City Of Austin CIP Sub-Projects By Neighborhood - 1/2/2004



MCKINNEY

Neighborhood Project Subproject Current Estimated End Manager

Planning Areas Name Name Phase Construction Dept. Email



MCKINNEY Replacement of Onion Creek Tunnel Liner Removal Construction 12/01/2003 WWW Leo.Pohren@ci.austin.tx.us

Deteriorated Facilities



FRANKLIN PARK,EAST Infiltration and Inflow Basin P2 Williamson Creek Preliminary WWW James.King@ci.austin.tx.us

CONGRESS,WEST Studies

CONGRESS,MCKINNEY,SWEETBRIA

R



RIVERSIDE,SOUTHEAST,SOUTH Infiltration and Inflow Govalle 3 SSES Preliminary WWW James.King@ci.austin.tx.us

RIVER Studies

CITY,MONTOPOLIS,PLEASANT

VALLEY,PARKER

LANE,MCKINNEY,ST. EDWARDS



EAST CONGRESS,PARKER General Utility US290/SH71, IH35 to Burleson Rd Bid Process PW Andrew.Gonzales@ci.austin.tx.us

LANE,MCKINNEY,ST. EDWARDS Relocations - W&WW Relocation



SOUTHEAST,MONTOPOLIS,PARKER General Utility SH 71 - Burleson Rd to East Construction 10/01/2005 PW Andrew.Gonzales@ci.austin.tx.us

LANE,MCKINNEY Relocations Riverside Dr



EAST CONGRESS,PARKER US 290/Payload Pass US 290/Payload Pass to Industrial Construction PW Andrew.Gonzales@ci.austin.tx.us

LANE,MCKINNEY,ST. EDWARDS to Industrial



FRANKLIN PARK,EAST Water Quality Williamson Creek IH 35 & Ben Bid Process 01/30/2010 WSP Virginia.Rohlich@ci.austin.tx.us

CONGRESS,PARKER Protection - Stormwater White WQ Ponds - Phase II

LANE,MCKINNEY,ST. EDWARDS Treatment



FRANKLIN PARK,MCKINNEY Freidrich Lane Freidrich Lane / St. Elmo to Teri Bid Process 06/30/2005 PW Dolores.Duran@ci.austin.tx.us

Improvements Rd.



FRANKLIN PARK,MCKINNEY Flood Control - Creek Williamson Creek-Creek Bend Construction 08/30/2005 PW Homer.Collins@ci.austin.tx.us

Flooding Mitigation Flood Control Improvements,

Phase 2



WESTGATE,SOUTH Flood Control - Creek Williamson Ck Flood Insurance WSP Joe.Walker@ci.austin.tx.us

MANCHACA,FRANKLIN Flooding Mitigation Rate Maps (FIRM)

PARK,GARRISON PARK,EAST

CONGRESS,WEST

CONGRESS,MCKINNEY,SWEETBRIA

R







Page: 1

City Of Austin CIP Sub-Projects By Neighborhood - 1/2/2004



MCKINNEY

Neighborhood Project Subproject Current Estimated End Manager

Planning Areas Name Name Phase Construction Dept. Email



MCKINNEY Solid Waste Facilities South Austin Transfer Station, Post Const 03/29/2001 PW Alison.Vonstein@ci.austin.tx.us

Phase II



MCKINNEY Solid Waste Facilities Todd Lane Service Center, Phase Post Const 05/17/2002 PW Alison.Vonstein@ci.austin.tx.us

II



MCKINNEY Solid Waste Facilities Vehicle Facility South (0201) SWS Joe.Word@ci.austin.tx.us



MCKINNEY Solid Waste Facilities Todd Lane Material Recovery SWS Robert.Fernandez@ci.austin.tx.us

Facility



MCKINNEY Solid Waste Facilities Todd Lane MRF Concrete Pad Post Const 07/11/2003 SWS Robert.Fernandez@ci.austin.tx.us

Expansion



MCKINNEY Solid Waste Facilities SATS Roofing and Waterproofing Post Const 06/20/2003 PW Alison.Vonstein@ci.austin.tx.us

Repairs



MCKINNEY Solid Waste Facilities SATS Indoor Air Quality Construction 03/06/2004 PW Christina.Calvery@ci.austin.tx.us

Ventilation Improvements



MCKINNEY Solid Waste Facilities CAPCO - HHW Storage Building Post Const 04/14/2003 SWS Robert.Fernandez@ci.austin.tx.us



EAST CONGRESS,PARKER ADA - Curb Ramps and Ben White sidewalk from IH35 to Construction PW Andrew.Gonzales@ci.austin.tx.us

LANE,MCKINNEY,ST. EDWARDS Sidewalks



MCKINNEY EMS Station - Far EMS Station - Far Southeast Construction 02/10/2004 PW Norman.Mattson@ci.austin.tx.us

Southeast



FRANKLIN PARK,MCKINNEY Nuckols Crossing Nuckols Crossing / St. Elmo to Post Const 01/23/2002 PW Ricky.Colbrunn@ci.austin.tx.us

Reconstruction Stassney



FRANKLIN PARK,MCKINNEY Nuckols Crossing Nuckols Crossing / Stassney to Bid Process 11/25/2004 PW David.Magana@ci.austin.tx.us

Reconstruction Pleasant Valley



FRANKLIN PARK,MCKINNEY Pleasant Valley Rd. S. Pleasant Valley / Nuckols Post Const 11/23/2001 PW Ricky.Colbrunn@ci.austin.tx.us

Reconstruction Crossing to Wm. Cannon



FRANKLIN PARK,MCKINNEY St. Elmo Rd. St. Elmo Rd. / Todd Lane to IH 35 Post Const 01/31/2003 PW Paulinda.Mackie@ci.austin.tx.us

Reconstruction



FRANKLIN PARK,MCKINNEY St. Elmo Rd. St. Elmo East/Nuckols Crossing Construction 04/30/2004 PW Homer.Collins@ci.austin.tx.us

Reconstruction to Todd Lane







Page: 2

City Of Austin CIP Sub-Projects By Neighborhood - 1/2/2004



MCKINNEY

Neighborhood Project Subproject Current Estimated End Manager

Planning Areas Name Name Phase Construction Dept. Email



FRANKLIN PARK,MCKINNEY Williamson Creek Williamson Creek Trail Construction 06/07/2002 PR Tony.Arnold@ci.austin.tx.us

Improvements Construction



MCKINNEY WWW Service Center Southeast Service Center Phase III Preliminary PW Mark.Schruben@ci.austin.tx.us

Improvements



Grand Total: 27









Page: 3



Related docs
Other docs by yunyi
2.2 Virtueller Adressraum
Views: 3  |  Downloads: 0
HIGHLINE TAPPED TO PRODUCE INAUG
Views: 2  |  Downloads: 0
Heteroflexibility
Views: 8  |  Downloads: 0
Lynn Jones 5 Grade Lesson Plan F
Views: 0  |  Downloads: 0
SPONSOR SHIP AND TABLE HOSTING OPPOR TUNITIES
Views: 0  |  Downloads: 0
NJTinside2
Views: 0  |  Downloads: 0
The Vegetarian Food Pyramid J
Views: 0  |  Downloads: 0
Anti-Spam Measures for End Users
Views: 0  |  Downloads: 0
Slide 1 - UCL
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!