docid CR WBS title
CRs since CR151 - Schedule Correction - Pallet Motion System Component Procurement
4635 151 8/4/10 Tasks
5007 183 CR183 ANU FY10 BoE Updates
CR184 - Budget and Schedule Adjustments for Assembly and Testing of Far
5112 184 WBS 2.5.3.3.2. Detector Modules- WBS 2.5.3.3.2.x
CR185 - Nova Project Management Effort and Budget Adjustments for FY11-
5052 185 FY14
CR182-Date Corrections for Far Detector Structure Monitoring Equipment
4995 182 Procurements
4950 180 CR180-Correction for Power Supply Procurement, PFL Scheduling Problems
CR187-Update to PVC Resin Budget and Schedule for Far Detector Extrusion
5116 187 Production
5121 188 CR188 - Revised TE Cooler Pricing - 2010
4617 147 WBS 2.1.1.4.10.8 CR147-WBS 2.1.1.4.10.8 - Tension Rock Anchors
4732 156 CR156- Schedule Change for Fabrication of Fiber Stringing Machines
4765 162 CR162 - April 2010 ANU Schedule Adjustments
4758 161 CR161 - Combined Change Order #4
4753 160 WBS 2.1 CR160 - WBS 2.1 - April 2010 Contractor Schedule Adjustments
CR163 - Adjustment of Level 2 Nova Federal Project Director Milestone for IPND
4767 163 Block 4 Completion
4770 165 CR165 -Change Request for DAQ Software, April 2010
CR167 - Adjustment of Level 1 DOE-OHEP Associate Director Milestone for
4794 167 "IPND Ready To Take Data"
CR191-Budget Updates to Operate Factory Space / Closeout Factory Space
5126 191 Tasks
CR190-Update to Budget and Schedule for Fiber Facing Machines Fabrication
5123 190 and Installation
CR193-Budget and Schedule Update for Fabrication and Delivery of Additional
5127 193 Tooling , Fixtures, and Safety Equipment
5128 194 CR194- Additional Budget for Training Workers in Module Factory
5130 195 CR195-Add task and budget for Maintaining Module QA Tracking System
CR196-Add task and budget for Continuation of Materials Strength and
5131 196 Chemical Interactions QA Testing
5133 197 CR197-Fabricate and Deliver Additional Presessure Testing Equipment
5134 198 CR198-Procure quality assurance system hardware - supplemental
5135 199 CR199-Budget Reduction for Production Manifold Component Fabrication
CR192-Schedule and Budget Adjustments for Far Detector Module Shipping
5136 192 Tasks
CR201-Budget and Schedule Update to Tasks for Manifold Parts Design, Molds,
5137 201 and Preproduction Articles Fabrication
5138 200 CR200-Rock Claim Change 002
4968 181 CR181 - Continue (UVa) work on PDB test stand
4897 177 CR177 - Target Carrier Design
4896 176 CR176 - NuMI RAW Exchange System
5096 186 WBS 2.1.5 CR186 - WBS 2.1.5 - Far Detector Building Outfitting
approved new
form? BOE?
yes no
no >1
no 5014
yes 5019
yes no
yes no
no 4926
no ?
yes 4905
no <$$
yes no
yes
yes no
yes no
yes 5006
yes no
no