Docstoc

AI SOQ Cover

Document Sample
AI SOQ Cover Powered By Docstoc
					STATEMENT OF QUALIFICATIONS

               2008

       . . . Building People Who Build Great Things
                   1133 W. Columbia Drive   P.O. Box 7287    Kennewick, WA 99336    Phone 509-586-1104
                            Fax 509-585-3686     Email info@apollosm.com    Web www.apollosm.com



                                   A NATIVE AMERICAN OWNED COMPANY
APOLLO, INC. is a locally owned and highly successful general contracting firm operating out of Kennewick
Washington since 1993. APOLLO specializes in infrastructure, industrial, commercial, and design build pro-
jects throughout the Pacific Northwest.

APOLLO has built a strong regional reputation for economical, on-time delivery on such diverse projects as
water treatment, wastewater treatment, bridges, laboratories, wineries, manufacturing facilities, commercial
buildings, and environmental remediation.

In addition:
• Northwest Construction Magazine (August 2007) ranks:
        - APOLLO #10 in the Northwest Top Specialty Contractors
        - APOLLO #1 in the Top 10 Excavation Foundation Utility Contractors
        - APOLLO # 8 in Washington Top Specialty Contractors
        - APOLLO #2 in the Top 10 Water Supply Contractor’s
• APOLLO is certified Native American Owned by the Northwest Minority Business Council
• APOLLO employs a constant workforce of over 200 employees.
.




                               CHEHALIS WASTE WATER TREATMENT PLANT




       COLUMBIA BLVD GRADE SEPARATION                              AINSWORTH BRIDGE




       COLVILLE WATER TREATMENT PLANT                      WALLA WALLA VITICULTURE COLLEGE
                      Apollo Incorporated
                     Corporate Information
Name:                             Apollo Incorporated
                                  1133 W. Columbia Drive
                                  Kennewick, WA 99336

Phone:                            (509) 586-1104
Fax:                              (509) 585-3686
E-mail:                           info@apollosm.com
Websites:                         www.apollosm.com

Date of Incorporation:            August 30, 1993

Total Employees:                  250

                                  2008           2007           2006        2005
EMR Ratings History                .52            .67            .55         .66
Annual Revenue (Million)                         $76.0          $67.6       $51.7

Surety:                    Travelers Casualty and Surety Co. of America
                           Agent: Ken Frick (253-267-0890)
                           3720 Olympic Blvd. West
                           University Place, WA 98466
                           Bond Limits: $ 75 million/project
                                         $150 million in aggregate

Technical Capabilities:    Estimating Software:          Timberline 6.7
                                                         PayDirt 5.2.1
                           Scheduling Software:          Premavera Planner, P-3
                           Design Software:              AutoDesk Building 2005
                           Coordination Software:        NavisWorks 4.0
                                                         Jetstream

Certifications and Awards:
       • ANSI NQA-1 Quality Assurance Program
       • Certified by the Northwest Minority Business Council as a Native American
           Owned Business.
       • Ranked #10 in the Northwest Top Specialty Contractor’s in the Pacific
           Northwest according to Northwest Construction Magazine, August 2007.
       • 2nd Largest Water/Sewage/Wastewater/Construction Contractor in the
           Pacific Northwest according to Northwest Construction Magazine, August
           2006.



                            . . . Building People Who Build Great Things.
                     APOLLO INC.
                  SAFETY STATISTICS


                                                         3 Year    Industry
                   2008     2007      2006     2005     Average    Average


EMR                .52      .67       .55       .66       .58        1.00


Recordable
                            4.41      3.86     4.06       4.11       7.80
  Incident Rate


Lost Time
                            0.49      0.00     0.00       0.16       2.90
  Incident Rate


Manhours                  408002    310215    344792




                   . . . Building People Who Build Great Things.
                     Chehalis Water Reclamation Plant


The Chehalis Regional Water Reclamation Plant is a new
waste water treatment plant which is being constructed to
replace the existing City of Chehalis WWTP. The project is a
$25 million waste water treatment with a peak capacity of 13
MGD. The plant will utilize a sequence batch reactor (SBR)
system to treat the waste water which after treatment will be
utilized to irrigate a poplar tree plantation.

Some of the scope of work in-
cluded:
•   Over 10,230 cy of concrete
•   650 Tons of Reinforcing Steel
•   155,000 sf of concrete forming
•   Over 4 miles of piping
•   We placed 800 feet of 18" Diameter
    HDPE pipeline line 32'-0" beneath the
    Chehalis River.




                              Phone (509) 586-1104 Fax (509) 585-3686
                         Web: www.apollosm.com Email: info@apollosm.com
                   1133 West Columbia Drive P.O. Box 7287 Kennewick, WA 99336
           Inc.
                   COLUMBIA RIVER PROCESSING PLANT




A multiple bid package project for the Apollo Group, Columbia River Process-
ing facility in Boardman, Oregon is the state-of-the-art $50 million dollar cheese
processing facility which includes a quality assurance laboratory, a 40-day cold
storage unit and a whey plant. The plant is projected to process 50 million
pounds of cheese a year.

Scope of the project included:                          •   HVAC & Mechanical Piping
     • Mass excavation                                  •   Controls
     • Site utilities                                   •   Process piping
     • Support concrete                                 •   Chemical Piping
     • Tilt-up construction                             •   Conveyance
     • Interior finishes                                •   Equipment setting and hook-up
     • Waste Water Treatment Facility                   •   Sanitary milk piping




                1133 W. Columbia Drive   P.O. Box 7287    Kennewick, WA 99336    Phone 509-586-1104
                         Fax 509-585-3686     Email info@apollosm.com    Web www.apollosm.com
         Inc.
                     SR-10 ATTALIA LANE ADDITION


From 2006—2007, Apollo Inc. completed the construction of SR-
12, Attalia Vicinity Add-Lanes project for the Washington State
Department of Transportation.
The work included:
• a 550 foot Pre-Stressed Concrete

  Girder Bridge
• 3.2 miles of four lane roadway with

  300,000 cubic yards of excavation
  and embankment
• 90,000 tons of crushed rock

• 50,000 tons of asphalt

• a 66 inch steel high pressure irriga-

  tion line
• along with signing, illumination,

  guideposts, guardrail and pave-
  ment markings.




             1133 W. Columbia Drive   P.O. Box 7287    Kennewick, WA 99336    Phone 509-586-1104
                      Fax 509-585-3686     Email info@apollosm.com    Web www.apollosm.com
      Inc.
      Columbia Center Blvd BNSF Rail Road Grade Separation

The City of Kennewick awarded Apollo, Inc., the task of constructing
a pre-stressed grade separation bridge structure, 81 feet in length,
for Columbia Center Blvd. A $7,406,963 valued project. The goal of
the project is lowering and re-aligning 7,850 linear feet of BNSF Rail
Road track including the installation of approximately 5,150 linear
feet of storm drain, 746,000 cubic yards of earthwork haul, and
street reconstruction.


  The scope of work included:
   • Complete construction of bridge
     structure for Columbia Center Blvd
   • Removing 746,000 cubic yards of
     dirt over a mile of land
   • Replacing over a mile of new track.
   • Reconstruction of Columbia Center
     Boulevard.




                           Phone (509) 586-1104 Fax (509) 585-3686
                      Web: www.apollosm.com Email: info@apollosm.com
                1133 West Columbia Drive P.O. Box 7287 Kennewick, WA 99336
         Inc.
                              CREEKSTONE DEVELOPMENT




                   The $2.4 million dollar Creekstone Development
                for Newland Communities was a Two-Phased Project.
Phase I Project Included:
• Installation of sanitary and sewer systems
• Storm water collection facilities
• Domestic water system
• Irrigation system
• Street lighting
• Asphalt paving
• Concrete curb
• Gutter
• Sidewalks

Phase II Project Included:
• 2,500 linear feet of 8 inch sanitary sewer with manholes
   and services
• 2,000 linear feet of 24 inch storm drain with manholes
   and catch basins
• 4,000 linear feet of 8 inch water main with fire hydrants
   and services
• 12,000 linear feet of curb and gutter
• 1,700 square yard of concrete sidewalk
• 5,000 tons of roadway base course
• 171,225 square feet of asphalt paving

Work included installation of 2,000 linear feet of 30 inch
ductile iron water transmission mainline for the City of
Kennewick. The project was successfully completed on
time and under budget.




                              Phone (509) 586-1104 Fax (509) 585-3686
                         Web: www.apollosm.com Email: info@apollosm.com
                   1133 West Columbia Drive P.O. Box 7287 Kennewick, WA 99336
         Inc.
                                                                                                                             RECENT PROJECT EXPERIENCE                                                                                                                                                                1
               APOLLO, INC.
                                                                                                                                     OVER 100K

          OWNER                               PROJECT                       LOCATION       VALUE            GENERAL     DESIGN ENGINEER             CONTACT                CONTACT ADDRESS             STATUS     START/STOP                                     DESCRIPTION


                                                                                                                                                                                                                               New construction or regional wastewater reclamation plant at an existing site
                                                                                                                                                                                                                               including the following: Influent structure, SBR, reaeration/equalization basin,
                                                                                                                                                                                                                               filter/UV building and equipment, sludge lagoons, in plant pump station, operatio
                                                                                                                                                                                                                               building with laboratory, constructed beneficial use wetlands, electrical including
                                                                                                                                                                                                                               power service and standby power generator, and site work including grading,
                            Cowiche Regional Wastewater Reclamation                                                                           (425) 881-7430           4032 148th Ave. NE,                                     entry road, fencing, site piping
Cowiche Sewer District      Plang                                         Cowiche, WA     $2,659,576.00 Apollo, Inc.   American Engineering   Cheryl Gerard            Redmond, WA 98052              Complete   7/01-8/02
                                                                                                                                                                                                                               Construction of wastewater treatment plant secondary process and related
                            Wastewater Treatment Plant Secondary                                                       City of Bend, Public   (541) 385-6677                                                                   improvements consisting of the control building expansion, aeration basin
City of Bend                Process & Related Improvements                Bend, OR        $2,843,776.00 Apollo, Inc.   Works                  Bob Griffith             P O Box 431, Bend, OR 97709 Complete      7/01-7/02     expansion and relocating the lime feed system.
                                                                                                                                              (509) 585-4249     Ron 210 West 6th Avenue,                                      Construction of 2,374 linear feet of 30-inch concrete sanitary sewer and misc.
City of Kennewick           Columbia Drive Sewer & Water                  Kennewick, WA    $637,568.15 Apollo, Inc.    City of Kennewick      McKinsey               Kennewick, WA 99336              Complete   9/01-3/02     water and storm sewer installations.

                                                                                                                                                                                                                               Removal and land application of biosolids from two digested sludge/supematant
                                                                                                                                                                                                                               lagoons, relining of Lagoon No. 2 with hydraulic asphalt and membrane, adding
                                                                                                                                                                                                                               was/Scum piping, addition of new aerator, equipment, replacement of an exterio
                                                                                                                                                                                                                               mounted MCC, replacement of existing aerator power cables, rehab of waste
                            Wastewater Biosolids Removal Lagoon                                                                               (509) 542-0011           2805 St. Andrews Loop, Suite                            site pump and vactor pad, and misc. appurtenances.
City of Kennewick           Rehabilitation Project                        Kennewick, WA   $2,588,371.00 Apollo, Inc.   HDR Engineers          Beth A. Kochur, P.E.     A, Pasco, WA 99301             Complete   8/01-6/02

                                                                                                                                                                                                                               Schedule A-Street improvements: New concrete sidewalks, clearing and
                                                                                                                                                                                                                               grubbing, concrete box culvert installation, roadway excavation, subgrade
                                                                                                                                                                                                                               preparation, asphalt paving and street illumination. Schedule B-Utility
                                                                                                                                                                                                                               Improvements: 12" ductile iron water main and appurtenances with connections
                                                                                                                                                                                                                               to existing water mains, installation of fire hydrant assemblies, valves and various
                                                                                                                                                                                                                               size service stubs. 8" PVC sanitary sewer main including manholes, future
                            North Prosser Business Park Street and Utility                                             Huibregtse, Louman     (509) 966-7000          801 North 39th Avenue,                                   service stubs, and side services.
City of Prosser             Improvements                                   Prosser, WA     $533,071.69 Apollo, Inc.    Associates             Steven Szeibert         Yakima, WA 98902                Complete   10/01-8/02
Orchard Hills Medical                                                                                                  Orchard Hill Medical   (509) 735-2255     Greg 8551 Gage Blvd., Ste. A,                                 Three story medical office building shell with parking area and site
Office Bldg.                Orchard Hills Medical Office Bldg.            Kennewick, WA   $1,315,296.00 Apollo, Inc.   Office Bldg.           Markel                  Kennewick, WA 99336             Complete   12/01-5/02    improvements.

                                                                                                                                                                                                                               Furnishing and installing chlorine disinfections systems to Well No. 1,2,3,5,6 and
                                                                                                                                                                                                                               7. Improvements include installation of the systems, power service upgrades,
Asotin Co. Public Utility   Asotin 2001 Disinfection System                                                                                   (208) 345-5310     Craig P O Box 8748, Boise, WA                                 well building additions and misc. piping additions.
District No. 1              Improvements                                  Asotin, WA       $376,187.00 Apollo, Inc.    CH2M Hill              Anderson                 83707-2748                     Complete   12/01-1/02
                                                                                                                                                                       128 North 2nd Street, Room                              Construct new 75 foot girder bridge. Widen an existing concrete box culvert
Yakima County Public                                                                                                   Yakima County Public   (509) 574-2319     Rae   408 Courthouse, Yakima, WA                              bridge. Widen existing two-lane road to four lanes for one mile.
Works                       Terrace Heights Area Improvements             Yakima, WA      $2,586,003.00 Apollo, Inc.   Works                  Sunderland               98901                          Complete   11/01-7/02

                                                                                                                                                                                                                               Installing 60,000 ft of C-905 PVC from 16 to 22 inches, constructing two pump
                                                                                                                                              (208) 454-4475           P. O. Box 1059, Caldwell, ID                            stations and associated mechanical in a period of eight weeks
J. R. Simplot Co.           Simplot Pipeline and Pump Station             Hermiston, OR    $949,887.00 Apollo, Inc.    J.R. Simplot Co.       Wayne Ernst              83606                          Complete   1/02-3/02
                                                                                                                                              (509) 539-5000 Glen      464 Anthony Avenue,                                     Ten unit strip mall complete including all utilities, site work, building and
TFG,LLC                     Gage Retail Center                            Kennewick, WA    $800,000.00 Apollo, Inc.    TFG, LLC               Englehard                Richland, WA 99352             Complete   1/02-4/02     excavation.


                                                                                                                                                                                                                               Replacement of bridge consisting of removing all existing structures, including th
                                                                                                                                                                                                                               deck, girders, abutments, piers and piles, all attachments, bridge and approach
                                                                                                                                                                                                                               railing and signs. Restore channel slopes disturbed by the construction of bridge
                                                                                                                                                                                                                               with hand-placed riprap, construction of two reinforced concrete abutment walls
                                                                                                                                                                       128 North 2nd Street, Room                              with wingwalls, installation of 6 precast girders, installation of bridge and
                                                                                                                                                                                                                               approach guardrail system and reconstruction of the asphalt roadway approach.
Yakima County Public                                                                                                   Yakima County Public   (509) 574-2319     Rae   408 Courthouse, Yakima, WA
Works                       Dekker Road Bridge No. 666                    Grainger, WA     $225,451.00 Apollo, Inc.    Works                  Sunderland               98901                          Complete   1/02-3/02
                                                                                                                                                                                                                               Perform Site Work, Utilities, Earthwork construction - excavation/embankment
John S. Foggy & James R.                                                                                                                      (509) 679-9959           2535 Duportail Street,                                  and subgrade for parking lot construction; gravel access road, hydroseeding, an
Halford                  Duportail Apts. Site Utilities                   Richland, WA     $522,028.66 Apollo, Inc.    James R. Halford       James R. Halford         Richland, WA 9959              Complete   2/02-6/02     sewer manholes.
                                                                                                                                                                                                                               Rehabilitation of six sewage lift stations including demolition of two existing
                                                                                                                                                                                                                               pumping facilities, installation of submersible pumps, plumbing, electrical,
                                                                                                                                                                                                                               telemetry improvements and installation of radio telemetry; installation and
                                                                                                                                              (509) 585-4249,    Tim 210 West 6th Avenue,                                      configuration of wastewater flow monitoring devices; and additional
City of Kennewick           Lift Station and Flowlogging                  Kennewick, WA    $562,840.00 Apollo, Inc.    City of Kennewick      Richman                Kennewick, WA 99336              Complete   2/02-6/02     improvements.
                                                                                                                                              (509) 659-3276         210 West Alder, Ritzville, WA                             Replacement of existing superstructure with precast prestressed concrete
Adams County                Batum East Bridge #297-1                      Adams Co.        $102,508.00 Apollo, Inc.    Adams County           Scott Yaeger           99169                            Complete   5/02-7/02     superstructure and reconstruct bridge approaches.

                                                                                                                                                                                                                               Schedule A-Water Treatment Plant consisting of construction of 13,000 sq ft
                                                                                                                                                                                                                               metal filter bldg., additional process equipment, on-site chlorine generation
                                                                                                                                                                                                                               system, high-level pump station, settling basins, 1.8 million gallon welded steel
                                                                                                                                                                                                                               tank, associated and associated yard piping.          Schedule B-River Intake/Pump
                                                                                                                                                                                                                               Station consisting of construction of 1,300 sq ft concrete block pump bldg. and
                                                                                                                                                                                                                               equipment, 20-foot deep concrete wetwell, 350 sq ft intake structure, deepening
                                                                                                                                                                                                                               of river channel, boring a 42-inch casing under RR R-O-W, installing 25-inch
                                                                                                                                              (541) 966-0202     Bob 500 S.W. Dorion, Pendleton,                               ductile iron river water pipeline, and other facilities.
City of Pendleton           Water Supply Development Project              Pendleton, OR   $6,246,154.00 Apollo, Inc.   City of Pendleton      Patterson              OR 97801                         Complete   3/02-7/03
                                                                                                                               RECENT PROJECT EXPERIENCE                                                                                                                                                                     2
             APOLLO, INC.
                                                                                                                                       OVER 100K

         OWNER                               PROJECT                     LOCATION           VALUE            GENERAL      DESIGN ENGINEER              CONTACT                 CONTACT ADDRESS              STATUS       START/STOP                                    DESCRIPTION

                                                                                                                                                                                                                                      Demolition of sewer lift station and construction of approx. 1,310 lf of 8" water,
                                                                                                                                                 (509) 527-4537            P O Box 478, Walla Walla, WA                               970 lf of 8" through 24" gravity sewer, 2 blocks of roadway reconstruction and 1
City of Walla Walla         2002 Sewer and Water Improvements         Walla Walla, WA       $438,452.00 Apollo, Inc.     City of Walla Walla     Kelly McFarley            99362                        Complete        4/02-7/02     block of ACP overlay.
                                                                                                                         Huibregtse, Louman      (509) 966-7000            801 North 39th Avenue,                                     Furnish and install 2800 lf of 8" ductile iron water main, 9 gate valves, 4 fire
Town of Naches              SR-12 Water and Sewer Extension           Naches, WA            $191,758.00 Apollo, Inc.     Associates              Steven Sziebert           Yakima, WA 98902             Complete        4/02-6/02     hydrants, 2 ditch crossing and 1 open-cut crossing of SR 12.
                                                                                                                                                 (509) 527-4537            P O Box 478, Walla Walla, WA                               Work consists of including influent screen, sludge storage canopy, sludge mixer,
City of Walla Walla         Walla Walla WWTP Upgrade - Phase-2        Walla Walla, WA       $844,576.00 Apollo, Inc.     City of Walla Walla     Frank Nicholson           99362                        Complete        3/02-12/02    laboratory remodel, and civil work.
White-Leasure                                                                                                            White-Leasure           (208) 345-1842            P O Box 1277, Boise, ID
                                                                                                                                                                                                                                      Site work and site utilities.
Development Co.             Colonnade Phase 3                         Kennewick, WA         $477,033.00 Apollo, Inc.     Development Co.         Gary D. Himes             38701-1277                   Complete        4/02-8/02
                                                                                                                                                                                                                                      Metal bldg. Erection and all sheeting, Electrical work that includes small power
                                                                                                                                                 (509) 371-4947            3000 George Washington                                     and lighting, overhead door installation, metal studs and drywall installation and
Department of Energy        B of F Pre-Engineered Metal Bldg.         Richland, WA         $2,061,168.00 Bechtel Nat'l   Bechtel National        Ken Swanson               Way, Richland, WA 99352         In Process   4/02-11/05    finishing, painting, and masonry.

                                                                                                        Renewable        Renewable Energy        (509) 585-6764     Chris 92308 S. Nine Canyon Road,                                  Demolition work, Visitor Center, Fire Water Tank, and Metal Building
Energy Northwest            Nine Canyon Wind Farm                     Kennewick, WA         $317,151.00 Energy System    System                  Hills                    Kennewick, WA 99338              Complete     4/02-9/02
                                                                                                                                                (509) 875-4418             P O Box 231, Patterson, WA                                 Concrete work, site work, tank setting & placement, demolition and iron work on
Stimson Lane Vineyards      Snoqualimie Winery                        Prosser, WA           $415,669.00 Apollo, Inc.     Stimson Lane Vineyards Bill Hamlin                99345                           Complete     4/02-8/02     existing building.
                                                                                                                                                 (509) 783-3435     Rick   7601 W. Clearwater,                                        Constructing partial slab on grade w/ basement metal bldg., steel stud framing,
Community First Bank        Community First Bank                      Kennewick, WA         $734,661.00 Apollo, Inc.     Community First Bank    Peenstra                  Kennewick, WA 99336             Complete     3/02-8/02     brick veneer and EIFS system.
Prosser Public Hospital                                                                                                                          (509) 575-5408            1310 N. 16th Avenue, Yakima,                               Addition of a 2400 sq ft modular bldg. - foundation and site work, 38 stall parking
District                  Prosser Clinic Addition & Parking Lot       Prosser, WA           $326,970.00 Apollo, Inc.     KDF Architecture        Jon Hopwood               WA 98902                     Complete        4/02-9/02     lot w/ associated landscaping, sidewalk and curbing.
Kennewick Public Hospital                                                                                                Dillman-luvaas          (509) 943-1796            660 Symons Street, Richland,
                                                                                                                                                                                                                                      Remodel of 8000 sq ft of interior of ICU space.
District                  Kennewick General Hospital                  Kennewick, WA         $552,887.00 Apollo, Inc.     Architects, P.S.        Lyman Luvaas              WA 99352                     Complete        5/02-12/02

                                                                                                                                                                                                                                      Construction of headworks, HDPE lined aeration basin, pump station, structural
                                                                                                                                                                                                                                      concrete, a pre-fabricated metal control bldg., UV disinfection, electrical controls
                                                                                                                                                 (360) 733-6100            805 Dupont Street,                                         instrumentation, telemetry, yard piping and related work.
City of Moses Lake          Larson Wastewater Treatment Plant         Moses Lake, WA       $2,013,271.72 Apollo, Inc.    Wilson Engineering      Jeff Christner            Bellingham, WA 98225            Complete     6/02-2/03
                                                                                                                                                                                                                                      Sludge removal and disposal; removal and replacement of influent piping and
                            Wastewater Treatment Facility Improvements                                                   Thomas, Dean &          (509) 622-2888            303 East Second Avenue,                                    manholes; preparation, shaping, and installation of synthetic liner; chainlink
Town of Rockford            Phase 2                                    Rockford, WA         $609,789.00 Apollo, Inc.     Hoskins                 Randy Noble               Spokane, WA 99202               Complete     9/02-11/02    fencing, and crushed surfacing.

                                                                                                                                                                                                                                      Demolition of existing pump station building and manhole No. 1, replacement of
                                                                                                                                                                                                                                      pumps and piping, construction of a new above-ground auxiliary bldg which
                                                                                                                                                                                                                                      contains an emergency generator and electrical control room, access road
                            Pump Station No. 1 and Forcemain                                                                                     (206) 443-5300            1917 First Avenue, Seattle, WA                             paving, and associated utility modifications.
City of Snoqualmie          Renovation                                Snoqualmie, WA        $574,635.00 Apollo, Inc.     Tetra Tech/Kcm, Inc.    Dennis Eckhardt           98101                          Complete      7/02-12/02
                                                                                                                                                                           16701 SE McGillivray Blvd.,
Newland Communities,                                                                                                                             (360) 254-0933            Ste. 150, Vancouver, WA                                    Install approximately 3,000 lf of 30" storm drain pipe and 72' manholes.
LLC                         12th Avenue Storm Drain                   Kennewick, WA         $207,570.00 Apollo, Inc.     Newland Communities     Jennifer Elson            98683-3417                     Complete      6/02-8/02
                                                                                                                                                 (509) 430-4788            1276 N. Bermuda Road,                                      Roadway excavation and grading, site utilities, and asphalt paving for a 40 acre
Bill and Holly Wilson       Badger Mountain Plateau                   Kennewick, WA         $523,592.00 Apollo, Inc.     Bill and Holly Wilson   Bill Wilson               Kennewick, WA 99338             Complete     2/02-8/02     housing development.
                                                                                                                                                                           16701 SE McGillivray Blvd.,
                                                                                                                                                                                                                                      Site grading, storm drain construction, street lighting, asphalt paving, and
Newland Communities,                                                                                                                             (360) 254-0933            Ste. 150, Vancouver, WA
                                                                                                                                                                                                                                      concrete work for a 85,000 sf RV parking lot.
LLC                         Creekstone RV Parking                     Kennewick, WA         $115,339.00 Apollo, Inc.     Newland Communities     Jennifer Elson            98683-3417                      Complete     6/02-7/02
                                                                                                                                                                                                                                      Installation of 6" D.I water main; 8" water main; 1" water services; 2" asphalt
                            Benham/Barth Water and Sewer                                                                                         (509) 942-7390            505 Swift Blvd., Richland, WA                              patch; fire hydrant assembly; new sanitary sewer manhole; 4" sewer services;
City of Richland            Improvements                              Richland, WA         $1,038,000.00 Apollo, Inc.    City of Richland        Jay Marlow                99352                           Complete     7/02-12/02    and 8" sewer main.

                                                                                                                                                                                                                                      Remove and replace fish ladder weirs in 800' long fish bypass tunnel. Install new
Confederated Tribes and                                                                                                  Harbor Engineering      (206) 709-2397            3006 Fuhrman Avenue East,
                                                                                                                                                                                                                                      water level control gate on face of dam.
Bands of Yakima Nation      Castile Falls Fishway Improvements        Castille Falls, WA    $592,927.00 Apollo, Inc.     Company                 John R. Hutchins          Seattle, WA 98102               Complete     8/02-9/02

                                                                                                                                                                                                                                      Rehabililitating existing steel water storage tank, demolish (2) well houses and
                                                                                                                                                                           2810 West Clearwater Avenue,                               booster station; replace well submersible well pumps, construct control bldg w/
                                                                                                                                                 (509) 783-2144            Ste. 201, Kennewick, WA                                    associated site, electrical/control, chlorination system and piping.
WSU Facilities Operations   WSU Prosser - Well Site Improvments       Prosser, WA           $388,128.00 Apollo, Inc.     J.U.B. Engineers        Alan Gesbrecht            99336                        Complete        8/02-11/02
                            Cle Elum Regional Water System                                                               Huibregtse, Louman      (509) 966-7000            801 North 39th Avenue,
                                                                                                                                                                                                                                      New water treatment and river intake facility with a design flow of 2800 gpm.
City of Cle Elum            Improvements                              Cle Elum, WA         $7,471,789.00 Apollo, Inc.    Associates              Steven Szeibert           Yakima, WA 98902             Complete        8/02-7/03
                                                                                                                                                                                                                                      Replacement of Whitman Bridge w/ two-span, 200' bridge w/ precast concrete
                                                                                                                                                                                                                                      girders, cast-in-place concrete deck, and steel pile supported concrete
                                                                                                                         Anderson Perry &        (509) 529-9260            214 E. Birch, Walla Walla, WA                              abutement walls and center pier; approach roadway including asphalt concrete
Walla Walla County          Whitman Bridge                            Walla Walla, WA      $1,147,174.00 Apollo, Inc.    Associates              Brandon Franklin          99362                         Complete       8/02-1/03     pavement and guardrail.
                                                                                                                                                 (509) 527-4537            P O Box 478, Walla Walla, WA                               Pump and dewater pond to allow dredging to deepen pond. Install new asphalt
City of Walla Walla         Pioneer Park Pond Rehabilitation          Walla Walla, WA       $120,178.00 Apollo, Inc.     City of Walla Walla     Alan Crawford             99362                         Complete       8/02-10/02    walk way.

                                                                                                                                                                                                                                      Construction of a 150 million gallon effluent storage lagoon. Work includes
                                                                                                                                                                                                                                      300,000 cy excavation and embankment. Construction of concrete intake, outle
                                                                                                                                                                                                                                      and overflow structures. Installation of inlet and outlet piping systems. All work
                                                                                                                                                (208) 454-4475             P. O. Box 1059, Caldwell, ID                               completed within the owner required six week time frame.
J. R. Simplot Co.           Simplot-Pump Station Lagoon               Hermiston, OR        $1,153,876.00 Apollo, Inc.    J.R. Simplot Co.       Wayne Ernst                83606                           Complete     8/02-9/02
                                                                                                                                                (920) 887-7375             100 Park Avenue, Beaver
                                                                                                                                                                                                                                      Construction of 25 yard p[ool with diving ell and related site upgrades.
City of Richland            George Prout Pool                         Richland, WA          $765,295.00 Apollo, Inc.     Water Technology, Inc. Matthew Freeby             Dam, WI 53916                   Complete     8/02-6/03
                                                                                                                               RECENT PROJECT EXPERIENCE                                                                                                                                                                    3
            APOLLO, INC.
                                                                                                                                       OVER 100K

         OWNER                               PROJECT                      LOCATION           VALUE            GENERAL     DESIGN ENGINEER              CONTACT                   CONTACT ADDRESS             STATUS      START/STOP                                    DESCRIPTION

                                                                                                                                                                                                                                      Installation of dbl containment pipe system approx. 1 1/2 mile of pipe. inner pip
                                                                                                                                                                                                                                      is 3" stainless and outside pipe is 6" carbon. Project quality requirements are
                                                                                                                                                 (509) 373-3471       T.J.   P O Box 1500, Richland, WA                               NQA-1. Paroject also includes earthwork, and instrumentation for monitoring the
Department of Energy       TFC/WTP Transfer Piping System               Richland, WA        $1,735,886.00 CH2M Hill      CH2M Hill               Parkes                      99352                          Complete    10/02-12/03   encasement pipe.

                                                                                                                                                                                                                                      Construct CMU block bldg.; install onsite generation unit for chlorine w/ water
                                                                                                                                                                                                                                      softener; construct an infiltration basin and evaporation trench; install pip;ing
                                                                                                                                                 (509) 453-4833              107 S. 3rd St., Yakima, WA                               valves and appurtenances; and install electrical and control equipment
City of West Richland      West Richland Well No. 9                     W. Richland, WA      $245,170.80 Apollo, Inc.    Gray & Osbourne, Inc.   Dave VanCleve               98901                          Complete    7/02-9/02
                                                                                                                                                                                                                                      New picnic shelter, horseshoe court, site upgrade existing concession/resstroom
                                                                                                                                                  (509) 585-4293             P O Box 6108, Kennewick, WA                              renovations, construction of 3800 sf concrete pad w/ associated H20 toys and
City of Kennewick          Columbia Park Aquatic Playground             Kennewick, WA        $377,752.89 Apollo, Inc.    City of Kennewick        Cindy Cole                 9936                           Complete    10/02-4/03    utilities.
                                                                                                                         Canyon Lakes Golf        (509) 582-3736             3700 Canyon Lakes Drive,
                                                                                                                                                                                                                                      50' x 100' metal building with office and restroom.
Canyon Lakes Golf Course Canyon Lakes Maintenance Bldg.                 Kennewick, WA        $116,031.00 Apollo, Inc.    Course                   Mike Lundgren              Kennewick, WA 99336            Complete    8/02-11/02
                                                                                                                                                  (509) 539-5000             1915 Sheridan Place, Richland,
                                                                                                                                                                                                                                      46,000 square foot of cmu office building with site improvements.
Quinault Properties, LLC   Quinault Professional Center                 Kennewick, WA        $890,337.00 Apollo, Inc.    Quinault Properties, LLC Glenn Englehard            WA 99352                       Complete    8/02-11/02
                                                                                                                                                                                                                                      Construction of two metal builing maintenance facilities plus infrastructure work
Washington                 Infrastructure Preparation and Erection of                                                    Washington              (541) 564-7000              78068 Ordnance Road,
                                                                                                                                                                                                                                      for facility.
Demilitarization Company   Maintenance Buildings                        Hermiston, OR        $750,478.00 Apollo, Inc.    Demilitarization Co.    W. H. English               Hermiston, OR 97838            Complete    9/02-1/03
                                                                                                                                                 (509) 838-0933 Dee          104 S. Division, Spokane, WA
                                                                                                                                                                                                                                      Clearing, mass excavation and sewer, storm and water utilities.
Robert Young & Associates Villas at Meadow Springs                      Richland, WA         $470,823.00 VMSCI, LLC      VMSCI, LLC              McGonigle                   99202                          Complete    9/02-4/03
                                                                                                                                                                                                                                      Install new water intake structure with fish protection screening, raise height of
                           Naches River Water Treatment Plant/Raw                                                                                ((208) 376-2288             12592 W. Explorer Drive, Ste.                            intake channel, install weirs on outflow channel, and re-route irrigation return
City of Yakima             Water Intake Project                         Naches, WA          $1,304,211.96 Apollo, Inc.   Carollo Engineers       Paul Walker, P.Ee.          200, Boise, ID 93713          Complete     10/02-2/03    flows.
                                                                                                                                                                             16701 SE McGillivray Blvd.,                              Project consisting of 10,000lf of irrigation mainline installation, 7ea zonal valve
Newland Communities,                                                                                                                             (360) 254-0933              Ste. 150, Vancouver, WA                                  stations, and 170ea services.
LLC                        Creekstone Phase 2, 8 and 9 Irrigation       Kennewick, WA        $175,198.33 Apollo, Inc.    Newland Communities     Jennifer Elson              98683-3417                    Complete     1/03-3/03
                                                                                                                                                                                                                                      Project consisting of rock crushing & processing, roadway excavation, sewer
                                                                                                                                                                                                                                      line, storm system, 8” waterline, 16” waterline, 30” waterline, f of curb and gutte
                                                                                                                                                                                                                                      sidewalk, asphalt paving, construction of 50’ Conspan bridge, and 3concrete
                                                                                                                                                                             16701 SE McGillivray Blvd.,
                                                                                                                                                                                                                                      encased irrigation canal utility crossings.
Newland Communities,                                                                                                                             (360) 254-0933              Ste. 150, Vancouver, WA
LLC                        Creekstone Phase 8                           Kennewick, WA       $1,177,455.00 Apollo, Inc.   Newland Communities     Jennifer Elson              98683-3417                     Complete    12/02-6/03

                                                                                                                                                                                                                                      Cold plane pavement removal, asphalt overlay, and sidewalk ramps as well as
                                                                                                                                                                                                                                      minor additions to the storm drain system. This work also includes the addition o
                                                                                                                                                                                                                                      curb and gutter, sidewalks, storm drain, asphalt, bridge replacement and street
                                                                                                                                                                                                                                      trees on Lamb Street from NW 8th Avenue to City Limits. The work will include
                                                                                                                                                                                                                                      5,379 tons of asphalt concrete, 752 sf of precast prestressed bridge slab,
                                                                        Milton-Freewater,                                                        (509) 529-8102 Gary         214 E. Birch, Walla Walla, WA                            sanitary sewer relocation, and irrigation pipe replacement
City of Milton-Freewater   Hi-Way 339 Preservation/Modernization        OR                   $735,291.08 Apollo, Inc.    Anderson Perry          Allgood                     99362                         Complete     1/03-5/03
                                                                                                                                                                                                                                      Construction of 80" by 30' wide by 5.5' deep concrete pond. Pond will be fed by
Confederated Tribes and                                                                                                                         (206) 888-4171        46208 SE 139th Place North                                      five 6" PVC lines. Approximately 200 LF of ditch excavation and backfill for the
Bands of Yakima Nation     Prosser Hatchery Waste Treatment Pond        Prosser, WA          $108,983.00 Apollo, Inc.    Sea Springs Co.        Greg Ferguson         Bend, WA 98045                        Complete    1/03-2/03     installation of 12" PVC water lines.
                                                                                                                         Washington State Parks
Washington State Parks &                                                                                                 & Recreation           (360) 902-8500 Steven 7150 Cleanwater Lane,                                           Repairs and span replacements on bridge.
Recreation Commission    Iron horse State Park - Lake Easton Bridge     Easton, WA           $955,322.00 Apollo, Inc.    Commission             Wright                Olympia,WA 98504-2650                 Complete

                                                                                                                                                                                                                                      Construction of wood frame building of about 16,100 sf including mechanical,
Grant County Family                                                                                                      M.J. Neal Associates    (509) 663-6455       Brad 200 Palouse Street, Ste. 202,                              electrical, plumbing systems and surface finishes along with site improvements.
Services                   Grant County Family Services                 Moses Lake, WA      $1,391,516.52 Apollo, Inc.   Achitects               Brisbine                  Wenatchee, WA 98807              Complete    9/02-4/03
                                                                                                                                                                                                                                      Structure and a main and lower level. Const. is cast-in-place concrete steel joist
Walla Walla Community                                                                                                    SCM Architects &        (509) 522-3636 Ed           104 S. 2nd Street, Walla Walla,                          and beam floor system, wood framed w/ an exterior efis finish and tile roof
College                    Institute of Enology & Viticulture           Walla Walla, WA     $1,883,053.00 Apollo, Inc.   Planning                Luebben                     WA aa99362                      Complete   10/02-4/03    system.

                                                                                                                                                                                                                                      Demolish portions of two existing Ranney collector structures. The structures will
                                                                                                                                                                                                                                      be brought to grade with surrounding ground elevation and a pre-cast concrete
                                                                                                                                                 (509) 546-2040 Linda 2805 St. Andrews Loop, Suite                                    viewing platform w/ safety railing will be placed.
Port of Kennewick          Ranney Collector Improvement                 Kennewick, WA        $115,490.00 Apollo, Inc.    HDR Engineers           Boomer               A, Pasco, WA 99301                    Complete    12/02-3/03
                                                                                                                                                                                                                                      Project includes two 10.5k sq ft roof only bldgs. With asphalt under roof for boat
                                                                                                                                                                                                                                      and or RV storage and will also have un-covered storage around property
                                                                                                                                                                                                                                      perimeter fenced and landscaped. Support columns are configured (column
                                                                                                                                                 (360) 378-5521 Maurice P O Box 518, Friday Harbor,                                   lines are at a 60 degree angle to the eve line) making these sheds the first of
James Cantrey              Pasco Covered Mini Storage                   Pasco, WA            $184,135.00 Apollo, Inc.    Mcadeli II Group        Leibman                WA 98250                            Complete    12/02-2/03    their kind in Tri-City area.
                                                                                                                                                                                                                                      Work consists of installing pump station, pumps, supply water line to existing fish
Confederated Tribes and                                                                                                                          (206) 888-4171            46208 SE 139th Place North                                 ponds. Refurbishing existing concrete fish ponds drain lines, grating, water
Bands of Yakima Nation     Leavenworth Fish Hatchery                    Leavenworth, WA      $262,853.00 Apollo, Inc.    Sea Springs Co.         Greg Ferguson             Bend, WA 98045                   Complete    2/03-4/03     supply system, and electrical upgrades.
                                                                                                                                                 (509) 585-4249       Alex 210 West 6th Avenue,                                       Installation of 7,276 LF of 8" to 15" PVC fold and form pipe liner; 1,611 LF of
City of Kennewick          Kennewick Misc. Sewer Phase 2                Kennewick, WA        $498,737.10 Apollo, Inc.    City of Kennewick       DeLepena                  Kennewick, WA 99336              Complete    3/03-6/03     trench instlled 8" sewer main and related construction.

                                                                                                                                                                                                                                      Construction of a 1600 sf CMU structure, piping, mechanical, electrical and
                                                                                                                                                 (509) 886-2900       Ryan 300 Simon Street SE, Ste. 5,
                                                                                                                                                                                                                                      control equipment to upgrade the existing surge control facility.
City of Wenatchee          Regional Surge Facility Improvement          Wenatchee, WA        $327,422.52 Apollo, Inc.    RH2 Engineering         Peterson                  East Wenatchee, WA 98802         Complete    4/03-7/03
                                                                                                                                      RECENT PROJECT EXPERIENCE                                                                                                                                                                       4
                APOLLO, INC.
                                                                                                                                              OVER 100K

         OWNER                               PROJECT                        LOCATION            VALUE            GENERAL         DESIGN ENGINEER               CONTACT                 CONTACT ADDRESS             STATUS     START/STOP                                     DESCRIPTION

                                                                                                                                                                                                                                           Construction of new pump station on shore of Snake River; renovation and
                                                                                                                                                                                                                                           upgrading of an existing infiltration pump station; construction of approx. 6000 sq
                                                                                                                                                                                                                                           ft block water treatment plant containing a mixer, flocculation tanks, ultrafiltration
                                                                                                                                                                                                                                           membranes, chemical feed and a lab and office; construction of new chlorine
                                                                                                                                                         (208) 467-5252 Bryan 217 W. Georgia Avenue, Ste.                                  appurtenances.
City of Glenns Ferry        Water Treatment Plant                         Glenns Ferry, ID $4,858,.654.55    Apollo, Inc.       J-U-B Engineers          Donaldson            120, Nampa, ID 83686                Complete   06/03-04/04

                                                                                                                                                                                                                                           Installation of ductile iron water main; 3" water service lines; water valves;
                                                                                                                                                                                                                                           connections to existing waterlines and connections to existing water services
                                                                                                                                                                                                                                           lines; 8" sewer mains sewer service lines; sewer manholes; connections to
                                                                                                                                                                                                                                           existing sewer mains and connections to existing sewer services; 2 water main
                                                                                                                                                                                                                                           crossing of the railroad; curb to curb reconstruction of 565 feet of 66 feet wide
                                                                                                                                                                                                                                           Main Street including side street connections, traffic control and other related
                            2003 Sewer and Water Replacement (Main                                                              Anderson, Perry &        (509) 529-9260     Gary P O Box 1687, Walla Walla,                                work.
City of Walla Walla         Street Improvements, Phase 1)                 Walla Walla, WA        $389,088.28 Apollo, Inc.       Associates               Allgood                 WA 99362-0032                    Complete   05/03-07/03
                                                                                                                                                                                                                                           Excavation, backfilling and compacting for utilities; trench excavation protection;
                                                                                                             J.E. Dunn                                   (503) 978-0800            437 N. Columbia Blvd.,                                  erosion and sediment control; water system; sewer systems; and storm drain
Wal-Mart Stores East, LP    Grandview Walmart Distribution Center 7021    Grandview, WA          $932,200.00 Construction       J.E. Dunn Construction   Joseph Bolkovatz          Portland, OR 97217             Complete   05/03-08/03   system with hancor pipe.

                                                                                                                                                                                                                                           McCain Foods Project is an upgrade to their water supply system. This System
                                                                                                                                                                                                                                           will put a new 1800 gal. per min. well on line to support the existing well. This
                                                                                                                                                                                                                                           system will have 1500 feet of HDPE pipe, 20'x 60' stand pipe, rework of their
                                                                                                                                                                                                                                           header system to feed water to the plant and to the City if needed. There will be
                                                                                                                                Parker, Messana &        (509) 764-0883 Kevin 406 W. Broadway Avenue, Ste.                                 a new well house and other misc. underground piping.
McCain Foods, USA           Water Supply System Upgrade                   Othello, WA            $286,051.00 Apollo, Inc.       Associates, Inc.         Stively              A, Moses Lake, WA 97737      Complete          05/03-07/03

                                                                                                                                                                                                                                           Construction of PVC sanitary sewer. Work includes trench excavation;
                                                                                                                                                                                                                                           dewatering; removal of existing sanitary sewer pipe and sanitary sewer
                                                                                                                                                                                                                                           manholes; demolition of existing lift station; constructing sanitary sewer manhole
                                                                                                                                                                                                                                           and an irrigation canal under crossing. Work also involves roadway excavation
                                                                                                                                                                                   2810 West Clearwater Avenue,                            an embankment construction for future extension of Keene Rd; pavement
                                                                                                                                                         (509) 783-2144     Bill   Ste. 201, Kennewick, WA                                 restoration, gravel driveway restoration, hydroseeding and related items.
City of W. Richland         South Sewer Interceptor Project-Phase 1       W. Richland, WA      $2,319,671.03 Apollo, Inc.       J-U-B Engineers          Talbot                    99336                        Complete     06/03-12/03
                                                                                                                                                                                                                                           Demo and saw cutting, new rafter w/ columns, 6 new tank pads underground
                                                                                                                                                       (509) 786-8168 Bill         P O Box 1976, Woodinville,                              drains, SS drain covers and power hose station poles. Tank unloading, setting
Stimson Lane Vineyards      Snoqualmie Winery - Tank Pads                 Prosser, WA            $377,766.00 Apollo, Inc.       Stimson Lane Vineyards Hamlin                      WA 98072                       Complete   4/03-9/03     and anchoring, and repair overhead doors.

                                                                                                                                                                                                                                           Tenant improvement to include interior finishes in an existing 2700 sf existing
                                                                                                                                                         (503) 226-9825     Bob 5200 SW Macadam Avenue,
                                                                                                                                                                                                                                           shell.
Merrill Lynch               Merrill Lynch - Kennewick Office Renovation   Kennewick, WA          $174,131.00 Turner Const.      Turner Construction      Andrews                Ste. 370, Portland, OR 97201 Complete        05/03-07/03
                                                                                                                                Department of Energy,
Bonneville Power                                                                                                                Bonneville Power         (509) 358-7363     Grace 2410 E. Hawthorne Road,
Administration              Schultz HMEH Facility                         Ellensburg, WA         $552,901.00 Apollo, Inc.       Administration           Y. Gates                 Mead, WA 99021                  Complete   7/03-11/03
                                                                                                                                                                                                                                           Construction of two roundabouts. Work includes street lights, misc. utility
                            4th Avenue/Union Street and Kennewick                                                                                        (509) 585-4284     Alex   P O Box 6108, Kennewick, WA                             installations, irrigation, landscaping, asphalt concrete street and concrete curbs
City of Kennewick           Avenue/Union Street Roundabouts               Kennewick, WA          $384,855.00 Apollo, Inc.       City of Kennewick        Delapena                  9936                        Complete      7/03-9/03     and sidewalks.

                                                                                                                                                                                                                                           Parking lot to provide 300 addt'l parking spaces. Will entail removing approx 37
                                                                                                                                                                                                                                           lf of railroad track and ties, use existing railroad embakment for initial fill, surface
                                                                                                             Washington                                                                                                                    entire parking area. Reconfigure access road so it travels north and south. Insta
US Army Corps of                                                                                             Demilitarization   Washington               (541) 564-7136            78068 Ordnance Road,                                    300 concrete bumpers.
Engineers                   PSB Parking Lot Expansion                     Hermiston, OR          $216,727.00 Company            Demilitarization Co.     Wally Whitney             Hermiston, OR 97838            Complete   8/03-10/03
                                                                                                                                                                                                                                           Construction of new bathhouse bldg. w/ lobby and shower rooms, a
                                                                                                                                                                                                                                           mechanical/storage bldg., outdoor pool consisting of 6-lane 50 meter pool, a
                                                                                                                                Robertson/Sherwood       (541) 342-8077            132 E. Broadway, Ste. 540,                              7,000 sf multi-use pool, wading pool, associated site development, mechanical
City of Hermiston           Hermiston Community Pool                      Hermiston, OR        $2,918,799.00 Apollo, Inc.       Architects               Brian Hamilton            Eugene, Or 97401               Complete   8/03-5/04     and electrical work.

                                                                                                                                                                                                                                           Work includes construction of a new raw sewage pump station and headworks
                                                                                                                                                         (541) 752-4271 Nancy 2300 NW Walnut Blvd.,                                        with screening capabilities and piping connection to the existing lagoons.
City of Colfax              WWTP Influent Pumping & Headworks             Colfax, WA             $687,830.00 Apollo, Inc.       CH2M Hill                Winslow              Corvallis, OR 97330                 Complete   9/03-4/04
                                                                                                                                                                                                                                           Construction of a pump station, fish ladder connected to rearing ponds and outle
                                                                                                                                                         (425) 482-6420      Paul 3100 - 243rd Street SW, Bier,                            channel, settling basin, adult fish spawning facility and four steel buildings for
Puyallup Tribe of Indians   Clarks Creek Hatchery                         Puyallup, WA         $2,385,464.00 Apollo, Inc.       Fisheries Consultants    Tappel                   WA 98036                        Complete   8/03-3/04     plant operations.

                                                                                                                                                                                                                                           Manage, coordinate and supervise the design and construction of 230' x 390'
                                                                                                                                                                                                                                           bldg. Provide site work for bldg. area, prepare bldg. Pad and compact for liner
                                                                                                                                                                                                                                           material using native material, provide and place one foot of clean washed
                                                                                                                                                                                                                                           crushed rock material on the liner and rock prep layer for concrete floor slab as
                                                                                                                                                         (541) 454-3201     Chris 18177 Cedar Springs Lane,                                needed, 8" reinforced concrete slab on rock w/ two sumps within interior of bldg.
Waste Management            Waste Management Bio Bldgs.                   Arlington, Or        $2,048,800.00 Apollo, Inc.       Waste Management         Haynes                   Arlington, OR 97812             Complete   9/03-2/04
                                                                                                                                                                                   16701 SE McGillivray Blvd.,                             Site excavation, road excavation, lot preparation, asphalt paving, curb & gutter,
Newland Communities,                                                                                                                                     (360) 254-0933            Ste. 150, Vancouver, WA                                 sidewalk, street lighting, sanitary sewer, water, storm sewer, irrigation installation
LLC                         Creekstone Phase 9                            Kennewick, WA          $318,933.09 Apollo, Inc.       Newland Communities      Jennifer Elson            98683-3417                     Complete   10/03-1/04    for residential housing development.
                                                                                                                                  RECENT PROJECT EXPERIENCE                                                                                                                                                                        5
              APOLLO, INC.
                                                                                                                                          OVER 100K

         OWNER                                 PROJECT                     LOCATION             VALUE            GENERAL     DESIGN ENGINEER               CONTACT                  CONTACT ADDRESS              STATUS      START/STOP                                    DESCRIPTION

                                                                                                                                                                                16701 SE McGillivray Blvd.,                               Site excavation, road excavation, lot preparation, asphalt paving, curb & gutter,
Newland Communities,                                                                                                                                 (360) 254-0933             Ste. 150, Vancouver, WA                                   sidewalk, street lighting, sanitary sewer, water, storm sewer, irrigation installation
LLC                          Creekstone Phase 6                          Kennewick, WA          $282,969.60 Apollo, Inc.    Newland Communities      Jennifer Elson             98683-3417                     Complete     12/03-2/04    for residential housing development.

                                                                                                                                                                                                                                          Construction of new concrete masonry block pumphouse bldg., including
                                                                                                                                                                                                                                          emergency generator, interior and exterior water mains, valves and fittings,
                                                                                                                            Huibregtse, Louman       (509) 966-7000             801 North 39th Avenue,                                    electrical and HVAC systems, asphalt surfacing, and site fencing.
City of Prosser              Well No. 4B Pumphouse                       Prosser, WA            $336,683.00 Apollo, Inc.    Associates               Steven Szeibert            Yakima, WA 98902               Complete     10/03-3/04

                                                                                                                                                                                                                                          Construction of 0.45 mgd treatment plant including: offiste Lift Station
                                                                                                                                                                                                                                          improvements, extension of existing utilities to the site, Lab/Control/Mechanical
                                                                                                                                                                                                                                          bldg., Headworks, Aeration Basins and Clarifiers, Facultative Sludge Storage
                                                                                                                            SCM Architects &         (509) 783-1626 Gary        7601 W. Clearwater Avenue,                                Lagoons, Infiltration Basins and all associated electrical and piping.
City of Irrigon              Irrigon Wastewater Treatment Plant          Irrigon, Or           $2,803,416.00 Apollo, Inc.   Planning                 Weatherly                  Kennewick, WA 99336            Complete     10/03-7/04
                                                                                                                                                                                16701 SE McGillivray Blvd.,                               Site excavation, road excavation, lot preparation, asphalt paving, curb & gutter,
Newland Communities,                                                                                                                                 (360) 254-0933             Ste. 150, Vancouver, WA                                   sidewalk, street lighting, sanitary sewer, water, storm sewer, irrigation installation
LLC                          Creestone Phase 7                           Kennewick, WA          $354,969.00 Apollo, Inc.    Newland Communities      Jennifer Elson             98683-3417                     Complete     12/03-2/04    for residential housing development.
                                                                                                                                                                                                                                          Construction of a new chemical building and associated chemical storage and
                                                                                                                                                                                                                                          feed systems, filter pipe gallery improvements, a new concrete wall at the raw
                                                                                                                                                     ((208) 376-2288            12592 W. Explorer Drive, Ste.                             waterintake, misc. site work and associated electrical and instrumentation and
City of Yakima               Naches River WTP Chemical & Filter Upgrade Yakima, WA             $2,856,875.46 Apollo, Inc.   Carollo Engineers        Paul Walker, P.Ee.         200, Boise, ID 93713          Complete      12/03-12/04   control upgrades.
                                                                                                                                                     (509) 585-4249             P O Box 6108, Kennewick, WA                               Removal and land application of biosolids from one (1) digested
City of Kennewick            Wastewater Biosolids Removal Lagoon 1       Kennewick, WA     $1,370.769.00     Apollo, Inc.   City of Kennewick        Bruce Beauchene            9936                          complete      12/03-6/04    sludge/supematant lagoon.
                                                                                                                                                                                                                                          Tunneling of two 42" diameter steel casings that hold utilities for future
                                                                                                                                                                                                                                          development. Tunneling process is done 15' below grade and 320' across
Richland Public Facilities   Hanford Reach Interpretive Center Utility                                                      Riverside Consulting,    (509) 783-2077        Ron 6722 Kennewick Ave., Ste. C,                               interstate. The casings hold subcasings that range from waer, sewer, power,
District                     Crossing                                    Richland, WA           $815,841.68 Apollo, Inc.    Inc.                     Hicks                     Kennewick, WA 99336             Complete     12/03-3/04    phone and gas.
                                                                                                                                                                                128 North 2nd Street, Room                                Demolition and reconstruction of an 102' long bridge. The new bridge is
Yakima County Public                                                                                                        Yakima County Public     (509) 574-2319       Rae   408 Courthouse, Yakima, WA                                consstructed of 5 pre-stressed concrete girders. The approaches on both sides
Works                        Fordyce Road Bridge No. 661 Replacement     Yakima, WA             $308,368.84 Apollo, Inc.    Works                    Sunderland                 98901                          Complete     1/04-3/04     of bridge will be widened.

                                                                                                                                                                                                                                          Removal of a water tower, installing input/output, drain and overflow undergroun
                                                                                                                                                                                128 North 2nd Street, Room                                piping. Installation of 36" diameter by 25' deep drilled concrete piers, installation
Yakima County Public                                                                                                        Yakima County Public     (509) 574-2319       Rae   408 Courthouse, Yakima, WA                                of 17' diameter by 104' tall water stand pipe.
Works                        Crewport Water System Storage Improvement Yakima, WA               $357,621.99 Apollo, Inc.    Works                    Sunderland                 98901                          Complete     3/04-9/04
                                                                                                                                                                                16701 SE McGillivray Blvd.,
Newland Communities,                                                                                                                                 (360) 254-0933             Ste. 150, Vancouver, WA                                   Construction of small irrigation pump station.
LLC                          Creekstone Pump Station                     Kennewick, WA          $127,714.59 Apollo, Inc.    Newland Communities      Jennifer Elson             98683-3417                     Complete     3/04-4/04
                                                                                                                            Loofburrow Architects,   (509) 457-5121             201 West Yakima Avenue,
                                                                                                                                                                                                                                          Construction of new 3,750 sf wood and masonry constructions building.
Banner Bank                  Banner Bank - Eastgate Branch               Walla Walla, WA          473,472.00 Apollo, Inc.   P.S.                     Richard Loofburrow         Yakima, WA 98902               Complete     9/03-3/04
                                                                                                                                                     (509) 377-4547       W.G. P.O. Box 968, Richland, WA
                                                                                                                                                                                                                                          Construction completion of existing security bldg with foundation installed only.
Energy Northwest             Security Access Building                    Richland, WA           $236,315.00 CH2M Hill       Energy Northwest         Edmonds                   99352                           Complete     10/03-2/04
                                                                                                                                                                                                                                          Design/build 4000 sf dental office. Four acres site development w/ wood framed
                                                                                                                                                                                                                                          main floor structure w/ full admin offices in basement. Dental equip including
                                                                                                                                                     (509) 783-8822             5000 West Clearwater Ave.,                                sterilization, laboratory, medical gas, air, & water supplied to 9 dental chairs.
James Chapados               Chapados Dental Clinic                      Kennewick, WA          $408,579.00 Apollo, Inc.    James Chapados           James Chapados             Kennewick, WA 99336            Complete     10/03-4/04    Complete interior finishes.

                                                                                                                                                                                                                                          Two small sites on Penitentiary property, a transfer station and the composting
                                                                                                                                                                                                                                          area. Work will include earth work, paving, asphalt pad, lined pond, fencing,
Washington State Dept. of                                                                                                                            (509) 527-4537       Frank 55 Moore Street, Walla                                    lighting, mechanical blower system and electrical work.
Corrections               Walla Walla Regional Composting Facility       Walla Walla, WA        $371,390.00 Apollo, Inc.    City of Walla Walla      Nicholson                  Walla,WA 99362                 Complete     10/03-1/04

                                                                                                                                                                                                                                          Installation of a 175 hp submersible pump and motor in an existing well.
                                                                                                                                                                                                                                          Construction of a concrete block pumphouse and appurtenances. Construction
                                                                                                                                                                                                                                          of underground storm drain system, underground water main lie to tie into the
                                                                                                                                                                                                                                          existing water system. Other work includes concrete curbing, sidewalks and
                                                                                                                            Anderson Perry &         (509) 529-9260             214 E. Birch, Walla Walla, WA                             drive areas, security and private chain link fencing.
City of Dayton               Dayton Well #1 Pump Station                 Dayton, WA             $203,963.00 Apollo, Inc.    Associates               Howard Boggs               99362                         Complete      1/04-4/04
                                                                                                                                                     (541) 454-3201       Chris 18177 Cedar Springs Lane,
                                                                                                                                                                                                                                          Installation of entire electrical and HVAC system to an already existing building.
Waste Management             Waste Management Bio Bldgs.- Phase 2        Arlington, Or         $1,569,624.00 Apollo, Inc.   Waste Management         Haynes                     Arlington, OR 97812           Complete      5/04-8/04

                                                                                                                                                                                                                                          Construction of 81 foot long prestressed concrete grade separation bridge
                                                                                                                                                                                                                                          structure lowering and re-aligning approx. 7,850 lf of BNSF track including the
                                                                                                                                                                                                                                          installation of approx. 5,150 lf of storm drain, approx. 746,000 cy of earthwork
                                                                                                                                                                                                                                          including haul; street reconstruction, curb, gutter, sidewalks and right turn
                                                                                                                                                                                                                                          widening; traffic signal, water, storm sewer, and utility modifications; illumination
                                                                                                                                                     (509) 546-2040             2805 St. Andrews Loop, Suite                              and other assoc. work.
City of Kennewick            Col. Center Blvd./BNSF Grade Separation     Kennewick, WA         $7,406,963.29 Apollo, Inc.   City of Kennewick        Mike Murray                A, Pasco, WA 99301             In Process   5/04-8/05
                                                                                                                                                                                                                                          Improvement of Herring Bridge by removing an existing concrete bridge and
                                                                                                                                                                                                                                          constructing an aluminum box culvert, removing existing asphalt concrete
                                                                                                                                                     (509) 527-3241             Dept. Public Works, P O Box                               pavement, grading, placing crushed surfacing, paving with asphalt concrete, and
Walla Walla County           Herring Bridge                              Walla Walla, WA        $522,777.55 Apollo, Inc.    Walla Walla County       Misty Savage               813, Walla Walla, WA 99362     Complete     7/04-10/04    other work.
                                                                                                                            RECENT PROJECT EXPERIENCE                                                                                                                                                                 6
                APOLLO, INC.
                                                                                                                                    OVER 100K

         OWNER                                PROJECT                 LOCATION            VALUE            GENERAL     DESIGN ENGINEER               CONTACT             CONTACT ADDRESS             STATUS     START/STOP                                    DESCRIPTION

                                                                                                                                                                                                                             Project consists of connection of existing 24" irrigation line to two vertical turbine
                          I-182 River Pump Station & Rd. 108 Pump                                                     SCM Architects &        (509) 783-1626 Gary    7601 W. Clearwater Avenue,                              pumps at river pump station and includes a booster pump station upstream on a
City of Pasco             Station Phase II                          Pasco, WA             $164,792.00 Apollo, Inc.    Planning                Weatherly              Kennewick, WA 99336            Complete   5/04-7/04     pipeline that is to be provided by others.
                                                                                                                                                                     1207 West Columbia Drive,
                                                                                                                                                                                                                             Excavation, storm/sewer water for housing development.
Bruce W. Ratchford        Inspiration Estates                       Kennewick, WA        $1,607,419.01 Apollo, Inc.   Bruce W. Ratchford      (509) 586-1104         Kennewick, wA 99336            Complete   4/04-8/04

                                                                                                                                                                                                                             Construction of headworks, HDPE lined aeration basin, pump station, structural
                                                                                                                                                                                                                             concrete, a pre-fabricated metal control bldg., UV disinfection, electrical controls
                                                                                                                                              (360) 733-6100         805 Dupont Street,                                      instrumentation, telemetry, yard piping and related work.
City of Moses Lake        Sand Dunes WWTP                           Moses Lake, WA       $6,491,047.00 Apollo, Inc.   Wilson Engineering      Jeff Christner         Bellingham, WA 98225           Complete   5/04-9/05

                                                                                                                                                                                                                             8" water main, 6" water main, 4" water main, gate valves, hydrant, water service,
                                                                                                                                                                     128 North 2nd Street, Room                              water service assemblies with sampling stations, service line borings, asphalt
Yakima County Public      Crewport Water System Distribution                                                          Yakima County Public    (509) 574-2319 Rae     408 Courthouse, Yakima, WA                              concrete pavement restoration, general surface restoration.
Works                     Improvements                              Yakima, WA            $357,621.99 Apollo, Inc.    Works                   Sunderland             98901                          Complete   6/04-10/04
                                                                                                                                              (509) 942-7791         P O Box 190, Richland, WA                               Water main, asphalt patch, water services, fire hydrants, and new sanitary sewer
City of Richland          Thayer/Roberdeau Water Main Replacement   Richland, WA          $893,361.24 Apollo, Inc.    City of Richland        Michael McShane        99352                          Complete   6/04-11/04    manholes.

                                                                                                                                                                                                                             Const. Of 2060 concrete masonry bldg with prefabricated metal bldg frame and
                                                                                                                                                                                                                             roofing, hvac system, site utilities, piping, grading, paving and fencing. Provie
                                                                                                                                                                                                                             and install tranformer , low voltage duct-bank , service and distribution panels to
                                                                                                                                                                                                                             power uv facility. Provide and install PLC controller. Gas chlorination storage
                                                                                                                                              (509) 942-7791         P O Box 190, Richland, WA                               and metering equiment, chlorine gas dry scrubber.
City of Richland          UV Disinfection Facility                  Richland, WA         $1,121,643.99 Apollo, Inc.   City of Richland        Jay Marlow             99352                          Complete   7/04-3/05
                                                                                                                                              (509) 942-7791         P O Box 190, Richland, WA
                                                                                                                                                                                                                             Construction of 3000 square foot steel bldg.
City of Richland          Richland WTP Maintenance Bldg.            Richland, WA          $228,944.83 Apollo, Inc.    City of Richland        Jay Marlow             99352                          Complete   7/04-3/05

                                                                                                                                                                                                                             Replacement of approx. 24,000 ft of existing water mains w/ new 6", 8", 10" and
                                                                                                                                                                                                                             12" PVC water mains, two railroad track crossings, two canal crossing, one
                                                                                                                                                                                                                             creek crossing on an existing bridge, new water service lines, valves, fire
                          City of Dayton Wtr System Improvement -                                                     Anderson Perry &        (509) 529-9260         214 E. Birch, Walla Walla, WA                           hydrants, surface restoration and other related items.
City of Dayton            Phase 2                                   Dayton, WA           $1,783,841.22 Apollo, Inc.   Associates              Howard Boggs           99362                         Complete    6/04-11/04
Meadow Springs Country                                                                                                Meadow Springs County   (509) 627-2234         700 Country Club Place,
                                                                                                                                                                                                                             2800 SF. Metal building for golf course maintenance facility.
Club                      Meadow Springs Maintenance Bldg.          Richland, WA          $405,000.00 Apollo, Inc.    Club                    E.L. Kelley            Richland, WA 99352            Complete    10/04-02/05
                                                                                                                                                                     7601 West Clearwater Ave.,
                                                                                                                                              (509) 783-1625         Ste. 301, Kennewick, WA                                 Site work and site utilities. Concrete foundation and metal building.
Beaver Bark & Rock        Beaver Bark & Rock                        Richland, WA          $514,828.00 Apollo, Inc.    SCM Consultants         Kevin W. Barney, PE    99336                         Complete    7/04-11/04

                                                                                                                                                                                                                             Flocculation/sed basin electrical equipment building addition; rapid mix chamber
                                                                                                                                                                                                                             addition; and powdered activated carbon system addition. Conversion of existin
                                                                                                                                                                                                                             ozone basins to flocculation basins, mod to existing flocculation basins and
                                                                                                                                                                                                                             sedimentation basin. Filer building elect room addition; mod to filter building to
                                                                                                                                                                                                                             convert existing gravity filters to submerged membranes; and installation of
                                                                                                                                                                                                                             submerged membrane system. Modification to existing WW Reclamation
                                                                                                                                                                                                                             building to house membrane support equipment, electrical room addition and
                                                                                                                                                                                                                             sodium bisulfite room addition along with all associated electrical,
                                                                                                                                              (509) 542-0519         2805 St. Andrews Loop, Suite                            instrumentation, yard piping and site work for all above modifications.
City of Kennewick         Water Treatment Plant                     Kennewick, WA        $4,614,803.00 Apollo, Inc.   HDR Engineers           Bruce Dudzik           A, Pasco, WA 99301             Complete   8/04-6/06
                                                                                                                                                                                                                             Installation of approx. 4083 lf of 10" sanitary sewer, 900 lf of 8" sanitary swr, and
                                                                                                                      City of Pasco,          (509) 545-3444         P O Box 293, Pasco, WA                                  2097 lf of 4" swr services. Includes installation of 17 new manholes and approx.
City of Pasco             Octave Street/Road 48 Sewer ULID 141      Pasco, WA             $432,935.99 Apollo, Inc.    Engineering Division    Doyle L. Heath         99301                          Complete   9/04-1/05     3000 tons of street overlay.
                                                                                                                                                                                                                             Water elevation dam installed downstream from fishway tunnel to maintain
Confederated Tribes and                                                                                               Harbor Engineering      (206) 709-2397         3006 Fuhrman Avenue East,                               miminum river elevation. Project consists of 40' dam installed in Klickitat River
Bands of Yakima Nation    Castile Falls River Sill                  Castille Falls, WA    $167,031.00 Apollo, Inc.    Company                 John R. Hutchins       Seattle, WA 98102              Complete   8/04-12/05    bed.

                                                                                                                                                                                                                             Removal the existing pumphouse and replacing it with a removable pumphouse
                                                                                                                                              (509) 766-9217         PO Box 1579, Moses Lake, WA                             and a main well house building with electrical, control and telementry systems
City of Moses Lake        Moses Lake Well 10 Pumphouse Project      Moses Lake, WA        $233,666.04 Apollo, Inc.    City of Moses Lake      Sean O'Brien           98837                       In Process    10/04-1/05
                                                                                                                                                                     128 North 2nd Street, Room                              Furnishing and installing high-density polyethylene (HDPE) pipe, fittings and
Yakima County Public                                                                                                  Yakima County Public    (509) 574-2319         408 Courthouse, Yakima, WA                              valves; electrical power to the blower/flare facility; condensate sump and a
Works                     Terrace Heights Landfill LFG Perimeter    Yakima, WA            $159,737.40 Apollo, Inc.    Works                   Rae Early              98901                          Complete   11/04-1/05    blower/flare facility.

                                                                                                                                                                                                                             Construction of a 1,700 sq. ft. concrete plaza, 505 yds of concrete sidewak,
                                                                                                                      City of Richland Parks & (509) 942-7529        500 Amon Park Drive,                                    landscaping including irrigation, topsoil, shrubs, sod and river rock.
City of Richland          Lewis & Clark Interpretive Outlook        Richland, WA          $115,401.06 Apollo, Inc.    Recreation Dept          Dave Bryant           Richland, WA 99352           Complete     11/04-1/05
                                                                                                                                               (509) 452-0609        1460 North 16th Avenue, Ste.
                                                                                                                                                                                                                             Consists of 4,298 sq. ft. addition and 6,172 sq. ft. of new roof over existing bldg.
City of Goldendale        Goldendale Fire Station                   Goldendale, WA        $567,725.00 Apollo, Inc.    Traho Architects         Ronald Phillips       A, Yakima, WA 98902          Complete     11/04-5/04
                                                                                                                                                                                                                             Expansion and upgrade of existing wastewater treatment plant including new
                                                                                                                                              (503) 260-7520     Jim 825 NE Multnomah, Ste. 1300,                            secondary clarifier sludge, processing equipment, new digester covers, polymer
City of The Dalles        The Dalles WWTP                           The Dalles, OR       $4,550,364.00 Apollo, Inc.   CH2M Hill               Lash                   Portland, OR 97232-2146      Complete     12/04-5/06    feed system, yard piping and sitework.
                                                                                                                      City of Pasco,          (509) 545-3444         P O Box 293, Pasco, WA                                  Building Expansion consisting of demolition, earthwork, concrete foundation and
City of Pasco             Public Works Expansion Building           Pasco, WA             $127,783.00 Apollo, Inc.    Engineering Division    Doyle L. Heath         99301                        Complete     1/05-3/05     floor, stick built/metal siding building and electrical.
                                                                                                                                              (541) 454-2030         18177 Cedar Springs Lane,                               Addition of lunchroom/breakroom consisting of sitework/utility, concrete,
Waste Management          Waste Management Bio Bldg Lunchroom       Arlington, Or         $206,500.00 Apollo, Inc.    Waste Management        Phillip Kovacs         Arlington, OR 97812          Complete     11/04-1/05    carpentry, plumbing, HVAC and electrical.
                                                                                                                                  RECENT PROJECT EXPERIENCE                                                                                                                                                                      7
                APOLLO, INC.
                                                                                                                                          OVER 100K

          OWNER                              PROJECT                        LOCATION           VALUE            GENERAL      DESIGN ENGINEER              CONTACT               CONTACT ADDRESS              STATUS      START/STOP                                     DESCRIPTION

                                                                                                                                                                                                                                      Construction of a new 1.45 MGD activated sludge wastewater treatment plant.
                                                                                                                                                                                                                                      Major elements include: earthwork, site improvements, utility and road
                                                                                                                                                                                                                                      improvements, lagoon modifications, concrete process basins, supply and
                                                                                                                                                    (509) 328-6066      Kurt West 601 Mallon Avenue,                                  installation of process equipment, process and operations bldgs., electrical and
City of Colville           Colville Wastewater Treatment Plant            Colville, WA       $13,507,624.10 Apollo, Inc.    Varela & Assoc., Inc.   Holland                  Spokane, WA 99114             In Process   4/05-8/06     controls.

                                                                                                                                                                                                                                      Construction of a new water reclamation facility and effluent forcemain.
                                                                                                                                                                                                                                      Reclaimed water facilities include earthwork, headworks, a 3-tank SBR
                                                                                                                                                                                                                                      treatment system, 2 HDPE lined basins, Continuous backwash sand filters, UV
                                                                                                                                                                                                                                      disinfection, intermediate and effluent pump stations, biosolids processing and
                                                                                                                                                                                                                                      handling equipment, electrical controls and instrumentation 5 CMU/metal bldgs,
                                                                                                                                                                                                                                      control bldg, and yard piping. Effluent forcemain consists of approx 7500 lf of 18
                                                                                                                                                                                                                                      and 30" HDPE pressure pipe, air release assemblies and a horizontal directional
                                                                                                                                                    (360) 425-0991          1405 17th Avenue, Ste. 300,                               drill under the Chehalis River.
City of Chehalis           Chehalis Regional Water Reclamation Facility   Chehalis, WA       $27,464,108.71 Apollo, Inc.    Gibbs & Olson, Inc.     Mike Marshall           Longview, WA 98632             In Process   3/05-2/07

                                                                                                                                                                                                                                      Construction of 2 43-meter single-span bridges to replace the existing bridges.
                                                                                                                                                                                                                                      Work includes const. of appox. 800 meters of realigned roadway, 198 meters of
                                                                                                                                                                                                                                      325 mm diameter drilled steel pipe pile, 248 cubic meters of structural concrete,
                                                                                                                                                                                                                                      696 meters of precast concrete girders, 12,100 cubic meters of road
                                                                                                                                                                                                                                      embankment, 5700 mg of riprap, 6500 mg of aggregate base, 2400 mg of
Confederated Tribes of the                                                                                                                                                                                                            asphalt concrete, 170 meters of guard rail, 1080 meters of fences and other road
Umatilla Indian                                                           Umatilla County,                                  Anderson-Perry and      (541) 963-8309       Ed P O Box 1107, La Grande, OR                               and bridge work required.
Reservation                Meacham Creek and Umatilla River Bridges       OR                  $2,110,790.02 Apollo, Inc.    Associates              Hibbard                 97850-0939                     Complete     6/05-11/06
                                                                                                                                                                            16701 SE McGillivray Blvd.,
                                                                                                                                                                                                                                      Project consists of 352 building lots, excavation sanitary sewer line, water line,
Newland Communities,       Creekstone Phase 10,13,14, Irving Street                                                                                 (360) 254-0933          Ste. 150, Vancouver, WA                                   storm sewer line, irrigation line and concrete curb and gutter.
LLC                        Extension                                      Kennewick, WA       $3,233,805.72 Apollo, Inc.    Newland Communities     Gary Warden             98683-3417                     Complete     4/05-11/05
                                                                                                                            Eastern Oregon
                                                                                                                                                                                                                                      Tenant improvement to existing bldg that was empty and constructed a complete
Eastern Oregon Children's Eastern Oregon Children's Multi-Treatment                                                         Children's Multi-       (541) 276-0057          P O Box 218, Milton
                                                                                                                                                                                                                                      bldg out of new offices and meeting rooms.
Multi-Treatment Center    Center                                          Pendleton, OR          420,000.00 Apollo, Inc.    Treatment Center        Mary Winter             Freewater, OR 97862            Complete     5/05-8/05
                                                                                                                                                                                                                                      Construction of Wastewater Treatment Plant. Work includes oxidation ditch
                                                                                                                            Anderson-Perry and      (541) 963-8309          P O Box 1107, La Grande, OR                               aerators, clarifier, return sludge pump station expansion, and associated
City of Umatilla           Umatilla Wastewater Treatment Plant            Umatilla, OR          $931,269.00 Apollo, Inc.    Associates              Brett Moore             97850-0939                     Complete     6/05-12/05    electrical work.
                                                                                                                                                                                                                                      General construction work and services for construction of composite lined
                                                                                                                                                    (509) 527-4537          P O Box 478, Walla Walla, WA                              landfill cells with leachate collection and removal systems, and a double-lined
City of Walla Walla        Sudbury Road Landfill                          Walla Walla, WA     $2,079,517.04 Apollo, Inc.    City of Walla Walla     Frank Nicholson         99362                        Complete       8/05-12/05    leachate storage evaporation pond.
                                                                                                                                                                                                                                      Improvement of Harvey Shaw Bridge by removing an existing 100 ft. concrete
                                                                                                                                                                                                                                      multi-span bridge and constructing a 150 ft. single span concrete bridge, remove
                                                                          Walla Walla                                                               (509) 527-3241          P O Box 813, Walla Walla, WA                              existing pavement, grading, placing crushed surfacing, paving w/ asphalt
Walla Walla County         Harvey Shaw Bridge                             County, WA          $2,463,303.92 Apollo, Inc.    Walla Walla County      David Eids              99362-0254                   Complete       8/05-1/06     concrete.

                                                                                                                                                    (509) 927-0800          10807 E. Montgomery, Ste.                                 Provide all labor for building framing.
City of Walla Walla        Walla Walla Fire Station                       Walla Walla, WA       $112,000.00 TW Clark        TW Clark                Scott Rountree          No. 3, Spokane, WA 99206       Complete     7/05-8/05
                                                                                                                                                                                                                                      Demolition, Site Grading, Excavation, Fill and Backfill, Trenching, Landscape
                                                                                                                                                    ((509) 943-7677         660 Swift Blvd., Ste. B,                                  Grading, Storm Water Collection, Storage Piping and Dissapation, Exterior
Columbia Basin College     CBC/KMC Health Science Center                  Richland, WA          $321,400.00 Bouten Const.   Bouten Construction     Michael Holstein        Richland, WA 99352             Complete     8/05-11/05    Water, and Irrigation and Sewer Piping
                                                                                                                            Washington State Parks                                                                                    Renovation and addition to the existing interpretive center, the construction of an
Washington State Parks &                                                                                                    & Recreation           (360) 902-8500      Tony P O Box 42650, Olympia, WA                                "interpretive" trail from the parking area, and related landscaping, sitework and
Recreation Commission    Sacajawea Park                                   Pasco, WA              738,951.24 Apollo, Inc.    Commission             Rapozo                   98504-7650                     Complete     9/05-3/06     related utilities.

                                                                                                                                                                                                                                      Provide material and resources required to construct the Control House. Provide
                                                                                                                                                                                                                                      and install concrete foundation and slab work, concarete masonry, metal
                                                                                                                                                                                                                                      fabrications, carpentry, sheathing and pre-engineered trusses, metal roofing,
                                                                                                                                                                                                                                      vapor barriers, insulation and sealing, doors and windows, suspended ceiling,
Bonneville Power                                                          Benton County,                                    Bonneville Power        (360) 619-6759          3404 Swallow Avenue, Pasco,                               floor base and painting, HVAC, and electrical conduit, wiring and circuitry.
Administration             White Bluffs Control House                     WA                    $201,657.00 Apollo, Inc.    Administration          Rudy Krohn              WA 99301                       Complete     9/05-11/05
                                                                                                                                                                                                                                      Construction of approx 3300 sf type VN, "B: bldg. Improvements include asphalt
                                                                                                                                                                                                                                      driveways, concrete sidewalk/curbs, landscape planters and water service. Utili
                                                                                                                                                    (541) 565-3406   Milt   67408 Hwy 97, Moro, OR                                    conduits for telephone, electrical, and fiber optic, utilities are also included in this
Gilliam County             Gilliam County Wheat Laboratory                Condon, OR            $754,329.00 Apollo, Inc.    Ketchum Enterprises     Ketchum                 97039                          Complete     10/05-5/06    project.
                                                                                                                                                    (2080 454-4566 Barry    Hwy 19, Gate 2, Caldwell, ID
J. R. Simplot Co.          Simplot Lagoon Repair                          Hermiston, OR         $238,000.00 Apollo, Inc.    J.R. Simplot Co.        Robinson                83686                          Complete     10/05-11/05
                                                                                                                                                                                                                                      Consists of installation of new concrete slabs, construction of new CMU block
East Columbia Irrigation                                                                                                                            (509) 735-9149          8836 W. Gage Blvd,                                        bldg, new pumps and associated electrical gear, new discharge piping, level
District                   EL 55 Pumping Plant                            Warden, WA            $692,355.00 Apollo, Inc.    CH2M Hill               Stan Scheissing         Kennewick, WA 99344            complete     11/05-3/06    monitoring equipment at discharge structure.

                                                                                                                                                                                                                                      Project involves design and construction of turn lanes, street lighting, drainage
Squaxin Island Gaming                                                                                                                                                       1920 Main Street, Ste. 17,                                improvements on SR 108 for a new access road to the Little Creek Casino.
Enterprise                 SR 108 Improvement Design Build                Shelton, WA           $291,125.00 Apollo, Inc.    Telegraph Engineering   Scott Wenger            Ferndale, WA 98248             In Process   11/05-3/06
                                                                                                                            Anderson-Perry &                                P O Box 1687, Walla Walla,                                New overpass bridge, earth wall, embankment appproaches, and street
City of Pasco              SR 397 Ainsworth Avenue Railroad Crossing      Pasco, WA           $5,572,268.58 Apollo, Inc.    Associates, Inc.        Jeremy Morris           WA 99362-0032                  Complete     1/06-8/06     improvements.
                                                                                                                                   RECENT PROJECT EXPERIENCE                                                                                                                                                                  8
                APOLLO, INC.
                                                                                                                                           OVER 100K

         OWNER                                 PROJECT                        LOCATION         VALUE            GENERAL     DESIGN ENGINEER               CONTACT                 CONTACT ADDRESS              STATUS      START/STOP                                     DESCRIPTION
Confederated Tribes of
                                                                                                                                                                                                                                        Work includes grading, access road, potable water, sanitary sewer, paving and
Umatilla Indian             Phase 1, Governance Center and                                                                                          (541) 276-3099          P O Box 638, Pendleton, OR
                                                                                                                                                                                                                                        stromwater drainage.
Reservation                 Infrastructure for the Public Safety Building   Pendleton, OR      $288,097.01 Apollo, Inc.    CTUIR                    Jim Beard               97801                            complete     12/05-6/06
                                                                                                                                                    (509) 520-6069     Alan 1231 Grant Street, Walla
                                                                                                                                                                                                                                        41 city lot subdivision - utility, excavation, concrete and street construction.
Alan Ashmore                Spring Terrace Sub-Division                     Walla Walla, WA    $700,000.00 Apollo, Inc.    Alan Ashomore Const.     Ashmore                 Walla, WA 99362                  Complete     1/05-4/05
                            Triple Creek Meadows Sub-Division                                                                                       (509) 301-5066     Doug P O Box 1384, Walla Walla,
                                                                                                                                                                                                                                        29 city lot subdivision - utility, excavation, concrete and street construction.
Majerus, Inc.               Improvements                                    Walla Walla, WA    $770,000.00 Apollo, Inc.    Doug Majerus Homes       Majerus                 WA 99362                         Complete     3/05-6/06
Housing Authority of City   Rosheaven Cottages Street and Utilities                                                        City of Walla Walla      (509) 522-7812     Linda 501 Cayuse Street, Walla
                                                                                                                                                                                                                                        13 duplex city lots - all utility, excavation, concrete and street construction.
of Walla Walla              Improvements                                    Walla Walla, WA    $226,354.00 Apollo, Inc.    Housing Authority        Kasting/Boggs            Walla, WA 99362                 Complete     3/05-5/05
                                                                                                                                                                                                                                        48" storm drain system to handle a flash flood or 100 year storm event in
Paul Gatewood                                                                                                                                    (509) 301-1144        Paul   945 SE Harves Drive, College                              shoulder of Cottonwood Road. Project located outside of new 400 lot
Construction                Table Rock 2 - Offsite Improvements             Walla Walla, WA    $162,000.00 Apollo, Inc.    Gatewood Construction Gatewood                     Place, WA 99324                Complete     5/05-6/05     subdivision.
                                                                                                                                                                                                                                        Reconstructing three existing wells, including new pitless adaptors, pumps, drop
                                                                                                                           Progressive Engineering (208) 746-5406             1208 Idaho Street, Lewiston,                              pipes, assoc. piping and fittings and installing a new electrical control and
City of Pomeroy             Pomeroy Water System Improvements               Pomeroy, WA        $243,551.03 Apollo, Inc.    Group                   Terry Nab                  ID 83501                       Complete     7/05-10/05    instrumentation system.
                            Carmella Addition Street & Utilities                                                                                    (509) 301-5066 Doug P O Box 1384, Walla Walla,
                                                                                                                                                                                                                                        9 city lot subdivision - utility, excavation, concrete and street construction.
Doug Majerus                Improvements                                    Walla Walla, WA    $225,200.00 Apollo, Inc.    Doug Majerus Homes       Majerus             WA 99362                             Complete     7/05-8/05
                                                                                                                                                    (509) 527-4537            55 Moore Street, Walla                                    Construction of 895 ft of 10" diameter PVC sanitary sewer pipe, five manholes,
City of Walla Walla         Isaacs Ave. Sewer Improvements                  Walla Walla, WA    $124,842.14 Apollo, Inc.    City of Walla Walla      Dean Abrams               Walla,WA 99362                 Complete     9/05-10/05    975 sy of araterial street patch and other associated work.
                                                                                                                                                    (509) 301-5066            P O Box 1384, Walla Walla,
                                                                                                                                                                                                                                        30 city lot subdivision - utility, excavation, concrete and sstreet construction.
Majerus, Inc.               Triple Creeks Meadows - Phase 2                 Walla Walla, WA     $740,600.00 Apollo, Inc.   Doug Majerus Homes       Doug Majerus              WA 99362                       Complete     9/05-12/05
                                                                                                            CH2MG-WG
Department of Energy        INTEC Water Treatment System Upgrade            Idaho Falls, ID   $2,699,699.00 Idaho                                                                                            In Process   12/05-9/06
                                                                                                                                                                                                                                        Decommission existing drywell storm drainage and construct new drainage
                                                                                                                                                                                                                                        system alternative. Removal and replacement of existing asphalt pavement,
United States Postal        Hermiston Post Office Dry Well Decommission                                                                             (303) 740-2626            8181 East Tufts Ave.                                      grading a retention pond, erecting a retaining wall and removal of existing storm
Service                     and Site Drainage                           Hermiston, OR          $162,649.09 URS Corp.                                Cindy L. Boyd             Denver, CO 80237               Complete     2/06-6/06     drainage facilities.

                                                                                                                                                                              1844 W. 11th Street, Ste.D,                               Building free stalls for the cattle to lay down an rest in between milking cycles.
Five D Farms                Five D Farms Freestalls                         Pasco, WA          $210,000.00 Apollo, Inc.    Van Dam Engineering      (909) 931-5070            Upland, CA 91786-3586          Complete     1/06-3/06
                                                                                                                                                                              2531 Marshall Street NE,                                  This was a complete demolition of the existing buffet line and construction of a
Legends Casino              Legends Casino Buffet Remodel                   Toppenish, WA      $242,120.00 Apollo, Inc.    LandMark                 (612) 673-9309            Minneapolis, MN 55418          Complete     3/06-3/06     new buffet in thirty days.

                                                                                                                                                                                                                                        Construction of one mechanically-mixed anaerobic Digester 4; two boilers; one
                                                                                                                                                                                                                                        recirculating sludge pump; one heat exchanger; one hot water pump; recoating &
                                                                                                                                                                                                                                        misc. repairs to existing Digester 3; interior lining of existing Digester 1; misc.
                                                                                                                                                    (509) 735-9732            8836 W. Gage Blvd,                                        work in the primary sludge pump room.
City of Pasco               Primary Digester Facilities Project             Pasco, WA         $2,389,541.00 Apollo, Inc.   CH2M Hill                Tony Krutsch              Kennewick, WA 99344            In Process   2/06-11/06
                                                                                                                                                                                                                                        Construction of a new 120,000 sf parking lot for BH zProperties that services
                                                                                                                                                    (509) 783-2144            2810 W. Clearwater Ave., Ste.
                                                                                                                                                                                                                                        Amazon.com
BH Properties               Amazon.Com Parking Lot                          Kennewick, WA      $479,077.00 Apollo, Inc.    JUB Engineers            Darral Moore              201, Kennewick, WA 99336      Complete      3/06-5/06

                                                                                                                                                                                                                                        Constructing1.28 miles of new roadway involving roadway excavation,
                                                                                                                                                                                                                                        embankment compaction, crushed surfacing base and top course, HMA 1/2",
                                                                                                                                                                                                                                        and adjustment of existing manholes. Includes extending sanitary sewer PVC
                                                                                                                                                                                                                                        pipe, installing CMP storm drainage pipe, constructing 12" water main, seeding,
                                                                            West Richland,                                                                                    2810 W. Clearwater Ave., Ste.                             fertilizing and mulching, pavement markings, signing, illumination system.
City of West Richland       Keene Road Extension Phase 3                    WA                 $652,849.64 Apollo, Inc.    JUB Engineers            (509) 783-2144            201, Kennewick, WA 99336      In Process    3/06-6/06

                                                                                                                                                    (503) 699-7556            4800 Meadows Road, Ste.
City of Yakima              Yakima WWTP Phase 1                             Yakima, WA        $8,198,458.00 Apollo, Inc.   Black & Veatch Corp.     Kenyon Hunt               200, Lake Oswego, OR 97035 In Process       4/06-3/08
                                                                                                                           Structure Engineering,   (509) 457-5886     Alan
Morrow Cold Storage         Morrow Cold Storage                             Boardman, Or      $3,240,755.00 Apollo, Inc.   Inc.                     McKeel                                                   Complete     4/06-10/06
                                                                                                                                                                                                                                        Installation of 8" and 15" PVC sewer main, 24" DI water main, fire hydrant
                                                                                                                                                    (509) 942-7540            P O Box 190, Richland, WA                                 assembly, street lights, concrete curb and gutter, HMA, top course, base course,
City or Richland            Duportail L.I.D.                                Richland, WA      $1,438,310.53 Apollo, Inc.   City of Richland         Jay Marlow                99352                          Complete     4/06-7/06     earthwork and traffic signals.
                                                                                                                                                                                                                                        Installation of 24",16", 12", 8" and 6" ductile iron water main; fire hydrant
                                                                                                                           City of Richland         (509) 942-7390            P O Box 190, Richland, WA                                 assembly, 2" water services connections; storm drain pipe, storm drain
City of Richland            Gage/Leslie Water Storm                         Richland, WA      $1,316,333.72 Apollo, Inc.   Engineering              Sheldon Williamson        99352                          In Process   5/06-8/06     manholes; catch basins, and site grading.
                                                                                                                                                                                                                                        Removal of existing well house foundation, construction of new well hous bldg.;
                                                                                                                                                                                                                                        pipe train and associated appurtenances; electrical, control and telemetry
                                                                                                                                                                                                                                        systems; furnishing and installing new 250 Hp vertical turbine pump, installation
                                                                            College Place,                                                          (509) 328-5139     Craig 621 W. Mallon Ave., Ste. 309,                              of 2 Type B drywells; and associatedsitework, fencing, curbing, sidewalk and
City of College Place       Well No. 2 Renovation                           WA                 $666,542.84 Apollo, Inc.    USKH, Inc.               Aldworth                 Spokane, WA 99201             Complete       1/06-6/06     paving repair.
                                                                                                                                                                                                                                        Construction of pumping plant and penstock. The pumping plant includes four
East Columbia Irrigation                                                                                                                            (509) 735-9149            8836 Gage Blvd.                                           vertical turbine pumps totaling 2,800 horsepower. The penstock will be 54-inch
District                    Saddle Gap Pumping Plant                        Othello, WA       $4,863,372.00 Apollo, Inc.   CH2M Hill                Stan Schweissing          Richland, WA 99352             In Process   5/06-4/07     diameter and approx. 3,585 feet in length.
                                                                                                                                                    (206) 826-4502            10940 NE 33rd Place, Ste.
Legends Casino              Legends Casino Cage Remodel                     Toppenish, WA      $448,407.43 Apollo, Inc.    Group West               Sonny Vinberg             202, Bellevue, WA 98004        Complete     5/06-8/06     Demolition and construction of cage and expansion of soft count room.
Yakama Nation Legends                                                                                                                               (360) 380-1873            1920 Maint Street, Ste. 17,                               Project design and construction of MBR reclaimed water treatment plant.
Casino                      Yakama Nation MBR Plant                         Toppenish, WA     $3,592,328.94 Apollo, Inc.   Telegraph Engineering    Scott Wenger, PE          Ferndale, WA 98248             In Process   9/06-9/07
                                                                                                                                  RECENT PROJECT EXPERIENCE                                                                                                                                                                  9
             APOLLO, INC.
                                                                                                                                          OVER 100K

         OWNER                                  PROJECT                   LOCATION         VALUE            GENERAL         DESIGN ENGINEER             CONTACT              CONTACT ADDRESS               STATUS       START/STOP                                    DESCRIPTION
                                                                                                        R.E.A.
                                                                                                                                                                                                                                     All wood framing, structural steel and its placement.
Richland Baptist Church     Richland Baptist Church                     Richland, WA        $356,090.46 Construction                                                                                     Complete      5/06-8/06
                                                                        West Richland,                                                            (509) 547-9511       P O Box 2738, Tri Cities, WA                                  Roadway excavation including haul, embankment compaction, ditch excavation
Benton County               Via Antinori Road                           WA                  $297,889.00 Transtate Paving                          Jonnie Askin         99302                             Complete      7/06-8/06     and borrow.
                                                                                                                                                  (541) 481-3281   Ron 79588 Rippee Road,
                                                                                                                                                                                                                                     All labor and equipment to complete site finishes.
Col. River Processing       Col. River Processing Cheese Expansion      Boardman, Or        $225,305.00 Apollo, Inc.       J.J. Henri Co.         Blaj                 Boardman, OR 97818                Complete      6/06-8/06
                                                                                                                                                                                                                                     Grading, surfacing, paving with HMA, guardrail work, guideposts, pavement
                                                                        Walla Walla                                                               (509) 577-1840 Will    1115 East Ahtanum Road,                                     markings, illumination, permanent signing, and construction of a prestressed
WSDOT                       Attalia Vicinity - Add Lanes                County, WA       $11,221,772.72 Apollo, Inc.       WSDOT                  Smith                  Union Gap, WA 99803             In Process    7/06-6/07     concrete girder biridge.

                                                                                                                                                                                                                                     The project consists of the construction of an outdoor zero depth swimming poo
                                                                                                                                                                                                                                     competition lap pool and bathhouse.
                                                                                                                                                                                                                                     The swimming pool is a 7,275 square foot concrete and stainless steel PVC line
                                                                                                                                                                                                                                     tank that varies in depth from 0’-0” to 9’-0”.
                                                                                                                                                                                                                                     The bathhouse consists of a 3,000 square foot single story concrete block and
                                                                                                                                                                                                                                     frame structure.
                                                                                                                                                                                                                                     The project also includes the following associated construction: 1) a 1,100
                                                                                                                                                                                                                                     square foot lazy river; 2) a 155 lineal foot waterslide complete with stair tower
                                                                                                                                                                                                                                     and shutdown lane; 3) renovation of the existing bathhouse structure; and 4)
Adams County Parks &                                                                                                                              (425) 226-3522 Geoff 607 SW Grady Way,Ste. 210
                                                                                                                                                                                                                                     other site improvements as indicated.
Recreation                  Othello Community Aquatic Center            Othello, WA       $2,369,888.00 Apollo, Inc.       ORB Architects         Anderson             Renton, WA 98055                  In Process    7/06-7/07
                                                                                                                                                                                                                                     Construction of a well house, installation of turbine pump and motor with variable
                            EDB Mitigation Transmission Pipeline and Well                                                                         (509) 453-4833         107 S. 3rd St., Yakima, WA                                  frequency drive discharge piping, and installation of HDPE or PVC water
City of Warden              No. 7                                         Warden, WA        $806,437.54 Apollo, Inc.       Gray & Osborne, Inc.   Ron Reiland            98901                           Complete      9/06-12/06    transmission pipeline and appurtenances.
                                                                                                                                                                                                                                     Site work, earth work, concrete work, masonry, steel/metals, carpentry, moisture
                                                                                                                           Jones & Jones          (206) 624-5702         105 S. Main Street, Ste. 300,                               protection, doors/windows/hardware, finshes, misc. specialties, mechanical,
Umatilla Tribe of Indians   CTUIR Public Safety Building                Pendleton, OR     $2,627,781.00 Apollo, Inc.       Architects             Jeremy Imhoff          Seattle, WA 98104               In Process    8/06-4/07     electrical and communications work.

                                                                                                                                                                                                                                     Construction of 40 foot per second irrigation diversion and fish screening facility,
                                                                                                                                                                                                                                     concrete fish ladder, repair of dam crest, removal and replacement of an
                                                                                                                                                                                                                                     inverted siphone pipeline crossing, two streambed constructed riffles, and fitting
Walla Walla County                                                                                                                                (360) 754-2133         2401 Bristor Court SW, Bldg.                                the irrigation diversion and fish screening structure with four belt screen.
Conservation District       Hofer Dam Fish Passage                      Touchet, WA         $482,632.56 Apollo, Inc.       Anchor Environmental   Patrick Powers         B, Olympia, WA 98502            Complete      8/06-11/06

                                                                                                                                                                                                                                     Reconstruction and widening of Gage Blvd. from Leslie Road to east city limits o
                                                                                                                                                                                                                                     Richland. Project includes removal and replacement of curb, gutter, sidewalk,
                                                                                                                                                                                                                                     street lighting, and storm drainage system. Also includes installation of water
                            Center Parkway Extension/gage Blvd.                                                                                                                                                                      main, const. of concrete retaining walls and relocation of triffic signals along with
City of Richland and City   Widening - Phase 2A (Leslie Road to         Kennewick and                                                             (509) 585-4259         P O Box 6108, Kennewick, WA                                 various signal upgrades.
of Kennewick                Louisiana Street                            Richland, WA      $3,731,456.62 Apollo, Inc.       City of Kennewick      Daniel Kaufman         9936                        In Process        9/06-6/07
Chemical Waste                                                                                                                                    (541) 454-2030         18177 Cedar Springs Lane,
                                                                                                                                                                                                                                     Pre-engineered metal building used for storage, wastewater management.
Management                  Wastewater Treatment Plant Building         Arlington, Or     $1,298,424.00 Apollo, Inc.       Waste Management       Sam Jiries             Arlington, OR 97812         Complete          10/05-12/06




                                                                                                                                                                                                                                     The CAT Equipment Repair Shop Addition is a Design/Negotiated project for
                                                                                                                                                                                                                                     Western States.This project is a 32,361 square foot addition to the existing
                                                                                                                                                                                                                                     building that included value engineering, preconstruction estimating, and
                                                                                                                                                                                                                                     constructability review. It includes a truck shop, heavy duty equipment shop,
                                                                                                                                                                                                                                     parts warehouse and two story office. The existing 3,012 office area was
                                                                                                                                                                                                                                     demolished, and existing equipment shop and parts warehouse were improved.
                                                                                                                                                                                                                                     This was done by doing construction around the office as much as possible,
                                                                                                                                                                                                                                     before moving the employees out to portable office space when time came to
                                                                                                                                                                                                                                     demo the existing office. Site work includes a completely new sanitary sewer
                                                                                                                                                                                                                                     system, water lines and fire water loop as well as 220,000 SF of asphalt. All of
                                                                                                                                                                                                                                     this had to be done while CAT continued to be open for business. In the
                                                                                                                                                                                                                                     beginning, Apollo worked on the north half while CAT operated out of the
                                                                                                                                                                                                                                     south half. When Apollo was finished, they moved to the south half and
                                                                                                                                                   Jim King (208)-884-                                                               continued construction. This environment, along with the agreed upon
Western States CAT          CAT Equipment Repair Shop Addition             Pasco, WA      5,000,000        Apollo, Inc.           In Process              2210                                        268 In Process                 completion date has kept Apollo on an accelerated process to get Western State
                     Inc.

    General Contractor

  Bruce Ratchford           Started Apollo in 1981 and has been in the industry for over 30 years.
 President and Chief
  Executive Officer

 Jesse VanSchoiack          B.S. Agricultural Engineering – Washington State University E.I.T. Certification
Executive Vice President
  General Manager                With Apollo since 1994
                                 6 years - Zypher Mechanical, Manager/Project Leader
                                 3 years - Gerald E. Johnson Construction, Project Leader
                                 Temporary Assignment - RA Weirich Company/The Zack Company, HVAC
                                 Field Engineer
                                 3 years University Nuclear Systems, Lead HVAC Engineer
                                 1 year - Neil F. Lampson Company, Engineer

                            Versatile seasoned professional with 20+ years of progressively responsible
                            positions. Participative style of management. Proactive style of leadership.
                            Consistent record of achievement. Construction experiences have focused on
                            industrial scale projects including Gas Collection and Treatment Facilities,
                            Contaminated Waste Piping Systems, Turn Key Operations for
                            Industrial/Municipal/Irrigation Infrastructure projects, Sewage and Water Treatment
                            Plants, Specialized Industrial Pipe Applications, Major and Minor HVAC and Piping
                            Projects, including large scale Power Piping Projects. Contracts have varied in
                            amounts from $5,000,000 to $50,000,000 Construction performed for private, public
                            government and DOE sponsored projects.

   Angie Haisch             Associate of Arts & Sciences Degree, Columbia Basin College
Chief Financial Officer
 Corporate Secretary             With Apollo since 1994
                                 4 years - Oswalt, Teel and Franklin, Staff Accountant/Office Manager
                                 Year Columbia Basin College, Business Division Aide

    Keith Larson            Bachelor of Sciences - Construction Management, Central Washington University
    Vice President
      Apollo Inc.                With Apollo since 1996
                                 1 year - Watts construction, Project Leader
                                 1 year - William E. Lewis Construction, Project Leader
                                 1 year - Rodarte Construction, Estimator
                                 4 years - ICF Kaiser Hanford, Field Engineer
                                 Supervisory Construction Experience Includes Stanfield Relift Pumping Plant,
                                 Department of Energy 309 Building Remodel, City of Richland Sewage Dry Bed
                                 Barrier, City of Richland Water and Sewer Line Installation
                                 A multi-talented professional who is bottom line oriented. Has in-depth
                                 knowledge of all facets of construction management, construction and
                                 computers; allowing a perspective that transcends narrow industry boundaries,
                                 and setting the stage for a useful blend of concepts and strategies.




                                                                                                               I
  Daniel F. Briscoe    Bachelor of Science, Agricultural Engineering Technology, Oregon State University
    Vice President
Business Development        With Apollo since 1999
                            6 years - Cascade Specialties, Vice President, Partner
                            1 year - Chukar Cherries, Inc., Operations Manager
                            1 year - Haas Foods, Inc., Executive Vice President of Operations
                            8 years - Cargill, Inc. Nutrena Feeds Division, Administrative Manager,
                            Merchandising Manager, Plant Manager
                            Over 16 years in the Industrial/Food Process industry with an emphasis on
                            management of turnkey type projects from inception to completion
                            Managed the design and construction of a 32,000 square foot dehydration
                            facility. Managed and oversaw staffing of production, maintenance, finance,
                            safety quality assurance and new process design
                            Significant experience in developing and implementing cost saving procedures
                            and processes
                            Responsible for the introduction and implementation of Total Quality
                            Management programs
                            Directed the construction of a $1.3 million state of the art garlic milling facility.
                            Directed the operations of a dry herb and spice milling facility

     Mike Ellis        Bachelor of Science - Loss Control Management, Central Washington University
 Safety Coordinator
                       Crane Inspection Hoisting and Rigging Considerations, NEC and OSHA Electrical
                       Standards, WISHA Excavation and Fall protection, Record Keeping, Claims
                       Management and Workman’s Compensation, Retro Programs, Lock and Tag,
                       Hanford Hoisting and Rigging Manual, OSHA 500, NFPA 101, Behavioral Based
                       Safety Training, and OSHA 16 hour construction safety course

   Michael C. Low      Associates Degree – Delta College, Stockton, California; Journalism/Technical
  Quality Assurance    Writing – Humboldt State College, Arcata, California; Welding Metallurgy – Lake
      Manager          Michigan College, Benton Harbor, Michigan.

                           With Apollo since May 2004
                           Responsible for Apollo Quality Assurance program based on the 18 basic
                           requirements of ASME NQA-1. Maintain a Quality Assurance program necessary
                           to maintain ASME “R” Stamp. Maintain Apollo Welding Program and Procedures
                           in accordance with ASME Section IX. Procedures cover GMAW, SMAW and
                           GTAW manual processes for P-1 and P-8 group materials. Oversees program by
                           which Apollo performs testing and inspection in accordance with written
                           procedures for QCP-02 Hydrostatic Testing (ASME), QCP-06 Pneumatic Testing
                           (ASME), QCP-06 General Visual Inspection, QCP-07 Visual Weld Inspection
                           Professional Certifications - Emergency Response Evaluator Training and
                           Certification – UMCDF, Hermiston, Oregon; Safety Evaluation Course, Arizona
                           Public Service; ANSI N45.2 Level II Mechanical, Visual, Welding, Civil,
                           Instrumentation AWS Certified Welding Inspector; Level II Radiographic
                           Interpretation; SNT-TC-1A Level II - PT, MT, RT, Level II – UT (Thickness
                           Over 25 years experience in Quality Control and Quality Assurance.

    Amy Jenne          Bachelor of Science, Construction Management/Business Administration
       Senior          Central Washington University
   Project Leader
                       Certification Associate Constructor (AC) Level 1 – Certified Professional Constructor
                       (CPC)

                           With Apollo, Inc., since 1999
                           1 year - V.K. Powell Construction, Project Engineer/Estimator
                           1 year - B.K. Roberts & Associates, Project Estimator
                           Internship - V.K. Powell Construction


                                                                                                          II
Nigel Stevenson   Bachelor of Science – Civil Engineering, University of Utah, Salt Lake City, UT.
     Senior
 Project Leader       With Apollo since 2004
                      Bayley Construction, Mercer Island, WA (12/01 to 05/04), Project Leader
                      Kirtley-Cole Associates, Inc. Snohomish, WA. (1/01-12/01), Project Leader
                      Baugh Construction, Inc., Seattle, WA. (5/98 to 1/01), Project Leader
                      M.A. Mortenson Company, Minneapolis, MN. (4/87 to 5/98), Project Leader

Mike Emmerson     PROJECT MANAGEMENT SKILLS: Responsibility of project from conception
     Senior       through completion, Materials selection and procurement, Design estimating
 Project Leader   assistance, Preparation of bid packages, Selection of General Contractors and/or
                  subcontractors, Management of construction and project close-out, Subcontractor
                  coordination, Quoting and resolving Owner changes, Budget review and
                  maintenance, Subcontractor selection, Safety program institution, Writing Owner and
                  subcontractor contracts Contract negotiation, Establishment of project schedule, Site
                  selection assistance

                      With Apollo, Inc., since March 2005
                      A&B Asphalt Co./A.J. Crushing & Concrete Co. – Benton City WA General
                      Manager (7/2001 to 10/2004)
                      Acme Materials and Construction Co. – Spokane WA Vice President (1987 to
                      2001) and General Manager (1980-1987)

  Ron Harris      Bachelor of Sciences, Diesel Power Technology – Oregon Institute of Technology
 Project Leader
                      With Apollo since 2000. Duties include Autocad, Field Installation and Field
                      Project Management on such projects as the Columbia River Processing new
                      cheese making facility, Castile Falls, Chehalis Waste Water Treatment Plant
                      3 Years Basin Frozen Foods – Maintenance Manager
                      2 Years Columbia Colstor – Building Maintenance Supervisor
                      7 Years National Frozen Foods – Mechanic, Maintenance and Production
                      Supervisor

   Lee Petty      Bachelor of Science in Construction Management with a Minor in Business
 Project Leader   Administration – Central Washington University

                      Certified Crane Operator
                      OSHA 10 Hour
                      Commercial Driving Licensed
                      Auto Cad, Timberline, Suretrak and P3; working knowledge of front end loader,
                      roller, water truck, blade, cat (D-5-8), forklift and basic skills in carpentry,
                      carpet/tile application, electrical and landscaping
                      Progressive experience in general construction with special skills in project
                      management, estimating, coordinating, analyzing, planning and procurement in
                      the institutional, industrial and commercial sectors.
                      Project Leader for Vono, Inc. Richland, WA
                      Assistant Cellar Master for Hogue Cellars Winery, Prosser, WA
                      Operator/Labor for Transtate Asphalt Company, Pasco, WA

Carrie Sullivan   Bachelor of Sciences in Construction - College of Engineering, Del E. Webb School of
Project Leader/   Construction, Arizona State University
   Estimator
                      With Apollo since 2002
                      Estimating: Experienced in handling all aspects of the bid process from review of
                      plans and specifications to soliciting and negotiating prices from
                      contractors/suppliers thru completion of the bid effort.
                      Valley Rain Construction Corporation, Tempe, AZ - Estimator/Assistant Project
                      Leader
                      Linthicum Constructors, Scottsdale, AZ - Internship, Project Engineer
                      US Home, Phoenix, AZ - Internship, Assistant Superintendent
                                                                                                III
  Mark Montgomery          B.A. Economics/ English minor, Washington State University, Pullman WA, 1986
   Project Leader          OSHA 10 hour Construction Safety and Health
                           OSHA 40 hour Hazardous Waste Operations and Emergency Response Training

                               With Apollo since 2006
                               1 year MKB Constructors Seattle, WA
                               8 years IMCO General Construction, Inc. Bellingham, WA
                               6 years Sheldrup Construction, Inc. Mount Vernon, WA

      Pete Firth           Bachelor of Science in Construction Management – Central Washington University
   Project Engineer        1995

                               With Apollo, since 2007
                               11 years EbbTide Construction, Kennewick, WA
                               2 years Bruehl Construction
                               1 year Timberline Construction

     Josh Combs            B.S. of Construction Management
Project Leader/Estimator   Central Washington University, July 2005

                               With Apollo, Inc. since 2005
                               Apollo, Inc. – June-September 2004
                               Apollo Sheet Metal - June-September (2003, 2002, 2001)

  Steven McKennon          B.S. Construction Management, Washington State University
   Project Engineer
                              With Apollo since September 2007
                              Lead Scheduler, Haskell Corporation, Bellingham WA
                              Field Engineer, Intermech Inc., Richland WA
                              Project Controls/Scheduler/Estimator, Los Alamos Technical Associates,
                              Richland WA

    Joel Mearns            Automotive Technology - Spokane Community College
   Senior Estimator
                                With Apollo since 1989
                                5 years - Jaremco Nissan, Automotive Technician
                                2 years - Apollo Sheet Metal, Maintenance Supervisor
                                Involved in estimating HVAC, piping and full mechanical systems on projects
                                ranging from $5,000 to $15,000,000

    James Pardue           Bachelor of Architecture - Washington State University
      Estimator            B.S., Construction Management - Washington State University
                           B.S., Architectural Engineering - Washington State University
                           Associate of Arts and Sciences - Columbia Basin College
                           Carpenter Apprenticeship

                                With Apollo since 1996
                                18 years - George A. Grant, Lead Estimator, Quality Assurance Manager and
                                Scheduler

     Jeff Carlson          Bachelor of Arts in English - Washington State University
      Estimator
                                With Apollo since 1999
                                Over 20 years experience in the construction industry
                                Project Leader/Estimator - estimated and managed civil projects to $4,000,000.
                                Project Leader/Estimator for D. J. Mc Millian Constructors
                                Superintendent for Zygotech, Inc.




                                                                                                     IV
  Neal Wind      With Apollo since 1990
    Civil
Superintendent       2 years with Owyhee Construction
                     8 years with Wind Irrigation
                     3 years with Northwest Construction

 Kevin Burke     Associate of Arts and Sciences - N. Idaho Jr. College
   Project       Carpenters Apprenticeship Program
Superintendent
                     With Apollo since 1996
                     2 years - Grant/Apollo Joint Venture, General Foreman
                     1 year - Coyote Corporation, Project Superintendent
                     Supervisory Construction Experience Includes Stanfield Relift Pump Station,
                     Environmental Molecular Science Laboratory, Finley Middle School Renovation
                     and Kennewick School District Transportation Facility

  Dan Kelly      Glendale Community College
   Project       Carpenters Apprenticeship Program
Superintendent
                     With Apollo since 2001
                     12 years with Total Development Inc. (T.D.I.)
                     2 years with B & A Construction
                     5 years with Ora B. Hoffer & Son
                     4 years with L.W. Laws Construction

John Oldham      With Apollo since 1999
   Project           Equipment Operator: loader, track hoe, backhoe, dozer and scraper
Superintendent
                 6 years with Ray Poland & Sons, Inc.

Larry Brisbois   Columbia Basin College, Pasco, WA
Superintendent   Tri-Tech Vocational Center, Kennewick, WA
                 Extensive JLC Training
                 Continuing Education Construction Certification

                 With Apollo, since May 2002
                    4 Years with CL Enterprises, Inc., Hermiston, OR
                    4 Years with Bob Boneck Construction, Kennewick, WA

 Dave Winter     School of Engineering, Temple University, Philadelphia PA
   Project       Associate Degree in Construction Technology, Williamson School of Mechanical
Superintendent       Trades, Media PA

                 With Apollo, since October 2003

                 Over twenty years of experience in the design and construction of complex projects.
                 Management assignments over the past 20 years include companies such as:
                    J.E. Dunn Construction NW (1994-2002)
                    Frontier Construction (1993-1994)
                    Winter Contracting (1983-1993)

Field Foremen    Apollo boasts a crew of field foremen with many years of combined experience on all
                 phases of construction ranging from General Construction, Waste Water Treatment
                 Facilities, Heavy Highway, and Concrete Structures




                                                                                             V

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:24
posted:11/13/2011
language:English
pages:23