Revision 1





SolidWorks

Part Model Name

Wiring Harness



Hand Side Plate*

Brace Mechanical Subsystem









Shoulder F Plate A*

Shoulder F Plate B*

UU Arm Plate*

LU Arm Plate*

UL Arm Plate*

LL Arm Plate*

Hand Twist Plate

Handle

Weight Retaining Ring

PB_Int_Bearing_Housing

Shoulder Joint Axel A

Shoulder Joint Axel B

Elbow Joint Axel

Arm Foam

Vinyl Cover (Arm Pad)

Modified Potentiometer

Pot integration bracket

Latteral Traverse Tube Cross-Bar_Traverse

Platform Mechanical Subsystem









Sagittal Fixed Tube Cross-Bar_Traverse

Sagital Traverse Tube Forward_Traverse-Bar

Lateral Fixed Tube Cross-Bar

PB_Int_Cap Brace_Int_Cap

Tower Lower Leg Tower_Leg_Low

PB_Int_Plug Brace_Int_Plug

Tower_Leg_Mid***needs hole

Tower Upper Leg

note for lowest hole

Upper Cross Diagonal Bracing Tower_Diagonal_Support

Lower Cross Diagonal Bracing Tower_Cross_Low_H

Sagittal Diagonal Bracing Tower_Low_Legs

Traverse_Spacer Traverse_Spacer

Foot Pad Spacer

Lateral Foot Pad (base) Tower_Feet_H

Sagittal Foot Pad (base) H_Side

*These parts require a similar

finishing milling process. The use

of a machining fixture will enable

this process to be performed more

efficiently all in one day. All of

these parts will need to reach a

semi final state before then.

Machining

Material Mfg Method Qty Complexity

Nylon - 25' x 5/8" ID Purchased 1 1



6061 - T6 Aluminum Plate Mill 2 2

6061 - T6 Aluminum Plate Mill 1 3

6061 - T6 Aluminum Plate Mill 2 2

6061 - T6 Aluminum Plate Mill 1 3

6061 - T6 Aluminum Plate Mill 1 3

6061 - T6 Aluminum Plate Mill 1 3

6061 - T6 Aluminum Plate Mill 1 2

6061 - T6 Aluminum Plate Mill 1 2

Aluminum Tube/Round Cut, Thread 1 1

1.5" Steel Round Cut, Lathe, Tap 3 2

1.5" Steel Round Mill, Weld 1 3

Steel Grade 8 Mill and Lathe 1 2

Steel Grade 8 Mill and Lathe 1 2

Steel Grade 8 Mill and Lathe 1 2

Polyethylene Purchased 1 1

Vinyl Cut and Sew 2 2

N/A Mill 3 2

Steel Bend and Tap 3 2

1.25" x 1/16" x 4" A36 Steel Square Tube Cut, Tap, Weld 2 1,3

1.25" x 1/16" x 4" A36 Steel Square Tube Cut, Tap, Weld 1 1,3

1" x 1/16" x 24" A36 Steel Square Tube Cut, Drill, Weld 1 1,3

1" x 1/16" x 45" A36 Steel Square Tube Cut and Drill 2 1

1.25" x 0.11" x 2" A513 Type 5 Steel Round Tube Cut, Drill, Weld 1 1,3

1.25" x 0.11" x 32" A513 Type 5 Steel Round Tube Cut and Drill 2 1

1" x 0.095" x 2" A513 Type 5 Steel Round Tube Cut, Drill, Weld 2 1,3

1" x 0.095" x 37" A513 Type 5 Steel Round Tube Cut and Drill 2 1

0.125" x 1.5" x 45" Steel Flat Cut and Drill 1 1

0.125" x 1.5" x 45" Steel Flat Cut and Drill 2 1

0.125" x 1.5" x 34" Steel Flat Cut and Drill 2 1

0.125" x 1" x 1" Steel Flat Cut, Drill, Weld 3 1,3

0.375" x 1" x 1" Aluminum Flat Cut and Drill 2 1

2" x 0.125" x 45" Steel Angle Cut, Drill, Weld 1 1,3

2" x 0.125" x 72" Steel Angle Cut, Drill, Weld 2 1,3

Desired

Order of Mfg Completion

Date Current Status





3B 12/12/2008 Need to cut channel to allow for adjustable handle location.

7B 12/18/2008

8B 12/18/2008 Need to drill mating holes for Shoulder F Plate A

14B

9B 12/23/2008

6B 12/15/2008 Mostly Complete*

1B 12/3/2008 Mostly Complete*

2B 12/4/2008 Complete

4B 12/12/2008 Complete

5B 12/12/2008 Complete

13B

10B

10B

10B 12/23/2008 Need to drill center hole.





11B, 15B, 17B 1 by 12/23/08

12B, 16B, 18B 1 by 12/23/08







13B





anytime





anytime









First 12/12/08?

First 12/12/08?

Spent Time Time Remaining

(hrs) (hrs) Owner

0 1.5



6 2 JJ, Alan and Melissa

0 3

3 1 JJ

0 6

0 6

8 0.5

4.5 0.5 JJ

2.5 0 JJ

2 0 JJ

5 0 JJ

0 3

0 1.5

0 1.5

1.5 1

0 ?

0 ?

0 3

0 5









Melissa, Alan

Melissa, Alan

Notes







One channel needed to cut in each



Requires completion of Shoulder F Plate A









If time permits, may do weight reduction pocket milling









Pending the arrival of fasteners

Pending the arrival of fasteners

Pending the arrival of fasteners

Pending completion of brace assembly (metal parts)

Pending completion of brace assembly (metal parts)



Pending arrival of M9 x 0.75 Tap









Cannot be machined until the base is complete



holes on Solidworks model are correct





holes on Solidworks model are correct









Cut and drill ASAP, need base complete before vertical pieces can be drilled



Related docs
Other docs by xiuliliaofz
FORM FOR IMPORT RESPONSE
Views: 0  |  Downloads: 0
Quirky CampersCampervan Hire
Views: 0  |  Downloads: 0
CITY COUNCIL
Views: 0  |  Downloads: 0
Stoneridge Property Owner's Association
Views: 3  |  Downloads: 0
Partner-Meeting
Views: 0  |  Downloads: 0
Infectious Diseases Review Course
Views: 2  |  Downloads: 0
whyworry
Views: 0  |  Downloads: 0
4th of July Holiday Sale
Views: 0  |  Downloads: 0
Paroles_FullTimeRide.. - Free
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!