the

implementation of the project as agreed between the all partners and the Shared Service Center

and described in the application form.







Place, Maastricht



Date, 16/09/2010



Name and title of the Signatory, Dr. F.W.B. van den Brink



Signature of the Lead Partner,









Official stamp1

1

If according to internal procedures, a stamp is not used, please state it.





5. List of annexes

Annex 1: Partner control confirmation of all reported expenditures in this progress report

Annex 2: INTERREG IVC Control report by independent auditor

Annex 3 (if applicable): 3 copies of main publicity material (e.g. project brochure/good practice guide/final

publication)

-3-

Table of content

Table of content









Table of content

Table of content

General instructions on filling in the progress report









FLOOD-WISE PROGRESS REPORT 1

Checklist for submission

Summary

Project Partner control confirmation

Project partner's signature

List of annexes

I. General information on project's implementation

I.1 Update of contact details

I.2 Summary of partner's achievements so far

I.3 Total eligible expenditure by budget line

I.3 involvement of partners not financed by Interreg IVC

I.4 Problems encountered and solutions fount / proposed

I.5 Further information (if applicable)

II. Detailed reporting per component

II.1 Component 1

Report on finances

Specifications of budget line "no. 4 External Expertise"

Specifications of budget line "no. 5 Equipment"

II.2 Component 2

Indicators

Report on activities and outputs

Report on finances

Specifications of budget line "no. 4 External Expertise"

II.3 Component 3

Indicators

Report on activities and outputs

Report on finances

Specifications of budget line "no. 4 External Expertise"

II.4 Component 4

Indicators

Report on activities and outputs

Report on finances

Specifications of budget line "no. 4 External Expertise"

II.5 Collective costs

Report on finances

Contact Details









-1-

General instructions for filling in the progress report









FLOOD-WISE PROGRESS REPORT 1

When to submit the report to the Lead partner?



This form shall be used by the project partner to provide content-related and financial information on

the progress of the project's implementation. The reporting periods are January - June and July -

December of each calendar year. The report must be submitted within 1,5 months after the last day

of the reporting period. For the reporting period of January - June, the report must be submitted by

25 August of the same year. For the reporting period July - December, the report must be submitted

by 25 February of the following year.



What to submit to the Lead Partner?



The electronic and paper version of the entire progress report must be submitted to the FLOOD-

WISE Shared Service Center by the above-mentioned deadlines.

This “Printable Summary” of the report shall bear the signatures of the authorised official of the

project partner institution and the independent first level controller selected by the project partner

institution. It must be accompanied by the partner control confirmation and the control report.

In addition, partners from countries where the first level control is decentralised, and in case

of the first reporting only or in case of change, must also provide the approbation certificate.

Three copies of the main publicity materials and digital scan version (e.g. newsletter in which the

project is mentionned, press articles related to conferences, etc) issued during the reporting period

have also to be submitted to the Lead Partner.





How to fill in the report?



Only the white fields of the report have to be filled in. Grey fields are pre-filled and can include

information from the original application form, from the previous progress report, or from the current

report itself (through automatic links and calculations).



Please ensure to use Microsoft Excel under Windows with Macros enabled; using other

systems/programmes might damage this template.



For any further information on the progress report and monitoring procedures, please consult the

INTERREG IVC programme manual and the FLOOD-WISE project handbook. Project partners

should not hesitate to contact the Lead Partner if questions arise.









The Excel protection of the form must not be removed.









-2-

Checklist for submission

Please make sure that you have fulfilled all the requirements listed below before submitting the









FLOOD-WISE PROGRESS REPORT 1

documents.



No 1. The report is protected and the protection has not been removed during the form's

completion.



No 2. The paper version of the progress report is complete. All the relevant worksheets are filled

in and provided.



No 3. The paper version is signed, stamped and dated by a duly authorised representative of the

project partner institution.



No 4. The “project partner control confirmation” is signed, stamped and dated by an independent

controller.



No 5. The text of the “project partner control confirmation” has not been amended.





No 6. The electronic and paper version of the report are identical.





No 7. Activities and outputs are clearly reported against the original work plan (component

description for the respective reporting period) in the contracted version of the application

form.

No 8. All deviations from the originally planned activities and outputs are explained and justified.





No 9. No error messages in the progress report indicating budget injuries (in total, in components,

in budget lines) appear in the progress report.



No 10.Any over- or underspending compared with the payment forecast and to the original budget

by budget line, component and partner is explained and justified.



No 11.The budget lines “external expertise and services” and "equipment" are specified.

Deviations from the original specifications are explained and justified.



No 12.Country specific first level control requirements are respected for all partners (cf.

www.interreg4c.eu).



No 13.Partner control checklist by your independent auditor is provided as an annex to the

progress report.



No 14.The project partner's bank details, project coordinator, financial contact, communication

contact person, First Level Controllers details are completed in the contact details.









-3-

I. General information on the project's implementation

This part of the report should provide an overview of the project's implementation, i.e. the project's









FLOOD-WISE PROGRESS REPORT 1

achievements so far, the involvement of partners, the use of different funding sources as well as the

problems encountered.



I.1 Update of contact details

Did the contact details of the project partner bank

details/project coordinator/financial contact/communication

contact person/first level controller change? No







If yes, then please go to the worksheet "ContactDetails" of the progress report and update the contact

details. For progress report 1 it is necessary to provide the Lead Partner's bank details, the project

coordinator, financial contact and communication



I.2 Summary of the partner's achievements so far

Please provide a brief overall summary of the partner's achievements from the start of the project

until now. Information shall be provided on the main activities as well as the achieved results and

produced outputs. It is advised that this field is filled in after the rest of the progress report has been

completed. Please note that this summary information will be published on the extranet. Thus

it should be easy readable, self-explanatory and without references to other parts of the

reporting form or other documents.









-4-

I.3 Total eligible expenditure by budget line









FLOOD-WISE PROGRESS REPORT 1

All costs in Euro

Budget line Previous Current

No. Specification Total budget reports report Accumulated % Remaining

Staff

1 118,906.43 5,320.62 0.00 5,320.62 4.47 113,585.81

Administration

2 0.00 0.00 0.00 0.00 0.00 0.00

Travel and

3 12,250.00 455.26 0.00 455.26 3.72 11,794.74

accommodation

External expertise and

4 47,952.49 5,265.03 0.00 5,265.03 10.98 42,687.46

services

Equipment

5 0.00 0.00 0.00 0.00 0.00 0.00

Preparation costs

6 0.00 0.00 0.00 0.00 0.00 0.00

Total 179,108.92 11,040.91 0.00 11,040.91 0.00 168,068.01

Original budget in the application: 180,000.00 180,000.00

Over- or underspending: -180,000.00 -168,959.09

Over- or underspending in %: -100.00 -93.87









-5-

I.3 Involvement of partners not financed by INTERREG IVC









FLOOD-WISE PROGRESS REPORT 1

Please describe any developments with regard to the partners or parts of the project not co-financed

by the INTERREG IVC programme.









I.4 Problems encountered and solutions found / proposed



1.4.a Concerning activities or partnership, please state any problems encountered during the current

reporting period, the impact of these problems and the solutions proposed.









1.4.b Concerning finances, please state any problems encountered during the current reporting

period, explain the reasons and propose solutions, in particular concerning:

• general under/overspending,

• expenditure that has been paid out during this period but exceptionally could not be reported

(amounts per partner to be indicated)

• and problems with first level control.

-6-

FLOOD-WISE PROGRESS REPORT 1

Have any corrections of already reported expenditure

No

been undertaken in this report?



If yes, please download a financial correction sheet from the INTERREG IVC website and

submit it as an annex to this progress report.





I.5 Further information (if applicable)

If you wish to report on any other issues not covered yet in the other parts of this report, please use

the following section.









-7-

II. Detailed reporting per component

FLOOD-WISE PRO

II. Detailed reporting per component

This part of the report is dedicated to the detailed reporting per component. Apart from Component 1,









FLOOD-WISE PROGRESS REPORT 1

the reporting per component consists of three main sections. The first section is dedicated to the

reporting of output and result indicators. These indicators are taken from the approved application

form; they can be either pre-defined at programme level or self-defined by the project. The

completion of this section is particularly important since it directly contributes to the monitoring of the

programme's implementation and success. The second section is dedicated to the detailed

description of the activities and outputs of the reporting period. The third and last section focuses on

the financial reporting of the component.



II.1 Component 1



Title: Management and coordination

Total eligible 0.00

Planned results: A well managed project reaching its objectives, without serious conflict between the partners, without

irregularities and with smooth reporting to the programme









II.1.1 Report on finances

II.1.1 A) Component's expenditure by budget line

All costs in Euro

Total Previous Current Accumulate

Budget line budget reports report d % Remaining

Staff related to

1 6,240.00 329.04 0.00 329.04 0.00 5,910.96



Reporting activities by

3,360.00 329.04 0.00 329.04 9.79 3,030.96

partner

Audit activities by

internal FLC 2,880.00 0.00 0.00 0.00 0.00 2,880.00



Administration

2 0.00 0.00 0.00 0.00 0.00 0.00



Travel and

3 1,043.75 0.00 0.00 0.00 0.00 1,043.75

accommodation

Traveling to Steering

Committee meetings 1,043.75 0.00 0.00 0.00 0.00 1,043.75

during PPM (6)

External expertise

4 and services * 0.00 0.00 0.00 0.00 0.00 0.00



Audit activities by

external FLC 0.00 0.00 0.00 0.00 0.00



Equipment **

5 0.00 0.00 0.00 0.00 0.00 0.00



Laptops, computers,

skype work station, 0.00 0.00 0.00 0.00 0.00

video projector etc.



7,283.75 329.04 0.00 329.04 4.52 6,954.71

Total

* Please go to B) Specification of budget line No 4 „External expertise and services'

** Please go to C) Specification of budget line No 5 „Equipment'

-8-

Deviations from the original plans

Please explain and justify any financial deviations that occurred in this reporting period, e.g. if you









FLOOD-WISE PROGRESS REPORT 1

exceeded the total budget by budget line or component, if there are discrepancies between the

activities described and finances reported.









II.1.1 B) Specification of budget line No 4 ‘External expertise and services'

Below you find the information on "External expertise" how it is agreed and appoved in the

application form with the INTERREG IVC programme. This means that only costs related to this

description will be accepted by the Lead Partner and by the Programme. In case you want to report

expenditures different than described below, please justify it and use "Justification of deviations for

items listed above although not foreseen in the application form" below. Please note that deviations

have to remain exceptional and can only be approved in well justified cases. Please provide

information on "External expertise" costs paid and certified. For each cost item provide clear

specification of the sub-contracted expertise including information on the partner responsible for sub-

contracting, the sub-contracted body and the corresponding amount. Note that the description and

the amount should correspond to the description stated in the approved application. If necessary two

lines can be used for the description of the same cost.







Description

Item (please refer to the specification of expertise foreseen in the application form, Amount

no. section 4.3, otherwise also provide specifications below and justify in the next table) (EUR)

Audit cost per partner (P.6,9,14,15 EUR 4.800 and P.12 EUR 2.000)

1 0.00



2 0.00



3 0.00



4 0.00



5 0.00



6 0.00

Sub-total: 0.00









-9-

Item Justification of deviations for items listed above although not foreseen in the application form









FLOOD-WISE PROGRESS REPORT 1

no. (please note that deviations have to remain exceptional and can only be approved in well justified cases)









II.1.1 C) Specification of budget line No 5 ‘Equipment'

Please provide information on "Equipment" costs paid and certified. For each cost item provide clear

specification of the purchased equipment including information on the actual costs. Note that the

information and expenditure should correspond to the description stated below.









Description

Item (please refer to the specification of expertise foreseen in the application form, Amount

no. section 4.3, otherwise also provide specifications below and justify in the next table) (EUR)

1 laptop, 1 printer, 1 flash USB and 1 mobile phone (P15)

1 0.00



2 0.00



3 0.00



4 0.00



5 0.00



6 0.00



Sub-total: 0.00









-10-

Item Justification of deviations for items listed above although not foreseen in the application form









FLOOD-WISE PROGRESS REPORT 1

no. (please note that deviations have to remain exceptional and can only be approved in well justified cases)









-11-

II.2 Component 2



Title: Communication and dissemination









FLOOD-WISE PROGRESS REPORT 1

Total eligible 0.00

Planned results: Strengthened comm. between partners in border areas; ext. (reg., nat. and internat.) stakeholders

informed about project activities and results. Comm. freely available FRM practices via project

website, linked to WISE-RTD portal.







II.2.1 Indicators

Please report on the following output and result indicators by inserting the respective figures of the

current period in the white column. The numbers should ONLY refer to outputs and results produced

by your own organisation. These indicators should also be reflected and justified in the description of

the activities and outputs of the component (section II.2.2).

Previous Updated

Current

Output indicators cumulative cumulative Project target

period

total total

N° of press releases about FLOOD-WISE

1 1 2 15

disseminated by your organisation

N° of copies of FLOOD-WISE brochures

0 0 0 2000

disseminated by your organisation

N° of copies of FLOOD-WISE newsletters

0 0 0 5000

disseminated by your organisation

N° of dissemination events organised by your 0 2 2 12

organisation

N° of other events participated in which Flood-wise

0 0 0 9

is presented by your organisation



0



0

0

0

0

Previous Updated

Current

Result indicators cumulative cumulative Project target

period

total total

N° of articles/appearances in press and media in

1 1 2 8

your region or country

N° of participants in events organised by the project

80 80 390

for your organisation

No. of flood man. practices of your river basin /

N/A 0 0 18

region published in WISE-RTD

No. of staff of your organisation with increased

3 3 40

cross-cultural skills

0

0









-12-

II.2.2 Report on activities and outputs

Please describe in the section below the activities which have taken place in your river basin and the

main outputs produced by your organisation during the reporting period for component 2.









FLOOD-WISE PROGRESS REPORT 1

Activities of the current reporting period as originally planned according to the application

form by SSC and project partners

SC with support of SSC:

- Organize political expert forum 1 during partner meeting 1 – Oct. 2011 - for dissemination project set up and inventory

phase 1 "flood risk assessment"



SSC:

- produce digital newsletters about partner meeting 1 and transfer-activities between RB's

- prepare press releases about partner meeting 1, pilot projects and transfer activities

- Prepare database structure in WISE-RTD









Activities which have taken place in your river basin or region during the reporting period

we worked further on a strategic communication plan for the Meuse basin. We published an article in a regional newspaper.

We presented the preliminary results of our work during 2 meetings of the International Meuse Basin: the plenary meeting of

the IMC (kind of political foruim) and meeting of working group on hydrology within the IMC.









Outputs of the current reporting period as originally planned according to the application form

by SSC and project partners

1 political expert forum during partner meeting 1

- 1 training session WISE-RTD

- first version database structure in WISE-RTD

- 2 digital newsletters

- 3 press releases







Outputs produced by your organisation during the reporting period

1 press release, 1 powerpoint presentation, 1 article in regional newspaper

-13-

FLOOD-WISE PROGRESS REPORT 1

Deviations from the original plans

If applicable, please describe possible deviations from the initially planned activities that may have

occured in this reporting period. The reason for the deviation should be provided as well as its

possible consequence on the project's implementation and the solution proposed to sort out this

deviation.









-14-

II.2.3 Report on finances

II.2.3 A) Component's expenditure by budget line









FLOOD-WISE PROGRESS REPORT 1

All costs in Euro

Total Previous Current Accumulate

Budget line budget reports report d % Remaining

Staff

1 16,786.86 300.96 0.00 300.96 0.00 0.00



Increase media and

non-media awareness

of the project in each 8,826.86 300.96 0.00 300.96 0.00 0.00

partner region



Establish links with

other authorities and

stakeholder groups in 3,800.00 0.00 0.00 0.00 0.00 0.00

each region



Dissemination of the

project results in each 4,160.00 0.00 0.00 0.00 0.00 0.00

region

Developing WISE-RTD

database structure to

collect good practices

on flood risk 0.00 0.00 0.00 0.00 0.00 0.00

management

strategies/tools





Travel and

3 3,131.25 0.00 0.00 0.00 0.00 3,131.25

accommodation

Political Expert Forum 3,131.25 0.00 0.00 0.00 3,131.25

during PPM (6)

External expertise

4 0.00 0.00 0.00 0.00 0.00 0.00

and services *

Increase media and

non-media awareness

0.00 0.00 0.00 0.00 0.00 0.00

of the project in each

partner region

Establish links with

other authorities and

stakeholder groups in 0.00 0.00 0.00 0.00 0.00 0.00

each region

Dissemination of the

project results in each 0.00 0.00 0.00 0.00 0.00 0.00

region

Developing WISE-RTD

database structure to

collect good practices

on flood risk 0.00 0.00 0.00 0.00 0.00 0.00

management

strategies/tools









19,918.11 300.96 0.00 300.96 0.00 3,131.25



Total

* Please go to B) Specification of budget line No 4 „External expertise and services'









-15-

Deviations from the original plans

Please explain and justify any financial deviations that occurred in this reporting period, e.g. if you









FLOOD-WISE PROGRESS REPORT 1

exceeded the total budget by budget line or component, if there are discrepancies between the

activities described and finances reported.









II.2.3 B) Specification of budget line No 4 ‘External expertise and services'

Below you find the information on "External expertise" how it is agreed and appoved in the

application form with the INTERREG IVC programme. This means that only costs related to this









FLOOD-WISE PROGRESS REPORT 1

description will be accepted by the Lead Partner and by the Programme. In case you want to report

expenditures different than described below, please justify it and use "Justification of deviations for

items listed above although not foreseen in the application form" below. Please note that deviations

have to remain exceptional and can only be approved in well justified cases. Please provide

information on "External expertise" costs paid and certified. For each cost item provide clear

specification of the sub-contracted expertise including information on the partner responsible for sub-

contracting, the sub-contracted body and the corresponding amount. Note that the description and

the amount should correspond to the description stated in the approved application. If necessary two

lines can be used for the description of the same cost.







Description

Item (please refer to the specification of expertise foreseen in the application form, Amount

no. section 4.3, otherwise also provide specifications below and justify in the next table) (EUR)

Developing WISE-RTD database structure for flood risk management strategies/tools P3

1 0.00



Increase media and non-media awareness and links with stakeholders in partner region P6

2 0.00



Dissemination of the project results in each region (P4 5.120; P6 3.584)

3 0.00



Logistics final event P2

4 0.00



Logistics other interregional partner meetings (P 5,7,9,11)

5 0.00



6 0.00



7 0.00

7 0.00



Sub-total: 0.00





-16-

Item Justification of deviations for items listed above although not foreseen in the application form









FLOOD-WISE PROGRESS REPORT 1

no. (please note that deviations have to remain exceptional and can only be approved in well justified cases)









-17-

II.3 Component 3



Exchange of experiences dedicated to the identification and analysis of good









FLOOD-WISE PROGRESS REPORT 1

Title: practices

Total eligible 0.00

Planned results: Partners exchanged good practices of cross-border cooperation between river basins. Lessons learnt

through interregional transfer are published in reports, available for EU Commission, Member States

and water managers in Eur.









II.3.1 Indicators

Please report on the following output and result indicators by inserting the respective figures of the

current period in the white column. The numbers should ONLY refer to outputs and results produced

by your own organisation. As indicated below, good practices need to be further justified directly in

this section (II.3.1.). The other indicators, they should be reflected and justified in the description of

the activities and outputs of the component (section II.3.2).

Previous Updated

Current

Output indicators cumulative cumulative Project target

period

total total

N° of interregional events organised by your

1 1 2 6

organisation to exchange experience

N° of participants in these interregional

3 10 13 240

events by your organisation

No. of regional / local policies and

instruments addressed concerning your 0 2 2 12

organisation, river basin, region or country





No. of good practices of your organisation,

3 3 6 18

river basin, region or country identified





Please describe briefly the good practices identified by your organisation during this reporting period.

At least, a short explanation on and the location of each practice have to be provided.

1. we identified the German LAWA method as a good pratice possibly to be introduced in our regional policy. 2. we identified

the Belorussian and Polish policy on the Western Bug river as a good example of how to deal with Nature 2000 sites and

flood risk management. 3. we identified the Belorussian and Ukrainian cooperation on the development of a cross-border

flood risk map as a good example of cross-border cooperation.

-18-

Please describe one (or several) good practice(s) of your organisation, river basin or region which

you consider of particular interest in more detail in the field below. The information provided in this

section will contribute to the qualitative evaluation of the programme's achievements and may be

published.









FLOOD-WISE PROGRESS REPORT 1

Previous Updated

Current

Result indicators cumulative cumulative Project target

period

total total

No. of staff members of your organisation with

increased capacity (awareness/knowledge/skills) 1 4 5 45

resulting from the exchange of experience at

interregional events



Please justify the figure reported for the above indicator.The numbers should ONLY refer to outputs

and results produced by your own organisation.

we published the good examples identified by our organisation on the flood-wise extranet in which 4 members of our

organization who worki in this policy field have access to.









-19-

Previous Updated

Current

Result indicators cumulative cumulative Project target









FLOOD-WISE PROGRESS REPORT 1

period

total total



N° of good practices successfully transferred

0 1 1 6

to or from your river basin, region or country.



If applicable, please describe in detail the transfer of practices to or from your river basin, region or

country that took place during this reporting period. Information on the 'donor' and 'benefiting' regions

is required as well as the way this practice was concretely transfered into the (these) 'benefiting'

region(s). The information provided in this section will contribute to the qualitative evaluation of the

programme‟s achievements and may be published.

1. The LAWA method from the German Ministry has been discussed here and we will probably take over this method for our

regional rivers.

-20-

Previous Updated

Current

Result indicators cumulative cumulative Project target

period

total total









FLOOD-WISE PROGRESS REPORT 1

N° of regional/local policies and instruments

0 1 1 6

improved by your organisation



If applicable, please describe in detail the specific policies / instruments that were improved by your

organisation during this reporting period andhow they were improved. The way interregional

cooperation has contributed to this improvement has also to be made clear. The information provided

in this section will contribute to the qualitative evaluation of the programme's achievements and may

be published.

1. we improved our methods on assessment of flood risk for regional rivers









Previous Updated

Current

Result indicators cumulative cumulative Project target

period

total total

N° of cross border contacts to harmonize policies in

1 2 3 10

your border area

0

0

0

0

-21-

II.3.2 Report on activities and outputs

Please describe in the section below the activities which have taken place in your river basin / region

and the main outputs produced by your organisation during the reporting period for component 3.









FLOOD-WISE PROGRESS REPORT 1

Activities of the current reporting period as originally planned according to the application

form

Partner Meeting 1 (Oct. 2010, Location: Western Bug river basin):

- Plenary partner Meeting 1 (Oct. 2010, Location: Western Bug river basin)

- Thematic workshops (3): transfer of (at least) 3 good practices on flood risk assessment

- Plenary partner meeting: conclusions of transfer workshops and follow-up

- Study visit W. Bug river (problems, practices, management issues)

- Regional meetings in each river basin (participants: partners and third parties involved in river basin concerned):

a) preparation of conclusions flood risk assessment.

b) start inventory of problems and good practices on flood risk mapping.

- 6 staff exchanges for interregional transfer activities of good practices









Activities in which your organisation was involved during the reporting period

1. we were actively involved in all activities as mentioned above during the PM1. 2. we also took part in the preparation of this

meeting. 3. we took part in a staff exchange meeting to Minsk Belarus to discuss subjects related to cross border flood risk

assessment and flood risk mapping. 4. we presented the preliminary results in our river basin for a broad group of

stakeholders.









Outputs of the current reporting period as originally planned according to the application

form

1 Partner meeting in W. Bug river basin (25 participants of project partners)

- 3 thematic workshops

- 2 reg. RB meetings

- 1 study visit in Western Bug river basin

- 6 partner staff members exchanged with other partners

- 6 inventory reports on problems and good practices on flood risk assessment









Outputs which your organisation helped to produce during the reporting period

1 partner neeting in W. Bug river basin, 3 thematic workshops, 2 reg. RB meetings, 1 study visit in W. Bug RB, 1 partner staff

member exchanged with Polish and Belorussian partners. 1 inventory report on problems and good practices on flood risk

assessment.

-22-

Deviations from the original plans

If applicable, please describe possible deviations from the initially planned activities that may have

occured in this reporting period. The reason for the deviation should be provided as well as its









FLOOD-WISE PROGRESS REPORT 1

possible consequence on the project's implementation and the solution proposed to sort out this

deviation.









-23-

II.3.3 Report on finances

II.3.3 A) Component's expenditure by budget line

All costs in Euro









FLOOD-WISE PROGRESS REPORT 1

Total Previous Current Accumulate

Budget line budget reports report d % Remaining

Staff

1 78,587.65 3,117.82 0.00 3,117.82 3.97 75,469.83



Coordinating partners 39,301.59 2,467.80 0.00 2,467.80 36,833.79

Preparation basin

in each riverof sub-

reports 3,840.00 0.00 0.00 0.00 3,840.00



Preparation of final

report 2,560.00 0.00 0.00 0.00 2,560.00



Organisation of launch

event + study visit P1 0.00 0.00 0.00 0.00 0.00



Organisation of final

event + political forum 3,840.00 0.00 0.00 0.00 3,840.00

P16



Organisation of

interregional partner

meetings: start and

closure of each project 0.00 0.00 0.00 0.00 0.00

phase + study visits P

5,7,9,11

Organisation of

individual river basin 3,840.00 0.00 0.00 0.00 3,840.00

meetings

Carry out interregional

exchange and transfer

activities (inventories,

bi-lateral intervisions, 25,206.06 650.02 0.00 650.02 0.00 24,556.04

transfer activities etc.)





Travel and

accommodation



3 8,075.00 455.26 0.00 455.26 5.64 7,619.74







Plenary Partner 4,175.00 455.26 0.00 455.26 0.00 3,719.74

Meetings visitsstudy

Bi-lateral incl. between

partners 3,900.00 0.00 0.00 0.00 0.00 3,900.00



Individual river basin

meetings (project 0.00 0.00 0.00 0.00 0.00 0.00

manager to each RB)

External expertise

4 and services * 6,000.00 0.00 0.00 0.00 6,000.00



Translation services to 0.00 0.00 0.00 0.00 0.00

exchange and transfer

Logistics individual river

6,000.00 0.00 0.00 0.00 6,000.00

basin meetings



92,662.65 3,573.08 0.00 3,573.08 9.61 89,089.57

Total

* Please go to B) Specification of budget line No 4 „External expertise and services'

-24-

Deviations from the original plans

Please explain and justify any financial deviations that occurred in this reporting period, e.g. if you









FLOOD-WISE PROGRESS REPORT 1

exceeded the total budget by budget line or component, if there are discrepancies between the

activities described and finances reported.









II.3.3 B) Specification of budget line No 4 ‘External expertise and services'

Below you find the information on "External expertise" how it is agreed and appoved in the

application form with the INTERREG IVC programme. This means that only costs related to this









FLOOD-WISE PROGRESS REPORT 1

description will be accepted by the Lead Partner and by the Programme. In case you want to report

expenditures different than described below, please justify it and use "Justification of deviations for

items listed above although not foreseen in the application form" below. Please note that deviations

have to remain exceptional and can only be approved in well justified cases. Please provide

information on "External expertise" costs paid and certified. For each cost item provide clear

specification of the sub-contracted expertise including information on the partner responsible for sub-

contracting, the sub-contracted body and the corresponding amount. Note that the description and

the amount should correspond to the description stated in the approved application. If necessary two

lines can be used for the description of the same cost.









Description

Item (please refer to the specification of expertise foreseen in the application form, Amount

no. section 4.3, otherwise also provide specifications below and justify in the next table) (EUR)

Translation services to exchange and transfer good practices P4,7,8,15

1 0.00



Logistics individual river basin meetings RBC

2 0.00



3 0.00



4 0.00



5 0.00



6 0.00

7 0.00



Sub-total: 0.00

-25-

Item Justification of deviations for items listed above although not foreseen in the application form









FLOOD-WISE PROGRESS REPORT 1

no. (please note that deviations have to remain exceptional and can only be approved in well justified cases)









-26-

II.4 Component 4



Title: Implementation of pilot actions to ensure interregional transfer of good practices









FLOOD-WISE PROGRESS REPORT 1

Total eligible 0.00

costs:

Planned results: Innovative examples of joint flood risk assessments, joint flood risk maps and joint flood risk

management plans in border areas of four international river basins.









II.4.1 Indicators



Please report on the following output and result indicators by inserting the respective figures of the

current period in the white column. The numbers should ONLY refer to outputs and results produced

by your own organisation. These indicators should also be reflected and justified in the description of

the activities and outputs of the component (section II.4.2).

Previous Updated

Current

Output indicators cumulative cumulative Project target

period

total total

No. of FLOOD-WISE partners involved in cross

3 3 9

border pilot projects in your river basin

No. of external parties involved in cross border

0 0 4

projects in your border area

No. of reports by your river basin on cross border

implementation of flood risk management 0 0 4

instruments

No. of presentations of experiences in your border

area with cross border implementation of flood risk 0 0 12

management instruments



0



0



Previous Updated

Current

Result indicators cumulative cumulative Project target

period

total total

No. of cross border flood risk assessments realised

0 0 4

in your river basin

No. of cross border flood risk maps realised in your

0 0 4

river basin

No. of cross border flood risk management plans

0 0 4

realised in your river basin



0



0



0

-27-

II.4.2 Report on activities and outputs

Please describe in the section below the activities which have taken place and main outputs

produced during the reporting period for component 4.

Activities of the current reporting period as originally planned according to the application









FLOOD-WISE PROGRESS REPORT 1

form

Each of the pilot team meetings aiming at the development of a joint approach for flood risk assessment in the 4 river basins,

addressing ecological, economic and spatial requirements as well; presentation of and discussion about approach with

responsible organisations;









Activities which have taken place in your river basin during the reporting period









Outputs of the current reporting period as originally planned according to the application form

4x3 pilot team meetings; W. Bug: 3 presentations and discussion sessions (in Ukrain, Poland and Belarus); Roer: 2

presentations and discussion sessions (NL, Germany); Elbe: 2 presentations and discussion sessions (Germany, Czech

Rep.); Sava: 2 presentations and discussion sessions formal (Croatia, Slov.);









Outputs produced by your organisation during the reporting period









-28-

Deviations from the original plans

If applicable, please describe possible deviations from the initially planned activities that may have

occured in this reporting period. The reason for the deviation should be provided as well as its









FLOOD-WISE PROGRESS REPORT 1

possible consequence on the project's implementation and the solution proposed to sort out this

deviation.









-29-

II.4.3 Report on finances

II.4.3 A) Component's expenditure by budget line

All costs in Euro









FLOOD-WISE PROGRESS REPORT 1

Total Previous Current Accumulate

Budget line budget reports report d % Remaining

Staff

1 0.00 0.00 0.00 0.00 0.00 0.00



Bug Pilot cross border

flood risk assessment 0.00 0.00 0.00 0.00 0.00 0.00

P12,11

Elbe Pilot cross border

flood risk assessment 0.00 0.00 0.00 0.00 0.00 0.00

P7,8

Roer Pilot cross border

flood risk assessment 0.00 0.00 0.00 0.00 0.00 0.00

P5,6

Sava Pilot cross border

flood risk assessment 0.00 0.00 0.00 0.00 0.00 0.00

P9,10

Bug Pilot cross border

flood risk map P11,12 0.00 0.00 0.00 0.00 0.00 0.00



Elbe Pilot cross border

flood risk map P7,8 0.00 0.00 0.00 0.00 0.00 0.00



Roer Pilot cross border

flood risk map P5,6 0.00 0.00 0.00 0.00 0.00 0.00



Sava Pilot cross border

flood risk map P9 0.00 0.00 0.00 0.00 0.00 0.00



Bug Pilot cross border

flood risk management

0.00 0.00 0.00 0.00 0.00 0.00

plan P11,12



Elbe Pilot cross border

flood risk management

0.00 0.00 0.00 0.00 0.00 0.00

plan P7,8



Roer Pilot cross border

flood risk management

0.00 0.00 0.00 0.00 0.00 0.00

plan P5,6



Sava Pilot cross border

flood risk management 0.00 0.00 0.00 0.00 0.00 0.00

plan P9

External expertise

2 0.00 0.00 0.00 0.00 0.00 0.00

and services *

Roer Pilot cross border









FLOOD-WISE PROGRESS REPORT 1

flood risk assessment 0.00 0.00 0.00 0.00 0.00 0.00

P5,6

Sava Pilot cross border

flood risk assessment 0.00 0.00 0.00 0.00 0.00 0.00

P9

Bug Pilot cross border

flood risk map P12 0.00 0.00 0.00 0.00 0.00 0.00



Elbe Pilot cross border

flood risk map P7,8 0.00 0.00 0.00 0.00 0.00 0.00



Roer Pilot cross border

flood risk map P5,6 0.00 0.00 0.00 0.00 0.00 0.00



Sava Pilot cross border

flood risk map P9 0.00 0.00 0.00 0.00 0.00 0.00



Elbe Pilot cross border

flood risk management

plan P7,8 0.00 0.00 0.00 0.00 0.00 0.00





Roer Pilot cross border

flood risk management

0.00 0.00 0.00 0.00 0.00 0.00

plan P5,6



Sava Pilot cross border

flood risk management 0.00 0.00 0.00 0.00 0.00 0.00

plan P9



Total 0.00 0.00 0.00 0.00 0.00 0.00

* Please go to B) Specification of budget line No 4 „External expertise and services'

-31-

II.4.3 B) Specification of budget line No 4 ‘External expertise and services'

Below you find the information on "External expertise" how it is agreed and appoved in the

application form with the INTERREG IVC programme. This means that only costs related to this









FLOOD-WISE PROGRESS REPORT 1

description will be accepted by the Lead Partner and by the Programme. In case you want to report

expenditures different than described below, please justify it and use "Justification of deviations for

items listed above although not foreseen in the application form" below. Please note that deviations

have to remain exceptional and can only be approved in well justified cases. Please provide

information on "External expertise" costs paid and certified. For each cost item provide clear

specification of the sub-contracted expertise including information on the partner responsible for sub-

contracting, the sub-contracted body and the corresponding amount. Note that the description and

the amount should correspond to the description stated in the approved application. If necessary two

lines can be used for the description of the same cost.









Description

Item (please refer to the specification of expertise foreseen in the application form, Amount

no. section 4.3, otherwise also provide specifications below and justify in the next table) (EUR)

Roer Pilot: cross border flood risk assessment, map and plan (P5 18.432; P6 21.504)

1 0.00



Sava Pilot: cross border flood risk assessment, map and plan

2 0.00



Bug Pilot: cross border flood risk assessment, map and plan

3 0.00



Elbe Pilot: cross border flood risk assessment, map and plan (P7 30.000; P8 25.000)

4 0.00



External expertise for interregional evaluation of pilot-experiments

5 0.00



6 0.00



7 0.00



Sub-total: 0.00







Item Justification of deviations for items listed above although not foreseen in the application form

no. (please note that deviations have to remain exceptional and can only be approved in well justified cases)

-32-

II.5 Collective costs



Title: Collective Costs









FLOOD-WISE PROGRESS REPORT 1

Total eligible 0.00





II.5.1 Report on finances

II.5.1 A) Expenditure by budget line and Component

All costs in Euro

Total Previous Current Accumulate

Budget line budget reports report d % Remaining

Staff

1 17,291.92 1,572.80 0.00 1,572.80 9.10 15,719.12



Component 1 11,697.15 1,572.80 0.00 1,572.80 13.45 10,124.35

Component 2 5,594.77 0.00 0.00 0.00 0.00

Travel

3 891.08 0.00 0.00 0.00 0.00 891.08



Component 1 891.08 0.00 0.00 0.00 0.00 891.08

External expertise

4 41,952.49 5,265.03 0.00 5,265.03 12.55 36,687.46

and services *

Component 1 12,222.23 1,175.63 0.00 1,175.63 9.62 11,046.60

Component 2 17,932.11 2,691.96 0.00 2,691.96 15.01 15,240.15

Component 3 11,062.48 1,397.44 0.00 1,397.44 12.63 9,665.04

Component 4 735.67 0.00 0.00 0.00 0.00 735.67

Total 60,135.49 6,837.83 0.00 6,837.83 11.37 53,297.66

-33-

P2 - Province of Limburg,The Netherlands

INDIVIDUAL PARTNER BUDGET

REMAINING NEW REMAINING NEW REMAINING

CURRENT TOTAL SPENDING REPORTED SPENDING AVAILABLE SPENDING SPENDING REPORTED SPENDING AVAILABLE SPENDING SPENDING REPORTED SPENDING AVAILABLE

BUDGETLINE ACTIVITIES / TASKS TOTAL APPROVED SHIFTS BUDGET REPORTED TARGET PR1 PR1 TARGET BUDGET TARGET PR2 TARGET PR2 PR2 TARGET BUDGET TARGET PR3 TARGET PR3 PR3 TARGET BUDGET

01 staff Half-yearly reporting per partner 3,360.00 0.00 3,360.00 329.04 329.04 3,030.96

01 staff Audit cost per partner 2,880.00 0.00 2,880.00 0.00 2,880.00

Increase media and non-media awareness of

01 staff the project in each partner region 8,826.86 0.00 8,826.86 300.96 300.96 8,525.90

Establish links with other authorities and

01 staff stakeholder groups in each region in each

Dissemination of the project results 3,800.00 0.00 3,800.00 0.00 3,800.00

01 staff region 4,160.00 0.00 4,160.00 0.00 4,160.00

01 staff Coordinating partners in each river basin 39,301.59 0.00 39,301.59 2,467.80 2,467.80 36,833.79

01 staff Preparation of sub-reports 3,840.00 0.00 3,840.00 0.00 3,840.00

01 staff Preparation of final report 2,560.00 0.00 2,560.00 0.00 2,560.00

01 staff Organisation of final event + political forum 3,840.00 0.00 3,840.00 0.00 3,840.00

01 staff Organisation of individual river basin meetings 3,840.00 0.00 3,840.00 0.00 3,840.00

Carry out interregional exchange and transfer

activities (inventories, bi-lateral intervisions,

01 staff transfer activities etc.) 25,206.06 0.00 25,206.06 650.02 650.02 24,556.04

Total staff 101,614.51 0.00 101,614.51 3,747.82 10,161.45 3,747.82 6,413.63 97,866.69 15,242.18 21,655.81 0.00 21,655.81 97,866.69 15,242.18 36,897.98 0.00 36,897.98 97,866.69

02 ext. expertise Logistics individual river basin meetings 6,000.00 0.00 6,000.00 0.00 6,000.00

Total ext. Expertise 6,000.00 0.00 6,000.00 0.00 600.00 0.00 600.00 6,000.00 900.00 1,500.00 0.00 1,500.00 6,000.00 900.00 2,400.00 0.00 2,400.00 6,000.00

05 travel Steering Committee meetings during PPM (6) 1,043.75 0.00 1,043.75 0.00 1,043.75

05 travel Political Expert Forum during PPM (6) 3,131.25 0.00 3,131.25 0.00 3,131.25

05 travel Plenary Partner Meetings incl. study visits (6) 4,175.00 0.00 4,175.00 455.26 455.26 3,719.74

05 travel Bi-lateral visits between partners 3,900.00 0.00 3,900.00 0.00 3,900.00

Total travel 12,250.00 0.00 12,250.00 455.26 1,225.00 455.26 769.74 11,794.74 1,837.50 2,607.24 0.00 2,607.24 11,794.74 1,837.50 4,444.74 0.00 4,444.74 11,794.74

Subtotal 119,864.51 0.00 119,864.51 4,203.08 11,986.45 4,203.08 7,783.37 115,661.43 17,979.68 25,763.05 0.00 25,763.05 115,661.43 17,979.68 43,742.72 0.00 43,742.72 115,661.43





COLLECTIVE PARTNER BUDGET

REMAINING NEW REMAINING NEW REMAINING

CURRENT TOTAL SPENDING REPORTED SPENDING AVAILABLE SPENDING SPENDING REPORTED SPENDING AVAILABLE SPENDING SPENDING REPORTED SPENDING AVAILABLE

Shared (collective) costs TOTAL APPROVED SHIFTS BUDGET REPORTED TARGET PR1 PR1 TARGET BUDGET TARGET PR2 TARGET PR2 PR2 TARGET BUDGET TARGET PR3 TARGET PR3 PR3 TARGET BUDGET

Total staff 17,291.92 0.00 17,291.92 1,572.80 1,729.19 1,572.80 156.39 15,719.12 2,593.79 2,750.18 2,750.18 15,719.12 2,593.79 5,343.97 5,343.97 15,719.12

Total ext. Expertise 42,843.57 0.00 42,843.57 5,265.03 4,284.36 5,265.03 -980.67 37,578.54 6,426.54 5,445.86 5,445.86 37,578.54 6,426.54 11,872.40 11,872.40 37,578.54

Subtotal 60,135.49 0.00 60,135.49 6,837.83 6,013.55 6,837.83 -824.28 53,297.66 9,020.32 8,196.04 0.00 8,196.04 53,297.66 9,020.32 17,216.37 0.00 17,216.37 53,297.66

Total costs 180,000.00 0.00 180,000.00 11,040.91 18,000.00 11,040.91 6,959.09 168,959.09 27,000.00 33,959.09 0.00 33,959.09 168,959.09 27,000.00 60,959.09 0.00 60,959.09 168,959.09

PAYMENT CLAIM

INTERREG VIC ´FLOOD-WISE´



I. GENERAL DATA PARTNER INSTITUTION



Partner number 2

Partner name Provincie Limburg

ERDF % 75%



II. REPORTING PERIOD



Progress Report 2

Reporting period 1 July 2010 - 31 December 2010



III. SUMMARY PAYMENT CLAIM

INDIVIDUAL COSTS

Budget Line Total certified eligible Expenditures Total ERDF applied for

Staff costs € 0.00 € 0.00

Administration costs € 0.00 € 0.00

Travel costs € 0.00 € 0.00

External expertise € 0.00 € 0.00

Equipment € 0.00 € 0.00

Preparation costs € 0.00 € 0.00

Subtotal € 0.00 € 0.00





COLLECTIVE COSTS

Budget Line Total certified eligible Expenditures Total ERDF part retained by LP

Staff costs € 0.00 € 0.00

External expertise € 0.00 € 0.00

TOTAL € 0.00 € 0.00





TOTAL REPORTED € 0.00



MONEY TO BE TRANSFERRED € 0.00



IV. GENERAL INFORMATION

IV.1 Bank information

Name of the bank

Address

Postal code

Town

Country

Account no / IBAN

SWIFT code

National bank code

Internal reference (if needed)

Holder of the account



Date of payment

Subject

Payment Officer

FLOOD-WISE PROGRESS REPORT I

Contact Details



Project Partner institution

Please provide details in white fields if there have been changes. For progress report 1 it is necessary to provide the

Project Partner's bank details, the project coordinator's and financial manager's contact details and the first level

controllers' contact details for all partners.

Partner contact

Title of the institution in original language

Provincie Limburg, Nederland



Title of the institution in official English translation

Province of Limburg, The Netherlands





Address PO Box 5700





Postal code 6202 MA Town MAASTRICHT





Country NL





Phone (office) +31(0)433897499 (mobile) +31(0)61143241





Fax +31(0)433897643





Contact person Fred van den Brink E-mail fwb.van.den.brink@prvlimburg.nl





Website www.limburg.nl









First level controller of partner

Name





Position/Department





Institution BAAT accountants en fiscalisten





Address





Postal code Town





Country





Phone (office) (mobile)





Fax





E-mail

FLOOD-WISE PROGRESS REPORT I

River Basin Coordinator / Flood-Wise coordinator within partner organisation

Please provide details in white fields if there have been changes.

Name Fred van den Brink





Institution Province of Limburg, The Netherlands





Address PO Box 5700





Postal code 6202 MA Town MAASTRICHT





Country NL





Phone (office) +31(0)433897499 (mobile)

+31(0)611143241



Fax +31(0)43 3618099





E-mail fwb.van.den.brink@prvlimburg.nl







If a new coordinator has been appointed during the current reporting period, please state the reason.









Contact person Finances

Please provide details in white fields if there have been changes.

Name Tom Martinussen





Institution Province of Limburg, The Netherlands





Address PO Box 5700





Postal code 6202 MA Town MAASTRICHT





Country NL





Phone (office) +31(0)433897835 (mobile)





Fax +31(0)43 3618099





E-mail tnm.martinussen@prvlimburg.nl





If a new contact for finances has been appointed during the current reporting period, please state the reason.







-2-

FLOOD-WISE PROGRESS REPORT I

Contact person Communication / PR

Please provide details in white fields if there have been changes.

Name Carlijn van Tijen





Position/Department Landelijk Gebief





Institution Province of Limburg, The Netherlands





Address PO Box 5700





Postal code 6202 MA Town MAASTRICHT





Country NL





Phone (office) +31(0)433897441 (mobile)





Fax +31(0)43 3618099





E-mail c.van.tijen@prvlimburg.nl







If a new person for communication/PR has been appointed during the current reporting period, please state the reason.









First level controller of the project partner

Please provide details in white fields if there have been changes.

Name





Position/Department





Institution





Address





Postal code Town





Country





Phone (office) (mobile)





Fax





E-mail







If a new first level controller has been appointed during the current reporting period, please state the reason.







-3-



Related docs
Other docs by xiaopangnv
pollution
Views: 1  |  Downloads: 0
User_Manual
Views: 3  |  Downloads: 0
ch09
Views: 0  |  Downloads: 0
E6-10597
Views: 0  |  Downloads: 0
kanon-aabenraa4
Views: 1  |  Downloads: 0
Cisco PIX Comparison
Views: 0  |  Downloads: 0
President's Message
Views: 0  |  Downloads: 0
Kim
Views: 0  |  Downloads: 0
9 and 10 Year Olds
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!