Embed
Email

Kick off meeting 191108

Document Sample

Shared by: yurtgc548
Categories
Tags
Stats
views:
3
posted:
11/19/2011
language:
French
pages:
45
Com m i s s a ri a t à l’ é ne r gi e a t om i que

Centre de Cadarache - 13108 St Paul lez Du rance Cedex – F rance

Tél 33 (0)4 42 25 6340 - Fax 33 (0)4 42 25 4990

Email : di rsipp @cea.fr









Association EURATOM-CEA

Direction des sciences de la matière

Institut de Recherche sur la Fusion par confinement

Magnétique

Service intégration plasma paroi





Activité I NG ENI ERI E DES PRO JET S MECANI Q UES







Nature CO MPT E RENDU DE REUNI O N





Référence PEFC/CRR-2008.024





Titre Kick Off Meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering





Auteur(s) L. Doceul





Résumé Summary of the kick off meeting of the ITER Goal Oriented Training Progamme Port Plug

Engineering held on the 19/11/08.









ANNEX 1 : Main points discussed ANNEX 6: Courses and Events

Annexe (s)

ANNEX 2 : WP1 description ANNEX 7: Sharing between associations

ANNEX 3 : WP2 description ANNEX 8: Sharing with industrial partners

ANNEX 4 : WP4 description ANNEX 9: Administrative matters

ANNEX 5 : WP5 description



Destinataires :

CEA: L.Doceul, M. Faury, C. Laviron, Ph. Magaud, JP.Martins, S. Salasca

EFDA :B. Franel, F. Le Guern

FZJ: O. Neubauer

FZK: A. Gaetano, H. Neuberger, T. Scherer, D. Strauss

HAS: O. Bede





Visa Rédacteur Visa Vérificateur Visa Qualité, Structure Visa Emetteur

L.DOCEUL JP. MARTINS M. FAURY





Date : Date : Date : Date :







IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 1/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 2/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

EFDA ITER GOAL ORIENTED TRAINING PROGRAMME PORT PLUG ENGINEERING



Date: November 19th, 2008; CEA-Cadarache



Summary of the kick off meeting:



Participants:

CEA: Doceul Louis, Martins Jean-Pierre, Salasca Sophie

FZJ: Neubauer Olaf

FZK: Neuberger Heiko, Scherer Theo (representing Strauss Dirk), Aiello Gaetano (trainee WP3)

HAS: Bede Otto



The aim of this kick off meeting is to give the status of each work programme and the recruitment

associated.

The points related to the events to be organized during the total duration of the task agreement have

been also discussed.

Finally miscellaneous points such as deliverable or financial questions have been discussed.



The annex 1 describes the main points to be discussed during the meeting.



The status of the recruitment relative to each work programme is the following:

WP1: Dapena Miguel will start his 3 years contract on the 5th January 2009

WP2: Michal Sébastien will start his 3 years contract on the 5th January 2009

WP3: Gaetano Aiello started his contract on the 1st September 2009

WP4: Recruitment on going (no candidate yet)

WP5: Recruitment on going (5 candidates perhaps to be shared with WP4), starting date probably in

January 2009.

WP6: One candidate has been interviewed (some documents of this candidate are missing).



The annex 2, 3, 4 and 5 describe respectively the work programme 1, 2, 4 and 5.



The annex 6 describes the courses and events to be organized during the task agreement.



The annex 7 describes the sharing of the trainees between the partner associations (subject, duration,

date).



The annex 8 describes the possible sharing with industrial partners.



The annex 9 describes the administrative matters of the training programme (EFDA document).



Some questions relative to the organization particularly on financial (reimbursement) have been raised

and need to be clarified. A meeting with the EFDA Responsible Officer of the Task Agreement was

suggested.



The next meeting should be organized when all the trainees will be engaged.









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 3/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

ANNEX 1





MAIN POINTS DISCUSSED









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 4/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Association

Euratom-Cea TORE SUPRA









Kick off meeting EFDA ITER Goal Oriented Training Programme

Port Plug Engineering



Participating host associations

CEA: Doceul Louis, Martins Jean-Pierre, Salasca Sophie

FZJ : Neubauer Olaf

FZK : Neuberger Heiko, Strauss Dirk

HAS : Bede Otto



1 – Introduction

2 – Work package description

3 – Course and events for next year

4 – Trainees sharing

5 – Miscellaneous





Kick off meeting ITER GOT PPE 19/11/08 1









Association

Euratom-Cea TORE SUPRA









1 – Introduction



The EFDA Steering Committee approved the EFDA 2008 Work Programme, including the implementation of

training programmes in the field of fusion energy research. One of these being in the field of Engineering

Design and Construction called ITER-PPE (ITER Port-Plug Engineering).

The thematic of the PPE training program being engineering associated to the procurement of the ITER

Port Plug including: design, structural analysis, neutronics, material requirement, nuclear requirement,

safety, manufacturing aspect, assembly aspect, maintenability …

This program will take place within a large collaborative group to provide the technical know-how and the

skills which are necessary for the engineering of components for ITER and for the management of ITER

relevant projects.

It is intended to train early-stage engineers during 3 years.

Each trainee will work on particular engineering tasks falling under a defined project within the “Host

Association” together with the other participating partners supporting the project (about 80% within host

association, 20% within partner associations).

Specific courses will also be chosen in order to quickly become familiar with fusion physics and fusion

technology.

The official starting date of the ITER GOT PPE is 1st september 2008 established for 4 years the first year

being devoted to the recruitment of the trainees.





Administrative aspects given by EFDA









Kick off meeting ITER GOT PPE 19/11/08 2









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 5/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Association

Euratom-Cea TORE SUPRA









2 – Work programmes description



Work Programmes



WP1 (CEA) Nuclear Requirements in different phases from the engineering design to

Tutor: Sophie Salasca decommissioning (particular application on ITER diagnostic port plug equatorial 1)

Trainee: Miguel Dapena (Jan 09)



WP2 (CEA) Maintainability associated to ITER Component Lifecycle

Tutor: Jean Pierre Martins (particular application on ITER diagnostic port plug equatorial 1)

Trainee: Sébastien Michal (Jan 09)

WP3 (FZK) Materials, manufacturing and assembly of upper port plug structures

Tutor: Dirk Strauss (particular application on ITER ECRH upper port plug)

Trainee:Gaetano Aiello (sept 08)



WP4 (FZK) Design, manufacturing and integration of ITER relevant structural components

Tutor: Heiko Neuberger (particular application on ITER TBM equatorial port plug)

Trainee:

WP5 (HAS)K) Thermomechanical Engineering of In-Vessel Components

Tutor: Otto Bede (particular application on ITER diagnostics)

Trainee:

WP6 (FZJ) Feasibility of manufacturing in the design of ITER in-vessel components

Tutor: Olaf Neubauer (particular application on ITER CXRS diagnostic port plug)

Trainee: Romaric Voinchet (??)

Kick off meeting ITER GOT PPE 19/11/08 3









Association

Euratom-Cea TORE SUPRA







3 – Course and events for next year









Table to be discussed









Kick off meeting ITER GOT PPE 19/11/08 4









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 6/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Association

Euratom-Cea TORE SUPRA







4 – Trainee sharing





To be discussed:





Sharing between association









Sharing with industrial partner









Kick off meeting ITER GOT PPE 19/11/08 5









Association

Euratom-Cea TORE SUPRA









5 – Miscellaneous: See task agreement ITER GOT PPE





Deliverables description, for 2009 and for each work programme:

•T0 is the start date of each associated 3 years training contract.

•First deliverable (3 month) ‘’Personal Career Development Plan’’ (EFDA form to be filled).

•At the end of 2009, progress report (progress made, activity status, skill obtained, corrective action if

any, …)

•Specific deliverable see table 4.1

•Financial status for 2009.









Other matters ??









Kick off meeting ITER GOT PPE 19/11/08 6









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 7/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

ANNEX 2





WP1 DESCRIPTION









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 8/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Association

EURATOM-CEA TORE SUPRA









Work Program 1

Nuclear requirements in different phases from the engineering design to

decommissioning





Host association : CEA

Involved associations : FZK, FZJ, HAS, ITER Organization

Industrial company : AREVA TA (TBC)







Trainee : Miguel DAPENA FEBRER

Date of contract : 5th January 2009 – 4th January 2012





ITER-PPE - Kick-off meeting – Cadarache - 19/11/08 S. Salasca 1









Association

EURATOM-CEA DESCRIPTION OF WORK PROGRAM 1 TORE SUPRA









Objectives (extract of Task Agreement – 15th July 2008)

Specificity of ITER : D + T reaction ⇒ management of tritium and shielding

against neutrons and gammas induced by the reaction

Main objective : give to a young engineer the knowledge necessary to efficiently

apply the nuclear safety rules in ITER projects

Application : the knowledge acquired during the training will be applied to the

project "ITER diagnostic equatorial port plug 1" ("Procurement Package 11"). The

trainee will be integrated in the CEA team working on this project

Content of training : general courses on fusion and ITER, specific courses on

nuclear engineering, application to equatorial port plug 1

Candidate : young mechanical engineer, experience All administrative implementation is done via the CoA

– Task Agreement

• Work to be implemented (objectives, work breakdown, deliverables,

milestones)

• All administrative provisions







GOT kick-off meeting,









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 42/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Mobility Agreement

In order that the Associates of the programme benefit from the mobility

funding, the procedure described in the Mobility agreement must be

respected





• The mobility figures given in the Task Agreement are indicative, not

contractual (contrarily to the Priority Support where the indicated ceiling is

contractual and notified by the Commission to the Associate).



– The forecast of expenditures must be included in the mobility plan of each

Association regularly approved by the Commission services.



– Associates who didn’t include these forecasts in their plan must amend it (this

can be done in // with the mid-October reporting).



– Letters of invitations are signed by the Associate who receive the visiting

scientists, or by the EFDA Associate Leader for JET in case of JET related

mobility .



– Ceilings on daily allowance, rules for transport reimbursement (>28days)

applies.



– Payment made through call for funds after approval of the accounts of the

Associate.



GOT kick-off meeting,









Financial aspects

The provisions which apply are the provisions of the

Contract of Association, with the ceiling fixed in the Task

Agreements.



• Eligible costs for the programme are:



– Personnel costs including

• Salaries of the trainees (in principle full time) + social charges +

overheads

• Salaries of the mentors for the time dedicated to the programme +

social charges + overheads

– Other costs

• Include all other direct expenditures like equipment, management,

participation to conferences, sub-contracts, missions which are not

eligible to mobility,…..

– Ceilings which apply

• Other costs limited to 10% of the global cost

• Mentoring costs limited to 20% of the global cost

• Global cost limited to the ceiling of PS fixed in the TA





GOT kick-off meeting,









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 43/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Financial aspects

The provisions which apply are the provisions of the Contract of

Association, with the ceiling fixed in the Task Agreements.



• Support from the Commission: 40% of the actual costs (art 8.2-b of

the Contract of Association)



– The amount of support of the Task Agreement represents a ceiling,

based on expenditures really committed, not a fixed price

• Expenditure must be justified (audit clause of CoA)

• The level of overheads is determined through the cost accounting of each

Associates

– JET related activities

• Expenditures cannot be charged twice,

– the salary of the trainee cannot be included in JET orders,

– the trainee cannot benefit from a secondment agreement (art 3.2 of the Task

Agreement)

– Support from the Commission paid

• Through call for funds emitted annually by each Associate, on the basis of

expenditures committed

• After approval of the annual accounts by the Commission services









GOT kick-off meeting,









Personnal Career Development Plan

Each researcher will establish, together with his/her

personal supervisor, a Personal Career Development

Plan comprising his/her training needs and scientific

objectives and later on report upon the success with

which these objectives were met. In this way the

trainees will be encouraged to play an active role in

shaping their own training programme and professional

development:

– The PCDP must be elaborated as soon as the trainee joins the team

and transmitted to the EFDA R.O.

– The document can be revised at the end of the training period (and be

used as a tool for further career development, outside the frame of the

GOT)

– The form proposed by the Commission in the EFTS (European Fusion

Training Scheme) is proposed to be used.









GOT kick-off meeting,









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 44/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page

Personnal Career Development Plan

– Brief overview of research project and major

accomplishment expected

– Long term career objectives

• Goals

• Training considered

– Short term objectives

• Research results

• Research skills and techniques

• Research management

• Communication skills

• Other professional training (course work, teaching activity

• Other activities with professional relevance







GOT kick-off meeting,









Financial reporting

• According to Art 4 of the Task Agreements



– Through annual progress report to be produced by the Task

Coordinator at the end of each calendar year with:

• Summary of the expenditures committed on the period, by each

Association



– Through the final report at the end of the training programme

• Breakdown of the expenditures committed by each Association for the

whole programme, according to the template in Annex 1



– It is recommended that the Annual Progress Reports and Final Report

are issued at the occasion of GOT management board/meetings



– (the EFDA R.O. is invited to all management boards/meetings)



– All reports to be transmitted to the EFDA Responsible Officer in

charge of the follow-up of the training programme. Reports have to be

approved by EFDA before payment.







GOT kick-off meeting,









IRFM SIPP / GIPM L.DOCEUL PEFC/CRR-2008.024 0 20/11/2008 45/45

Structure Service/groupe Premier auteur Référence indice Date de mise à jour page



Related docs
Other docs by yurtgc548
Viewing and Imaging in the SW USA
Views: 0  |  Downloads: 0
VILLES CHINOISES_ VILLES INDIENNES
Views: 0  |  Downloads: 0
VIII Periodic Table Trends
Views: 0  |  Downloads: 0
View-Dependent Polygonal Simplification
Views: 0  |  Downloads: 0
View the presentation - Big Lottery Fund
Views: 0  |  Downloads: 0
View Slides - Conferences
Views: 0  |  Downloads: 0
View poster - Queens University Belfast
Views: 0  |  Downloads: 0
View a slide show
Views: 0  |  Downloads: 0
Veto Threats
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!