                            PDR Agenda

 • Opening Remarks                             Rose Pajerski
 • SNAS Design Approach                        Damon Smith
 • SNAS Overview                                Dave Warren
 • Data Server Design                           Dave Warren
 • Closed/Open Server Design                        Hoai Vo
 • Client Design                         Helly Maghsoudlou
 • Graphical User Interface Design             Damon Smith
 • Security                                        Joe Clark
 • Architecture Recommendation &             Scott Robinson
     Development Environment
 • Software and Effort Estimates               Chii-der Luo
 • Risks & Mitigation                          Dave Warren
 • Closing Remarks                            Rose Pajerski


Preliminary Design Review                               Page 2
 NASA/GSFC Code 452                                September 12, 2005
                            Welcome/Purpose of Review



 • Review System Requirements adjusted from Delta-SRR due to
    RFA’s
      – Updated SRD
      – Updated OCD
      – Baselined documents 08/31

 • Review High Level System Design

 • Review GUI Prototyping Effort

 • Approval for Detailed Design


Preliminary Design Review                                    Page 3
 NASA/GSFC Code 452                                     September 12, 2005
                            Review Board



 • Jon Walker (chair), NASA Code 452

 • Merri Benjamin, WSC Operations

 • John Bristow, NASA Code 583 – GMSEC

 • Tim Rykowski, NASA Code 581 – GPM

 • Steve Tompkins, NASA Code 581




Preliminary Design Review                       Page 4
 NASA/GSFC Code 452                        September 12, 2005
                                             Review Process

                                                                                   Accepts
                                                                   Originator
                    SRR Chair     Assignee                                                                                 Actions
     Originator                                                    accepts or                       SRR Chair
                   assesses and   prepares                                                                              assigned and
     writes RFA                                                      rejects                        Disposition
                      assigns     response                                                                                executed
                                                                   response

                                        Assignee feels rejection
                                                                                Assignee feels response
                                       is warranted and reworks
                                                                                is valid and appropriate
                                               response
                                                                    Rejects




• Request for Action (RFA) items may be written by any party and are to be
   submitted to the review Chair
     – Forms are available at this review or via the SNAS website:
         http://snas.gsfc.nasa.gov
     –   RFAs are due Friday, September 16, 2005
     –   The Chair will assess RFA validity, combine similar ones if necessary, and
         assign them to appropriate personnel
     –   RFA responses will be prepared by the assignee and forwarded to the
         originator for their acceptance or rejection
     –   The RFA assignee will notify the Chair after working the RFA response with
         the originator
     –   RFA responses will be approved/disapproved by the SRR Chair at a meeting to
         be scheduled by the Chair
Preliminary Design Review                                                                                              Page 5
 NASA/GSFC Code 452                                                                                               September 12, 2005
                                                   Organizational Chart

                                                          SN Project Manager
                                                               Code 452

                                                             Keiji Tasaki




                                                          SNAS Deputy Product
                        IT Security                        Development Lead      Resource/Business
                                                            Rose Pajerski/           Manager
                     Curtis Emerson                         Frank Herman           Paula Tidwell




                                                                                    Code 451
                                                                                  GSFC Customer
                                                                                Commitment Manager
                                                                                S. Greatorex / NENS




                                                          Product Management     Systems Engineering
                 Implementation Contractor
                                                               Contractor             Contractor

                          NENS                                 PAAC-II                  ITT




                      NASA                   Contractor




Preliminary Design Review                                                                                  Page 6
 NASA/GSFC Code 452                                                                                   September 12, 2005
                                  SNAS Team

 • Product Development Lead (Code 452)
      – Fraunhofer USA: Rose Pajerski / Frank Herman

 • System Engineering Support
      – ITT: Denise Gilliland, Joe Clark

 • Customer Liaison Lead
      – BAH: Farrokh Jahandari

 • Core Implementation Team
      – BAH: Damon Smith
      – HTSI: Chii-der Luo, Dave Warren, Helly Maghsoudlou, Hoai Vo,
         Scott Robinson, Yuen-Han Kan, Dave Smith, Marcelo Reynolds


Preliminary Design Review                                       Page 7
 NASA/GSFC Code 452                                        September 12, 2005
                             System Requirements Status

 • Delta-SRR RFAs
      – 28 RFA’s submitted and responded to
             Automation (3, 9, 12, 15)
             Certification & encryption (1, 8, 11, 21)
             Client Capability (5, 16, 20, 27)
             Configuration and Specs (4, 7, 9, 13, 23)
             Report and Data Access (2, 6, 10, 17, 18, 24, 25, 26, 28)
             Schedule Planning (14, 22)
                      SNAS Interface with DAS (14) withdrawn
      – Additionally, 3 RFAs from the 2003 SRR (62, 65 and 83) were Closed




Preliminary Design Review                                                      Page 8
 NASA/GSFC Code 452                                                       September 12, 2005
                            System Requirements Status (cont)

 • Decomposition of the 337 SNAS System (software)
    Requirements
      – 282 are partially applicable to Client
             13 fully applicable to Client
      – 247 are partially applicable to GUI
             8 fully applicable to GUI
      – 202 are partially applicable to Open/Closed Server
             22 fully applicable to Open/Closed Server
      – 138 are partially applicable to Data Server
             2 fully applicable to Data Server




Preliminary Design Review                                         Page 9
 NASA/GSFC Code 452                                          September 12, 2005
                            Documentation


 • System Requirements Document                 CCB approved

 • System Operations Concept Document           CCB approved

 • Security Plan                       2nd draft in development

 • System Test Document                1st draft in development

 • Acceptance Test Document            1st draft in development

 • Customer Liaison Plan                      in NENS Review

 • ICD between DAS/SNAS         derived from DAS/SWSI for CDR

 • ICD between EPS/SNAS           derived from UPS/EU for CDR



Preliminary Design Review                                Page 10
 NASA/GSFC Code 452                                 September 12, 2005
                            SNAS Design Approach



                                  Presented By:
                                 Damon Smith




Preliminary Design Review                               Page 11
 NASA/GSFC Code 452                                September 12, 2005
                            Customer Centric Design

 • Requirements: Involved end users early to address customer
    requirements while supporting:
      –   MOC operations
      –   Legacy MOC components
      –   Various MOC configurations
      –   O&M Operations


 • Design: Presented the SNAS prototype to illustrate and
    negotiate design features
      – Solicited design options during customer demonstrations

 • Testing: Planning Involvement of selected customers in beta
    testing


Preliminary Design Review                                       Page 12
 NASA/GSFC Code 452                                        September 12, 2005
                            Customer Centric Design (cont)

 • Group Customer Interface Meetings
             CIM #1, April 13, 2005
             CIM #2, June 14, 2005
             CIM #3, August 25, 2005
             CIM #4 (tentative), January 2006
 • Meetings with Individual Missions
             JSC, TX (HSF, Shuttle, ISS)
             GSFC & APL (GPM, R-XTE, EOS, TRMM, HST & STSCI, SP&M, GLAST)
             Raytheon, CO (NPOESS & Aura)
             Stanford University, CA (GP-B)
             WSC, NM (O&M Operations)
 • Meetings with other Programs
             GMSEC, IONet, TKUP, SNIS
 • RFAs
             Original SRR, and Delta-SRR on April 28, 2005
             PDR, September 12, 1:00 – 4:00
Preliminary Design Review                                           Page 13
 NASA/GSFC Code 452                                            September 12, 2005
                            Functional Wish List (1 of 4)

 • Majority of customer requests already included in the current
    requirements (wish list features are not in the current
    requirements)

 • Workspace concept for scheduling
      – The Workspace is envisioned as a bulk schedule builder and
         compatible with UPS RS. A Workspace is saved locally for a multi-
         day building period. Local file sharing for (Orbital Data, Schedule
         Data, and Reports) supports collective group scheduling. Degraded
         mode of operations and local off-line building are supported by the
         Workspace.
 • Auto processing for various file types (GCMR, TSW, TCW,
    PSAT/UAV)
      – SWSI and UPS contain functionality to pass TSW files automatically.
         Importing PSAT/UAV is only available in UPS and requires manual
         processing.
 • UPS Queries
      – UPS canned queries are easy to implement and satisfy customer
         requests for access to mission data in the database.

Preliminary Design Review                                            Page 14
 NASA/GSFC Code 452                                             September 12, 2005
                            Functional Wish List (2 of 4)

 • Show 24 hour UPD history in the UPD panel & Alert history in
    the Alert panel
      – These features are currently in the concept to support lights-out
         MOC operations. Unattended operations can show a selectable 24
         hours of event information.
 • Drag/Drop & Point/Click features in the graphical scheduling
    mode
      – The Java development environment allows for advanced user
         interactions with the graphics. In line comparisons and overlaying
         user selected data types (e.g. TUT with orbital data and schedule
         requests).
 • Performance Statistics (active) reporting
      – Currently in the concept to provide counters for input/output file
         transfers. Ensures that the message counts for “sent” and
         “received” match.


Preliminary Design Review                                            Page 15
 NASA/GSFC Code 452                                             September 12, 2005
                            Functional Wish List (3 of 4)

 • UPD summary panel
      – Currently in the SNAS concept, triggered off the current UPD stream
         panel for user specified services. Provides a high level summary
         for active services (concept currently used at JSC).
 • User configurable alert threshold settings
      – In addition to configurable color coding, users would possess the
         ability to adjust thresholds for alert settings and UPD settings
         (audibles, confirmation dialog)
 • Combine NCC and DAS scheduling
      – DAS and NCC schedules are presented together in the graphical
         scheduling mode, the user must resolve schedule conflicts.
 • Schedule SN and GN resources
      – The SNAS graphical mode can display GN resource in the
         scheduling mode, when it is loaded as orbital data exclusion
         periods.

Preliminary Design Review                                             Page 16
 NASA/GSFC Code 452                                              September 12, 2005
                            Functional Wish List (4 of 4)

 • User ability to change SIC after login
      – This function does not currently exist in SWSI or UPS. SNAS
         incorporation of this function would support SNIS when platforms
         can uniquely (IP) address science instruments.
 • GMSEC configurable support in the SNAS client
      – A SNAS interface with GMSEC would enhance the support for
         lights-out MOC operations. GMSEC could allow SNAS to utilize the
         pager feature for critical alerts. SNAS could also interface with the
         system status reporting on the GMSEC bus.
 • Display the current values and acceptable values for each
    reconfigurable parameter
      – Current values are available – bound range values are not.




Preliminary Design Review                                             Page 17
 NASA/GSFC Code 452                                              September 12, 2005
                            System Overview


                               Presented By:
                              David Warren




Preliminary Design Review                           Page 18
 NASA/GSFC Code 452                            September 12, 2005
                              Current SWSI System Architecture

                                                  NISN Secure
                                                   Gateway


                MOC Clients

                                 MOC Clients                                      DAS
                                                           MOC Clients




                                                                                                     Firewall
                                                                                                                Operational
                                                                                                                 NCCDS

                 Internet

                                                                         Closed
                                                                         IONet
                                    Open
                                    IONet                                                                       Auxiliary




                                                                                                   Firewall
                                                                                                                NCCDS
              NISN/CNE




             SNAS Open Server       SNAS Open Server       SNAS Closed Server                  SNAS Closed Server
                 (Prime)               (Backup)                 (Prime)             RAID           (Backup)
                                                                                        Data



Preliminary Design Review                                                                                               Page 19
 NASA/GSFC Code 452                                                                                                September 12, 2005
                            Proposed SNAS System Architecture

                                                   NISN Secure
                                                    Gateway




                                                                                                               Firewall
                                                                                                                           Operational
                MOC Clients
                                                                                                                            NCCDS
                                MOC Clients                                        DAS
                                                             MOC Clients



                 Internet




                                                                                                                Firewall
                                                                          Closed
                                                                                                                           Auxiliary
                                                                           IONet
                                    Open                                                                                    NCCDS
                                   IONet


            NISN/CNE




                                                             SNAS Closed Server       SNAS Closed Server
                                                                     (Prime)               (Backup)


             SNAS Open Server       SNAS Open Server
                 (Prime)               (Backup)


                                                       SNAS Data Server                     SNAS Data Server
                                                           (Prime)                              (Backup)
                                                                               RAID
                                                                               Data



Preliminary Design Review                                                                                                       Page 20
 NASA/GSFC Code 452                                                                                                        September 12, 2005
                             SNAS Notional Reference Architecture


         Open IONET           Internet                                                  Closed IONET


              SNAS SNAS SNAS
             CLIENTCLIENTCLIENT                                                       SNAS SNAS SNAS
                                                                                     CLIENTCLIENTCLIENT




                                                                                                 SNAS Closed Server




                                                                                                Connection Manager
                                                                                                 Connection Manager
                                                NISN
                                           Secure Gateway

                  SNAS Open Server


                                                                          Message Router
                                                                       Message Router                                 Message Router
                                                                                                                       Message Router

             TUT              Connection
                            Connection
           Webserver          Manager
                               Manager

                                                 Open       Closed
                                                IONET       IONET


                                                                           SNAS-
                                                                          SNAS-NCCDS                                     SNAS-
                                                                                                                          SNAS-DAS
                                                                                                        Data
                                                                         NCCDS IF                     Interface          DAS IF
                                                                            Interface                                      Interface



                                                                             SNAS Data Server


                                                                                                       Data
                                                                                                      Manager




                                                               NCCDS                                   SNAS                             DAS
                                                                                                        Data




Preliminary Design Review                                                                                                          Page 21
 NASA/GSFC Code 452                                                                                                           September 12, 2005
                                Key Design Concepts

• Reuse of Applications with Modifications
   – Maximize code reuse:
          25% UPS (of 305K SLOC)
          75% SWSI (of 200K SLOC)
   – Reuse of “logic” for all UPS C code assimilated into SNAS
• Design Features
   – Framework provided by current SWSI system for stability and security
   – Enhance GUI functionality while providing combined SWSI/UPS menu functionality
   – Incorporate UPS functionality for orbital data processing & recurrent scheduling
       for automated SAR generation
   –   Include External Processing System (EPS) interface for MOC data exchanges,
       which enables “lights-out” MOC operations
   –   Provide Scheduling Workspace for users working “what if” forecast schedules
   –   Separate O&M client application (better security, remote admin control)
   –   SNAS/NCCDS interface (SNIF) process rewritten in Java
   –   New common alert logging package for use by all processes in Client and Servers
   –   New common data message logging package for use by Client, SNIF and
       SNAS/DAS interface (SDIF)

 Preliminary Design Review                                               Page 22
  NASA/GSFC Code 452                                                September 12, 2005
                            SNAS Context Diagram




Preliminary Design Review                               Page 23
 NASA/GSFC Code 452                                September 12, 2005
                            SNAS Context - Internal




Preliminary Design Review                                  Page 24
 NASA/GSFC Code 452                                   September 12, 2005
                              SNAS Data Transfers –
                            NCCDS Scheduling (Ref. 1)




 * from 452 ICD SN/CSM

Preliminary Design Review                                    Page 25
 NASA/GSFC Code 452                                     September 12, 2005
                             SNAS Data Transfers –
                            NCCDS Real-time (Ref. 2)




 * from 452 ICD SN/CSM

Preliminary Design Review                                   Page 26
 NASA/GSFC Code 452                                    September 12, 2005
                             SNAS Data Transfers –
                            DAS Scheduling (Ref. 3)




* from 452 ICD DAS/SNAS

Preliminary Design Review                                  Page 27
 NASA/GSFC Code 452                                   September 12, 2005
                            SNAS Data Transfers –
                            DAS Real-time (Ref. 4)




* from 452 ICD DAS/SNAS

Preliminary Design Review                                 Page 28
 NASA/GSFC Code 452                                  September 12, 2005
                              SNAS Data Transfers –
                        External Processing System (Ref. 5)




* future 452 ICD EPS/SNAS

Preliminary Design Review                                    Page 29
 NASA/GSFC Code 452                                     September 12, 2005
                            System Data Flow




Preliminary Design Review                           Page 30
 NASA/GSFC Code 452                            September 12, 2005
                            Diagramming Conventions




Preliminary Design Review                                  Page 31
 NASA/GSFC Code 452                                   September 12, 2005
                            SNAS Data Server



                                Presented By:
                              David Warren




Preliminary Design Review                            Page 32
 NASA/GSFC Code 452                             September 12, 2005
                            Data Server Context




Preliminary Design Review                              Page 33
 NASA/GSFC Code 452                               September 12, 2005
                            Data Server Level 1




Preliminary Design Review                              Page 34
 NASA/GSFC Code 452                               September 12, 2005
                            Data Server Level 2




Preliminary Design Review                              Page 35
 NASA/GSFC Code 452                               September 12, 2005
                            Database Components - SWSI

 • SNAS database starting with current SWSI Schema




 • Adding UPS tables to support orbital, recurrent scheduling, and EPS


Preliminary Design Review                                       Page 36
 NASA/GSFC Code 452                                        September 12, 2005
                            Database Components - UPS




Preliminary Design Review                                    Page 37
 NASA/GSFC Code 452                                     September 12, 2005
                            SNAS Closed Server



                                 Presented By:
                                  Hoai Vo




Preliminary Design Review                             Page 38
 NASA/GSFC Code 452                              September 12, 2005
                            SNAS Server Key Points


• Maximize SWSI Server code reuse
• Move Database Server Process to separate (3-tier) system
• Rewrite SNIF in Java
   – Communications with NCCDS uses XDR protocol
   – Log NCCDS input messages after XDR decoding
   – Log NCCDS output messages before XDR encoding
• Create and use common alert logging package for all processes,
 including the client application
• Create and use common NCCDS/DAS message logging package for
 all processes, including the client application
• Replace SWSI custom HA package
• System Administration functions moved to separate O&M client
• TUT data resident on the Open IONET web server & MOC client

Preliminary Design Review                                  Page 39
 NASA/GSFC Code 452                                   September 12, 2005
                            SNAS Server Level 1




Preliminary Design Review                              Page 40
 NASA/GSFC Code 452                               September 12, 2005
                              Server Context
                            Connection Manager




Preliminary Design Review                             Page 41
 NASA/GSFC Code 452                              September 12, 2005
                              Server Level 2
                            Connection Manager




Preliminary Design Review                             Page 42
 NASA/GSFC Code 452                              September 12, 2005
                            Server Context
                            Message Router




Preliminary Design Review                         Page 43
 NASA/GSFC Code 452                          September 12, 2005
                             Server Level 2
                            Message Router




Preliminary Design Review                          Page 44
 NASA/GSFC Code 452                           September 12, 2005
                                Server Context
                            SNAS-DAS Interface (SDIF)




Preliminary Design Review                                    Page 45
 NASA/GSFC Code 452                                     September 12, 2005
                                 Server Level 2
                            SNAS-DAS Interface (SDIF)




Preliminary Design Review                                    Page 46
 NASA/GSFC Code 452                                     September 12, 2005
                                  Server Context
                            SNAS-NCCDS Interface (SNIF)




Preliminary Design Review                                      Page 47
 NASA/GSFC Code 452                                       September 12, 2005
                               Server Level 2
                            SNAS-NCCDS Interface




Preliminary Design Review                               Page 48
 NASA/GSFC Code 452                                September 12, 2005
                              SNAS Client



                                Presented By:
                            Helly Maghsoudlou




Preliminary Design Review                            Page 49
 NASA/GSFC Code 452                             September 12, 2005
                            Client Context




Preliminary Design Review                         Page 50
 NASA/GSFC Code 452                          September 12, 2005
                            Client Level 1




Preliminary Design Review                         Page 51
 NASA/GSFC Code 452                          September 12, 2005
                                Client Level 2
                            Graphical User Interface




Preliminary Design Review                                   Page 52
 NASA/GSFC Code 452                                    September 12, 2005
                            Client Level 2
                            EPS Interface




Preliminary Design Review                         Page 53
 NASA/GSFC Code 452                          September 12, 2005
                                Client Level 2
                            Transaction Processor




Preliminary Design Review                                Page 54
 NASA/GSFC Code 452                                 September 12, 2005
                                    Client Level 3
                            Single Transaction Processor




Preliminary Design Review                                   Page 55
 NASA/GSFC Code 452                                    September 12, 2005
                                   Client Level 3
                            Bulk Transaction Processor




Preliminary Design Review                                     Page 56
 NASA/GSFC Code 452                                      September 12, 2005
                                     Client Level 3
                            Recurrent Transaction Processor




Preliminary Design Review                                     Page 57
 NASA/GSFC Code 452                                      September 12, 2005
                                Client Level 2
                            Client Data Manager




Preliminary Design Review                              Page 58
 NASA/GSFC Code 452                               September 12, 2005
                               Client Level 3
                            Connection to Server




Preliminary Design Review                               Page 59
 NASA/GSFC Code 452                                September 12, 2005
                                  Client Level 2
                            Workspace Saver / Restorer




Preliminary Design Review                                     Page 60
 NASA/GSFC Code 452                                      September 12, 2005
                     SNAS Graphical User Interface



                               Presented By:
                              Damon Smith




Preliminary Design Review                             Page 61
 NASA/GSFC Code 452                              September 12, 2005
                            GUI Prototype Design Principles

 Assumptions:                               Methodology:
 • SWSI used as the development               SNAS Main Menu illustrates the
    base                                      multi-stage development,
 • Selecting inherited features from          arriving at the current solution
    SWSI or UPS                                1. Main Menu - SWSI with SNAS
                                                    Overlay
      – Maximize code reuse for logic
      – Minimize development cost while        2. Main Menu - SWSI/SNAS with
                                                    UPS Overlay
         providing full feature functions
                                               3. Main Menu - SNAS Fully
 • UPS Recurrent Schedule logic                     Combined
    specifically cited for reuse to
                                               4.   Main Menu - SNAS Optimized
    provide expected SAR results
                                               5.   SWSI GUI Flow Illustrated
 • Report functions support current
                                               6.   UPS GUI Flow Illustrated
    MOC systems
                                               7.   SNAS Fully Combined GUI
      – SNAS retains UPS EU reporting               Flow
         functions, (request/response
         protocol & file naming)               8. Revisit Main Menu - SNAS
                                                    Optimized

Preliminary Design Review                                               Page 62
 NASA/GSFC Code 452                                                September 12, 2005
                            Proposed MOC Client Main Menu

 Proposed Main Menu with Traceability to SWSI and UPS Functions




Preliminary Design Review                                    Page 63
 NASA/GSFC Code 452                                     September 12, 2005
                            Prototype Demo Preface

 • The O&M client is separate from MOC client
      – Provides electronic client interface between O&M-MOC
 • O&M and MOC Client electronic interactions for Mission Data
      – SSC data
      – Mission User Lists
      – Prototype Events
 • O&M functions are not distributed for security reasons
 • SNAS O&M Positions are: System Administrator, Database
    Administrator
 • O&M Client Functional Segments
      –   SNAS User Data
      –   Static Mission Data
      –   System Maintenance
      –   System Monitor
Preliminary Design Review                                       Page 64
 NASA/GSFC Code 452                                        September 12, 2005
                            Proposed O&M Client Main Menu

 Proposed Main Menu with Traceability to SWSI and UPS Functions




Preliminary Design Review                                    Page 65
 NASA/GSFC Code 452                                     September 12, 2005
                            Prototype Demo Preface

 • Prototype demonstrated at CIM #3, August 25, 2005
      – Currently collecting feedback

 • All GUIs will include the following capabilities as a standard:
    Execute/Transmit/OK/Submit, Print, Save, Duplicate/Clone,
    Cancel
 • The distinction for Simulated or Operational environment is
    established at login
      – A “Simulation” or “Operational” label will appear in a status
         indicator Main Menu panel
 • The Main Menu shown in the prototype includes selections for
    all MOC positions
      – SNAS User positions are: Mission Manager, Mission
         Scheduler/Planner, Mission Controller, Mission Support, Mission
         Observer
Preliminary Design Review                                           Page 66
 NASA/GSFC Code 452                                            September 12, 2005
                            Advanced Workspace and
                              Scheduling Concepts

 • The Workspace is envisioned as     • Visually support combined
    a bulk schedule builder and         scheduling for GN and SN
    compatible with UPS RS              resources, with a concept for GN
 • A Workspace is saved locally for     schedules imported as orbital
    a multi-day building period         constraint data
 • Local file sharing for (Orbital    • The combined tabular and
    Data, Schedule Data, and            graphical scheduling concept
    Reports) supports collective        supports drag/drop features
    group scheduling                    between panels
 • Degraded mode of operations        • The current graphical scheduling
    and local off-line building are     concept contains 20 timelines,
    supported by the Workspace          so all lines can be viewed in a
                                        single pane
 • Graphics pane will include both
    DAS and NCC schedule data for     • Ability to overlay user selected
    visual inspection                   timelines in the graphics pane



Preliminary Design Review                                        Page 67
 NASA/GSFC Code 452                                         September 12, 2005
                            SNAS GUI Prototype Download



 Download the Prototype:
 • Via the WWW at swsi.gsfc.nasa.gov/hoai
      – Request the download password from the SNAS Website

 Provide Feedback:
 • Via the WWW at snas.gsfc.nasa.gov/
      – Enter the “Customer Input” section

 • Email at snascusinput@class.gsfc.nasa.gov




Preliminary Design Review                                    Page 68
 NASA/GSFC Code 452                                     September 12, 2005
                            SNAS GUI Prototype




Preliminary Design Review                             Page 69
 NASA/GSFC Code 452                              September 12, 2005
                            Security


                             Presented By:

                            Joe Clark




Preliminary Design Review                         Page 70
 NASA/GSFC Code 452                          September 12, 2005
                                         Outline

 • System Description
      – Purpose, status, etc.
      – Responsible organization(s) and individuals
      – System Architecture
             boundaries
             Interconnections and information sharing and
 • Preliminary Risk Assessment
 • Technical Controls




Preliminary Design Review                                         Page 71
 NASA/GSFC Code 452                                          September 12, 2005
                              System Description

 • The Space Network Access System (SNAS) is considered a General
    Support System (GSS)
      – Acquisition and Development Phase
 • The purpose of the SNAS is to provide a standards-based customer
    interface for performing Tracking and Data Relay Satellite (TDRS)
    scheduling and real-time service monitoring and control. The intent of
    the SNAS is to replace existing scheduling and real-time systems (i.e.
    SWSI and UPS) for SN customers.
 • The SNAS servers and database will be housed with the NCCDS at the
    White Sands Complex (WSC). Customer access will be through an
    application running on a customer-provided workstation, which will
    normally be housed at the Customer’s Mission Operations Center
    (MOC). Approved mobile workstations, e.g. notebooks, will be used by
    Customers in an uncontrolled environment in some cases.
      – SNAS falls under the WSC security plan



Preliminary Design Review                                         Page 72
 NASA/GSFC Code 452                                          September 12, 2005
                            SNAS Security Architecture




Preliminary Design Review                                     Page 73
 NASA/GSFC Code 452                                      September 12, 2005
                            SNAS System Boundaries




Preliminary Design Review                                 Page 74
 NASA/GSFC Code 452                                  September 12, 2005
                             SNAS Server Interconnectivity

 • SNAS Servers and Database
      – SNAS Closed IONet Server and Database
             SNAS Database only interconnects with the SNAS Closed IONet Server
             SNAS Closed IONet Server interconnects with
                        SNAS Database (directly)
                        NCCDS and ANCC through the Closed IONet
                        DAS through the Closed IONet
                        SNAS Open IONet Server through the NISN Secure Gateway
                        SNAS Clients in Customer MOCs through the Closed IONet
      – SNAS Open IONet Server
             SNAS Open IONet Server interconnects with
                      SNAS Closed IONet Server through the NISN Secure Gateway
                      SNAS Clients in Customer MOCs through the Open IONet
                      SNAS Clients in Customer MOCs through the Public Internet ***



       ***Note: Some SNAS Clients may be under the control of a Customer MOC but not
                physically present in the MOC

Preliminary Design Review                                                              Page 75
 NASA/GSFC Code 452                                                               September 12, 2005
                            SNAS Client Interconnectivity

 • SNAS Clients *
      – SNAS Clients on the Closed IONet interconnect with the SNAS Closed
         IONet server through the Closed IONet
      – SNAS Clients on the Open IONet interconnect with the SNAS Open
         IONet server through the Open IONet
      – SNAS Clients on the public Internet interconnect with the SNAS Open
         IONet server through the public Internet and the Open IONet ***
      – SNAS Clients may interconnect with a MOC EPS




     *Note the SNAS Client application is a software module that runs on a customer
             supplied computing platform
     *** Note: Some SNAS Clients may be under the control of a Customer MOC but not
               physically present in the MOC


Preliminary Design Review                                                              Page 76
 NASA/GSFC Code 452                                                               September 12, 2005
                            Constraints on Information Sharing

 • The SNAS servers are constrained by
      –   Rules for interconnecting with the IONet
      –   Rules for interconnecting through the NISN Secure Gateway
      –   Limitations of the NCCDS/ANCC interface
      –   Limitations of the DAS interface
 • The SNAS clients are constrained by
      – The Customer MOC security program
      – Rules for interconnecting with the IONet
             This includes accessing the Open IONet through the public Internet




Preliminary Design Review                                                  Page 77
 NASA/GSFC Code 452                                                   September 12, 2005
                            Preliminary Risk Assessment

 •   SNAS carries the same information as SWSI
 •   SNAS has the same vulnerabilities as SWSI
 •   SNAS faces the same threat environment as SWSI
 •   The SNAS approach to security will be very much like the SWSI
     approach
      – The SNAS servers and database will be housed at WSC
             WSC management policies will apply
             WSC operational policies will apply
      – The SNAS clients will be under MOC management
             MOC management policies will apply
             MOC operational policies will apply
      – The Technical control provided by SNAS will be the focus of this
         presentation



Preliminary Design Review                                          Page 78
 NASA/GSFC Code 452                                           September 12, 2005
                            Technical Controls

 •   Identification and Authentication
 •   Logical Access Controls
 •   Audit Trails
 •   System and Communication Protection




Preliminary Design Review                             Page 79
 NASA/GSFC Code 452                              September 12, 2005
                            Identification and Authentication

 • All SNAS users will have an established User ID
      – Provided to SN O&M personnel by project official
      – Determines roles and privileges
      – Determines which SIC or SICs can be accessed
 • All SNAS users will have a password
      – Meets common minimum standards
      – Must be changed at least every 90 days
 • All SNAS sessions require a passphrase
      – Meet common minimum standards for passphrases
      – Must be changed at least every year
 • All SNAS Client workstations will have a known fixed IP address
 • MOC Mission Manager and SNAS Database Administrator will
    coordinate to maintain currency of SNAS user IDs


Preliminary Design Review                                        Page 80
 NASA/GSFC Code 452                                         September 12, 2005
                               Logical Access Controls

 • Server OS (Linux/UNIX) limits user access to server and/or database
    resources
 • SNAS defined user roles will support least privilege and separation of
    responsibilities
      – MOC will be responsible for determining how roles are applied
 • Attempted unauthorized transactions will not be monitored except for
    failed login attempts
 • User Inactivity will not be monitored by SNAS
      – Lights out operation requires that a SNAS terminal be left with an active,
         unattended session for extended periods of time
      – All actions will be logged to an unique User ID
      – MOC must ensure
             SNAS workstation is protected when left unattended
             Automatic transactions are safe
      – SNAS will provide the MOC with the option of encrypting SNAS files stored
         locally to the SNAS Client


Preliminary Design Review                                                  Page 81
 NASA/GSFC Code 452                                                   September 12, 2005
                                           Audit Trails

 • SNAS will log
      – All message that transit the servers
      – Records pertaining to
             Establishment and termination of communications
             System alerts
             Database alerts
             Successful login and logout including Switch User
             Failed login including Switch User
 • SN O&M personnel will be able to selectively control logging of
    messages and records
 • SN O&M personnel will be able to selectively delog all logged data
 • SNAS will display a 24-hour alert history for
      – SNAS clients
      – SNAS Database Administrators
      – SNAS System Administrators
 • Automated tools for monitoring logs will be investigated
Preliminary Design Review                                              Page 82
 NASA/GSFC Code 452                                               September 12, 2005
                     System and Communication Protection

  • Data on the SNAS servers and the SNAS database is protected by
    access restrictions
      – The SNAS system administrator has access to all data on the SNAS servers
         and database
      – The SNAS database administrator has access to all information in the SNAS
         database
      – SNAS users can only access data
             Using predefined queries and
             Only data related to the specific SIC(s) for which they are authorized
      – Unauthorized access is prevented by the Identification and Authentication
         provisions
      – Data stored locally on the SNAS Client is protected by the MOC security plan
             SNAS will provide an encryption option
      – Data transported between the SNAS Client and the SNAS Servers will be
         encrypted
NOTE: “Encryption is required for data that is sensitive, requires confidentiality, has a high value,
or would expose NASA to legal liability, criminal sanction, or embarrassment in any way if the
information were compromised.”

Preliminary Design Review                                                              Page 83
 NASA/GSFC Code 452                                                               September 12, 2005
                            Architecture Recommendation
                                          &
                             Development Environment
                                      Presented By:

                                  Scott Robinson




Preliminary Design Review                                      Page 84
 NASA/GSFC Code 452                                       September 12, 2005
                                        Architecture Recommendation



      Open                                                Closed                       Data
      Server                                              Server                      Server
                                                                                                                      RAID
          Heartbeat LANs




                                                            Heartbeat LANs




                                                                                          Heartbeat LANs
                                           Closed IONET
                           Open IONET




                                                                             Switch                          Switch



      Open                                                Closed                       Data                           RAID
      Server                                              Server                      Server

                                                                  Inter-segment Network                    RAID Network

Preliminary Design Review                                                                                         Page 85
 NASA/GSFC Code 452                                                                                          September 12, 2005
                            Architecture Recommendation (cont)

 •   Rack mountable servers and peripherals
 •   Shared monitors, mice, and keyboards with KVM switches
 •   Dual 64-bit processor capability for each server
 •   10/100 Mbps Ethernet for external and heartbeat LANs
 •   Gigabit Ethernet for Inter-segment Network
 •   RAID Network (TBD): either Fiber Channel or iSCSI (Copper)
 •   Tape drives (TBD): either one drive per server or shared network
     tape drives
 • Supports active/passive and active/active clustering




Preliminary Design Review                                        Page 86
 NASA/GSFC Code 452                                         September 12, 2005
                      Development Environment - Hardware

 • 3 HP Server Systems
      – Configurable-HP ProLiant DL145 AMD Opteron™ - SCSI Rack Model
         Server
             AMD Opteron™ Model 242 (1.6GHz/1MB) processor
             1GB of Advanced ECC PC2700 DDR SDRAM DIMM Memory Kit (2 x 512
              MB)
             Dual Channel Ultra 320 SCSI HBA
             HP 36.4GB Ultra320 Non-Hot Plug 15,000 rpm (1") Hard Drive
             16X DVD-ROM Drive
             Two (2) integrated Broadcom 5704 10/100/1000 Ethernet NICs w/WOL and
              PXE support
             500W power supply (non-hot plug, auto-switching)


 • 6 HP Workstations
      – Same as above except in Tower Model

Preliminary Design Review                                                 Page 87
 NASA/GSFC Code 452                                                  September 12, 2005
                       Development Environment - Software

 • UPS and SWSI Code analyzers for mapping current logic and
    reverse engineering
      – Understand for C++
      – Understand for Java
      – With Class 2000 Professional
 • GUI Builders and Code outline generators
      – JBuilder
      – Eclipse
      – With Class 2000 Professional
 • Configuration Management
      – Concurrent Versioning System (TBR)
 • Red Hat Enterprise Linux AS Standard (AMD64/Intel EM64T)


Preliminary Design Review                                  Page 88
 NASA/GSFC Code 452                                   September 12, 2005
                            SNAS Software Size Estimate


                                     Presented By:

                                   Chii-der Luo




Preliminary Design Review                                      Page 89
 NASA/GSFC Code 452                                       September 12, 2005
                            SWSI Software Reuse Analysis

 • Client
      – All SWSI Client code written in Java
      – Over 92% of SWSI Client code reusable
      – About 3,260 lines of new DSI to be developed for SNAS Client
 • Server
      –   SNIF logic will be reused and code implemented in Java for SNAS
      –   Remaining SWSI Server code is written in Java language
      –   Reuse percentage: 70%
      –   About 39,130 lines of new DSI necessary for SNAS Servers,
          including SNIF rewrite




Preliminary Design Review                                          Page 90
 NASA/GSFC Code 452                                           September 12, 2005
                            UPS Software Reuse Analysis


 • UPS GUI was developed with TAE+ and will not be reused
 • Majority of remaining UPS code is in C programming language
 • Major subsystem logic reuse
      –   Recurrent Scheduling
      –   Orbital Data Processing
      –   Electronic User
      –   User Input Validation
 • About 67,910 lines of new Java DSI to be written for
    implementing select UPS functions on SNAS




Preliminary Design Review                                      Page 91
 NASA/GSFC Code 452                                       September 12, 2005
                             SNAS Software Size Estimate

 • SNAS GUI will be written in Java with an estimated size of about
    64,020 DSI
 • Software tools such as Eclipse and JBuilder will be used to
    build GUI graphics
 • Estimated SNAS software size:
         3,260 – from SWSI Client (SNAS Client)
        39,130 – from SWSI Server (SNAS Servers)
                                                                     New Code
        67,910 – from UPS (SNAS Client & Servers)
        64,020 – SNAS GUI
        95,130 – Reused SWSI code
      ------------------------------------------------------------
      269,450 – SNAS Software DSI




Preliminary Design Review                                                        Page 92
 NASA/GSFC Code 452                                                         September 12, 2005
                            Development Resource Estimate

 • Estimation: COCOMO II Post-Architecture model
 • Software size used in the calculation: 142,310 lines of new DSI
 • Range of effort in person-month (PM): 223 to 349




                                                          Transition
          FTE




                                      Code
                       Design   CDR
                                                   Test




Preliminary Design Review                                        Page 93
 NASA/GSFC Code 452                                         September 12, 2005
                            Risks & Mitigation

                                 Presented By:

                               Dave Warren




Preliminary Design Review                             Page 94
 NASA/GSFC Code 452                              September 12, 2005
                            Risks & Mitigation (1 of 6)



 • SNAS Risk Type                       # Risks       Severity Range

        – Customer Support Related         6              Low - High

        – DAS                              2              Med - High


        – Mgmt                             1                 Low


        – Security                         2                 Low


        – System                           3                 Low




Preliminary Design Review                                         Page 95
 NASA/GSFC Code 452                                          September 12, 2005
                                      Risks & Mitigation (2 of 6)

                                SNAS Risk Classification Chart

              Very High     5
       L                                                                    Criticality
       I
                                                                               High
       K      High          4
       E
       L                                                    3                Medium
       I      Moderate      3
       H                                                                       Low
                                                             6
       O      Low           2
                                                            11
       O
       D
                                           5
              Very Low      1

                                  1       2        3        4     5      Note:
                                 Very
                                 Low
                                          Low   Moderate   High   Very
                                                                  High
                                                                         • SNAS Risk #’s
                                                                         =


                                         CONSEQUENCES

Preliminary Design Review                                                        Page 96
 NASA/GSFC Code 452                                                         September 12, 2005
                               Risks & Mitigation (3 of 6)

 • Risk # 03 – Interface between Customer Critical Activities & SNAS Test
     Schedule
 •   Risk: Customer lack of availability to test with SNAS due to other high priority
     customer activities or implementation issues at the customer site could delay
     the completion of SNAS interface testing.
 • Likelihood: 3                Consequence: 4               Timeframe: Testing
 • Approach & Plan:
      – Identification of potential customers that will be involved in the SNAS test
          program will be identified early.
      –   Tests that are key to validating SNAS functionality versus those that can be
          completed as a customer post-SNAS transition activity will also be
          identified.
      –   The SNAS staff will regularly communicate with customers and will request
          a commitment from those agreeing to participate during the SNAS test
          period.
      –   Test and transition activities will be designed to minimize impact on
          Customer resources and schedule.
 • Status:
    – Open: advertising schedules through notifications; and CIM’s; missions
          signing up for beta-testing


Preliminary Design Review                                                   Page 97
 NASA/GSFC Code 452                                                    September 12, 2005
                             Risks & Mitigation (4 of 6)

 • Risk # 11 – Lack of a DAS Test Interface
 • Risk: The lack of an activity to design and prototype a Demand Access System
    (DAS) Simulator will put the development of the interface between SNAS and
    DAS at very high risk. As seen with the current SWSI sustaining engineering
    environment, developers cannot adequately verify reported DAS user problems
    or resolve contributing software errors because a DAS interface is unavailable.
 • Likelihood: 2 (4)           Consequence: 4               Timeframe: CDR
 • Approach & Plan:
      – A DAS Simulator would mitigate the risk for the need of this direct interface.
      – The team will continue to monitor the status of the NASA's review of the
         current WSC DAS upgrade activities and the decisions for provision of a
         backup system to determine the need/implementation of a DAS simulator for
         SNAS testing.
 • Status:
      – Open: the WSC DAS team currently working towards a Release 05.1 for Oct.
         ’05; SWSI has limited access to the WSC DAS Testbed to investigate
         functionality and verify open SWSI-DAS problem reports

Preliminary Design Review                                                   Page 98
 NASA/GSFC Code 452                                                    September 12, 2005
                               Risks & Mitigation (5 of 6)

 • Risk # 5 – Customer Liaison and System Acceptance
 • Risk: Conflicting design issues may result in a system that doesn’t meet desired
    customer expectations
 • Likelihood: 1 (3)            Consequence: 2 Timeframe: PDR
 • Approach & Plan:
      – The Customer Liaison Plan will be utilized to achieve customer participation
          in all phases of development to mitigate a lack of user input and feedback.
      –   The design will include those requirements where the majority of the user
          community agrees that the functionality is necessary.
      –   Customer inputs will be balanced against reasonable cost and time
          considerations.
 • Status:
      – Open: meetings held at customer sites; held three group CIMs to keep
          future SNAS users abreast of requirement changes and design, especially in
          the GUI functionality




Preliminary Design Review                                                   Page 99
 NASA/GSFC Code 452                                                    September 12, 2005
                               Risks & Mitigation (6 of 6)

 • Risk # 6 – SN Customer Transition from UPS and SWSI to SNAS
 • Risk: An ineffective transition from UPS and SWSI to SNAS could potentially
    impact SN customer service support.
 • Likelihood: 2 (3)            Consequence: 4          Timeframe: Transition
 • Approach & Plan:
      – A period of time for transitioning SN customers from UPS and SWSI to SNAS
          has been provided in the schedule.
      –   The SNAS system engineering support contractor will develop a plan early
          during SNAS development to facilitate a smooth transition.
      –   The Customer Liaison Plan will be utilized to achieve customer participation
          in all phases of development to mitigate a lack of user input and feedback.
 • Status:
      – Open: keeping customers aware of schedule and development through site
          meetings and CIM’s




Preliminary Design Review                                                   Page 100
 NASA/GSFC Code 452                                                    September 12, 2005
                            Closing Remarks

                                Presented By:

                              Rose Pajerski




Preliminary Design Review                            Page 101
 NASA/GSFC Code 452                             September 12, 2005
                              Next Steps


 • Accept Mod for new Task Order and begin critical design
 • Continually assess potential impacts to requirements & design
 • Continue supporting the Customer Liaison Program
 • Hold CDR in late April 2006
 • Adjust baseline schedule




Preliminary Design Review                                  Page 102
 NASA/GSFC Code 452                                   September 12, 2005
                                  Assess System Impacts

 • Sources of potential impacts
      – Results from RFA actions
      – Functional and subsystem requirement changes
      – Evolving SN and mission operational needs
 • Assess impacts
      – Track identified changes as risks
      – Estimate “size” of change using function point analysis
      – Factor changes into requirements, implementation plan, and schedule
 • Functionality change analysis (ongoing)
      – Use recently baselined requirement & preliminary design materials
      – Analyze function point counts to calculate growth
             760 FPs (initial count in 2003)
                                                    41% increase in functional size
             1074 FPs (prior Delta-SRR in 2005)
             ? FPs (after this PDR)                Anticipate <10% increase in
      – Factor into schedule and effort estimates   functional size



Preliminary Design Review                                                Page 103
 NASA/GSFC Code 452                                                 September 12, 2005
                                                   Schedule


                                                               Revised       Original
                                                              Schedule     Schedule
 •   CDR #1                                                        ---      12/2005
 •   CDR #2                                                    4/2006         5/2006
 •   Implementation                                            2/2007       11/2006
 •   System Test                                               5/2007         1/2007
 •   Acceptance Test                                           7/2007         3/2007
 •   Training & Transition to Ops                             11/2007         7/2007




       ***Note: Beta testing to begin early 2007


Preliminary Design Review                                                     Page 104
 NASA/GSFC Code 452                                                      September 12, 2005
                              Post PDR Activities

 • Respond to RFAs
      – Existing: 9 deferred to design phase (from July 2003 SRR)
      – New from today’s review
 • Refine hardware architecture proposal
 • Finalize project documentation for CDR
      –   Security Plan
      –   ICD between DAS and SNAS
      –   ICD between EPS and SNAS
      –   Draft Detailed Design Specification
      –   Configuration Management Plan
      –   System Test Plan
      –   Acceptance Test Plan




Preliminary Design Review                                         Page 105
 NASA/GSFC Code 452                                          September 12, 2005
                                 In Closing


 • Closing remarks from review board
 • Thanks for your attendance
 • RFA due date, September 16 (PAAC II)
 • See you at the CDR in April




Preliminary Design Review                          Page 106
 NASA/GSFC Code 452                           September 12, 2005
                                   Backup Slides
                               Acronym and Abbreviation List
                               Requirement Traceability Matrix
                            SNAS COCOMO II Model Cost Drivers




Preliminary Design Review                                             Page 107
 NASA/GSFC Code 452                                              September 12, 2005
                        Acronym and Abbreviation List (1 of 2)

ANCC       Auxiliary Network Control Center      HTTP    Hypertext Transfer Protocol
BAH        Booz, Allen, Hamilton                 ICD     Interface control Document
CA         Certificate of Authority              IIRV    Improved Inter Range Vector
CDR        Critical Design Review                IONet   Internet Protocol Operational Network
CIM        Customer Interface Meeting            IT      Information Technology
CLP        Customer Liaison Plan                 ITT     ITT-SNAS System Engineering Contractor
CNE        Center Network Environment            JSC     Johnson Spaceflight Center
COCOMO     Constructive Cost Model               MOC     Mission Operations Control
COTS       Commercial-Off-the-Shelf              NASA    National Aeronautics and Space
DAS        Demand Access System                          Administration
DBMS       Database Management System            NCCDS   Network Control Center Data System
DSI        Delivered Source Instruction          NENS    Near Earth Networks Services
EPS        External Processing System            NISN    NASA Integrated Services Network
EU         Electronic User                       NPOESS National Polar-orbiting Operational
                                                         Environmental Satellite System
FTP        File Transfer Protocol
                                                 O&M     Operations and Maintenance
FP         Function Points
                                                 OCD     Operations Concept Document
GCM        Ground Control Message
                                                 PAAC-II Program Analysis and Control
GCMR       Ground Control Message Request
                                                 PDR     Preliminary Design Review
GMSEC      GSFC Missions Services Evolution
           Center (Code 581)                     PE      Prototype Event
GUI        Graphical User Interface              PSAT    Predictive Satellite Acquisition Table
HTSI       Honeywell Technology Solutions Inc.   RCTD    Return Channel Time Delay

Preliminary Design Review                                                       Page 108
 NASA/GSFC Code 452                                                        September 12, 2005
                        Acronym and Abbreviation List (2 of 2)

RFA         Request For Action               SUPIDEN   Support Identifier
RR          Replace Request                  SV        State Vector
RV          Requirement Volatility           SWSI      Space Network Web Services Interface
SAR         Schedule Add Request             TAE       Transportable Application Executive
SCP         Space Communications Program     TCP/IP    Transmission Control Protocol/Internet
                                                       Protocol
SDIF        SNAS DAS Interface
                                             TCW       TDRSS Communications Window
SDR         Schedule Delete Request
                                             TDRSS     Tracking and Data Relay Satellite System
SHO         Schedule Order
                                             TRMM      Tropical Rainfall Measuring Mission
SIC         Spacecraft Identification Code
                                             TSW       TDRSS Satellite Window
SN          Space Network
                                             TTM       Time Transfer Message
SNAS        Space Network Access System
                                             TUT       TDRSS Unscheduled Time
SNIF        SNAS NCCDS Interface
                                             UAV       User Antenna View
SP          Security Plan
                                             UPD       User Performance Data
SP&M        Special Projects and Missions
                                             UPS       User Planning System
SPSR        Service Planning Segment
            Replacement                      WSC       White Sands Complex
SRD         Systems Requirement Document     UPDR      User Performance Data Request
SRM         Schedule Result Messages         UPS       User Planning System
SRR         System Requirements Review       USM       User Scheduling Message
SRR         Schedule Result Request          WLR       Wait List Request
SSC         Service Specification Code
SSL         Secure Socket Level

Preliminary Design Review                                                     Page 109
 NASA/GSFC Code 452                                                      September 12, 2005
                    Requirement Traceability Matrix (1 of 6)




Preliminary Design Review                                      Page 110
 NASA/GSFC Code 452                                       September 12, 2005
                    Requirement Traceability Matrix (2 of 6)




Preliminary Design Review                                      Page 111
 NASA/GSFC Code 452                                       September 12, 2005
                       Requirement Traceability Matrix (3 of 6)




Preliminary Design Review                                        Page 112
 NASA/GSFC Code 452                                         September 12, 2005
                       Requirement Traceability Matrix (4 of 6)




Preliminary Design Review                                        Page 113
 NASA/GSFC Code 452                                         September 12, 2005
                       Requirement Traceability Matrix (5 of 6)




Preliminary Design Review                                        Page 114
 NASA/GSFC Code 452                                         September 12, 2005
                       Requirement Traceability Matrix (6 of 6)




Preliminary Design Review                                        Page 115
 NASA/GSFC Code 452                                         September 12, 2005
                            SNAS COCOMO Modeling Scale Factors




      Note: Refer to COCOMO II Model Definition Manual for details on features and ratings

Preliminary Design Review                                                              Page 116
 NASA/GSFC Code 452                                                               September 12, 2005
                     SNAS COCOMO Modeling Effort Multipliers




 Note: Refer to USC COCOMO II Reference Manual for details on features and ratings




Preliminary Design Review                                                           Page 117
 NASA/GSFC Code 452                                                            September 12, 2005

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:17
posted:11/18/2011
language:English
pages:117