Embed
Email

Design Principles

Document Sample

Shared by: linzhengnd
Categories
Tags
Stats
views:
0
posted:
11/13/2011
language:
English
pages:
13
Land at 51 St. John’s Road Buxton

“Serpentine Court”



Design Statement



Aims:



To demonstrate how sustainability can be seamlessly incorporated into

new, small-scale developments within an historic town where housing

development must have high regard for conservation and preservation.





To create a small mixed group of well designed homes: 4 privately

owned and 2 available for renting, 2 and 3 bedrooms, one specially

adapted to improve mobility.





To build efficient, environmentally aware, high performance homes,

suited to modern living and working from home.





Design Goals

• A solution that maintains the unique character and setting of

this beautiful site, the vernacular traditions of the High Peak and

the neighbouring Conservation Area.

• A new structure where mass, fenestration and orientation reflect

current thinking on energy efficiency, acknowledging local

character without being a pastiche.

• A building that fits within the existing mature trees to maintain

the scale and maturity of the site.

• To create a balanced composition whose form, scale, siting,

massing, density and height will compliment the landscape and

neighbouring development.

• To respect privacy and general amenity: providing a

development which neither reduces daylight, nor encroaches

on, the neighbouring property.

• To provide a safe and secure environment and minimise

opportunities for crime.

• To exceed current standards for building ecologically

considerate, sustainable homes.









“Serpentine Court” Design Statement Page 1

Land at 51 St. John’s Road Buxton

“Serpentine Court”



Site Location and Context





The development site lies on a main approach road to

Buxton at the point where a ribbon development of

mixed age and scale housing meets the perimeter of

the town’s conservation area. A marked change takes

place in the style and quality of buildings as this

threshold is crossed.









Although outside the conservation area any

development must respect this context and seek to

preserve its essential nature: maturity of landscape;

quality and scale of development.









Residential buildings along St.

John’s Road, further into the

conservation area and approaching

town, tend to be large, tall, mostly

converted and sub-divided on the

northern side, a mixture of ages and

styles to the south, typically well

maintained, with a level of quality

that presents a coherent approach

into the main town.









Approaching Town







“Serpentine Court” Design Statement Page 2

Land at 51 St. John’s Road Buxton

“Serpentine Court”



At the conservation area’s

closest point is an informal exit

from landscaped public

gardens, which follow the

meandering “Serpentine”,

breaking up the residential strip

along St. John’s Road, and

culminating in an area of large,

densely screening, mature

trees, within 15 metres of the

plot’s northern boundary.





To the east of the plot is the

Lismore Fields development of

modern detached and semi-

Leaving Town detached family estate housing.





To the southeast is an un-developed open field, likely to remain. The gable end of one

neighbouring family “pre-war” house borders the south/south west side. Across the street the

conservation area continues unbroken, out of town, with large, mainly residential housing with

some infill.









View From South East









It is difficult to identify another, previously developed site, so close to the town centre, within

walking distance of most amenities, shops and public transport links, primary, secondary and

tertiary/higher education, yet so relatively private and concealed.







“Serpentine Court” Design Statement Page 3

Land at 51 St. John’s Road Buxton

“Serpentine Court”



Scale of Development

The government sustainable target density (30 – 50 homes/hectare) for this plot size of 0.14

hectares is between 4.2 and 7 dwellings, where 4.2 would be considered “inefficient use of

land” (PPG3 57, 58). The best way of achieving this target is by way of a single, or close

linked building, to maintain the existing urban grain. To achieve the target the building should

be sub-divided into apartment dwellings.



The proposal is for a low-rise development of 3, closely linked blocks of 2 apartments. This

meets the government density target halfway (42 homes/hectare), as is appropriate for the

current urban grain.





Mass and Silhouette

By utilising 3 closely linked blocks the design uses 1/3rd of the building to form a consistent

street elevation. The two remaining blocks diminish away from the street, are orientated to

take advantage of solar gain, provide a discrete courtyard and fit neatly between existing

mature trees. They screen modern aspects from the street. This orientation provides

improved privacy and security, and maintains a good separation distance (13 metres).



Height, proportions and rooflines are consistent with the remainder of the street whilst

detailing is predominately “arts and crafts” influenced, to fit the historic architectural context.









“Serpentine Court” Design Statement Page 4

Land at 51 St. John’s Road Buxton

“Serpentine Court”



Materials

Materials reclaimed from the previous building will add maturity on the street side of the

development and reduce demand on quarries and transport: a slight reduction, but an

important principle. Good quality dressed and aged walling stone, lintels, cills, and excellent

“scalloped” Staffordshire tiles will help uphold the traditional features of the town architecture

and integrate the new building.









Landscaping

A covenanted maintenance scheme will ensure the health and quality of the development’s

gardens, designed to lead into the backdrop provided by the conservation area. Traditional

stone walling and wooden fencing will bound shrubbery and additional tree planting.



Parking

Being close to amenities, shops, schools and good public transport links, parking provision

should not exceed 1.5 places per dwelling (PPG3 62). Nine are distributed into two areas to

the sides of the building. Immediate street parking is unrestricted, but should not be

encouraged. Provision will be made on-site for secure covered cycle storage. Each home

will include high-speed data network cabling, linked to the Internet, to facilitate home working

and help reduce transport needs.









“Serpentine Court” Design Statement Page 5

Land at 51 St. John’s Road Buxton

“Serpentine Court”



Building Efficiency

The building will be insulated, glazed, and heated in a manner to achieve a “very good” to

“excellent” rating as measured using the Building Research Establishment EcoHomes

assessment criteria. For information on how this will be achieved please see appendix a.



Waste recycling

Covered areas will be provided to allow the separation and storage of paper, plastic, metal,

glass and organic materials for LA collection and garden use. This will be linked to internal

provision for waste separation. The ambition is to facilitate a household recycle rate of 50%



Water use

Site water run-off and domestic grey water will be separately managed and re used for

garden watering and appropriate domestic use. The aim is to demonstrate less than 40 m3

per bed space, per year.



Solar energy

A system of photovoltaic roofing panels will be incorporated into the roof design at the south-

facing rear elevation. The design will aim for 20% contribution to net electrical consumption,

with periodic excess supplied to the grid. No application is made at this stage for any

contribution from wind generation; though such technology is becoming improved, it is not yet

small or efficient enough to make a contribution within the context of Serpentine Court.





Conclusion

Serpentine Court reconciles the needs of development just outside a conservation area, with

energy efficiency and environmental awareness. These sensitivities should inform the design

of all contemporary products.



The cost of this project is high: “Green”, in this setting, is not cheap. Our solution relies upon

sharing the high costs amongst the group of 6 dwellings, as proposed, in order to achieve the

ambitious goals outlined in this proposal.









“Serpentine Court” Design Statement Page 6

Recycled Staffordshire tiles Staffordshire tiles









Recycled Dressed and coursed grit stone Dressed stone









Front Elevation



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 7

Solar Photo-Voltaic Roof Slates









Cedar Wood cladding

Dressed Stone Dressed Stone

Dressed Stone

Rear Elevation



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 8

Recycled dressed coursed grit stone

Side Elevation 1



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 9

Side Elevation 2



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 10

Dressed stone







Cedar Wood Cladding



Side Elevation 3



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 11

Side Elevation 4



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 12

Plan View



Please note: Refer to Oldfield Design Drawings No. 04120-08 Not to scale.









“Serpentine Court” Design Statement Page 13



Related docs
Other docs by linzhengnd
i-Health
Views: 0  |  Downloads: 0
State employees recall events of September 11
Views: 7  |  Downloads: 0
0804050421330_2110
Views: 4  |  Downloads: 0
Listino2009 - Meetup
Views: 0  |  Downloads: 0
TwoSurveyCalculator
Views: 0  |  Downloads: 0
Guidelines.xlsx
Views: 0  |  Downloads: 0
APPALACHIA AND THE OZARKS
Views: 2  |  Downloads: 0
Proliferation Studies
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!