Reallocation

W
Shared by: BC9Wm7I
Categories
Tags
-
Stats
views:
0
posted:
11/15/2011
language:
English
pages:
5
Document Sample
scope of work template
							                                                                            BUDGET REALLOCATION REQUEST



BORROWER:                                                                                                                          DATE:
PROJECT:                                                                                                                           DRAW NO.:

ALL Change Orders (CO's) for direct construction or any budget reallocations must be referenced on this form and are subject to approval as provided in, but not limited to, the
Construction Loan Agreement. Copies of all CO's (AIA G701) must be submitted, regardless of any approval limitations, and approved prior to a request for payment being
submitted.

Indicate below the reallocations being requested:


         AMOUNT                       FROM COST CATEGORY                           TO COST CATEGORY                             CO #                        EXPLANATION CODE




                                                                                                                                   EXPLANATION CODES
The undersigned hereby certifies that (1) the reallocations requested herein are valid and reasonable; (2) the
remaining balance in the construction loan or project fund is sufficient to complete the project and to pay all                    1. Adjust line to actual contract amount.
obligations thereof; (3) that there have been no actions which would result in a default under the terms of any and                2. Increase to contract due to materials revision.
all loan/bond documents, and (4) the Borrower hereby agrees with and approves the requested reallocations.                         3. Decrease to contract due to materials revision.
                                                                                                                                   4. Change in contract due to change in scope
      Borrower:                                                           Date: ____________________________                          of work (+-).
            Its:                                                                                                                   5. Work complete, move excess funds to
                                                                                                                                      contingency.
                   Before me, a Notary Public, personally appeared                                                                 6. Reallocation for overruns from contingency.
                   who is personally known to me (or) presented                                                                    7. New line item not in original budget.
                   for identification, who acknowledged that he/she executed this document for the purpose herein.                 8. Reallocation-cost savings between buildings.
                                                                                                                                   9. OTHER:
                   My Commission Expires:
                                                                                        Notary Public




                                                                                                                         G:\USERS\COMMON\Construc\a03379ab-d362-4a2f-b880-d3b1443c651b.xls - Reallocation
                                                                                     CONSTRUCTION PROGRESS SCHEDULE
                                                                                                                                                                                                Draw No.:
                                                                                                                                                                                                Date:

PROJECT NAME:                                                                                                                    Borrower:
Property Location:                                                                                                                         New Construction:                          Rehab:


General Contractor:                                                                                                              Total Construction Costs: $
Estimated Construction Period:                                                                                                   Number of Buildings:                           Total Units:


MONTH/YEAR

Estimated Work in Place

ACTUAL Work in Place


Estimated % Complete

ACTUAL % Complete


Estimated # Units Complete

ACTUAL # Units Complete


Submitted by:
General Contractor:                                                                                                      Date:

Approved by:
Inspecting Engineer:                                                                                                     Date:

Supervising Architect:                                                                                                   Date:

NOTE: This form is part of First Housing's construction requisition package and must be submitted with each construction requisition request. Failure to properly complete or to submit may delay disbursement.




                                                                                                                                                       G:\USERS\COMMON\Construc\a03379ab-d362-4a2f-b880-d3b1443c651b.xls - Progress
                               REQUISITION FOR CONSTRUCTION LOAN ADVANCE



PROJECT:                                                                                   REQUISITION NO.
PROJECT ADDRESS:
PERIOD FROM:                                                            TO:                                         DATE:
BORROWER:
INSPECTING ARCHITECT/ENGINEER:

                                                    SUMMARY OF REQUISITION

                              DIRECT HARD COSTS                                 $
                               LESS RETAINAGE            (      %)            - $
                              SOFT COSTS                                      + $

                              TOTAL REQUESTED                                 = $


                      OWNER'S CERTIFICATION AND APPROVAL OF REQUESTED DISBURSEMENT


    THE UNDERSIGNED OWNER(s) certifies that (1) he has inspected the progress of the construction and that the work covered by
this Requisition For Construction Loan Advance has been completed and the materials put in place in accordance with the plans,
specifications and Construction Contract, and (2) the funds now requested as shown and evidenced by this Requisition for Construction
Loan Advance No. _____ are due and owing and are to be used for the sole purpose of paying for materials used and/or labor or
services performed herein described, and (3) all costs of materials, labor and/or services prior to this Requisition have been paid in full,
and (4) that the remaining balance in the Construction Loan will be sufficient to complete the project and to pay all obligations thereof,
and (5) that there have been no actions which would result in default under the terms of the mortgage, note, construction loan
agreement or other loan documents which have been executed in connection with this loan, and (6) that except for liens in favor of
Lender, there are no liens outstanding against the premises which are securing repayment of the Loan from the Lender to the
undersigned and (7) that he (they) hereby approve the requested disbursement under the terms of the Construction Loan Agreement
and/or the Construction Loan Escrow and/or Disbursing Agreement.

   The Owner(s) further certifies that all taxes and special assessments which may be now due and payable have been paid (include
copy of tax receipt if not previously furnished).

                Signed this                    day of                          , 20_____

                                                                         By:
                                                                                                         (Owner)

                                                                                                          (Title)
STATE OF FLORIDA
COUNTY OF

BEFORE ME, a Notary Public, appeared                                                                           , who is personally known
to me (or) presented                                                           for identification, who acknowledged before me that he
(they) executed the foregoing instrument for the use and purpose thereof.

IN WITNESS WHEREOF, I have hereunto set my hand and seal at                                                    this
                         day of                             20__.

My Commission Expires:                                                                                Notary Public

                                                DISBURSING AGENT'S CERTIFICATION


    We hereby certify that we have examined all paid bills, lien waivers and other documents submitted to us in support of this
Requisition for Construction Loan Advance. From information contained in the current title report, we certify that, to the best of our
knowledge, there have been no instruments filed of record through the date of the title report, and are not aware of the existence of any
conditions, which in any way may disturb the priority of the _______ mortgage lien of _____________________________. We make no
certification, however, with respect to the state of progress of the building improvements or that construction has been completed in
accordance with the final plans and specifications.

                                                                      FIRST HOUSING DEVELOPMENT CORPORATION OF FLORIDA



                                                                      By:______________________________________________




                                                              G:\USERS\COMMON\Construc\a03379ab-d362-4a2f-b880-d3b1443c651b.xls - Advance
                                                                                        REQUISITION #:

DATE:
PAYABLE TO:


                                                                                                                                                         Other Income
                                                                                                            FHDC       0      FHFA          0               Source               0                Equity              0
                       Use of Funds                  Draw No.    Prior   Equity     Total    Balance to    Current   Total   Current      Total             Current             Total             Current            Total
 Number                 Description         Budget     ____     Drawn    Funded   Expended    Complete      Draw     Drawn    Draw        Drawn              Draw              Funded              Draw             Funded
              Sample Breakdown                (a)       (b)       (c)      (d)     (b+c+d)   (a)-(b+c+d)
      100     Land
      200     Site Development Fee
      201     Hard Costs
      202     Hard Cost Contingency
      203     Construction Supervision
      300     F,F&E (W/D Personalty)
      301     Impact/Permit Fees
      302     Architect & Engineer
      303     Accounting
      304     Appraisal/Environmental
      305     Legal
      306     Marketing
      307     Closing Costs
      308     Taxes/Insurance & Utilities
      309     Administrative Overhead
      310     Interest Reserve
      311     Loan Fees - 1st Mortgage
      312     Loan Fees - 2nd Mortgage
      313     Tax Credit Fees
      314     Developer's Cash Reserve
      315     Deferred Developer's Fee
      316     Developer's Fee
      317     Due Diligence/Start Up
 TOTALS




                                                                                                                                       G:\USERS\COMMON\Construc\a03379ab-d362-4a2f-b880-d3b1443c651b.xls - Requisition
PROJECT NAME:                                            DRAW NO.

LOCATION:                                                PERIOD                                  to


LINE ITEM             BUDGET   PREVIOUSLY   CURRENT      TOTAL TO              REMAINING              (Hard Cost)
(Hard & Soft Costs)   AMOUNT   REQUESTED    REQUEST      DATE                  FUNDS                  RETAINAGE
                      $        $            $            $                     $                      $




                               SAMPLE DOCUMENT ONLY

                                                      G:\USERS\COMMON\Construc\a03379ab-d362-4a2f-b880-d3b1443c651b.xls - Budget

						
Related docs
Other docs by BC9Wm7I
HOW TO TORRENS MANUAL
Views: 0  |  Downloads: 0
801487 dec
Views: 0  |  Downloads: 0
HOUSE BILL 1136 INDIANA BROKER LIEN LAW
Views: 0  |  Downloads: 0
database - Download Now Excel
Views: 29  |  Downloads: 0
PIP Loan Application
Views: 0  |  Downloads: 0
ALL - Excel 4
Views: 6  |  Downloads: 0
S135160
Views: 0  |  Downloads: 0
jeffFinal2
Views: 0  |  Downloads: 0
Terjesen - ED Affidavit (460481.DOC;1)
Views: 0  |  Downloads: 0