Embed
Email

8. Others

Document Sample

Categories
Tags
Stats
views:
0
posted:
11/15/2011
language:
English
pages:
4
8.0 Others



.1 Assistance required from Board.



.2 Powers to General Managers to engage Advocates from outside the Panel

Approved by Railway Board in High Court and District courts -



Background:- (1) At present GMs’ powers for payment of fees to a Counsel engaged in

High Court from outside the approved Panel (approved by Board) is limited to a

maximum of Rs.1050/- per day. This power has become meaningless, as no Advocate of

standing would be prepared to be engaged for such a fee.



(2) The Committee for revamping the legal set-up of Railways had recommended in its

report of October 2002 for allowing General Managers powers to engage Special

Advocates(not on Panel) sparingly, based on the importance of a case. However the

recommendation was not accepted by Legal Advisor/Rly. Board as per Status Report

circulated on 14.7.06.



Present Problems:- The existing provision for engagement of Special Advocates today

requires Board’s prior approval, which is a time-consuming process defeating the very

purpose.



Problem peculiar to N.F. Railway:- The significance of this powers being available

with General Manager is even more marked for N.F. Railway as Advocates empanelled

by Railway Board for High Court refused to continue resulting in not a single empanelled

Senior Advocate being available for Guwahati High Court.



In Guwahati High Court all the three Sr. Advocates empanelled in 2005 resigned within

2 months of their empanelment.



Recommendation:- It is recommended that this power should be unfettered by any

ceilings of fees and exercisable by General Managers on a regular basis, on his

consideration of the importance of cases.



(Signal)



.3 Post of CCE: - CCE’s post which was transferred to Railway Board is required to

be restored on N.F.Railway. G.M. N.F.Railway has also requested for restoration

of post vide D.O. No. N/51/1/15 part XXI dated 28.06.07.



.4 3 JAG grade posts are vacant and no one is due on this railway for promotion.

Railway Board may please fill up these posts of all departments..

( Security)



.5 Consequent upon the Amendments to RPF Act and the Railways Act, RPF has

been entrusted with additional responsibility of security passenger, passenger area

and Access Control, a proposal for creation of additional requirement of 367 non-

gazetted posts (in 1st phase) for the new duties of RPF was sent to the DG/RPF,

Railway Board, New Delhi vide CSC/MLG’s letter No. P/164/1/Draft Rules-

RPF(Amendment) dated 22.1.07. The proposal was approved by the General

Manager N.F. Railway on 22.1.07 duly vetted by the Associate Finance. The

sanction of the proposal from the Railway Board is still awaited ( photocopy of

the proposal and General Manager’s approval is enclosed ).



.6 Proposal for creation of additional 82 posts of Non-gazetted posts of RPF for

newly commissioned (Dharmanagar – Agartala section) for the safety and security

to railway property as well as passengers was sent to the DG/RPF/Railway

Board/New Delhi vide CSC/MLG’s letter No. P/164/1/A-81/GB dated 04.06.07

duly vetted by Associate Finance and approved by the General Manager/N.F.

Raiwlay. The sanction of the proposal from the Railway Board is still awaited



(Engineering)



.7 Allotment of Group ‘A’ IRSE Officer to NF Railway: No IRSE Probationary

Officer has been joined to NF Railway in last 2 years. As a result, young and

energetic officers at the grass root level are not available for posting in difficult

terrain area on this Railway. It is requested that at least 3-4 officers may be

allotted every year to N.F.Railway.



.8 Recruitment of Supervisors: There are large number of vacancies in the

Supervisory category in Engineering Department as not only it takes considerable

time in recruitment but also the number of candidates available finally to continue

their employment on this Railway is considerably less than number indented. This

leads to inadequate supervision of maintenance work as well as for creation of

new assets. It is therefore, suggested that procedure for recruitment may be

modified for NF Railway for increasing the availability of number of candidates.

Operating :

Freight:-

.9 Increase in axle load of MG covered wagons on LMG-BPB hill section.

Follow up with RDSO is requested. (Ref: this railway’s letter

No.T/329/0/Pt VIII/TG dated 29.06.06 to EDTT(M).



Issues for inter-ministerial co-ordination meeting :



i) M/S HPC to be impressed upon to augment rail infrastructure at

NPM/Jagiroad to deal full rakes without splitting.

ii) M/S FCI to reduce rake detention on NFR by developing adequate

infrastructure (particularly at MLFC, HJI and propose for full

infrastructure in GC section).

iii) NNGE Military Siding to be made full rake by Defence Ministry.



.10 DHR



(MEDICAL)



.11 There is acute shortage of Anesthetists in NFRLY. Two nos. of Anesthetists are

working at CH/MLG and one at KIR hospital. Anaesthetists are not available in

other hospitals. As per the directive of the Railway Bd. during the last one year 4

selection procedure were being held with due approval of GM but nobody

joined.



.12 Provision of Road mobile van in all the health unit level: This Railway is having

difficult hilly terrain than other railways, therefore, provision of Road mobile van

in each and every health unit level, will be of great help during disasters to provide

golden hour medical assistance.



Coaching:-



.13 NF coaches on foreign Rlys :As on 1.10.2007.



NF coaches are on foreign Rlys. Details are :



Zone NF coaches on Zone Other Zone coaches on NF

SR 4 1

ER 6 7

ECR 5 4

NER 2 6

SWR 1 1

E.Co.R 2 1

CR 5 Nil

NR 36 6

SCR 2 3

NWR 9 2

WR Nil 2

NCR Nil 2

TOTAL 72 35



A proposal for GHY byepass line by extending the sanctioned project new line from

Azara to Barnihat towards Digaru (using Burnihat – Digaru alignment sanctioned in early

1980’s) has been submitted to Board (Director Planning) vide this office

No.T/555/11/Digaru – Barnihat dated 20.06.07. Sanction is solicited.

.14 There is regular requirement of BRN/BRHE rakes on N.F. Railway to

meet concrete sleeper loading demands. There are two major concrete

sleeper plants on N.F. Railway (NJP & JID) which also load for other

zones. Due to shortage of rakes indents for other zones are kept pending,

material is stabled and kept waiting for despatch.



.15 More allotment of WDG-4 locomotives to this railway is requested.



Related docs
Other docs by Stariya Js @ B...
Lab2_Fishing_lab_pack
Views: 0  |  Downloads: 0
JMK sample legal brief
Views: 1  |  Downloads: 0
DriveQ
Views: 0  |  Downloads: 0
cybersecurity_reform_-_senate_bill_eyes
Views: 0  |  Downloads: 0
Opening and Marketing
Views: 0  |  Downloads: 0
Making_it_Work_notes
Views: 0  |  Downloads: 0
First Announcement 7th ISFS_
Views: 0  |  Downloads: 0
as90173
Views: 0  |  Downloads: 0
VNAfashionshow2010
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!