University of Palestine

Faculty of Applied Engineering and Urban Planning

Dept. of Architecture

2nd Semester 2010

-2011

Building Construction II (EAAS 3202 )

Lecture 9

‫ أعمال التبليط‬Planking Works

Dr. Nihad Almughany

1

Review of Last Lecture

– Fireplaces

• Types of Fireplaces

• Function of Fireplaces

• Elements of the Fireplace

• Rules for building a fireplace









2

Planking Works

– Types of Tiles :

• Natural:

– Marble ( Italian, Khalili, Karara, Granite )

– Wood

• Manufactured:

– Perlato

– Mosaic Tiles

– Terrazzo tiles

– Interlock Cement Tiles

– Ceramic

– Porcelain

– Mosaics

– Linoleum, carpet, …. Etc.

3

4

5

6

7

Tiles Works

– Location of Tiles :

• Floors ( Interior – Exterior )

• Walls

• Sills

• Stairs

• Roads

• Sidewalks









8

Tiles Works

– Stages of Tile works :

• Manufacturing of tiles

• Tiles supply

• Preparatory works

– Plumbing and mechanical works

– Electrical works

– Wood frames

• Tiling

• Finishing







9

10

Tiles Works

– Installation of Tiles ( Floors) :

• Preparation of Tiles:

– Supply to site

– Sinking in water

• Preparation of Floor:

– Floor base

– Sand ( dry and clean) 4 cms

– ( Mfalfala ( cement and sand) under ceramic tiles )

• Mortar: (2-4 cms)

– Cement (1) + Sand (3) + Lime (.5 ) + water

– Use of white cement in case of light color tiles like Karara tiles

• Leveling:

– Use of levels ( ‫( انودعات‬

– Consider entrance level, Gal traps and networks levels.

– Consider the slope especially in bathrooms and kitchens and in

external works

• Pattern : Consider the pattern of tiles used – extension – Where to start

11

Tiles Works

– Installation of Tiles ( Floors) Continued :

• Tiling:

– Fix the tile on mortar

– Tiles must be leveled according to the required level

– Joints are equal, Perpendicular and Parallel

– Use of cutting machine in cutting tiles

– Do not walk on tiles or load it before they are dry.

– Fill the ends and fix the skirting perpendicular to the floor.

• Filling the Joints ‫:انترويب‬

– Clean the tiles and the floor, spray water and fill the joints with

cement filling with appropriate color.

– Remove extra filling

– Spray water

– Cleaning or polishing tiles

12

13

14

15

16

17

18

19

20

Tiles Works

– Installation of Tiles ( Walls) :

• Preparation of Tiles:

– Supply to site

– Sinking in water

• Preparation of wall:

– Remove additions and fill holes as in plaster

– Add scratch and brown (1st layer) plastering layers

• Mortar: (2 cms)

– Cement (1) + Sand (3) + Lime (.5 ) + water

– Use of white cement in case of light color tiles like Karara tiles

• Leveling:

– Use of levels ( ‫( انودعات‬

– Consider fixed levels such as worktops, bathtub, … etc.

– Consider the verticality of the tiles

• Pattern : Consider the pattern of tiles used – extension – Where to start

21

Tiles Works

– Installation of Tiles ( Walls) - Continued :

• Tiling:

– Fix the tile on mortar

– Tiles must be leveled according to the required level

– Joints are equal, Perpendicular and Parallel

– Use of cutting machine in cutting tiles

– Do not load tiles before they are dry.

– Use the Plastic or metal angles on projecting corners.

• Filling the Joints ‫:انترويب‬

– Clean the tiles, spray water and fill the joints with cement

filling with appropriate color.

– Remove extra filling

– Spray water

– Cleaning or polishing tiles

22

23

Tiles Works

– Installation of Tiles :

• Sills

• Stairs

• Wooden floors

• Linoleum, carpet, … etc.

• Ornaments in tiles

• External interlock tiles









24

25

Tiles Works

– The role of the engineer :

• Physical inspection of tiles when supply:

– Homogeneous

– Edges

– Surface shape and level

– Cracks and voids ( ‫(انتنميم – انتشعير – انتفهيق – انتقشر – انتنقير – االنفصال‬

– Dimensions

• Laboratory testing: ( ‫( انفيزيائي – انبري – االمتصاص - انكسر‬

• Before tiling:

– Define level

– Inspect all networks required

– Define pattern

• During Tiling:

– Mortar

– Levels

• After Tiling:

– Level

– Edges

26

– Joints

– ‫انتطبيم – انتسنين – انفصال انبانيم – انفصال انسيراميك‬



Related docs
Other docs by wanghonghx
Foundation Grants 2009-2010
Views: 3  |  Downloads: 0
2Referat_ LMU_100205
Views: 0  |  Downloads: 0
Beleggen
Views: 3  |  Downloads: 0
asw_may07_p27
Views: 0  |  Downloads: 0
comprehensive assessment planning
Views: 0  |  Downloads: 0
ROMANIA- Rromania
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!