docid CR WBS title

CRs since CR151 - Schedule Correction - Pallet Motion System Component Procurement

4635 151 8/4/10 Tasks

5007 183 CR183 ANU FY10 BoE Updates

CR184 - Budget and Schedule Adjustments for Assembly and Testing of Far

5112 184 WBS 2.5.3.3.2. Detector Modules- WBS 2.5.3.3.2.x

CR185 - Nova Project Management Effort and Budget Adjustments for FY11-

5052 185 FY14

CR182-Date Corrections for Far Detector Structure Monitoring Equipment

4995 182 Procurements



4950 180 CR180-Correction for Power Supply Procurement, PFL Scheduling Problems

CR187-Update to PVC Resin Budget and Schedule for Far Detector Extrusion

5116 187 Production

5121 188 CR188 - Revised TE Cooler Pricing - 2010

4617 147 WBS 2.1.1.4.10.8 CR147-WBS 2.1.1.4.10.8 - Tension Rock Anchors

4732 156 CR156- Schedule Change for Fabrication of Fiber Stringing Machines

4765 162 CR162 - April 2010 ANU Schedule Adjustments

4758 161 CR161 - Combined Change Order #4

4753 160 WBS 2.1 CR160 - WBS 2.1 - April 2010 Contractor Schedule Adjustments

CR163 - Adjustment of Level 2 Nova Federal Project Director Milestone for IPND

4767 163 Block 4 Completion

4770 165 CR165 -Change Request for DAQ Software, April 2010

CR167 - Adjustment of Level 1 DOE-OHEP Associate Director Milestone for

4794 167 "IPND Ready To Take Data"

CR191-Budget Updates to Operate Factory Space / Closeout Factory Space

5126 191 Tasks

CR190-Update to Budget and Schedule for Fiber Facing Machines Fabrication

5123 190 and Installation

CR193-Budget and Schedule Update for Fabrication and Delivery of Additional

5127 193 Tooling , Fixtures, and Safety Equipment

5128 194 CR194- Additional Budget for Training Workers in Module Factory



5130 195 CR195-Add task and budget for Maintaining Module QA Tracking System

CR196-Add task and budget for Continuation of Materials Strength and

5131 196 Chemical Interactions QA Testing

5133 197 CR197-Fabricate and Deliver Additional Presessure Testing Equipment

5134 198 CR198-Procure quality assurance system hardware - supplemental



5135 199 CR199-Budget Reduction for Production Manifold Component Fabrication

CR192-Schedule and Budget Adjustments for Far Detector Module Shipping

5136 192 Tasks

CR201-Budget and Schedule Update to Tasks for Manifold Parts Design, Molds,

5137 201 and Preproduction Articles Fabrication

5138 200 CR200-Rock Claim Change 002

4968 181 CR181 - Continue (UVa) work on PDB test stand

4897 177 CR177 - Target Carrier Design

4896 176 CR176 - NuMI RAW Exchange System

5096 186 WBS 2.1.5 CR186 - WBS 2.1.5 - Far Detector Building Outfitting

approved new

form? BOE?



yes no

no >1



no 5014



yes 5019



yes no



yes no



no 4926

no ?

yes 4905

no <$$

yes no

yes

yes no



yes no

yes 5006



yes no



no



Other docs by hedongchenchen
June 1_ 2009
Views: 0  |  Downloads: 0
Student Learning and Effective Teaching
Views: 3  |  Downloads: 0
Sheet1 - for IEEE 802
Views: 0  |  Downloads: 0
JADUAL WAKTU SEMESTER PENDEK 2011
Views: 31  |  Downloads: 0
2009-05-17_Menton
Views: 0  |  Downloads: 0
MIS Implants hosts global meeting
Views: 0  |  Downloads: 0
Drainage Culverts and Ditches
Views: 0  |  Downloads: 0
Data Watch
Views: 0  |  Downloads: 0
wr_promelt_specification_product-en
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!