							                                                             LESOTHO RESULTS FRAMEWORK OUTCOMES

      Outcome Indicators                          Baseline           Target at              Revised Target at Mid- Means of         Actual/Latest Estimate           % of target   Comments
                                                                     Inception              term                     verification                                    achieved
                                                                                              Component 1: Project Management & Transfrontier Collaboration
      Effective Project Management through        Project            Milestones as          Milestones as defined in the Progress Reports, Disbursement rate currently 80%         Action plan in place for remaining phase I activities.
      timely delivery of project milestones       Implementation     defined in the PIP,    revised Log frame,           Bank Aide         at 79.45%. Project
                                                  Plan - Five year   Satisfactory rating    Satisfactory Rating          Memoirs           implementation rating
                                                  Plan                                                                                     satisfactory.


      Improved bilateral cooperation in           Bilateral MoU and Revised MoU             Revised MoU, 7 joint       Implementation    7 joint projects under      80%           Preparations being made for signing of revised MoU.
      conservation and development                Steering          outlining areas of      projects to be implemented Completion        implementation (
                                                  Committee         cooperation                                        Report            Transfronteir Strategy
                                                                                                                                         completed). Exit strategy
                                                                                                                                         developed.



                                                                                                            Component 2: Conservation Planning
      Increase in number of protected areas       4                  6                      6                       Progress Reports, SEA for Senqu Sources          60%           Declaration of SS-PA by September 2008. Liqobong PA to
                                                                                                                    Government         approved. A management                      be considered under MDTP phase II.
                                                                                                                    Gazzette           plan for Senqu Sources
                                                                                                                                       developed.




      Biodiversity issues mainstreamed into local none               Bioregional Planning   Bioregional Planning      Progress Reports, Biorigional planning process 95%           Distribute transfrontier strategy and action plan by
      government planning                                            documented and         documented and            Local Government documented. Transfrontier                   November 2008.
                                                                     mainstreamed into      mainstreamed into local   Plans             conservation and
                                                                     local government       government                                  development strategy
                                                                                                                                        approved by BSC.
                                                                                                                                        MDTFCA strategy action
                                                                                                                                        plan completed. 3 MRA
                                                                                                                                        management plans
                                                                                                                                        developed.



      Areas of national biodiversity & cultural   none               Natural & Cultural Natural & Cultural Heritage Progress Reports,    C-Plan highlighting areas of 100%
      heritage importance protected and                              Heritage             Conservation Plans -      Maps                 importance completed.
      managed appropriately                                          Conservation Plans - Zonation Plan                                  Management plans for 2
                                                                     Zonation Plan                                                       Heritage sites developed.
                                                                                                                                         Fire and removal of alien
                                                                                                                                         species programmes initiated
                                                                                                                                         for SNP, BNR and TNP.
                                                                                                                                         Fine scale biodiversity plans
                                                                                                                                         produced for 3 MRAs.


                                                                                 Component 3 & 4: Protected Area Management Planning and Conservation Management




11/17/2011                                                                                                                         Page 1 of 8                                                              C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
      Outcome Indicators                        Baseline           Target at              Revised Target at Mid- Means of          Actual/Latest Estimate    % of target       Comments
                                                                   Inception              term                   verification                                achieved
      Increase coverage of protected area system 14142             22650                  22650                  Progress Reports, SEA report for SS-PA      70%               Declare SS-PA by Septmeber 2008. Liqobong to be
                                                                                                                 Maps              approved. Management plan                   considered under MDTP phase II.
                                                                                                                                   for SS-PA developed.




      Eroded paths/road rehabilitated           0                  10 km rehabilitated    10 km rehabilitated          Progress Reports, Rehabitation of SNP road in 90%       Complete rehabilitation of the road by December 2008.
                                                                                                                       Field Reports     progress.


      Alient plant cleared inside SNP           0                  Eradicate 10ha of      Eradicate 10ha of Alien      Area cleared         Alien species have been      90%   On going. Report available
                                                                   Alien invasive plant   invasive plant species and                        cleared, the next clearing
                                                                   species and replace    replace with indigenous                           action will await the next
                                                                   with indigenous        plants                                            flowering season. 10ha
                                                                   plants                                                                   cleared


      Reduction in illegal grazing              Illegal grazing    zero hectares          zero hectares illegally      Progress Reports, Community sensitization in      95%   Continous sensitization and law enforcement need to be
                                                within the park    illegally grazed       grazed                       Field Reports     progress                              undertaken.


      Enhanced protected area management        old infrastructure office building,       office building, enviro      Progress Reports, Phase I construction (Arrival 60%     Complete bulk engeneering services by December 2008.
      capacity                                  (research station & enviro education      education center, gate &     certificate of as Centre and Gate) completed.           Start construction of environmental centre by Setember
                                                weather station)    center, gate &        arrival center               built drawings    Construction of bulk                  2008. Complete construction of Environmental centre in
                                                                    arrival center                                                       engeneering services in               10 months from start.
                                                                                                                                         progress, Construction
                                                                                                                                         process for environmental
                                                                                                                                         centre initiated.




      Resource base used to contribute to       0                  Management &       Management & Business            Management and       SNP business plan and PAs    95%   MTEC to make final dicision on nature conservation
      biodiversity management and community                        Business Plans for Plans for SNP                    Business Plans       planning framework                 structure. HNRRIEP working on Implementation of
      development                                                  PAs (SNP, Bokong operationalised                                         completed. SNP                     management plans for northern parks.
                                                                   & Tsehlanyane)                                                           management plan
                                                                   operationalised                                                          completed. Conservation
                                                                                                                                            management support for
                                                                                                                                            BNR & TNP identified on
                                                                                                                                            going. MTEC to make final
                                                                                                                                            dicision on nature
                                                                                                                                            conservation structure.




                                                                                           Component 5 : Conservation Management outside Protected Areas




11/17/2011                                                                                                                            Page 2 of 8                                                      C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
      Outcome Indicators                         Baseline   Target at            Revised Target at Mid-      Means of          Actual/Latest Estimate         % of target   Comments
                                                            Inception            term                        verification                                     achieved
      Wetland rehabilitated                      0          5 hectares wetland   5 hectares wetland          Progress Reports, Wetlands mapping and           10%           A national wetlands programme to be developed by
                                                            rehabilitated at     rehabilitated at Motete     Field Reports     classification complete. Met                 Ministry of Natural Resources with the support of the
                                                            Motete                                                             with the Millenium                           MCC.
                                                                                                                               Challenge Coorperation
                                                                                                                               (MCC) and Wetlands Unit
                                                                                                                               (MNR) to agree of areas of
                                                                                                                               collaboration.




      Improved range condition                              136563 under MRA 136563 under MRA                Progress Reports, 3 MRA management plans         95%           Livestock invetory being undertaken to review grazing
                                                            management       management                      Maps              and grazing plans                            plans.
                                                                                                                               completed.



      Competent range managers (DPUs &           0          90 trained DPUs and 30 trained DPUs and          Training and      EM tools training course       30%           This activity has been cancelled due to shortage of funds.
      Communities)                                          community members community members in           Evaluation Report undertaken.
                                                            in Range            Range Management
                                                            Management


                                                                                                  Component 6: Community Involvement
      Enhanced skills for communities in         0          500 community        500 community members       Training and      2050 community members         410%          Training Report available.
      conservation & nature-based tourism                   members trained in   trained in conservation and Evaluation Report trained. EE materials
                                                            conservation and     tourism activities                            distributed to stakeholders.
                                                            tourism activities
      Extensive participation & involvement of   0          200 community        200 community members       Progress report       410 members engaged (120 205%            Community members actively involved in conservation
      local communities in conservation &                   members engaged in   engaged in conservation &                         MRCs, 140 CCFs, 60 TAs &                 (MRAs) & tourism (handicrafts, tour guiding, pony
      nature-based tourism                                  conservation &       nature-based tourism                              90 DSC)                                  trekking, traditional dances etc).
                                                            nature-based         activities
                                                            tourism activities




                                                                                      Component 7: Nature-based tourism/Sustainable Livelihoods
      Jobs created for local communities         0          60 jobs created      60 jobs created          Reports and         200 temporary jobs created
                                                                                                          relevant statistics during construction at SNP,
                                                                                                                              4 tour guides self-employed.




      Increase in income generating activities   0          10 business          10 business supported       Reports and           7 businesses supported     70%           2 B&Bs, 1 dance group, 4 tour guides, hadycraft
      related to conservation & nature-based                supported                                        relevant statistics                                            producers.
      tourism

                                                                                               Component 8: Institutional Development




11/17/2011                                                                                                                  Page 3 of 8                                                              C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
      Outcome Indicators                      Baseline   Target at             Revised Target at Mid-    Means of           Actual/Latest Estimate     % of target   Comments
                                                         Inception             term                      verification                                  achieved
      Effective nature conservation management 0         nature conservation   nature conservation law   Report, Nature     Nature conservation bill   80%           Drafting of the law by Law Office.
      with legal framework                               law drafted &         drafted & enacted         Conservation Act   drafted. Review of
                                                         enacted                                                            Environmental units
                                                                                                                            undertaken.




11/17/2011                                                                                                           Page 4 of 8                                                             C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
11/17/2011   Page 5 of 8   C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
11/17/2011   Page 6 of 8   C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
11/17/2011   Page 7 of 8   C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls
11/17/2011   Page 8 of 8   C:\Docstoc\Working\pdf\a52950d6-3b9d-4bce-a098-fdeb6c6c180e.xls

						
Related docs
Other docs by GZ3q5g
Document
Views: 5  |  Downloads: 0
PATHFINDER - DOC - DOC
Views: 330  |  Downloads: 0
Sheet2
Views: 12  |  Downloads: 0
Rachel Britchkow
Views: 16  |  Downloads: 0
scarcity
Views: 6  |  Downloads: 0
internet
Views: 2  |  Downloads: 0
DENNIS A
Views: 11  |  Downloads: 0
Proforma
Views: 105  |  Downloads: 1
Acct 440
Views: 15  |  Downloads: 0