Flood Athletic Center









Woong June Chung

Penn State University Mechanical Option

Thesis Advisor : DR. Willam Bahnfleth, P.E.

Presentation Outline Project Background Project Background

Existing Mechanical System

•Richard T. Flood Jr., & Sally Elliot Flood Athletic Center

Proposed Mechanical System



CHP System •Completed in December 2009



GSHP System

•Northwest Connecticut

Acoustical Breadth



Cost Estimation •Area: 102,000 ft2



Conclusion

•Replacement of Ice rink

Presentation Outline Project Background Project Background

Existing Mechanical System

•Function of gymnasium

Proposed Mechanical System •Basketball Court



CHP System •Fitness Center

•Wrestling Room

GSHP System

•Ice Rink

Acoustical Breadth •Offices



Cost Estimation •Locker Room



Conclusion

Presentation Outline Project Background Existing Mechanical System

Existing Mechanical System Mech.

•(4) Boilers 85% Efficiency Room



Proposed Mechanical System •(5) Hot Water Unit



CHP System •(26) Hot Water Heating Coil Mech.

Room



GSHP System

•(9) Air Handling Units

Acoustical Breadth •(2) Energy Recovery Ventilators Mech.

Room

Mech.

Cost Estimation Room







Conclusion

Presentation Outline Project Background Existing Mechanical System

Existing Mechanical System Mech.

•(1) Ice Rink Ventilating and Dehumidifying Unit Room



Proposed Mechanical System •With Desiccant Wheel Dehumidification System



CHP System •100% OA system Mech.

Room

•Prevent water condensation in ice rink

GSHP System



Acoustical Breadth Mech.

Room

Mech.

Cost Estimation Room







Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•Objective of Proposed Mechanical System

Proposed Mechanical System



CHP System •Provide economic benefit to the owner



GSHP System

•Reduce of energy consumption

Acoustical Breadth



Cost Estimation •Decrease emission of the system



Conclusion

Presentation Outline Project Background Proposed Mechanical System

Electricity – Northeastern Utilities suppliers provide

Existing Mechanical System electricity rate of 0.09051/kWh to commercial buildings.

•CHP system

Electricity rate =(0.09051/kWh) * (1 kWh / 0.003412 MMBtu)

Proposed Mechanical System •Feasibility Check = $26.53/MMBtu

CHP System •Spark Spread = Electricity rate – Gas rate

Natural gas – Natural gas price was adjusted by the

= $11.29/MMBtu government and it is 14.81 dollar/ 1000 cubic feet.

GSHP System Natural gas rate = 14.81 dollar/ 1000 cubic feet *1.029 =

$15.24/ MMBtu

Acoustical Breadth •System may be inefficient

Spark Spread = electricity rate – natural gas rate

Cost Estimation •Spark Spread was lower than $12/MMBtu

=$26.53/ MMBtu – $15.24/ MMBtu = $11.29/ MMBtu

•Building does not run 24/7

Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•CHP system

Proposed Mechanical System •Components



CHP System •Prime Mover



GSHP System

•Generator

Acoustical Breadth



Cost Estimation •Heat Recovery Unit



Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•Selection of Prime Mover

Proposed Mechanical System



CHP System •High efficiency



GSHP System

•Low start-up time

Acoustical Breadth



Cost Estimation



Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•Estimation of annual cost and savings

Proposed Mechanical System •BCHP Screening Tool



CHP System



GSHP System

•$21,563 / year

Acoustical Breadth



Cost Estimation



Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•Emission

Proposed Mechanical System



CHP System •Reduction of NOx and SOx



GSHP System

•NOx – 57.6% reduction

Acoustical Breadth •SOx – 99.1% reduction



Cost Estimation



Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•Ground Heat Source System GSHP

Proposed Mechanical System System



CHP System •Location

•Plenty of ground to utilize as GSHP system

GSHP System



Acoustical Breadth • Soil



Cost Estimation •Stockbridge Loam

•Thermal Conductivity = 1.15 Btu/(h*ft*F)

Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•Utilize underground temperature

Proposed Mechanical System •Underground temperature is low on summer and high on

winter

CHP System



GSHP System •Run with 23.5% propylene glycol and 76.5% water



Acoustical Breadth •Lower the freezing point to 15oF



Cost Estimation



Conclusion

Presentation Outline Project Background Proposed Mechanical System

Existing Mechanical System

•25 Bore holes

Proposed Mechanical System



CHP System •Vertical Loop System



GSHP System

•Ground Loop Design

Acoustical Breadth •$4,900 / year



Cost Estimation



Conclusion

Presentation Outline Project Background Acoustical Breadth

Existing Mechanical System

•Installation of All weather Acoustical tile

Proposed Mechanical System •Acoustiblok reduces approximately 10 dB



CHP System



GSHP System 100

90

80

70

Acoustical Breadth 60

50 Generator

40 Noise Reduced

Cost Estimation 30

20

10



Conclusion 0

125 250 500 1000 2000 4000

Presentation Outline Project Background Cost Estimation

Existing Mechanical System

•Combined Heat and Power System 12%



6% 28%

Proposed Mechanical System •Installation Cost = $1,676,211

Space heating



CHP System •Annual Savings = $21,563 21%

Water heating

Lighting



•Payback Period = 50years 7% Misc. Equipment

Ventilation

GSHP System Pumps



11% 15% Space Cooling





Acoustical Breadth •Ground Source Heat Pump System



Cost Estimation •Installation Cost = $63,900

•Annual Savings = $4,900

Conclusion

•Payback Period = 13years

Presentation Outline Project Background Conclusion

Existing Mechanical System

•Recommendation

Proposed Mechanical System •Inadequacy to install CHP system



CHP System

•GSHP is challenging

GSHP System

•Owner can consider due to the function and religion

Acoustical Breadth of school

•Acoustical tiles are recommended to install after the

Cost Estimation installation of GSHP system



Conclusion

Presentation Outline Project Background Acknowledgements

Existing Mechanical System

Special thanks to

Proposed Mechanical System Faculty - Dr. Bahnfleth



CHP System - Dr. Freihaut



GSHP System

AE Students - Jeff, Devon, Luke, Jeremy,

Acoustical Breadth Salisbury School – My high school



Cost Estimation All my family and grandmother pasted away on March



Conclusion



Related docs
Other docs by yunyi
2.2 Virtueller Adressraum
Views: 3  |  Downloads: 0
HIGHLINE TAPPED TO PRODUCE INAUG
Views: 2  |  Downloads: 0
Heteroflexibility
Views: 8  |  Downloads: 0
Lynn Jones 5 Grade Lesson Plan F
Views: 0  |  Downloads: 0
SPONSOR SHIP AND TABLE HOSTING OPPOR TUNITIES
Views: 0  |  Downloads: 0
NJTinside2
Views: 0  |  Downloads: 0
The Vegetarian Food Pyramid J
Views: 0  |  Downloads: 0
Anti-Spam Measures for End Users
Views: 0  |  Downloads: 0
Slide 1 - UCL
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!