Consultant Forms

Read Me File



Included are the forms required for the expediting and processing of Bid Documents and for the

administration of the Contract (i.e. Change Orders, Charge Orders against the Cash

Allowances).







Template Name



Bid Document Quality Assurance Checklist

Change Order Worksheet

Change Order Request for Proposal (RFP)

Change Order

Charge Order Request for Proposal (RFP)

Cash Allowance Charge Order

Emergency Work Order (EWO)

Field Order









Rev: 2011 03 11 Page 1 of 4

Filename: [eef40d4e-a47a-4d84-9c08-b6a80fd8f70e.doc

Resource ID: CA_E_739

Consultant Forms

Read Me File







! It is essential that all the information requested on the following forms is provided.







BID DOCUMENT QUALITY ASSURANCE CHECKLIST: This checklist applies to bid

documents prepared for building construction and renovation projects on property owned or

leased, and managed by Alberta Infrastructure. This checklist must be completed and

submitted after the Department’s review of previous draft submissions and when complete

“tender ready” bid documents (specifications and drawings) are submitted to the Department.



CHANGE ORDER WORK SHEET: must be submitted whenever a change to an existing

construction contract over $1000 is required. The purpose of the form is to describe and justify

the change. When completed, there should be enough information for an auditor to understand

why a change was necessary. The language on the form should be addressed to someone

who is knowledgeable of construction, but is not familiar with the specific project being

changed.

1. "Date" - Of typing.

2. "Location" - Town or City.

3. "Project" - Official project name as it appears on drawings.

4. "Project ID" - as it appears on drawings.

5. "Contract ID" – if known or as provided by the Project Manager

6. "Changes Requested by" - The person who actually requested the change and not

necessarily the initiator of the form.

7. "Of" - Name of Firm, Department or Division.

8. "Name of General Contractor" - Company name.

9. "Description of Work Required" - A technically exact description of change with

reference to accompanying drawings or sketches.

10. "Purpose of Change" - The technical reason for making the change not the reason that

a change was necessary, e.g. "to provide access out of Room 204" or "to reduce

bearing pressure on footing" NOT "client request", or "error on drawings".

11. "This work was not included in the tender documents because" - Check off number as

requested. The space immediately below is to clarify the reason chosen.

12. "Extra/Credit" or "Scope" - A change can only be attributed to one or the other. An extra

(or credit) means that nothing was added to the intended function of the building. Scope

means that the design program has been enlarged to provide more service usability or

space (this is always associated with user request AFTER tender).

13. "Cash Allowance" - If Cash Allowance(s) are included in the contract, these must be

depleted first, before issuing Change Order proposals. A Cash Allowance proposal

must be requested on a Change Order Work Sheet.









Rev: 2011 03 11 Page 2 of 4

Filename: [eef40d4e-a47a-4d84-9c08-b6a80fd8f70e.doc

Resource ID: CA_E_739

Consultant Forms

Read Me File



14. "Cost Estimate" - The initiator is responsible for obtaining the cost estimate which must

be indicated.

15. "List Drawings/Sketches Attached" - Which must be numbered and identifiable.

16. "Initiator" - The initiator will normally be the designer of the work for which the largest

amount of change is necessary.

17. "Signature of Prime Consultant" - This must be the Principal of the Prime Consultant

Firm or In-House Section Head. Before signing, the Prime Consultant must ensure that

all the requirements have been met and approval obtained from the appropriate Alberta

Infrastructure expenditure officer.

18. "Signature of Project Manager" - Original Change Order Worksheet to be signed by the

Project Manager.



CHANGE ORDERS:



Proposals 001, 002, ..., 099



Change Orders 001, 002, ..., 099



CHARGE ORDERS:



Cash Allowances 001, 002, 003, ...



Proposals 001.01, 001,02, 001.03, ...



002.01, 002.02, 002,03, ...



Proposals are numbered in the order they are received. The first three digits of Proposals for

Charge Orders match the Cash Allowance they are issued against.



Charge Orders 001.01, 001.02, 001.03, ...



002.01, 002.02, 002.03, ...





EMERGENCY WORK ORDER (EWO): If an emergency change is required for life and/or

safety issues on a site, then the Project Manager or the Consultant prepares the EWO that

includes an expenditure upset limit and a work description that describes the magnitude of the

situation. The Project Manager or GOA designate signs the EWO based on the Expenditure

Officer Signing Authority Guidelines. The contractor is then authorized to perform the work on a

time and material basis. Labour and equipment rates and costs must be approved prior to

commencement of any work. Once the contractor has reached the value of the EWO, they will

contact the consultant who in turn will contact the Project Manager for further direction. The

contractor’s work is conducted on a time and material basis with records signed daily by the

contractor. The contractor will submit signed daily time and material records to the Project

Manager. The Project Manager is to ensure all signed time sheets are on file and used to

validate the claim. On completion of the work and on receipt and approval of the Contractor’s

final pricing, a Change order or a Charge order will be issued.



Rev: 2011 03 11 Page 3 of 4

Filename: [eef40d4e-a47a-4d84-9c08-b6a80fd8f70e.doc

Resource ID: CA_E_739

Consultant Forms

Read Me File



FIELD ORDER: If a change is required, and it is anticipated that the paperwork may delay

the work, a Field Order may be issued. To expedite the work, the Contractor provides a quote

for the portion of work required by the field order. The consultant must prepare a Change Order

Worksheet (COW) which includes a description of the work and an estimate. The Project

Manager signs based on the Expenditure Officer Signing Authority Guidelines. The field order is

issued subject to the approval of the contractor’s estimate. The field order must be

acknowledged by the Contractor, Project Manager and Consultant. Once the field order work is

complete, a proposal is issued to the Contractor for pricing. The contractor submits a final

quotation and following the approval of the final quotation, a Change or Charge order will be

issued.





Numbering System



We also request that the following numbering system be adhered to:



EMERGENCY WORK ORDERS and FIELD ORDERS: should be numbered sequentially as

they are issued beginning with 001.









! Change and Charge Orders are numbered in the order they are approved.









Rev: 2011 03 11 Page 4 of 4

Filename: [eef40d4e-a47a-4d84-9c08-b6a80fd8f70e.doc

Resource ID: CA_E_739



Related docs
Other docs by alice jenny
LAW dd kansas auto accident lawyer
Views: 6  |  Downloads: 0
Ariel heaving
Views: 1  |  Downloads: 0
Form Order for Prisoner Attendance
Views: 0  |  Downloads: 0
NASC SG Accidents
Views: 0  |  Downloads: 0
Presentation Air Quality and Conformity
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!