Embed
Email

SHOULDER CLOSURE - HIGH SPEED

Document Sample

Shared by: xiuliliaofz
Categories
Tags
Stats
views:
1
posted:
11/18/2011
language:
English
pages:
1
SIGN SPACING = X (1) CHANNELIZATION DEVICE

MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SPACING (feet) BUFFER DATA

1500’ – (OR

FREEWAYS & EXPRESSWAYS 55 / 70 MPH MPH TAPER TANGENT

PER MUTCD) SHOULDER Posted Speed (mph) LONGITUDINAL BUFFER SPACE = B

WIDTH 50/70 40 80

RURAL HIGHWAYS 60 / 65 MPH 800’ –

(feet) 25 30 35 40 45 50 55 60 65 70 35/45 30 60 SPEED (MPH) 25 30 35 40 45 50 55 60 65 70

RURAL ROADS 45 / 55 MPH 500’ –

8’ 40 40 60 90 120 130 150 160 170 190

(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE LENGTH (feet) - - - - 360 425 495 570 645 730

RAMPS, AT-GRADE INTERSECTIONS AND DRIVEWAYS.

10’ 40 60 90 90 150 170 190 200 220 240

BUFFER VEHICLE ROLL AHEAD DISTANCE = R

USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN 8’.

TRANSPORTABLE ATTENUATOR

30 FEET MIN.

MINIMUM HOST VEHICLE WEIGHT 15,000 LBS. THE MAXIMUM WEIGHT SHALL TO

BE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATION. 100 FOOT MAX.









PROTECTIVE VEHICLE

NO SPECIFIED



MAY BE A WORK VEHICLE STRATEGICALLY LOCATED TO SHIELD

DISTANCE

THE WORK AREA. REQUIRED









’ N.

2 MI

TMA

WORK AREA



X X X L/3 B R 100’









48" 48"

ROAD

WORK SHOULDER



AHEAD 48" CLOSED



48" 48"

SHOULDER

W20-1 WORK W20-301



48"





W21-5

NOTES:

LEGEND 1. NO ENCROACHMENT IN TRAVELLED LANE. IF ENCROACHMENT IS

NECESSARY, LANE SHALL BE CLOSED.

TEMPORARY SIGN LOCATION

2. DEVICE SPACING FOR THE DOWNSTREAM TAPER

TRAFFIC SAFETY DRUM

SHOULDER CLOSURE - HIGH SPEED SHOULD BE 20’ O.C.

TMA









3. ALL SIGNS ARE BLACK ON ORANGE.

TRANSPORTABLE ATTENUATOR

NOT TO SCALE



FILE NAME S:\Design R P& S\4-Standards\2-Plan Sheet Library\10-Work zone plans (WZ)\TC-1-21\TC-6\TC-6.dgn

REGION STATE

TIME 8:34:38 AM FED.AID PROJ.NO.

NO.



DATE 10/8/2010 TC6

10 WASH

PLOTTED BY Cyfordl

JOB NUMBER

DESIGNED BY

Washington State SHEET



ENTERED BY

CHECKED BY CONTRACT NO. LOCATION NO. Department of Transportation OF





PROJ. ENGR.

DATE DATE TRAFFIC CONTROL PLAN SHEETS



REGIONAL ADM. REVISION DATE BY P.E. STAMP BOX P.E. STAMP BOX



Related docs
Other docs by xiuliliaofz
COSMOLITEApril22
Views: 0  |  Downloads: 0
NIBE FIGHTER 200 _ 360 INSTALLATION
Views: 25  |  Downloads: 0
Fairtrade Group 7 April 11
Views: 0  |  Downloads: 0
SubRay Radiant System
Views: 2  |  Downloads: 0
Sheet1 - Eden Rugby International Supporters
Views: 0  |  Downloads: 0
downloaded here - Lions SaveSight Centre
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!