Embed
Email

WORKSHOP

Document Sample

Shared by: linzhengnd
Categories
Tags
Stats
views:
4
posted:
11/18/2011
language:
Romanian
pages:
1
Proforma No. 2

DEPARTMENT OF TECHNICAL EDUCATION & INDUSTRIAL TRAINING,PUNJAB.

(TECHNICAL EDUCATION WING)

NAME OF THE INSTITUTE:---G.P.C.G.PATIALA-------------------------------------------



REPORT REGARDING STATUS OF EQUIPMENT & MACHINERY

MONTH

BRANCH/TRADE-- Workshop Deptt.



SR. NO. NAME OF THE DATE OF TOTAL PRICE DATE OF WHETHER THE IF NOT IN WORKING NO. OF HOURS IF THE EQUIPMENT/ MACHINERY WAS DOWN NO. OF HOURS *PERCENTAGE

EQUIPMENT/MACHINER PURCHASE INSTALLATION MACHIN IS IN CONDITION THEN EQUIPMENT / EQUIPMENT / UTILIZATION

Y (Qt.) WORKING OR WHETHER IT IS MACHINE MACHINE ACTUALLY

NOT WORKING SERVICEABLE OR SUPPOSED TO BE OPERATIONAL IN A

CONDITION UNSERVICEABLE USED AS PER MONTH (8-13)

SYLLABUS

DATE WHEN IT REASONS THEREOF STEPS TAKEN HOURS OF

WENT OUT OF OPERAION

ORDER LOST



1 2 3 4 5 6 7 8 10 11 12 13 14 15

ELECTRICAL WORKSHOP

Three Phase Induction







1 Motor 1 HP 14.7.2003 4992 14.7.2003 Working N.A. 2 Hours Per Week 8 Hours







2 Hand Drill Machine 14.7.2003 624 14.7.2003 Working N.A. 45 Hours Per Week 180 Hours



WELDING WORKSHOP



Master Single Operator

1 Type Rectifier 15.5.1992 23184 15.6.1992 Working N.A. 4 Hours Per Week 16 Hours



Master AC-ARC Welding

2 Transformer 15.5.1992 14490 15.6.1992 Working N.A. 4 Hours Per Week 16 Hours

Bench Grinder

3 1"x3"/4"x8" 27.3.2003 2808 1.10.2004 Working N.A. 1 Hour Per Week 4 Hours

CARPENTARY WORKSHOP

1 Drilling Machine 10.2.1993 6000 18.2.1993 Working N.A. 2 Hours Per Week 8 Hours

2 Jigsaw Machine 15.3.1993 10277 23.5.1993 Working N.A. 1 Hour Per Week 4 Hours

Chain and Chisal

3 Mortising Machine 29.10.1992 30798 22.12.1992 Working N.A. 1 Hour Per Week 4 Hours

Universal Wood

4 Working Machine 10.2.1993 47500 26.2.1993 Working N.A. 2 Hours Per Week 8 Hours

FITTING WORKSHOP

1 Drilling Machine 10.2.1993 6000 20.2.1999 Working N.A. 2 Hours Per Week 8 Hours

2 Bench Grinder 13.3.2002 2650 13.8.2002 Working N.A. 1 Hour Per Week 4 Hours

Hydrollic Power

3 Hacksaw 17.6.2008 60320 17.8.2008 Working N.A. 2 Hours Per Week 8 Hours

NO. OF HOURS EQUIPMENT / MACHINE ACTUALLY OPERATIONAL IN A MONTH X100

* % NO. OF HOURS EQUIPMENT / MACHINE SUPPOSED TO BE USED AS PER SYLLABUS

UTILIZATION

Sig. of concened Incharge/Head of Department

Sig. of Instructor/Technician/Lab Incharge Sig. of Principal



Related docs
Other docs by linzhengnd
F_Rehab
Views: 0  |  Downloads: 0
affirmative asylum
Views: 1  |  Downloads: 0
er-oz_spor_malzemeleri__fiyatlar_a_dan_z_ye
Views: 19  |  Downloads: 0
Questions to homeworks 1 and 2
Views: 0  |  Downloads: 0
_FP7_partnerkeres__int_zm_nyek_honlapra
Views: 0  |  Downloads: 0
200811251358390.November 24_ 2008
Views: 0  |  Downloads: 0
2nd Grade Summaries Theme 3
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!