Embed
Email

AFP+Funtional+Req+Spec+for+eSourcing

Document Sample

Shared by: qingyunliuliu
Categories
Tags
Stats
views:
4
posted:
11/18/2011
language:
English
pages:
5
APPROPRIATE FIT PROCUREMENT









Functional Requirements Specification and Evaluation

Criteria for eTendering

Guideline









Appropriate Fit Procurement Guideline

July 2007









1

APPROPRIATE FIT PROCUREMENT









Introduction





Scope

The purpose of this document is to provide an overview for public sector buying organisations to assist to

establish evaluation criteria when considering the selection of an e-Tendering and e-sourcing tools in the

UK public sector. The consolidated Directive and legislation for the devolved assemblies requires a

rigorous and robust approach to the procurement of an e-Tendering suite and e-Sourcing tools to be

undertaken.









Mandatory and desirable requirements for public sector



e-Tendering to ensure compliance to EU legislative requirements.





The “End to end” procurement process from a buyer AND supplier perspective.

To be delivered in “real-time” through a secure web based solution.





1. OJEU Contract Notice

2. Sub-OJEU advertisement

3. Supplier Registration

4. Supplier Expression of Interest

5. PQQ

6. PQQ Clarification

7. PQQ Evaluation

8. Shortlisting for ITT

9. ITT

10. ITT Clarification

11. ITT Evaluation

12. Award or Conversion to Auction

13. Award

14. Secure Storage & Exchange of award information

15. OJEU Contract Award Notice









Functional requirement specification to ensure compliance to EU public

sector procurement requirements and national legislative requirements :





1. Creation of OJEU Notices including live “eSender” integration with SIMAP (Official Journal of

European Union). Reason: removal of risk of delay in process, incorrect transfer of data and

incomplete electronic audit trail.





2

APPROPRIATE FIT PROCUREMENT









2. Creation of contract opportunities listing area for OJEU / sub-OJEU requirements, including

automated linking of OJEU Notices to opportunity where appropriate to ensure “single point of

contact” approach.



3. Full support for ALL procurement activities from Sub-OJEU to OJEU procurement procedures.



4. Supplier self-registration based on organisation specific User Terms and Conditions (critical for

Expressing Interest, otherwise each buyer has to verify, authorise and grant access to suppliers

manually - potentially resulting in a non-auditable collection of Expression of Interest phase.



5. Fully integrated support of linkage from OJEU Notice to automated self-service supplier

"Expression of Interest" phase (for PQQ's within restricted procedure, ITT's within Open

procedure) with full non-repudiated audit stamps of registration by supplier.



6. Shortlisting audit trail between processes (eg: Shortlisting from PQQ to ITT with audit trail)



7. Official Shortening of timescales due to complete electronic procedure



8. Additional shortening of procurement timetable by allowing simultaneous publishing of PQQ or

ITT (within open procedure) at the same time as the OJEU notice. This allows the buyer exercise

the option to set the closing date for PQQ responses as parallel to closing date for Expression of

Interest. (since the information is available immediately to suppliers upon self-registration – and

critically, is down to suppliers to respond therefore NO possibility of buyers receiving EOI offline,

and not activating simultaneously….)



9. Set-up of multiple compliant public sector process types:

a. OJEU Defined processes with timescale defaults and warnings (eg: closing date of a PQQ

within a “Restricted Procedure” should be at least 37 days after publication.

b. (“Unsealed” - for sub-OJEU requirements et/c, “Sealed” or “Sealed with different

opening dates / stakeholders” (to allow for technical / commercial teams of evaluators

to open and evaluate separately without prejudice.).

c. Single buyer or Committee based opening procedures (to allow for strategic, sensitive

procurement exercises to have multiple people present prior to opening, eg: audit).

d. Full user right configuration available at system, procurement unit or individual user

level to allow for creation, viewing, editing and publishing rights definition by role.

e. Authorisation workflow of publication of PQQ / ITT's based on £ value and business unit

workflow to enable verification of processes prior to publication where appropriate. Can

be set by system, procurement unit or individual user level.

f. Full audit tracking of supplier response status from “Expression of Interest” stage to

publication.

g. Public sector handling of supplier responses (configurable at a procurement policy level

to address late responses et/c) with full audit tracking of opening procedures, who

opened what, when and which "envelopes" in which order.

h. Public sector compliant opening procedures, allowing for Qualification, Technical and

Commercial evaluations to be conducted together or separately by different

stakeholders.



10. Fully configurable public sector terminology ("Tenders, OJEU Notices, PQQ's, ITT's et/c).



11. Fully configurable system email alerts to public sector standards in compliance with areas such as

Alcatel "cooling off" periods. Developed in conjunction with European counsel, HM Treasury

solicitors, OSSE solicitors et/c.



3

APPROPRIATE FIT PROCUREMENT









12. Creation of online web-form questionnaires in addition to attachments to allow for automatic

alignment and scoring of supplier responses.



13. Ability for Buyers AND suppliers to develop projects (or responses) offline and upload.

Particularly relevant for online web-forms.



14. Integrated Email audit trail and edit facility within each part of procurement (eg: ability to run

audit trail at single click regarding all messages sent / received / forwarded at each stage

of the process.)



15. Totally integrated eAuction facility with OGCbs public sector compliance including weighted

scoring.



16. Full integrated audit trail of processes for FOIA requests, internal audit or challenges from step 1

(OJEU Contract Notice) to the end (OJEU Award Notice)



17. Localised solution view for buyers and suppliers (dependant on where they are located, they

receive local time et/c)



18. Audit trail of any buyer amendments to supplier response scoring with audit trail





19. Full reporting by system, business unit, procurement project (tender), individual procurement

process (PQQ, ITT, eAuction et/c), buyer, supplier creating “drill down” analysis (eg: i) average

numbers of suppliers invited and responding to a projects at an organisation, business unit and

buyer level. ii) average timescale per individual procurement process (PQQ, ITT, eAuction et/c).



20. Collaborative Files / Forum area for secure document storage / exchange with explicit user rights

(Blind, view, edit, create et/c).









Due Diligence and Total Quality Management Methodology required for

an excellent e-Tendering and e-Sourcing service :



1) Economic and financial standing of the supplier. Business viability of the supplier in the long-run

(audited financial accounts).

2) Ongoing product development of e-Tendering and e-sourcing tools (roadmap / product

development)

3) Suitability for EU public sector procurements and national legislative requirements.

4) Security

5) Disaster recovery

6) Fallover

7) Helpdesk

8) Service Level agreements

9) Commitment to ongoing public sector development.

10) Direct relationship with solution provider rather than multi-stage removal.





4

APPROPRIATE FIT PROCUREMENT







11) Personalised web-portal (for unique buyer organisation look and feel to outside supplier

community).

12) Personalised security accreditation to HMGovernment Information Security Level 3 for unique

site certification (with guaranteed continual independent verification, including staff background

checks)

13) Test (prep) site for local training, testing and upgrade staging et/c

14) Guaranteed upgrades (at least Twice per year) to continually address areas such as support /

enhancement requests, new OJEU developments et/c

15) Official "eSender status" Integration into SIMAP for end-to-end linking with OJEU Notices.

http://www.simap.eu.int/List%20of%20OJS%20eSenders/b8a68426-020a-9c5e-

19aef7640f8a3be1_en.html

16) Built in opportunity advertisements for OJEU or non-OJEU contracts, with automated links to

SIMAP for "single point of reference" where appropriate.

17) Unique help documentation / support with online tutorials

18) Public Sector compliant user terms and conditions for suppliers, developed with multiple legal

counsels across Europe.

19) Demonstrable implementation, delivery and project support capability of service provider

20) Pro-active User Forums’ to ensure continuous improvement of the solution and service whilst

sharing best practice and processes.









5



Other docs by qingyunliuliu
iFebruary 2010 special issue-rr _revised_
Views: 19  |  Downloads: 0
Overview of the New Highway Safety Manual
Views: 28  |  Downloads: 0
60057
Views: 16  |  Downloads: 0
Insure Idaho_
Views: 14  |  Downloads: 0
4-IP_Networking
Views: 9  |  Downloads: 0
01_84_00-Maintenance_Products
Views: 10  |  Downloads: 0
SFO_BP_2010061617
Views: 12  |  Downloads: 0
Reduce + Rusee = Green Preservation
Views: 10  |  Downloads: 0
bog5.31.07
Views: 48  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!