CONTINGENCY

AUTHORIZATION

PROJECT: River View High School CONTINGENCY AUTHORIZATION NO.: 09

Kennewick, Washington



OWNER: Finley School District No. 53 DATE OF ISSUANCE: Dec. 10, 2001



TO: Tim Burns ARCHITECT: Design West

KOP Construction

ARCH. PROJECT NO: 9930





The Work, the Contract Documents are hereby amended as described below. Proceed with this work promptly.

This change is approved with no change in the Contract Amount or Contract Time. This change affects the

Contingency Balance Only.



1. Provide additional concrete sidewalk; remove and replace asphalt

patch as indicated in CCA 9/8/01-2. (PR #68) $ 2,560.00

2. Remove two center beams below skylight in Commons as indicated

in CCA 9/8/01-4. (PR #70) $ 903.00

3. Remove abandoned drywell at new flagpole location as indicated in

CCA 9/8/01-5. (PR #71). $ 372.00

4. Provide threshold at Door 405A as indicated in CCA 9/24/01-1 (PR #78). $ 85.00

5. Install 1-hour rated gypsum board ceiling system in rooms Biology 210,

Workroom 212, and Lab 214 as directed in CCA 3/6/01-1.

Provide one additional smoke/fire damper at 36x24 return air in

Biology 210. (PR #53) $ 15,143.00

6. Relocate parking lot light standard in rear lot as directed in

CCA 7/25/01-2. (PR #58) $ 691.00

7. Remove and replace asphalt at NW corner of Gymnasium damaged

by district athletic boosters as indicated in CCA 9/12/01-1. (PR #73) $ 199.00

8. Provide threshold and door sweep at Door 405B as indicated in

CCA 9/12/01-2. (PR #74) $ 355.00

9. Reroute existing conduit in the Gymnasium and Mezzanine as directed

in CCA 4/11/01-1. (PR #79) $ 2,007.00

10. Provide three new exit lights as indicated in CCA 3/13/01-7. (PR #86) $ 1,057.00









TOTAL $ 23,372.00









C:\Docstoc\Working\pdf\53e1a68d-da2a-46de-95ac-666a7a8e573e.DOC

Contingency Authorization No. 09; River View High School



CONTINGENCY SUMMARY:

Starting Balance $ 100,000.00

Contingency Authorization #1 $( 15,120.00)

Contingency Authorization #2 $( 25,589.00)

Contingency Authorization #3 $( 5,036.00)

Contingency Authorization #4 $( 11,321.00)

Contingency Authorization #5 $( 12,030.00)

Contingency Authorization #6 $( 8,768.00)

Contingency Authorization #7 $ 27,042.20

Contingency Authorization #8 $( 3,476.00)

Contingency Authorization #9 $( 23,372.00)



BALANCE $ 22,330.20









ARCHITECT: CONTRACTOR: OWNER:

Design West KOP Construction Finley School District No. 53

9 Twelfth Ave. South 1602 S Chestnut St. 224606 E Game Farm Rd.

Nampa, ID 83651 Spokane, WA 99244 Kennewick, WA 99337





By: By: By:







Date: Date: Date:









C:\Docstoc\Working\pdf\53e1a68d-da2a-46de-95ac-666a7a8e573e.DOC



Related docs
Other docs by linzhengnd
i-Health
Views: 0  |  Downloads: 0
State employees recall events of September 11
Views: 7  |  Downloads: 0
0804050421330_2110
Views: 4  |  Downloads: 0
Listino2009 - Meetup
Views: 0  |  Downloads: 0
TwoSurveyCalculator
Views: 0  |  Downloads: 0
Guidelines.xlsx
Views: 0  |  Downloads: 0
APPALACHIA AND THE OZARKS
Views: 2  |  Downloads: 0
Proliferation Studies
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!