CR-2538 - RFC 1918 Routing Update on the EGRs

Implementation Plan

CHANGE REQUEST TYPE:

NETWORK: X

REMEDY:

INFRASTRUCTURE:

SUBMITTER CONTACT INFORMATION:

Request Date: March 30, 2011

Requested By: LCM Engineering

Organization: AT&T LCM Team

Contact Information during AT&T GCSC for General Monitoring Information 800 222 8926 pin 78283

Implementation:

Jenny Notestein, AT&T PM, for Change Information 201-360-9208

Escalation Contact Jenny Notestein, AT&T PM 201-360-9208

Information:



CHANGE REQUEST INFORMATION:

General: X

Critical:

Emergency:

SUPPORTING CHANGE DOCUMENTATION:

Request for Change Description: This change request is being submitted for approval to perform the

following configuration changes:



- Apply null routes for RFC 1918 IP address space for each VRF on

the NetTN Network on the Nashville and Knoxville EGRs.







Risk category assigned: 14 - Critical

Benefit/Reason for Change: This change will prevent IP packets from looping between the EGRs and the firewalls for RFC

1918 IP address space.

Requested Implementation Date / Time: Sunday, April 10, 2011 12:00 AM Central to 6:00 AM Central



Justification for work outside maintenance window: An extended window is required to complete this work.



Corresponding Change Ticket or RFS ID assigned: Business Direct ticket 136579097



TECHNICAL INFORMATION:

Work products affected: N/A

Network Components affected: Please see the Affected Sites & Devices Tab

Additional work/rework required: None. Standalone change.





SUPPORTING DOCUMENTATION:

Back-out/recovery Plan: Y - See Backout Plan

Test Plan completed (y/n): Y - See Implementation & Test Plan

Monitoring Plan: Y - AT&T Engineers will monitor the routers as changes occur. GCSC will continue to monitor network

following standard GCSC processes and procedures.

END-SITE(s) IMPACT:

No end site impact is anticipated during this work.







Mark "X" for Affected Groups in yellow and corresponding comments in white section:

STATE: X

PROVISIONING:

ENGINEERING: X

MSS:

REMEDY:

MRS GCSC: X

OTHER: X Freeze any VRF builds 3 days prior to CR execution



CHANGE PLANNING:

Engineering Peer Review Required? (y/n) Y



Engineering Peer Review Date Tuesday, January 25, 2011



Completed by Change Manager

APPROVED:



9e19bf54-39f3-4e31-9170-aca8fff6b30a.xlsx

CHANGE FORM

NETWORK CHANGE RISK EVALUATION FORM

** One form must be filled out for each Request for Change submitted **

RISK EVALUATION MATRIX CR-2538 - RFC 1918 Routing Update on the EGRs

RISK EVALUATION TOTAL:

Weighted *Change Requester *Post Implementation

Change Attributes Impact Assessment Assessment

Impact of the change to the Network:

Major impact ( > 3 hours ) 3

Significant impact ( between 1 and 3 hours) 2 2

Minimal impact 1

No impact 0

Exposure:

Back out possible, though not easily executed 3

Back out easily executed (1 hour or more) 2 2

Back out easily executed (less than 1 hour) 1

No back out required 0

Activities required to prepare for implementation:

3 or more affected groups 3 3

2 affected groups 2

Multiple activities - one affected group 1

One activity - one affected group 0

End-Site Impact

All below 4

Core 3 3

NAP/POP/VIP Sites 2

Multiple End-Sites 1

Single End-Site 0

Preparation effort (all affected groups):

More than 2 months 3 3

2 weeks to 2 months 2

2 days to 2 weeks 1

2 days or less 0

Supporting Documentation:

Considerable amount 3

Moderate amount 2

Minimum 1 1

None required 0

Sum Categories Total 14

Risk Category Assigned:

10 - 13 = (Critical), 5 - 9 = (Major),1 - 4 = (Minor), 0 = ( No Impact)

Enter comments below:









9e19bf54-39f3-4e31-9170-aca8fff6b30a.xlsx

RISK EVAL (NETWORK)

CR-2538 - RFC 1918 Routing Update on the EGRs

List all affected sites that could be impacted by the change



Core Devices Affected Remote Sites Affected

(Check Appropriate Boxes Below) (Check Appropriate Boxes Below)

Nashville (Y/N) Knoxville (Y/N) Memphis (Y/N) Chattanooga (Y/N) Johnson City (Y/N) Node Name Description

nshpe1 knxpe1 mempe2 chtpe2 jhnpe1 Please See Note Below

nshpe2 knxpe2 mempe3 chtpe3 jhnoob

nshpe6 knxpe3 memi2br chtgsr1

nshpe4 knxpe4 memgsr1 chtgsr2

nshpe5 knxpe5 memgsr2 chtoob

nshpe6 knxrr memoob1

nshcspe1 knxgsr1

nshrr knxgsr2

nshgsr1 knxegr1 Y

nshgsr2 knxegr2 Y

nshcat1 knxibr1

nshcat2 knxibr2

nshegr1 Y knxmgmt1

nshegr2 Y knxoob

nshibr1

nshibr2

nshmgmt1

nshmgmt2

nshoob

nshoob1







No end site impact is anticipated during this work.



Other docs by hedongchenchen
June 1_ 2009
Views: 0  |  Downloads: 0
Student Learning and Effective Teaching
Views: 3  |  Downloads: 0
Sheet1 - for IEEE 802
Views: 0  |  Downloads: 0
JADUAL WAKTU SEMESTER PENDEK 2011
Views: 31  |  Downloads: 0
2009-05-17_Menton
Views: 0  |  Downloads: 0
MIS Implants hosts global meeting
Views: 0  |  Downloads: 0
Drainage Culverts and Ditches
Views: 0  |  Downloads: 0
Data Watch
Views: 0  |  Downloads: 0
wr_promelt_specification_product-en
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!