Potential Projects Last Updated: 10/27/2011
Office/District Project Title Project Description Contact Person Last Updated
Bridge Oslo Bridge Rehabilitation Study Investigation of the feasibility of rehabilitation of Bridge 9100 and colleen.harer@state.mn.us 08/19/2011
development of rehabilitation alternatives. The pre-qualification
program will be utilized for consultant selection.
Bridge Baudette Feasibility Study Bridge 9412 feasibility study. It is anticipated that the Pre- colleen.harer@state.mn.us 02/25/2011
Qualification selection process will be utilized to select a
consultant.
Bridge Cayuga Bridges Provide final bridge design for up to 10 bridges. This may involve colleen.harer@state.mn.us 02/25/2011
multiple contracts, and it is anticipated that consultant selection
will be conducted through the Pre-Qualification program.
Bridge Underwater Bridge Inspections Provide visual and tactile underwater inspection of Trunk colleen.harer@state.mn.us 02/25/2011
Highway bridges.
Civil Rights Civil Rights -Business Development E- This project will develop at least three different e-learning kathryn.bique@state.mn.us
Learning Modules modules that will increase learning opportunities for certified
Disadvantaged Business Enterprise businesses.
Civil Rights Civil Rights -Civil Rights Labor This project will provide on-going desktop support for internal kathryn.bique@state.mn.us
Management System and external CRLMS users.
Civil Rights Civil Rights -Targeted Group Business This project will provide outreach and assistance to small kathryn.bique@state.mn.us
Program Outreach and Assistance businesses to become certified as a Targeted Group Business
Program through the Minnesota Department of Administration.
Construction Construction Inspection Academy The Inspector Academy is a three year course. Course bobbi.iverson@state.mn.us
development and a week of classes covering applied math,
practical geometrics, review of standard plate usage, contract
administration, project authority, acceptance of work,
supplemental agreements, project overview, project
communications, etc.
District 1 District One Solid Stem Auger Drilling District One will be requiring assistance with Soils field work derek.fredrickson@state.mn.us 02/08/2011
Potential Projects Last Updated: 10/27/2011
throughout the district. This work will assist the district in
clearing up a backlog of field work and will fall under the Pre-
Qualification Program Work Type 6.8 Solid Stem Auger Drilling.
District 4 Detroit Lakes, Hwy 10 & Frontage Road Detroit Lakes, Hwy 10 & Frontage Road Design from Airport seth.yliniemi@state.mn.us 09/08/2011
Design Road to TH 59 and from Hwy 59 from TH 10 thru Morrow Ave.
This contract will include the pre-design and final design. This
Detroit Lakes Transportation Planning
project is a recommendation from the 2010 Detroit Lakes Area
Study (25.9 Mb .PDF)
Transportation Study.
Anticipated Advertisement Information: Request for Proposals /
November 2011
District 4 Alexandria Project, SP 2102-58 The Alexandria project, SP 2102-58, is a recommendation from seth.yliniemi@state.mn.us 08/18/2011
the Alexandria Area Transportation Study. This project will be
Alexandria Area 2030 Transportation
modifying the existing I-94/TH 75 interchange to a tight
Study (14.39Mb .PDF)
diamond, improving the 50th Ave/TH 29 intersection, and
expanding from 2-4 lanes 1 mile south of the I-94/TH 29
intersection. This contract would include the pre-design and final
design.
Anticipated Advertisement Information: Request for Proposals /
December 2011
District 4 Geometric Layout of I-94/TH 75 These improvements were the recommendations of a 2008 TH seth.yliniemi@state.mn.us 08/18/2011
Interchange Improvements 75 Corridor Study.
th
SP TH 75 / 20 Street Final Corridor Prequalification Work Types: 1.12, 1.21, 2.1, 14.1, 14.3
Study 2006 (30Mb .PDF)
Anticipated Advertisement Information: Pre-Qualification Letter
of Interest / October 2011
District 4 Detroit Lakes, TH 59/Willow St. This contract will perform the pre-design and final design of a les.bjerketvedt@state.mn.us 08/18/2011
Intersection Roundabout roundabout at the intersection of TH 59 and Willow Street.
Prequalification Work Type: 17.1
Anticipated Advertisement Information: Pre-Qualification Letter
Potential Projects Last Updated: 10/27/2011
of Interest / October 2011
District 4 ADA Inspection, Evaluation and Design This Contract would be designing ADA projects that meet thomas.pace@state.mn.us 08/18/2011
in Cities of Breckenridge, Elbow Lake, Mn/DOT and PROWAG standards.
and Parkers Prairie Minnesota
Prequalification Work Types: 2.3, 9.4, 14.1
Anticipated Advertisement Information: Pre-Qualification Direct
Select / September 2011
District 4 ADA Inspection, Evaluation and Design This Contract will be designing ADA projects that meet MnDOT thomas.pace@state.mn.us 08/18/2011
in Cities of Browns Valley, Beardsley, and PROWAG standards.
Ortonville, Appleton and Benson
Prequalification Work Types: 2.3, 9.4, 14.1
Minnesota
Anticipated Advertisement Information: Pre-Qualification Direct
Select / September 2011
District 4 ADA Inspection, Evaluation and Design This Contract will be designing ADA projects that meet MnDOT thomas.pace@state.mn.us 08/18/2011
in the Cities of Morris, Donnelly, and PROWAG standards.
Herman and Wendell Minnesota
Prequalification Work Types: 2.3, 9.4, 14.1
Anticipated Advertisement Information: Pre-Qualification Direct
Select / September 2011
District 4 ADA Inspection, Evaluation, Surveys and This Contract will be designing ADA projects that meet MnDOT thomas.pace@state.mn.us 08/18/2011
Design in the City of Pelican Rapids and PROWAG standards.
Minnesota
Prequalification Work Types: 2.3, 9.4, 14.1
Anticipated Advertisement Information: Pre-Qualification Direct
Select / September 2011
District 4 Hydrology Study District 4 has several closed basin areas in the District that are bridget.miller@state.mn.us 08/18/2011
flooding highways. This study will look at the existing water
levels, look at the history of the water levels and determine how
much higher the water could rise. The contract will recommend
preferred alternatives to mitigate the flooding conditions.
Prequalification Work Type: 2.3
Potential Projects Last Updated: 10/27/2011
Anticipated Advertisement Information: Pre-Qualification Letter
of Interest / January 2012
District 6 Preliminary Design: SP 2515-21 US Mn/DOT is proceeding with development of the Red Wing Bridge chad.hanson@state.mn.us 05/26/11
Highway 63 Bridge over Mississippi and Route Improvement Project through the preliminary design
River and Approaches near Red Wing phase. The Red Wing Bridge and Route Improvement Project
includes US Trunk Highway 63 (US 63) Bridge No. 9040 over the
SP 2512-21 Final Report (10.2Mb .PDF)
Mississippi River and Bridge No. 9103 over US Trunk Highway 61
Risk Register (47Kb .XLS) (US 61), as well as the highway connections to US 61, Minnesota
Trunk Highway 58 (TH 58), and approach roadways in the State
CRAVE Report (2803Kb .PDF) of Wisconsin.
Mn/DOT anticipates issuing one RFP for the River Bridge and all
other project elements (roadway, traffic control, non-river
bridges, retaining walls, drainage, lighting, public involvement,
permitting, etc.).
District 6 MN Highway 19 Planning Study - Mn/DOT and the City of Northfield have identified a need to mark.schoenfelder@state.mn.us 05/26/2011
Interstate 35 to Northfield conduct a planning study for this Medium Priority Inter-regional
corridor with the State’s highway system. Safety and high
volumes are becoming a greater problem in this 7-mile corridor.
The current ADT's on various segments of this corridor range
from 9,000 to 10,000. The city of Northfield recently annexed
530 acres northerly, adjacent to the corridor and 450 acres
southerly, adjacent to the corridor. Also, the City has developed
a Master Plan adjacent to the corridor. Publication of the RFP is
scheduled for mid October 2011.
District 6 Construction Inspection for Mn/DOT and Mn/DNR have identified a need for construction kyle.lake@state.mn.us 05/26/2011
Rehabilitation and Relocation of inspection for rehabilitation and relocation of Historic Bridge No.
Historic Bridge No. 5399/R0259 5399/R0259 to Lake Louise State Park in Mower County. The
Contractor will need prior experience with re-assembly of a truss
structure.
Among other duties, the Contractor will perform construction
inspection in accordance with State’s Contract Administration
Manual and Mn/DOT Construction Manual, respectively. The
Potential Projects Last Updated: 10/27/2011
Contractor will also perform all tasks required and provide
results for Materials Sampling and Testing (Field Sampling and
Testing) in accordance with the current State Schedule of
Materials Control. Publication of the RFP is scheduled for mid
June 2011.
District 6 Construction Oversight for I-90 Mn/DOT has identified a need for construction oversight services terry.ward@state.mn.us 05/26/2011
Mississippi River Bridge Approaches and for the I-90 Mississippi River Bridge Approaches and US Highway
US Highway 61/14 Interchange 61/14 Interchange project. The project is scheduled for letting
on February 24, 2012.
The Construction Oversight Contractor will need prior
experience with oversight services on complex roadway and
bridge construction projects. Among other duties, the
Contractor will perform construction inspection in accordance
with State’s Contract Administration Manual and Mn/DOT
Construction Manual, respectively. The Contractor will also
perform all tasks required and provide results for Materials
Sampling and Testing (Field Sampling and Testing) in accordance
with the current State Schedule of Materials Control.
Publication of the RFP for the oversight contract is scheduled for
late fall 2011.
District 6 District-wide ADA Improvements for Mn/DOT has identified a need for a contractor to provide detail heather.lukes@state.mn.us 05/26/2011
Pedestrian Facilities design for over 270 pedestrian ramps district-wide to bring them
to compliance with the Americans with Disabilities Act (ADA).
We will direct select a consultant from the Pre-Qualification
Program list in mid June 2011.
District 7 TH 23, SP 6703-23 – Final Design Plan, Request for Proposals expected Mid to late 2011 charles.slama@state.mn.us 05/26/2011
Field Inspection/testing/Oversight: I90
to TH 269.
District 7 TH 60 four-lane expansion SP 8308-44 -- Final Design for four-lane expansion. Request for proposals rolin.sinn@state.mn.us 02/26/2011
first of three two-lane gaps - this one expected 2012 pending completion of Supplemental EIS.
Potential Projects Last Updated: 10/27/2011
between Butterfield and St. James
District 8 Surveying for Public Land Survey (PLS) Land surveying services for PLS corners along the highway 68 gene.east@state.mn.us 10/25/2011
corners from Canby to Marshall corridor between Canby and Marshall. Services needed include;
research for existing PLS corner monuments and existing
Government Certificates, field surveying and monumentation of
PLS corners, providing and filing of Government Certificates, and
a final Survey Report.
Anticipated Selection Method: Pre-Qualification, Letter of
Interest.
Anticipated Pre-Qualification Work Type(s): 9.6 Land Surveys
Anticipated Time Frame: Advertisement for LOIs in January 2012.
Environmental Demolition Landfill Audits Perform multi-media environmental audit at demo landfills to mark.vogel@state.mn.us
Services avoid future superfund site cleanup actions
External Mn/DOT Hear Every Voice/Public Development and delivery of training events that are part of the
Partnering Involvement FY 2011 Mn/DOT Hear Every Voice Public Involvement Program.
Freight & Weigh Scale Mechanism Assessment Evaluate condition and capabilities of existing scale mechanisms william.gardner@state.mn.us
Commercial Project at weigh station sites
Vehicle
Human Leadership Foundations The Leadership Foundations Program is designed to build and eric.davis@state.mn.us
Resources enhance the leadership skills of Mn/DOT supervisors and high
potential employees preparing them for greater leadership
responsibility in their current or future positions. The program
includes action learning, lecture, discussion, case studies,
technology, incorporation of participant's expertise, and direct
application of course content to work to provide the means to
reach individual and organizational goals of leadership
development.
Human Executive Leadership Development Individual and team development for Stewardship Council eric.davis@state.mn.us
Resources
Potential Projects Last Updated: 10/27/2011
Human Talent Management Employee assessments, 360 reviews, performance development eric.davis@state.mn.us
Resources and related
Land Oblique Mapping Corrections Along North Shore to correct aerial mapping joseph.pignato@state.mn.us
Management
Maintenance ADA Self Assessment for Buildings Mn/DOT, as required by Title II of ADA, must conduct a self- ernest.lloyd@state.mn.us
evaluation of physical assets and current policies and practices.
Materials Validation of Strain Gage installation, Validate the use of strain gages at MnROAD and for other critical gary.person@state.mn.us
calibration and data structures including bridges
Metro TH 120 SP 6227-57 Contract Administration and Inspection - On T.H. 120 from keith.baker@state.mn.us 08/24/2011
(Construction) Brookview Drive to Fourth Street in Maplewood - Intersection
julie.fiereck@state.mn.us
Modification, Auxiliary Lane Addition, Mill and Overlay, Traffic
Signal Replace and Revision (Includes $1.53M Access
Management $) (SP 6227-67 is included here)
**Pre-Qualification Direct Select
Metro I-35E SP 6280-355 Contract Administration and Inspection - On I-35E from Edgerton keith.baker@state.mn.us 08/24/2011
(Construction) Road to Little Canada Road and on I-694 from Edgerton Road to
julie.fiereck@state.mn.us
Rice Street (Unweave the Weave) – Landscaping
**Pre-Qualification Direct Select
Metro I-94 SP 6282-193 Contract Administration and Inspection - On I-94 from John keith.baker@state.mn.us 08/24/2011
(Construction) Ireland Boulevard to I-694/I-494 - Sign Replacement
julie.fiereck@state.mn.us
**Pre-Qualification Direct Select
Metro TH888A (Old Hwy 8) SP 6284-145 Contract Administration and Inspection - On T.H. 888A (Old T.H. keith.baker@state.mn.us 08/24/2011
(Construction) 8) from County Road D to Junction I-35W in New Brighton -
julie.fiereck@state.mn.us
Bituminous on Concrete Overlay
**Pre-Qualification Direct Select
Metro (Design) TH 100 SP 2734-33 Subsurface Utility Engineering - On T.H. 100 from 36th Street to keith.baker@state.mn.us 08/24/2011
Cedar Lake Road - Interchange Reconstruction, Noise Walls,
Potential Projects Last Updated: 10/27/2011
Replace Bridges 5308, 5309, 5462, 5598 and 27012 julie.fiereck@state.mn.us
**Pre-Qualification Direct Select
Metro TH 8 SP 1301-98 Construction Excavation Oversight - On T.H. 8 from 0.6 Mile keith.baker@state.mn.us 08/24/2011
(Environmental) West of Shoquist Lane in Chisago City to 0.2 Mile East of Irene
julie.fiereck@state.mn.us
Avenue in Lindstrom - Roadway Reconstruction and Replace
Bridge 570
**Pre-Qualification Direct Select
Metro TH 10 SP 6205-38 Drilling Investigation - On T.H. 10 at County Road 96 in Arden keith.baker@state.mn.us 08/24/2011
(Environmental) Hills - Partial Interchange Construction and Overpass
julie.fiereck@state.mn.us
**Pre-Qualification Letter of Interest
Metro I-35W SP 6284-159 Drilling Investigation - On I-35W under South Junction T.H. 10 in keith.baker@state.mn.us 08/24/2011
(Environmental) Arden Hills - Replace Bridges 9585 & 9586 and Approach Work
julie.fiereck@state.mn.us
**Pre-Qualification Letter of Interest
Metro TH 100 SP 2734-33 Contamination Investigation - On T.H. 100 from 36TH Street to keith.baker@state.mn.us 08/24/2011
(Environmental) Cedar Lake Road - Interchange Reconstruction, Noise Walls,
julie.fiereck@state.mn.us
Replace Bridges 5308, 5309, 5462, 5598 and 27012
**Pre-Qualification Direct Select
Metro TH 169 SP 2776-03 Construction Excavation Oversight - On T.H. 169 Remove Signals keith.baker@state.mn.us 08/24/2011
(Environmental) at I-494 North and South Ramps and at Highwood Drive and
julie.fiereck@state.mn.us
Reconstruct Existing Interchange Ramps (Design Build Project)
**Pre-Qualification Letter of Interest
Metro TH13 SP 7001-103 Construction Excavation Oversight - On T.H. 13 from T.H. 169 TO keith.baker@state.mn.us 08/24/2011
(Environmental) 1000 Feet East of Louisiana Avenue in Savage - Reconstruct
julie.fiereck@state.mn.us
Interchange including TH Overpass (Design Build Project)
**Pre-Qualification Letter of Interest
Metro TH 52 SP 1906-55 Drilling Investigation and Oversight - On T.H. 52 East and West keith.baker@state.mn.us 08/24/2011
Side of Highway from T.H. 50 to CSAH 47 - Frontage Road
Potential Projects Last Updated: 10/27/2011
(Environmental) Construction - also Construction of T.H. 52 Ramps and Loops to julie.fiereck@state.mn.us
CSAH 47
**Pre-Qualification Letter of Interest
Metro TH 65 SP 2710-42 Drilling Investigation - On T.H. 65 from 1.2 Miles North of keith.baker@state.mn.us 08/24/2011
(Environmental) Junction T.H. 47 in Minneapolis - Replace Railroad Bridge
julie.fiereck@state.mn.us
**Pre-Qualification Letter of Interest
Metro I-494 SP 2785-330C Phase I Drilling Investigation for 13 Bridges on I-494 from I-394 keith.baker@state.mn.us 08/24/2011
(Environmental) to I-94
julie.fiereck@state.mn.us
**Pre-Qualification Letter of Interest
Metro I-35W Hot Lane Appraisals I-35W Hot Lane - Right of Way Appraisals keith.baker@state.mn.us 08/24/2011
(Right-of-Way)
**Pre-Qualification Direct Select julie.fiereck@state.mn.us
Metro TH 8 Chisago/Lindstrom SP 1301-98 Original Appraisals - On T.H. 8 from 0.6 Mile West of Shoquist keith.baker@state.mn.us 08/24/2011
(Right-of-Way) Lane in Chisago City to 0.2 Mile East of Irene Avenue in
julie.fiereck@state.mn.us
Lindstrom - Roadway Reconstruction and Replace Bridge 570
**Pre-Qualification Direct Select
Metro I-35E University SP 6280-308 Original Appraisals - On I-35E from University Avenue to just keith.baker@state.mn.us 08/24/2011
(Right-of-Way) North of Maryland Avenue in St. Paul- Reconstruct including
julie.fiereck@state.mn.us
Replace Existing Interchange at Pennsylvania Avenue with
Interchange at Cayuga Street, Frontage Road Construction, etc.,
Replace 5 Bridges and add 7 Bridges
**Pre-Qualification Direct Select
Metro TH 36 Hilton Trail SP 8204-55 Original Appraisals (est. 3 parcels) - On T.H. 36 at Hilton Trail keith.baker@state.mn.us 10/27/2011
(Right-of-Way) (CSAH 36) in Pine Springs - Reconstruct Intersection, Access
julie.fiereck@state.mn.us
Closures and Extension of North Frontage Road over Gateway
Trail
**Pre-Qualification Direct Select
Potential Projects Last Updated: 10/27/2011
Metro TH 36 Oak Park Heights SP 8217-82045 Original Appraisals (est. 4 parcels) - On T.H. 36 New Bridge over keith.baker@state.mn.us 08/24/2011
(Right-of-Way) St. Croix River, including Ramps on and off T.H. 95, in Stillwater
julie.fiereck@state.mn.us
and Oak Park Heights
**Pre-Qualification Direct Select
Metro (Traffic TH 100 SP 2755-83 Lighting Design - On T.H. 100 from I-694 to CSAH 152, including keith.baker@state.mn.us 08/24/2011
Engineering) the Interchange of CSAH 10 (Bass Lake Road) - Install Continuous
julie.fiereck@state.mn.us
Lighting
**Pre-Qualification Direct Select
Multi Modal Long Range Vision Plan Development Develop a long range vision to guide all MnDOT planning efforts mark.nelson@state.mn.us
Planning going forward.
Policy Analysis, Risk Management Training Continue to develop and deploy up to 2 Risk Management nick.thompson@state.mn.us
Research & Classes/Group Training Clinics for the purpose of informing
Innovation MnDOT employees and external customers about timely risk
management information and procedures.
Policy Analysis, Understanding how to value This project will look at long term costs and benefits of nick.thompson@state.mn.us
Research & sustainability sustainability in MnDOT purchases and practices for contracting
Innovation so that investments reflect the true value and costs of the
investment
Policy Analysis, Omnibus Study '10 (Centrally Funded) Annual Performance Tracker nick.thompson@state.mn.us
Research &
Innovation
Policy Analysis, Online Community Customer (OLC) Create a second (one year) online community when the current nick.thompson@state.mn.us
Research & Program II OLC terminates. Another set of 600 Minnesotans providing
Innovation ongoing feedback/surveys via online interactions.
Project Scope & Project Management (PM) Implement the findings from the PM Peer Review Multi Phases linda.moline@state.mn.us
Cost Implementation
Management
Potential Projects Last Updated: 10/27/2011
Project Scope & Cost Estimating/Cost Management Delivery of follow-up Cost Estimating/Cost Management Classes linda.moline@state.mn.us
Cost to ensure that MnDOT employees and external
Management
Project Scope & Project Management Training A renewed training effort to provide some PM courses that were linda.moline@state.mn.us
Cost offered in the past and add some new courses that were
Management recommended by the PM Peer Review Study Team
Technical Design Quality Training Development of curriculum and training schedule and deliver judy.rossi@state.mn.us
Support training to implement Design Quality Manual Process. Develop
procedures and reference documentation for design quality and
constructability review processes for the design bid build
environment.
Technical Projectwise Support The Contractor will provide on-going technical support for the judy.rossi@state.mn.us
Support ProjectWise (PW) applications that have been implemented
within the State and on-going technical support for integrations
between other applications/data bases and PW
applications/data bases. Since these applications and
integrations are critical to PW, on-going and highly skilled
technical support is required. The primary goals for the contract
are to provide: on-going technical support for customer
issues/problems with using the PW applications and
integrations; support for prioritized changes to both the PW
applications (customization capability is provided within the
software) and integrations required to meet specific State
requirements; and support for development projects that
require the use of PW applications and infrastructure, and are
identified through the State program management process.
Technical Mn/DOT Research/Planning Project: Evaluate the most cost effective and politically acceptable judy.rossi@state.mn.us
Support Interstate approach to developing Truck Havens and/or Public Private
Partnerships on the Interstate to better meet CMV Parking
needs in Minnesota.
Technical Truck Havens and Public Private Document all laws that permit or restrict these developments judy.rossi@state.mn.us
Potential Projects Last Updated: 10/27/2011
Support Partnership Pilot Project (SRA-PPP along the Interstate; Organize and facilitate meeting with
study) stakeholder/special interest groups; Define products and
services of a Truck Haven; Identify the requirements of a PPP
solution; Develop one business model for each for comparison
including anticipated lifecycle cost for each; Prepare 30%
complete pilot project plan set for one facility
Traffic Traffic Training Traffic Related training including: Signals, Lighting, and Sign ron.bisek@state.mn.us 08/17/2010
Design related classes.
Transit Mn/DOT Statewide Bicycle Network This project would allow Mn/DOT to convene all relevant michael.schadauer@state.mn.us 08/17/2011
Plan stakeholders and Mn/DOT staff in an effort to identify and
designate a system of trunk highways that are both currently
suitable and desirable for bicycling and those that serve as
important connections and may need future consideration for
improvements. It will also allow Mn/DOT to align with existing
and on-going planning efforts to understand the needs of the
cycling community in traversing across the state safely and
efficiently. This effort will also allow Mn/DOT to move towards
providing some comprehensive resources for public
consumption on navigating Mn/DOT's roads for bicycling such as
a map or a website as well as other marketing materials.