CA NO. CDR 48 BRTF/ OF 2011-12 Serial page No. 01



BORDER ROADS ORGANISATION

48 BORDER ROADS TASK FORCE, C/O 99 APO





Name of work :-SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20

MM, STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H

SPECIFICATIONS FOR RESURFACING WORK IN BETWEEN KM 63.550 TO KM

78.658 ON ROAD TOHANGAM-HAYULIANG OF 116 RCC SECTOR UNDER 48

BRTF IN ARUNACHAL PRADESH UNDER PROJECT UDAYAK





COMPOSITION OF THE TENDER DOCUMENTS





S/No Particulars Page

From To

01. Composition of the tender documents 01

02. Tender forwarding letter 02 10

03. Tender form with schedule ‘A’ based on IAFW – 1815 11 16

(R)

04. General Conditions of Contract for supply of stores and 17 35

materials based on IAFW 1815 (Z) (Revised 1953)

including errata and amendments

05. Special conditions 36 41

06. Particular specifications 42 45

07. Notice inviting Tender (NIT) 46 48

08. Errata /Amendment to the tender documents

09. Relevant correspondence

10. Acceptance letter

Total Pages









EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer









Tender-8685

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.02





Registered/AD



Headquarters

48 Border Roads Task Force

PIN – 930048

C/O 99 APO



8102/2011-12 /E8 Aug 2011



_______________________

_______________________

_______________________

_______________________







NAME OF WORK : SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20

MM, STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H

SPECIFICATIONS FOR RESURFACING WORK IN BETWEEN KM 63.550 TO KM

78.658 ON ROAD TOHANGAM-HAYULIANG OF 116 RCC SECTOR UNDER 48

BRTF IN ARUNACHAL PRADESH UNDER PROJECT UDAYAK



Dear Sir (s),



1. A set of tender documents for the above work is forwarded herewith, Please note that the tender

will be received by The Commander 48 BRTF, PIN – 930048, C/O 99 APO up to 1200 Hrs 06

Sept 2011. Tender received after the due date and time will not be considered.



2. Tenderer or their duly authorized representative who have submitted their tenders and who

wish to be present at the time of opening of tenders may visit the office of Commander 48 BRTF, PIN

– 930048, C/O 99 APO at the above mentioned time.



3. Please note that tender documents are to be submitted in two stages containing the following

documents:-



3.1 Stage-I: Qualification details:



3.1.1 Under this stage, clearly labeled “STAGE-I QUALIFICATION DETAILS” on the envelop,

particulars about the following shall be furnished as per the format specified at Appendix „A‟ and

annexure thereto. No indication of the price bid shall be given at this stage. The details as sought as per

the given format be submitted along with EMD.



(a) Particulars and status of the firm.

(b) Annual turn over of last three years.

(c) Manpower and mechanical resources held by the firm.

(d) Work executed over last three years.

(e) Verification statement

(f) EMD in original in case of unenlisted bidders.

(g) Power of attorney to submit tender (where applicable).

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.03



3.1.2 The stage-I tender document shall comprise of the :-(Srl page No. 1 to 11&15 to 48)

(a) Notice Inviting Tender

(b) Tender forwarding letter

(c) Eligibility criteria as per appx „A‟ and annexure I & II

(d) Tender page



(i) General conditions of contract.

(ii) Special conditions of contract.

(iii) Particular specification.

3.1.3 Stage-II: - FINANCIAL BID (Price Bid)

3.1.3.1. This stage clearly labeled „STAGE-II-FINANCIAL BID, on the envelop shall comprise

of the:- (Srl Page No 12 to 14)



(a) Sehedule - „A‟ notes

(b) Schedule – „A‟

(c) Schedule - „B‟

3.1.3.2. The financial proposal should include the costs associated with the work. These shall

normally cover, complete cost associated with arranging supply of materials as required including

labour charges, loading, unloading, transportation and all the taxes as applicable. The financial

proposal should clearly indicate the amount asked for without any assumptions of conditions attached

to such amounts. Conditional offer or the proposal not furnished in the format specified shall be

considered non-responsive and is liable to be rejected.

3.1.3.3. The financial proposal shall take into account all types of the tax liabilities and cost of

insurance.

3.1.3.4. Costs shall be expressed in Indian Rupees only both in figure and words.

3.1.2.5. All payments shall be subject to deduction of Income Tax at source in accordance with

the Income tax act as applicable.



4. Tender documents shall be submitted in two stages as listed above and each stage shall be kept

in a separate sealed envelop marked name of work and Stage-I and marked Stage-II

appropriately. Both the envelopes containing Stage-I (Qualification Details) and Stage-II (Financial

Bid) duly sealed shall be put in one large size envelop (cloth lined outer cover). This outer cover shall

indicate name of work, name of bidder, last date and time of receipt of tender prominently.

5. The tender documents (in full) either duly downloaded from BRO website or issued by BRO

along with various documents required to be submitted should be dropped in Tender Box Kept at HQ

48 BRTF, PIN-930048, C/O 99 APO before the date and time fixed for receipt of tender. The tender

received after due date and time shall not be considered and shall be returned to the tenderer unopened.

HQ 48 BRTF, PIN – 930048, C/O 99 APO, shall not be responsible for any postal or other delay and

shall not take care to ensure the submission of tender at place and time fixed for receipt of tender.

6. The tenderer are requested to submit the complete details about their firm, annual turn over,

resources and experience as per the format given at Appendix „A‟ and annexure thereto, to examine

their resource and financial capability. It shall be ensured that details are provided correctly.

Falsification of details will make the tender liable for rejection at any stage.

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.04

7. STAGE-I of tender shall be opened immediately after the time indicated in Para-1 herein before

in the presence of tenderers or their authorized representative. However price bid of tenderer shall be

put in one envelope and sealed by the opening Officer. Stage-I (Qualification details) will be opened

and evaluated as per eligibility criteria/listed hereunder. Priced bid in respect of unsuccessful tenderer

will be returned unopened. Please note that:-

(a) The tender shall be based on details and data given in tender documents, Particular

specifications, General Conditions of contact, drawing, general information and lump sum contract

form with schedule „A‟ (list of work) to be priced by tenderer.

(b) The Commander, 48 BRTF, PIN – 930048, C/O 99 APO will be Accepting Officer

here-In-after referred to as such for the purpose of this contract.

(c) The tender shall be accompanied with Earnest Money amounting to Rs. 15987 .00

(Rupees fifteen thousand nine hundred eighty seven only) in the form of Deposit at

Call receipt/Term Deposit Receipt/special Term Deposit Receipt issued in favour of Commander, 48

BRTF, PIN – 930048, C/O 99 APO by scheduled bank . Tenders (In respect of unenlisted bidders)

not accompanied with earnest money will not be considered for acceptance. The amount of this receipt

should be basic amount and not their maturity value. Any deposit lying with the department in any

form against any tender and /or contract shall not be considered for adjustment as the earnest money

against this tender. Any tender not accompanied with earnest money in the form as indicated here-in-

before or accompanied with any letter/communication containing any request for adjustment of any

other deposit as earnest money shall be treated as non bonafide tender. If an un-registered/un-enlisted

firm revokes his offer (tender) after opening of bids within the validity period of his offer, the earnest

money deposited by the firms along with his tender will be forfeited. The Commander, 48 BRTF, PIN

– 930048, C/O 99 APO will return the earnest money wherever applicable to all unsuccessful tenderers

by endorsing the authority on the deposit for its refund.

(d) The security deposit amount for this work shall be 25% more than the amount of earnest

money based on the value of contract (i.e. 1.25 times of the earnest money) subject to the provision

that in no case the individual Security deposit shall exceed Rs. 11,25,000.00 (Rupees eleven lacs

twenty five thousand only)

(e) The tenderer shall be deemed to have full knowledge of all relevant drawings

documents, samples, site & etc., whether he had inspected them or not.

(f) Tenderer are requested to quoted rates both in figure and words in column 6 against

each items of schedule „A‟ and extend the amount to column 7 of schedule –„A‟

(g) Any tender which stipulates any alternations to any of the conditions laid down or

which proposes any other conditions of any description whatsoever is liable to be rejected.

(h) Tenderer are requested to submit their tender strictly complying with the various

provision given in the tender documents.

(i) Accepting Officer reserves the right to accept the tender submitted by a Public Sector

Undertaking, giving a price/purchase preference over other tender (s) which may be lower, as are

admissible under the Govt. Policy. No claim for any compensation or otherwise shall be admissible

from those, whose tenders may be rejected on account of the said Policy.

(k) The submission of tender by a person implies that he has read this tender forwarding

letter, the conditions of contract and has made himself aware of the scope and specifications of the

work to be done and of the conditions, and other factors, site conditions, taxes & levies prevailing etc

which may affect the quotation and execution of the work.

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.05



(l) Tenderer must be very careful to deliver a bonafide tender failing which the tender will

be out rightly rejected. Tenderer are, therefore, advised to ensure that their tender must satisfy each and

every condition laid down in the notice.

8. Tenderer must ensure that the tender is unambiguous and is complete in all respect. Your

particular attention is drawn to the following requirements, which must be complied with:-

(a) Tender documents are to be signed, dated and witnessed at the pages provided for the

purpose. Each page and all corrections are to be initiated.

(b) All corrections should be signed or initiated. Use of correcting fluid is not allowed.

(c) Cloth lined envelope shall be used for returning the tender documents.

(d) In case you are submitting a BLANK TENDER word ‘BLANK’ must be prominently

endorsed on the envelope, the forwarding letter and general summary duly signed by the tenderer. The

tender documents complete including drawing (s) is required to be returned to this Office.

(e) If a tender is submitted on behalf of a firm, it may be signed either by all partners or a

person or a person holding a valid power of attorney from all the partners constituting the firm. The

person signing the tender on behalf of another or on behalf of a firm shall attach with tender a proper

power of attorney duly executed in his favour by such other person or by all the partners stating

specifically that he has authority to bind such other person (s) or the firm as the case may be in all

matters pertaining to the contract including the arbitration clause. The power of attorney shall be

executed as indicated below:-

(i) In case of individual, a suitable affidavit should be submitted.

(ii) In case of partnership concern, power of attorney shall be executed by all

partners.

(iii) In case of company, power of attorney shall be executed in accordance with

constitution of company.

9. Attention of tenderer is drawn to the Indian Official Secret Act – 1923 (XIX of 1923} as

amended up to date particularly section 5 thereof.

10. In view of postal and other delays, it is suggested that your tender be posted sufficiently in

advance of the last date fixed for receipt of tenders or sent through a special messenger, if necessary,

tender received late will not be considered. Telegraphic communications received in connection with

this tender will also be not considered.

11. The tender shall remain open for acceptance for a period of sixty days (60 Days) from the

date of opening of the tender (excluding the date of opening)

12. The tender shall be signed and returned along with the tender documents and shall form part of

the tender documents.

13. Tenderer are required to quote for complete scope of work as per Schedule „A‟ particular

specification, special conditions and other provisions of the tender documents, failing which the tender

will be considered as “ non bonafide” and shall be liable for rejection. Tenderer‟s rate shall be

inclusive of all statutory levies, duties, surcharges, taxes, octroi, service tax etc and including

VAT/State sale tax, on works contract tax payable under the respective statutes pursuant to the

constitution 46th Amendment Act 1982. Any other conditions stipulated by the tenderer regarding Sales

Tax on works contract will not be considered and such tender will be liable for rejection.

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.06



14. The tenderer are advised to visit the work site to acquaint themselves of working and site

conditions, before submitting their tender.

15. The applicant tenderer who has downloaded the tender documents from BRO website are

requested to collect the standard drawing of related structures where applicable from the HQ 48 BRTF

, PIN – 930048, C/O 99 APO.

16. On acceptance of tender, the name of authorized representative (s) of the contractors who

would be responsible for taking instructions from Engineer-in-Charge or its authorized representative

shall be intimated by the contractor within 7 days of issue of Acceptance letters.

17. DRAWING: The related drawing of structures (where applicable) are available in the office

HQ 48 BRTF, PIN – 930048, C/O 99 APO.

18 Evaluation of Bid

18.1. A two stage procedure will be adopted in evaluation of the bids with qualification details

(STAGE-I) being completed prior to opening of financial bid (Stage-II).

(a) The qualification details (STAGE-I) will be evaluated by Board of Officers to be

appointed by the accepting officer. The following criteria will be applied for evaluation of the

details.

(i) Whether EMD as required has been submitted or otherwise. The tender will be

considered non bonafied where EMD, if applicable, has not been enclosed in the form

sought for.

(ii) Enlistment class of the tenderer.

(iii) If tenderer belong to appropriate enlisted class, i.e. have upper tender limit at par

with the value of work, the tenderer will be treated qualified for participation in the bid.

(iv) In case a tenderer is not enlisted with BRO or have enlistment in a class lower

than the one desired as per value of work, in that case only those tenderer who meet the

following criteria will be treated qualified. The accepting officer however, reserves the

right to review the criteria depending upon the extent of competition and other aspect

including security considerations.

(aa) Maximum value of work executed in a year, over last three years less the

value of balance works in hand exceeds the value of NIT.

(b) After the evaluation of STAGE-I (qualification details) is completed, the STAGE-II

(Financial bid) will be opened at 1600 Hrs on 06 Sept 2011 in the presence of the

representatives of the qualified bidders who choose to attend. The prices as quoted by each

bidder will be read aloud and recorded while opening the bid. All the bidders who have not

qualified for the participation in the bid, their STAGE-II (price bid) will be returned unopened

by registered post.



(c) The lowest financial bid as whole or in a stage (if so defined) and if found complete in

all respect will generally be invited for execution of contract agreement. However, accepting

officer is not bound to accept the lowest or any bid received or to give any reason for doing so.

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.07



19. After opening of the bid, information related to the examination, clarification, evaluation and

comparison of bids and recommendation concerning the award of the contract shall not be disclosed to

the bidders or any other person not connected with the process until the award of the contract is

finalized. Any effort by a bidder or his representative to influence the department in the process of

examination, clarification and evaluation of bids and in decision concerning award of contract may

result in the rejection of the bid



20. This letter shall be signed and returned alongwith the tender documents and shall from part

of the tender documents.







Yours faithfully,







(EE (Civil)

SW

Signature of contractor for Accepting Officer



Dated:…………………..





Enclosures: Tender documents including drawing

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.08



Appendix – „A‟



PARTICULARS OF APPLICANTS AND RESOURCES HELD



S/No Items Details

1 Name of firm or individual

2 Legal status of the firm Individual company

(incorporated/Un-incorporated)/

partnership firm/public limited

3 Address

4 Contract telephone, Mobile Fax No.

5 PAN No.

6 Details of banker & Bank A/C

7 Availability of credit facility duly certified by the bankers

(Not more than three months old)

8 Annual Turnover for last three years (Please enclose copy

of balance sheet)

(a) 2008-09 Rs.___________



(b) 2009-10 Rs.__________



(c) 2010-11 Rs.___________



9. Registration details :

(a) Registration Class & No.

(b) Authority with whom registered and with their address

10 Details of personnel resources employed :-

(a) Graduate Engineer and above



(b) Diploma Holder Engineers



(c) Others



11 Details of Veh/Eqpt/Plants owned



(a) Load carriers/Tippers

(b) Stone crusher

(c) Laders cum excavators

(d) HMP (Capacity___________)



(e) Paver finisher (Sensor/Mech)

(f) Road Roller Static

(g) Tandom Vibratory road Roller

(h) Other equipment held, if any

12 Sales tax Registration No. under Arunachal Pradesh Goods

Tax Act 2005 (Copy be enclosed).









(Signature of Contractor)

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.09



Annexure –I of appendix –‘A’



WORKS COMPLETED AND IN HAND DURING LAST THREE YEARS INCLUDING THIS

YEAR RELATED TO ROAD WORKS/MATERIALS SUPPLIERS/FABRICATION

ACTIVITY





S/ Name of CA Nature CA Date of Stipulat Actual/li Value of work Value Rema

N Client/dep No. of work amo comme ed kely executed during of rks

o tt in brief unt ncemen period date of the year (Rs in balance

concerned (Rs. t of completi lacs) work

in complet on 2008 2009- 2010- (Rs in

lacs) ion -09 10 11 lacs)









Signature of contractor

Note:-



1. In case the work executed or in hand related to any other deptt or TF other than 48 TF, please

enclose a copy of completion certificate (in case of completed work) and copy of acceptance

letter/work order in case of on going work.



2. The details of contracts may be given in Category wise manner viz H/C contract, supply of

materials, Fabrication works, Bridge construction, Building Construction etc.

CA NO Cdr 48 TF/ OF 2011-12 Serial page No 10



Annexure –II of appendix –‘A’





VERIFICATION STATEMENT



By virtue of my signature below, I confirm that to the best of my knowledge and belief

the information contained in the specified formats (Appendix „A‟, Annexure-I & Annexure-II) and

enclosure there to be truthful and exact.









Dated: (Signature of contractor)

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.11







(Based on IAFW – 1815)



(To be used in conjunction with General condition of contract for supply of stores and

materials IAFW-1815 (R) and IAFW – 1815 (Revised 1963) form of tender)





BORDER ROADS ORGANISATION

48 BORDER ROADS TASK FORCE, C/O 99 APO







Headquarters

48 Border Roads Task Force

C/O 99 APO



Name of work :-SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20 MM,

STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H SPECIFICATIONS

FOR RESURFACING WORK IN BETWEEN KM 63.550 TO KM 78.658 ON ROAD

TOHANGAM-HAYULIANG OF 116 RCC SECTOR UNDER 48 BRTF IN ARUNACHAL

PRADESH UNDER PROJECT UDAYAK







1. M/s / Shri ………………………………………………………………………………………………………



…………………………………………………………………………………… is/are hereby authorized to tender

for above works. The tender is to be delivered at the office of the Commander 48

BRTF (GREF), C/O 99 APO up to 1200 hrs on 06 Sept 2011 addressed to the

Commander 48 BRTF (GREF), C/O 99 APO and marked on the out side of tender

for SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20 MM, STONE CHIPS OF

SIZE 11.20 MM AND SAND AS PER MORST&H SPECIFICATIONS FOR RESURFACING

WORK IN BETWEEN KM 63.550 TO KM 78.658 ON ROAD TOHANGAM-HAYULIANG OF

116 RCC SECTOR UNDER 48 BRTF IN ARUNACHAL PRADESH UNDER PROJECT

UDAYAK





2. All documents must be returned whether or not a tender has been submitted.



3. Drawings and specifications if not included with tender documents may be seen on application

at the Office of the Commander 48 Border Roads Task Force, C/O 99 APO.



4. Any correspondence concerning to this tender should be addressed to as indicated at the top

of this sheet quoting the reference as given at page No. 02.



“THE PRESIDENT OF INDIA DOES NOT BIND HIMSELF TO ACCEPT THE LOWEST OR ANY

TENDER AND RESERVES THE RIGHT TO ACCEPT A TENDER IN WHOLE OR PART/PARTS (IF

SO DEFINED) AS HE MAY DECIDE AT HIS SOLE DISCRETION”









EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.13



SCHEDULE `A’





Name of Work : SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20 MM,

STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H SPECIFICATIONS

FOR RESURFACING WORK IN BETWEEN KM 63.550 TO KM 78.658 ON ROAD

TOHANGAM-HAYULIANG OF 116 RCC SECTOR UNDER 48 BRTF IN ARUNACHAL

PRADESH UNDER PROJECT UDAYAK





SL Description of work/ Item Unit Quantity Unit rate in Total amount Period of

No (Net after words and completion

deduction figures

of voids)

1 2 3 4 5 6 7



1. Supply and stacking of stone Cum 329.00 To be

chips of size 13.20 mm, for completed

resurfacing works as per within

MORT&H specifications 90 (ninety)

days in single

2. Supply and stacking of stone Cum 164.00 phase from

chips of size 11.20 mm, for the date of

resurfacing works as per commen-

MORT&H specifications cement

mentioned in

3. Supply and stacking of Sand for Cum 108.00 the work order

resurfacing works as per

MORT&H specifications





Total Amount Rs.



(Rupees ………………………………………………………………...……………….……………………… only)



Note :- 1. Tenderers are required to quote the rates of all items separately.

2. For detailed specifications of each item, refer particular specifications referred therein.









EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO CDR 48 TF/ OF 2011-12 Serial page No.12

SCHEDULE `A’

(Schedule of requirement)

Notes:-

1. The quantities in column 4 of this schedule „A‟ at page No 13 are approximate and are inserted

as a guide for departmental purpose only. They do not constitute any guarantee for the ultimate

quantities that shall be ordered under the contract. They shall however, not be varied beyond the limit

laid down in Condition 5 of General Conditions of Contract, IAFW – 1815 (Z).

2. The tender shall be accepted as a whole or part wise (if so defined) at the discretion of the

Accepting Officer and contractor shall not have any claim on this account.



3. Unless otherwise specified all materials shall be delivered as ordered through work order and

location mentioned therein and as directed by Engineer-In-Charge. The items are to be delivered

BETWEEN KM 63.550 TO KM 78.658 ON ROAD TOHANGAM-HAYULIANG OF 116 RCC

SECTOR UNDER 48 BRTF IN ARUNACHAL PRADESH UNDER PROJECT UDAYAK



4. The entire supplies of all the items as per the schedule „A‟ shall be completed within 90

(Ninety) days from the date of commencement mentioned in the work order in single phase. The

work order will be placed within fifteen days from the date of acceptance of tender

5. No item of stores will be issued by the department. The contractor has to make his own

arrangements for procurement of all items which are required to be incorporated in the supply and

stacking of item/material as per schedule `A‟.

6. Contractor shall submit time and progress chart to OC contract on acceptance of tender. Time

and progress chart shall be prepared in consultation with OC contract to ensure smooth supply of

materials at uniform rate. Supply of material shall be given as per the time and progress chart as

approved by OC Contract.

7. The contractor shall quote his rates and amount for all items in column No. 05 & 06

respectively in schedule „A‟ at page No. 13 of tender documents.

8. Tendered rates shall be deemed to include the provisions of all materials, processes,

operations and requirements detailed in the particular specifications, irrespective of whether those

appear as specific items, or are mentioned in the description of schedule „A‟ items or not and the

contractor will not be paid extra for the same, it is an express condition of this contract that the rates

quoted by the contractor in the tender for various items of works shall be deemed to include al taxes,

octroi/toll tax, excise, sales tax, value added tax, royalties, education cess, etc and for the full, entire

and final completion of the work in accordance with the provisions given elsewhere in the contract.

9. Income Tax at source at the rate notified by the Government of India from time to time along

with surcharge as applicable shall be deducted from the gross amount of payment of RAR(s)/Final

Bill. Similarly, Sales tax at source, if applicable at the rate notified by the Government of

Nagaland/Arunachal Pradesh/Assam from time to time along with surcharge as applicable shall be

deducted from the gross amount of payment of RAR(s)/Final Bill. The contractor may ascertain full

details in this respect from the concern Department(s). Necessary No demand

certificate/Challan/Permit/Affidavit duly verified by the concerned department be obtained for releasing

the RAR (s)/Final bill payments. The contractor may refer Arunachal Pradesh Goods Tax Act 2005 as

amended from time to time.

10 If the bidder is authorized dealer/distributor of product of original manufacturer, a certificate to

this effect shall be enclosed alongwith product catalogue and company price list. Discount, if any

offered thereon shall be specified clearly. Proprietary certificate pamphlets/leaflets/sketches/samples

of the stores for which rates are quoted shall be attached with the tender which will not be returnable.









EE (Civil)

(Signature of Contractor with seal) SW

Date:______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.14

SCHEDULE `B’

ISSUE OF STORES TO THE CONTRACTOR



(See condition 10 of DGBR General Condition of Contracts)







Name of Work : SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20 MM,

STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H SPECIFICATIONS

FOR RESURFACING WORK IN BETWEEN KM 63.550 TO KM 78.658 ON ROAD

TOHANGAM-HAYULIANG OF 116 RCC SECTOR UNDER 48 BRTF IN ARUNACHAL

PRADESH UNDER PROJECT UDAYAK





S/No Particulars Rates at which stores will be issued Place of issue by Name Remarks

to the contractor

Unit Rate

1 2 3 4 5 6







------Nil -----









Notes :-



1 This schedule consists of Nil items only.



2 Recoveries will be made for the gross quantity of stores issued.



3 It shall be the responsibility of the contractor to submit his demand for stores in writing at least

seven days in advance of his requirements.



4 If the contractor requires any of the items of stores listed above issued to him for making good

any loss or damage arising from any cause what so ever other than accepted risk and the

Govt issues the same to him. The rate of issue for such items of stores shall be MES stock

book rate or market rate mentioned in this schedule whichever is higher.









EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.15



TENDER

To,

THE PRESIDENT OF INDIA

Through the Commander, 48 BRTF (GREF)

C/O 99 APO (Referred to also as an Accepting Officer else where in the tender documents)



1. Having examined and perused the following documents:-

(i) Specifications signed by SW of HQ 48 BRTF, C/O 99 APO

(ii) Schedule „A‟ attached hereto.

(iii) General conditions of Contract based on IAFW – 1815 (Z) alongwith errata and

amendments.

(iv) Special Conditions.

(v) Particular Specifications.

2. Should this tender be accepted, I/We agree:-

(a) That a sum of Rs. 15987 .00 (Rupees fifteen thousand nine hundred

eighty seven only) forwarded as Earnest Money shall either be retained as part of the

security/additional security deposit or be refunded by the Govt. on receipt of full amount of

security/additional security deposit within the time specified in condition 15 of General

Conditions of Contract IAFW-1815 (Z).

(b) To Supply to the extent to which my/our tender may herein before be accepted upto

the terms and conditions contained or referred to in the said documents and at the price or

prices quoted by me/us in schedule `A‟ hereto, such of the stores and materials listed as may

be required and demanded on me/us during the period of 90 (ninety) days commencing from

the date of commencement mentioned in the work order and in respect where my/our tender

may herein be accepted.

(c) I/We further agree that any condition of sole or contract or general reservations, which

may be printed or written on any correspondence, delivery notes, invoices etc, submitted by

me/us in connection with this contract shall not be applicable hereto and to refer all disputes,

as required by condition 37 of General Conditions of Contract IAFW-1815 (Z) to the sole

arbitration of an Engineer Officer to be appointed by Director General Border Roads, New

Delhi or on his absence the Officer officiating as Director General Border Roads, New Delhi,

whose decision shall be final, conclusive and binding.

(d) Any supplies being made under the provisions of this contract will be available for

inspection at the premises situated at manufacturing site/delivery site or as directed by

Engineer-In-Charge /OC Contract.

Signature of Contractor

_______________________________________________________________ in the capacity of

_________________________________________________________________________ duly

authorised to sign the tender for and on behalf of M/s / Shri

__________________________________Postal Address of the firm

____________________________________

_________________________________________________________________________________

_______________________

Dated: on the _________________ day of ___________________________________ 2011

Signature and address of witness:

__________________________________________________________ Address

______________________________________________________________________________

Dated: on the _________________ day of ___________________________________ 2011

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.16



ACCEPTANCE







................................................... alterations have been made in this documents and as evidence that

these alterations were made before the execution of this Contract Agreement. They have been

initialed by the contractor and …………………………………………………..…………………. of HQ 48

BRTF, C/O 99 APO. The said officer is hereby authorized to sign and initial on my behalf the

documents forming part of this Contract Agreement.





The above tender is hereby accepted by me for and on behalf of the President of India

(at the item rates contained in Schedule „A‟ herein before) for a total of

Rs...................................................... (Rupees ……………………………………………

…………………………………………………………………………………………………… in favour of M/s

/ Shri ………………..……………………………………………………………..

…………………………………...……………………….………....……………………………………………

………….on the ………………... …………………………day of ………………………………………. Two

thousand ten









Signature









Accepting Officer

Commander 48 BRTF (GREF)

For and on behalf of the President of India

Signed this on...........…….........2011





___________________________

(Signature of Contractor with seal)

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.17 to 35



ABRIDGED AGREEMENT TO

GENERAL CONDITIONS OF CONTRACT, IAFW-1815 (Z)

FOR SUPPLIES OF STORES AND MATERIALS

(Revised 1953)



1. A copy of General Conditions of Contract, IAFW – 1815 (Z), Revised 1953 with errata 1 to 28

and amendments 1 to 34 has been supplied to me / us and or is in my possession. I/We have read

and understood the provisions contained in the aforesaid GENERAL CONDITIONS OF CONTRACT

before submission of this tender and I/We agree that I/We shall abide by the terms and conditions

thereof, as modified, if any else where in these tender documents.





2. It is hereby further agreed and declared by me/us, that the General Conditions of Contracts

including condition 37 thereof pertaining to the settlement of disputes by arbitration containing 19

pages (serial Page No. 17 to 35 including errata 1 to 28 and amendments 1 to 34 form part of these

tender documents.





3. Wherever the phrases Commander Works Engineer (CWE) and Garrison Engineer (GE) have

been used in the General Conditions of Contract, IAFW-1815 (Z), the same are considered as

Commander Task Force and OC Contract respectively as applicable in the Border Roads

Organisation.









EE (Civil)

SW

for Accepting Officer (Signature of Contractor with seal

Dated : ___________ 2011

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.36

SPECIAL CONDITIONS

GENERAL

1. The following special conditions shall be read in conjunction with the General Conditions of

Contract based on IAFW-1815 (Z) including up to date amendments and errata thereto. Any provision

in these special conditions if at variance with the General Conditions of Contract mentioned above

provisions of this Special Conditions will take precedence over the General Conditions of Contract,

IAFW – 1815 (Z).

SCOPE OF WORK

2.1 The scope of work under this contract is only for “supply and stacking of the items of materials

shown in the schedule „A‟ at the locations given in schedule „A‟ and as per Particular Specifications

including conveyance, loading and unloading and stacking charges etc complete in all respects as

directed by Engineer -in-Charge.

2.2 The contractor‟s rate shall be deemed to have inclusive of all taxes, octroi/toll tax, central

excise duty, sales tax, value added tax (VAT), royalties, education cess, Freight charges, etc as per

existing Central Govt / State Govt, order to be paid by the contractor for the full, entire and final

completion of the supplies in accordance with the provisions given elsewhere in the contract. No

extra claim will be admissible on account of fluctuation of market rates directly and/or indirectly and/or

implied on any account. No claim on account of misunderstanding, whatsoever, shall be entertained

on any account in this respect.

VISIT TO SITE

3.1 The contractor is advised to visit the site of work by making prior appointment with

Commander 48 BRTF/Officer Commanding 116 RCC (GREF), C/O 99 APO so as to acquaint

himself with regard to the nature and working conditions of the site, nature and means of local

communications, conditions of access of site and all other cognate matters concerning the execution

and entire completion of the work. The contractor shall be deemed to have fully inspected and made

himself familiar with various factors which may effect his quotation whether he actually inspects the

site or not. No extra charges consequent on any misunderstanding or other otherwise shall be

allowed.

3.2 The contractor shall be deemed to have fully become conversant with the local conditions

prevailing in the Assam/Arunachal Pradesh/Nagaland States where the contract is operative e.g.

restriction of plying of the vehicles imposed by the Security Forces and/or local administration and/or

law enforcing agencies and also the liabilities for the security checks etc. The department will not be

responsible for the eventualities due to security risks/security requirements as may be required and/or

imposed by the security forces and/or by the local administrative and/or law enforcing agencies. No

claim whatsoever on this account shall be admissible.

WORKING HOURS

4. Contractor‟s materials, transport etc, shall normally be permitted to enter/leave at the work site

between 8 AM to 5 PM only. Dumping outside the timings mentioned above can be permitted by the

OC Contract, if he so desires in the interest of the work.

WORK ON HOLIDAYS

5. The contractor shall not carry out any work on gazetted holidays, weekly holidays and other

non working days except when he is specially authorised in writing to do so by the OC Contract on his

request in writing. The OC Contract may at his sole discretion, declare any day as holiday with out

assigning any reason for such declaration. Copy of request letter from contractor and permission so

accorded by the OC Contract for the work on holidays will be forwarded by the OC Contract to

Accepting Officer for record.

UNLOADING AT SITE

6. Unloading of materials shall be done by the contractor at the places shown/marked by the

Engineer-in-Charge. If the contractor‟s labour unloads materials at places other than shown/ordered,

the same will have to be removed and taken to the places at contractor‟s own cost, if not lifted and

delivered at the requisite place as directed by Engineer-in-Charge within the reasonable time, the

same can be got done by the department and cost/charges on this account shall be recovered from

his RAR(s)/Final Bill. The amount of recovery levied by OC Contract on his account will be final and

binding.



EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.37

SECURITY AND PASSES

7.1 The contractor shall employ only Indian Nationals after verifying their antecedents and loyalty.

The contractor shall, on demand by the Engineer-in-Charge, submit list of his agents, employees and

work people concerned and shall satisfy the Engineer-in-Charge as to the bonafide of such people.

The contractor and his workmen shall observe all the rules promulgated by the authorities controlling

the area in which supplies under the contract are to be delivered, e.g. Prohibition of smoking, lighting,

fire precautions, search of person on entry and exit, keeping to specified routes, restricted hours of

work etc. Thorough search of all persons and transports may be conducted by the departmental

authorities, Military authorities or by any other authorities as approved/authorised by the OC Contract

at the site of delivery of materials at any time and any number of the times for security reasons.

Permits are to be obtained from the civil authorities, by the contractor for himself, his staff and labour.

Nothing shall be paid extra on this account.

7.2 The work is to be executed in Assam/Arunachal Pradesh/Nagaland States area, contractor

shall obtain all passes/permits as per the rules at his own expense and risk and nothing extra on this

account shall be paid. Necessary assistance shall be sought by the contractor from the department

for obtaining passes to the firm or his representatives and workmen to enter in the Assam/Arunachal

Pradesh/Nagaland States.

REIMBURSEMENT / REFUND ON VARIATION IN PRICES

8. All the supplies under this contract shall be executed at fixed rate and fixed time and no claim

under Condition 32 of General Conditions of the Contract, IAFW-1815(Z) regarding

reimbursement/refund due to variations in the prices of the materials, fuel and wages of labour is

admissible/applicable and the said condition 32 is deemed to have been deleted. Accordingly no

reimbursement whatsoever will be made to the contractor for increase in prices of materials, fuel and

wages of labour which the contractor may have to incur during the execution of the supplies / work on

any account and as announced by the Central Govt or State Govt or other statutory bodies. The

contractor shall quote their rates accordingly. Also no additional payment will be made for any

multiple shift work or other alternative methods contemplated by contractor.

PHASE WISE SUPPLY

9. The contractor shall commence the supplies immediately as per the phasing given in schedule

„A‟ of the tender or in absence of this, supplies shall be made in a phased manner as fixed and

directed by the Engineer-in-Charge. Any change in quantities of materials to be supplied will be

decided by Accepting Officer in conformity to condition 5 of General Conditions of Contract, IAFW –

1815 (Z) based on the recommendations of OC Contract on merits of the case.

SOURCE OF MATERIALS AND ITS INSPECTION

10. No stone / sand quarry shall be made available by the department for this work. The

arrangements for the source of materials as well as compliance to the different environmental

requirements as stipulated, from time to time by the Ministry of Environmental and Forest,

Government of India and the local bodies, as applicable shall be sole responsibility of the contractor.

The materials to be supplied under this contract shall be strictly in accordance with the requirements /

specifications mentioned in the particular specifications for materials brought to the work site if found

acceptable, as per lab tests conducted in the laboratory of the department, will be approved for

payment after compaction in layers as per full satisfaction of Engineer-in-Charge.

LAND FOR OFFICE

11. The contractor shall have to make his own arrangements for lands as may be required by

him/firm for housing of staff and labour and for erection of store sheds, offices, godowns etc. The

contractor must ensure that the staff, labour, plant, equipment, stores etc employed or collected in

connections with the work are so located that there is no hindrances to the free flow of the traffic on

the road. Suitable warning boards, lights and other measures are to be provided by the contractor at

his own cost for the safety of the traffic as directed by the Engineer-in-Charge.



PERMIT FROM LOCAL AUTHORITIES FOR PLYING VEHICLES

12. The contractor shall make his own arrangements for obtaining necessary permit from local

authorities for plying his vehicles for the work in accordance with the rules and regulations of the land.





EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.38



REJECTION

13. Materials after being brought to site and dumped and having been rejected in laboratory tests

will have to be removed immediately by the contractor but within not more than seven days of

rejection. If the contractor fails in doing so, the Engineer-in-Charge will have the right to get these

rejected materials removed and thrown out side the road land under departmental arrangements and

no compensation on account of damages/loss will be payable to the contractor. Besides, cost of such

removals as worked out by the OC Contract in consultation with Engineer-in-Charge will be recovered

from RAR(s)/Final Bill. The decision of the OC Contract for the amount to be deducted will be final

and binding on the contractor.



EMPLOYMENT OF LOCAL LABOUR

14. Attention of the contractor is invites to the Condition 18 of the General Conditions of Contract,

IAFW-1815(Z) and the contractor shall as far as possible employ local labour under this contract. All

facilities as per provisions in Labour Acts in force will be provided to the labour by the contractor. The

contractor shall pay wages not less than the fair wages fixed from time to time by the

Assam/Arunachal Pradesh/Nagaland States or minimum wages fixed under the Minimum Wages Act

by the Central Govt., whichever is higher. The department will have the right to call for any

documents related with employment of labour as a principle employer.



INSPECTION [REFER CLAUSE 20 OF IAFW-1815(Z)]

15. Inspection of work at different stages will be carried out by Engineer-in-Charge, OC Contract

or any officer of the department concerned with the work. The contractor shall provide all facilities for

such inspection and examination of any part of the work and no special claim on this account shall be

admissible and/or accepted by the department.



ROYALTIES

16. The contractor shall make his own arrangements for procurement/supply of materials mention

in Schedule „A‟ and elsewhere. Royalties are payable by the contractor to the concerned department

of Assam/Arunachal Pradesh/Nagaland State Government. The contractor shall attach with his RAR

(s)/ final bill, the royalty clearance certificates for the quantity which has been supplied under the

contract issued by the concerned Mining/Forest department of State Govt or the Primary Licence

Holder as per below, failing which full amount of royalty charges for the quantities supplied under the

contract shall be recovered from contractor‟s RAR (s)/Final Bill and remitted to concerned department

of Assam/Arunachal Pradesh/Nagaland State Government.

CERTIFICATE

It is certified that I/We, M/s ……………………………………… (Primary Licence Holder) having

a licence No. ……… issued by Forest/Mining Department, Government of ……………………… have

supplied the following materials to M/s ……………………………. (Name & address of contractor)

against CA No. COMDR 48 BRTF/………… of 2011-2012 during the period from ……………….. to

………………..



S/No Materials Quantity supplied

(a)

(b)



It is further certified that Royalty etc for above quantity of materials at the applicable rates have

been paid by us to the concerned department of the Government of ……………………. A copy of No

demand certificate/challan/permit/affidavit duly verified by the concerned department etc is attached

herewith.

Signature

(M/s …………………………..)

(Primary Licence Holder)



Above certificate as proof is required to be attached with the RAR (s)/final bill for releasing

payment to contractor. The RAR (s)/final bill will not be entertained in absence of above proof of

royalty payment.



EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.39



PAYMENT OF POSTAL CHARGES FOR CHEQUES SENT BY POST [CLAUSE-33 IAFW-1815(Z)]

17. In case where the payment through cheque is being made by post to the contractor, the

postage charges will be deducted from the net amount due to the contractor.



MINIMUM FAIR WAGES PAYABLE TO LABOUR

18. The contractor shall pay wages to labour not less than the fair wages fixed from time to time

by the Assam/Arunachal Pradesh/Nagaland State Govt. or minimum wages fixed under the Minimum

Wages Act by the Central Govt. whichever is higher. He shall have no claim, whatsoever, if on

account of any local regulations and/or otherwise, he is required to pay wages in excess of the wages

so fixed. The contractor shall observe the laws, Rules, Regulations of Govt of Assam/Arunachal

Pradesh/Nagaland applicable in the area regarding the employment of labour, payment of wages and

other cognate matters relating to the local conditions. In case local labourers are not available the

contractor will have to obtain written permit from appropriate authority of concerned State Govt. to

import labour from outside the state if necessary, at his cost



TESTING OF MATERIALS AND PRODUCTION OF TEST CERTIFICATES

19. Testing of material shall be carried out by the contractor at his own expenses from recognized

laboratory in the near vicinity of area as decided by Engineer-in-Charge/OC Contract. The random

samples shall be collected by Engineer-In-Charge in presence of contractor or his accredited

representative, properly packed and sealed and forwarded to laboratory for carrying out necessary

tests. The test certificate shall be produced before the payment of RAR(s)/Final bill. All charges on

account of tests carried out shall be borne by the contractor



ACCEPTANCE OF SUPPLIES

20. The Accepting Officer shall have the over riding powers in all the decisions of officers detailed

in this contract for various purpose from time to time and his decision shall be final and binding under

this contract.



DEDUCTION OF TAXES AT SOURCE

21. Income Tax at source at the rate notified by the Government of India from time to time along

with surcharge as applicable shall be deducted from the gross amount of payment of RAR(s)/Final

Bill. Similarly, Sales tax at source, if applicable at the rate notified by the Government of

Assam/Arunachal Pradesh/Nagaland from time to time along with surcharge as applicable shall be

deducted from the gross amount of payment of RAR(s)/Final Bill. The contractor may ascertain full

details in this respect from the concern Department(s).



COLLECTION OF MATERIALS

22. The materials shall be stacked properly on even/level ground and clear of the road way/work

site at various places site of work and in a manner and dimensions as directed by the Engineer-in-

Charge. Contractor shall ensure that his trucks/Lorries do not dump materials on road/work site.

Materials shall not be stacked in location liable to inundation or floods. The dimensions of the stacks

and its location shall be as approved by the Engineer-in-Charge. Where the materials is improperly

stacked, the Engineer-in-Charge shall have the right to order complete re-stacking of the materials to

specifications as required by him at the cost of the contractor.



RATES QUOTED

23. Tendered rates shall be deemed to include the provisions of all materials processes,

operations and requirements detailed in the particular specifications, irrespective of whether those

appear as specific items, or are mentioned in the description of schedule „A‟ items or not and the

contractor will not be paid extra for the same, it is an express condition of this contract that the rates

quoted by the contractor in the tender for various items of work shall be deemed to include all taxes,

Octroi/toll tax, Inter-State barrier charges, Sales tax, value added tax, Royalties, Transport/Vehicle

with fuel for conveyance including all leads and lifts, Loading/Unloading into/from vehicles, Tools and

plants for procurement/quarrying, stacking of materials at work site of delivery, other

charges/arrangement like measurement tools, materials testing charges in laboratory, etc and for the

full, entire and final completion of the work in accordance with the provisions given elsewhere in the

contract.

EE (Civil)

(Signature of Contractor with seal) SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.40

MEASUREMENT

24.1 The measurements shall be recorded by volume in cubic meter (cum). The contractor at his

own expense shall provide all labourers and measuring equipments for taking measurement.

24.2 The coarse and fine aggregates supplied at site of work shall be paid for in cubic meter. The

actual volume of the aggregates to be paid for shall be computed after deducting the specified

percentage as given at condition 8.1 of Particular Specifications from the volume computed by

stacked measurement.

24.3 All measurement for materials should be properly recorded in the measurement book (IAFW-

2261) as and when materials brought, stacked and measured at work site. No payment on account

shall be made to the contractor for materials that are not stacked and not measured at site as

specified and not recorded in the measurement book. Immediately after measurement, the stacks

shall be marked by white wash or other means as directed by the Engineer-in-Charge

24.4 All measurement shall be taken after proper stacking jointly by the contractor or his accredited

representative and Engineer-in-Charge at work site. The measurement shall be recorded in the

measurement books IAFW-2261 and signed with date by both the parties immediately after

completion of each set of measurements. The contractor‟s signature in the measurement books shall

be taken as a token of his acceptance of the measurement. If the contractor‟s representative fails to

attend the measurement with out prior intimation, the Engineer-In-Charge has power to proceed by

him self to take measurement and in that case these measurements shall be accepted by the

contractor as final and no dispute on this account will be admissible.

ATTENDANCE OF DEPARTMENTAL WORKMEN AND OTHER AGENCIES

25. The contractor shall permit free access and generally afford all facilities and usual

conveniences to other agencies and/or departmental workmen to carryout works, if any, under

separate arrangements. The contractor shall not be allowed any extra payment on this account.

ACCEPTANCE OF MATERIALS

26.1 The Engineer-in-Charge shall exercise control over the quality of the materials so as to

ascertain their conformity with the specifications mentioned in the particular specifications at the cost

of the contractor. Frequency of the testing of the aggregates shall be as per below:-

(a) Gradation : One test per 200 cum

(b) Other physical and chemical properties : One test per 200 cum

26.2 Materials not confirming to the specification requirements shall not be brought to the work site.

26.3 In case the materials brought by the contractor found inferior and does not confirm to the

particular specifications, the materials will be rejected. The contractor at his cost shall remove the

rejected materials from the work site immediately. No payment/compensation shall be made on this

account.

DISCREPANCIES/DOUBTS

27. In case of any disputes or discrepancies or any doubt or obscurity as to the interpretation of

any of the tender documents i.e. General Conditions of Contract, Special Conditions, Particular

Specifications etc, the matter shall be referred to the Accepting Officer, whose decision in this regard

shall be final and binding.







EE (Civil)

(Signature of Contractor with seal) SW

for Accepting Officer



Dated : ______________ 2011

CA NO Cdr 48 TF/ OF 2011-12 Serial page No.41



RE-IMBURSEMENT/REFUND ON VARIATION IN “TAXES DIRECTLY RELATED TO CONTRACT

VALUE”

28. The rate quoted by the contractor shall be deemed to be inclusive of all taxes (including sales

Tax/VAT on materials. Sales tax/VAT oln Works contracts, Turnover Tax, Service Tax, Labour

Welfare Cess/Tax etc), duties, Royalties, Octroi & other levies payable under the respective statues.

No re-imbursement/refund for variation in rates of taxes, duties, royalties, Octroi & other levies, and/or

imposition/abolition of any new/existing taxes, duties, Royalties, Octroi & other levies shall be made

except as provided in sub para here-in-below.



28.1 The taxes which are levied by Govt. at certain percentage rates of contract Sum/Amount shall

be termed as “taxes directly related to contract value” such as Sales Tax/VAT on works contracts.

Turnover Tax, Labour Welfare cess/Tax and like but excluding income tax. The tendered rates shall

be deemed to be inclusive of all “taxes directly related to contract value” with existing percentage

rates as prevailing on last due date for receipt of tenders. Any increase in percentage rates of “taxes

directly related to contract value” with reference to prevailing rates on last due date for receipt of

tenders shall be reimbursed to the contractor and any decrease in percentage rates of “taxes directly

related to contract value” with reference to prevailing rates on last due date for receipt of tenders shall

be refunded Contractor to the Govt/deducted by the Govt. from any payments due to the contractor.

Similarly imposition of any new taxes directly related to contract value after the last due date for

receipt of tenders shall be reimbursed to the contractor and abolition of any taxes directly related to

contract value prevailing on last due date for receipt of tenders shall be refunded by the contractor to

the Govt/deducted by the Govt. from the payments due to the contractor.



28.2 The contractor shall within a reasonable time of his becoming aware of variation in percentage

rates and/or imposition of any taxes directly related to contract value given written notice thereof to

the OC Contract stating that the same is given pursuant to this Special Condition, together with all

information relating there to which he may be in a position to supply. The contractors shall submit the

other documentary proof/information as the OC Contract may require.



28.3 The contractor shall for the purpose of this condition keep such books of account and other

documents as are necessary and shall allow inspection of the same by a duly authorized

representative of Govt. and shall further, at the request of the OC Contract furnish, verified in such a

manner as the OC Contract may require. Any documents so kept and such other information as the

OC Contract may require.



28.4 Reimbursement for increase in percentage rates/imposition of taxes directly related to contract

value shall be made only if the contractor necessarily & properly pays additional taxes directly related

to contract value to the Govt without getting the same adjusted, against any other tax liability or

without getting the same refunded from the concerned Govt authority and submit documentary

prooffor the same as the OC Contract may require.









(Signature of Contractor with seal) EE (Civil)

SW

Dated : ______________ 2011 for Accepting Officer

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No.42:



PARTICULAR SPECIFICATIONS







Name of work : SUPPLY AND STACKING OF STONE CHIPS OF SIZE 13.20 MM,

STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H

SPECIFICATIONS FOR RESURFACING WORK IN BETWEEN KM

63.550 TO KM 78.658 ON ROAD TOHANGAM-HAYULIANG OF 116 RCC

SECTOR UNDER 48 BRTF IN ARUNACHAL PRADESH UNDER

PROJECT UDAYAK



1. GENERAL



1.1 The materials to be supplied under this contract shall be in accordance with schedule “A” and

the Particular Specifications referred to herein and Ministry of Road Transport & Highways

Specifications for Road and Bridge works (Fourth Revision, Reprint of January, 2002).

2. Specifications

2.1 The contractor shall ensure that the materials supplied are as per the stipulations given at Sch

„A‟ and meets the specifications listed hereunder:-



3. Delivery Schedule

3.1 All the materials as listed in Schedule „A‟ shall be delivered within the period as specified

therein.



3.2 The responsibility for any loss/damage during transit, loading and unloading of materials shall

rest with the contractor.



4. STONE CRUSHED CHIPS OF SIZE 13.20 MM & 11.20 MM

4.1 GENERAL REQUIREMENTS

4.1.1 The aggregates shall consist of crushed stone, crushed gravel or other stones. They shall be

clean, strong, durable of fairly cubical shape and free from disintegrated pieces, organic or other

deleterious materials and adherent coatings.





4.2 PHYSICAL REQUIREMENTS

4.2.1 The aggregate shall satisfy the following physical requirements:-

S/No Property Test Test Method Specification

(a) Cleanliness Grain Size analysis IS : 2386 (Part-I) Maximum 5 %

passing 0.075 mm

sieve

(b) Particle Shape Flakiness and Elongation index IS : 2386 (Part-I) Maximum 30 %

(combined) $

Los Angeles Abrasion Value @ IS-2386 (Part–IV) Maximum 40 %



(c) Strength Aggregate impact Value @ IS-2386 (Part–IV) Maximum 30 %

Sodium Sulphate S 2386 (Part-V) Maximum 12 %

(d) Magnesium Sulphate IS 2386 (Part-V) Maximum 18 %

Durability



(e) Water absorption Water absorption IS 2386 (Part-III) Maximum 1 %



(f) Stripping Coating and stripping of Bitumen IS:6241 Minimum retained

Aggregate Mixtures coating 95 %



(g) Water sensitivity Retained Tensile Strength # Minimum 80 %



(h) Polished Stone Value BS–812(Part-1144) Should not be less

than 55

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No.43

Notes:-

# - The water sensitivity test is only to be carried out if the minimum retained coating in the

stripping test is less than 95%.

$ - The elongation test to be done only on non-flaky aggregates in the sample)

@ - Aggregates may satisfy requirements of either of these two tests



4.3 GRADING REQUIREMENT

4.3.1 The grading of the aggregates shall be as per below:-



(a) Nominal Stone Chips size 13.20 mm size -Passing through 22.40 mm sieve and

retained on 11.20 mm sieve



(b) Nominal Stone Chips size 11.20 mm size -Passing through 13.20 mm sieve and

retained on 5.60 mm sieve

5. RIVER/COURSE SAND



5.1 GENERAL SPECIFICATIONS

5.1.1 River/Coarse sand shall be clean, hard, durable, uncoated, coarse dry particles and be free

from dust, soft or flaky particles or organic matter or other deleterious substances.



5.2 GRADING REQUIREMENT



5.2.1 The grading of the sand shall conform to medium coarse sand (Fineness modulus of more

than 2.5) passing 2.36 mm sieve and retained on 180 micron sieve.



5.3 PHYSICAL REQUIREMENTS

5.3.1 The bulk density of sand shall conform to minimum 1120 kg per cum in accordance with IRC:

14-1977.



5.3.2 The stone crushed chips and sand not confirming to the above specifications shall be rejected

by the Engineer-in-charge. Such rejected materials shall be removed from the site by the contractor at

his own expenditure failing which the Engineer-in-charge shall do the same at the risk & Cost of the

contractor.



5.3.3 The cost of all tests stated above shall be borne by the contractor and his rates quoted in the

Schedule „A‟ shall be deemed to include these testing charges and nothing extra shall be admissible

on this account. Testing shall be done from the Government laboratories or from QCC of HQ CE (P)

Udayak.

6. PERIODICITY OF TESTS

6.1 All test, shall be carried out for every 200 cum quantity of each item of Schedule “A”. However

Engineer-in-Charge/OC Contract reserve the right to carry out more test at any intervals at their sole

discretion. The contractor shall not have any claim on account of additional tets, if any ordered by

Engineer-in-Charge/OC Contract.



7. MEASUREMENTS

7.1 All measurement will be done at work site where materials have been ordered to be delivered

by the Engineer-in-Charge. The measurement shall be taken jointly by the Engineer-in Charge and

the contractor or any person authorized by the contractor. All measurements shall be properly

recorded in the measurement book IAFW-2261, as per IS-1200 (Part-VII) of 2469, and signed by both

the parties immediately after completion of each set of measurement. The Contractors signature in

the measurement book shall be taken as a token of his acceptance of the measurements. If the

contractor or his representative fails to attend at the appointed time of recording measurement, then,

the Engineer-in-Charge will have the power to proceed himself to take measurement ex-parts and in

that case these measurements shall have to be accepted by the contractor and no dispute/claims on

this account shall be admissible.

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No.44:



7.2 All the materials shall be procured from approved sources and shall conform to the physical

requirements, specified in the respective Specifications Clause for the individual items given

elsewhere in this Specification.



7.3 Only the aggregate satisfying the Specification requirement shall be conveyed to the roadside

and stacked. Each size of aggregate shall be stacked separately. Likewise, materials obtained from

different quarry sources shall be stacked separately and in such a manner that there is no

contamination of one source with another.



7.4 The aggregates shall be stacked entirely clear of the roadway on even clear hard ground, or

on a platform prepared in advance for the purpose by the Contractor at his own cost and in a manner

that allows correct and ready measurement. If the stockpile is placed on ground where the scraping

action of the loader can contaminate the materials with underlying soil, then the stockpile shall be

rejected by the Engineer. Materials shall not be stacked in locations liable to inundation or flooding.



7.5 The dimensions of the stockpiles and their location shall be approved by the Engineer. Where

the material is improperly stacked, the engineer shall direct complete re-stacking of the materials in an

approved manner at the Contractor‟s cost.



8. PERCENTAGE REDUCTION IN VOLUME TO ALLOW FOR VOID SAND BULKING:-

8.1 The actual volume of aggregate/materials to be paid for to the contractor under this contract

shall be computed after deducting the specified percentages as listed hereunder from the volumes

computed by stack measurements to allow for voids and bulking.



S/No Nominal size of Aggregate/nature of work for which material is Percentage reduction to

meant for be effected in volume

computed by stack

measurement to arrive

at the volume to be paid

for

1 GSBC (Grade-I as per table 400-1) 12.50

2 (a) WBM Grade-I (90 mm to 45 mm) 12.50

(b) WBM Grade-II (63 mm to 45 mm) 10.00

(c) WBM Grade-III (53 mm to 22.40 mm) 10.00

3 (a) BUSG (Coarse aggregate) 10.00

(b) BUSG (Key aggregate) 5.00

4 BM, DBM, SDBC premix carpet, surface dressing 5.00

5 Coarse aggregate

(a) 53 mm and above 12.50

(b) Less than 53 but more than 26.5 mm 10.00

(c) Less than 26.5 5.00

6 Sand 5.00



9. MEASUREMENT FOR PAYMENT

9.1 Coarse and fine aggregate supplied to the site shall be paid for in cubic meter. The actual

volume of the aggregates to be paid for shall be computed after deducting the specified percentages

as per the clause 8 above of particular specification of the contract (serial page No.39). From the

volume computed by stack measurements, to allow for voids and bulking.



9.2 Unless otherwise directed by the Engineer, measurement shall not be taken until sufficient

materials for use on the road have been collected and stacked immediately after measurement, the

stacks shall be marked by white wash or other means as directed by the Engineer.

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No.45:



10. RATES



10.1 The contract unit rates for different sizes of coarse aggregate, fine aggregate and other

materials shall be payment in full for collecting, conveying and stacking or storing at the site including

full compensation for :



i) All royalties, fees, rents where necessary;

ii) All leads and lifts and

iii) All labour, tools, equipment and incidentals to complete the work to the Specifications.



All necessary testing of material, both initial, to approve and source, and regular control testing

thereafter.









EE (Civil)

SW

(Signature of the Contractor with seal) for Accepting Officer



Dated:

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No. 46

BORDER ROADS ORGANIZATION

HQ 48 BORDER ROADS TASK FORCE, C/O 99 APO

NOTICE INVITING TENDER

NIT No: 8102/2011-2012/ 01 /E8



1. A sealed tender is invited for “SUPPLY AND STACKING OF STONE CHIPS OF

SIZE 13.20 MM, STONE CHIPS OF SIZE 11.20 MM AND SAND AS PER MORST&H

SPECIFICATIONS FOR RESURFACING WORK IN BETWEEN KM 63.550 TO KM 78.658

ON ROAD TOHANGAM-HAYULIANG OF 116 RCC SECTOR UNDER 48 BRTF IN

ARUNACHAL PRADESH UNDER PROJECT UDAYAK





2. The work is estimated to cost Rs. 7.99 lacs approximately. This estimate,

however, is not a guarantee and is merely given as rough guide and if it costs more or

less to any extent, the tenderer will have no claim on that account.

3 The tender shall be based on IAFW - 1815(R) used in conjunction with General

Conditions of Contract, IAFW 1815 (Z) and Special Conditions, where the tenderer are

required to quote their rates for the items of supplies listed in the Schedule ‘A’ both in

figures and words.



4. The contract is to run for a period of 90 days with reference to the total cost of the

work from the date of issue of work order.



5. Not more than one tender shall be submitted by one contractor or one firm of

contractors. Under no circumstance will a father and son(s) or other close relations, who

have business dealing with one another be allowed to tender for the same contract as

separate competitors. A breach of this condition will render the tenders of both parties

liable to be rejected.



6. The Commander 48 BRTF (GREF), C/O 99 APO will be the Accepting Officer,

hereinafter referred to as such for the purpose of this contract.



7. Application for tender documents may be submitted to The Commander 48 BRTF

(GREF), C/O 99 APO so as to reach this office preferably on or before 10 Aug 2011 by

1200 hrs. The tender document may however be downloaded directly from the web site

as mentioned hereunder.



8. The applicants must attach with their application, cost of the tender documents in

the form of Bank Draft for Rs. 500.00 (Rupees five hundred only) issued by the

State Bank of India drawn in favour of the Commander 48 Border Roads Task

Force payable at Tezu, Code No - 1520 (Arunachal Pradesh State). Please note that

the application received without Bank Draft towards cost of the tender documents will

not be entertained.

9. In addition to the above, the tender document will also be available in

downloadable form in website www.bro.nic.in or www.bro.gov.in. An applicant may

download it directly from the website and participate in the process. However, in such

case cost of document shall be payable in the above form at the time of submission of

the document. Intimation to this effect may however be given to this office so that

subsequent changes, if any could be intimated.



10. Applicants not enlisted with BRO or enlisted with a class having tendering limit

lower than that of the value of work listed here above, shall attach details about the

registration/enlistment letter/certificate with BRO / MES / State PWDs / CPWD / Railway

or other Govt organization, particulars of the works executed during last three years and

works in hand and details about resource and financial capability to undertake the work,

as per the format enclosed with the tender. Tender not accompanying with these details

may be rejected without assigning any reasons thereto.

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No.47



11. The cost of tender documents in the form of Bank Demand Draft shall be non-

refundable, if the application for issue of the tender documents is accepted and tender

documents are issued to the applicants. However, the bank draft shall be returned to the

applicants by the Accepting Officer after endorsing ‘Release order’ in case the tender

document is not issued. The contractor/applicants shall bear the cost of bank charges for

drawing and encashing the Bank Draft and they shall not have any claims whatsoever on

this account on the Government.



12. Tender forms and conditions of contract and other necessary documents will be

issued from 11 Aug 2011. Tender could also be downloaded directly from the website

www.bro.nic.in or www.bro.gov .in.



13. The tender shall be accompanied by earnest money deposit of Rs. 15987 .00

(Rupees fifteen thousand nine hundred eighty seven only) for complete work in

the form of Call Deposit Receipt (CDR) issued in favour of Commander 48 border Roads

Task Force, C/O 99 APO by any scheduled Bank, payable at State Bank of India,

Tezu, Code No - 1520 (Arunachal Pradesh State).



14. In case the tenderer is not enlisted/registered with any formation of BRO and his

tender is not accompanied with the requisite earnest money deposit, such tender shall

be considered as non-bonafide tender and shall be rejected.



15. Earnest money deposit of all unsuccessful tenderer will be returned immediately

by endorsing an authority on the CDR for its refund.



16. The security deposit amount for this work shall be 25% more than the amount of

earnest money deposit calculated as per scale laid down based on the contract amount.

The amount of security deposit shall, however, not exceed Rs.11, 25,000.00.



17. The earnest money deposit of the successful tenderer will be returned on receipt

of the full security deposit or will be retained it as a part of security deposit.

18. Tenderers are advised to visit the site by making prior appointment with

Commander 48 BRTF, C/O 99 APO/Officer commanding 116 RCC,

C/O 99 APO well in advance before quoting the rates in the tender form. The tenderer

shall be deemed to have full knowledge of all relevant documents, sites, etc. whether he

has inspected in person or not. However the cost of visiting the sites shall be at the

expense of tenderer.



19. Tender duly sealed will be received by Commander 48 BRTF (GREF), C/O 99 APO

up to 1200 Hrs on 06 Sept 2011. Tender will be opened immediately after the time

indicated herein before.



20. Tender will be opened in two stages i.e. Stage-I (Qualification bid) and Stage-II

(price bid). Under Stage-I, (Qualification bid), the documents as sought about the

qualification will be opened on the date specified above. The Stage-II (Price bid)

containing price bid and complete tender document will however be opened separately

on evaluation of Stage-I. The Stage-II will be opened only in respect of those bidders

who qualify the stipulated criteria about their resourcefulness. Stage-II (Price bid) of

non-qualified tenderer will be returned back unopened.



21. The tender shall remain open for acceptance for a period of 60 days from the

stipulated date of its receipt.



22. Any tenderer who proposes any alternation to any of the conditions laid down or

which proposes any other conditions described whatsoever is liable to be rejected.

CA NO Cdr 48 TF/ OF 2011-12 Serial Page No. 48





23. The submission of tender by a tenderer implies that he has read this notice and

conditions of contract and has made himself aware of the scope and specifications of the

work to be done and of the conditions and other cognate factors having bearing on the

execution of the work.



24. The Accepting Officer reserves his right to accept a tender submitted by a public

undertaking giving a price preference over other tender(s) which may be lower, as are

admissible under the Govt. policy. No claim for any compensation or otherwise shall be

admissible for such tenderers whose tenders may be rejected on account of the said

policy.



25. A bonafide tenderer must satisfy each and every condition laid down in this notice.

Tenderer must be very careful to deliver a bonafide tender or alternatively to return the

blank tender complete with all documents forming part of the tender duly signed



26. The earnest money as submitted with the tender document will be forfeited:-



(a) If the tenderer withdraws the tender after tender opening during the validity

period.



(b) If the successful bidder fails within the specified time limit to sign the

agreement or furnish the required security deposit.



27. The Accepting Officer does not bind himself to accept the lowest or any tender or

to give any reasons for not doing so.



28. Information relating to examination, evaluation and comparison of tender and

recommendation for the award of contract shall not be disclosed to the bidders or any

other person not officially concerned with such process until the award to the successful

bidder has been announced. Any efforts by a tenderer to influence the processing of

tender or award decision may result in rejection of his tender. This notice of tender shall

form part of the Contract Agreement.



29. Further details can be seen at the Indian Trade Journal and the BRO website

http://www.bro.nic.in and http://www.bro gov.in. The tenderer may also contact

SW of HQ 48 Border Roads Task Force at 03804-208332 during office hours.



Sd/xxx

(Signature of Contractor) (AK Jain)

EE (Civil)

SW

Dated: Jul 2011 for Accepting Officer

Headquarters

48 Border Roads Task Force

PIN – 930048

C/O 99 APO



NIT No: 8102/2011-12/01/E8



Dated : 18 Jul 2011



Related docs
Other docs by yunyi
2.2 Virtueller Adressraum
Views: 3  |  Downloads: 0
HIGHLINE TAPPED TO PRODUCE INAUG
Views: 2  |  Downloads: 0
Heteroflexibility
Views: 8  |  Downloads: 0
Lynn Jones 5 Grade Lesson Plan F
Views: 0  |  Downloads: 0
SPONSOR SHIP AND TABLE HOSTING OPPOR TUNITIES
Views: 0  |  Downloads: 0
NJTinside2
Views: 0  |  Downloads: 0
The Vegetarian Food Pyramid J
Views: 0  |  Downloads: 0
Anti-Spam Measures for End Users
Views: 0  |  Downloads: 0
Slide 1 - UCL
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!