Embed
Email

DAVIS.xlsx - Los Rios Community College District

Document Sample

Shared by: linzhengnd
Categories
Tags
Stats
views:
2
posted:
11/11/2011
language:
English
pages:
35
UNIT PLAN INSTRUCTIONS & TIPS (print these for reference)

Overview

Each unit plan is made up of one excel workbook which has several worksheets.

Identification – enter basic information about the department/unit

Main Unit Plan – enter the unit plan objectives, outcomes, types of resources requested, etc.

Financial Resources – enter details of your financial requests

IT Resources – enter the description and rationale for your IT request

Facilities Resources - enter the description and rationale for your facilities request

You can switch from one worksheet to another using the tabs that show at the bottom of the screen. Some information is

automatically filled in from one worksheet to another so you don’t have to re-enter the same information – please note that you

can't add columns or merge cells. We have set it up this way as changing columns or merging cells will mess up the autofill

function.



Identification Worksheet Enter the following information:

CSA: One of four College Service Areas identified by the title of the President or Vice President – Student Services,

Instruction, Administrative Services, and President’s Office. (Use the drop down box)

Division (Use the drop down box)

Department/Unit (Use the drop down box)

Contact person: name, phone number and email (typically this will be the department chair)

Date/revision date: It’s useful to change this each time you revise the unit plan so that you can keep track of what version is

the most recent.

Planning year: This has been filled in for you. This is the year you are planning for; remember that in this year, we are

planning for next year’s work.

Unit Mission: The mission of your department or unit is the main role or function(s) that the department or unit fills at the

college. This should align with the overall Mission of the College. For example, an instructional department’s mission may

include providing general education, basic skills development, degree or certificate courses, courses which develop specific

job skills, etc. A student services unit may have a mission that includes specific types of support for student learning, the use

of data to improve the success of students from diverse backgrounds, etc.



Main Unit Plan Worksheet Enter the following information:

Identification: This information will automatically be filled in from the “Identification” worksheet.

Enter the following information:

Objective ID: Name each objective using the abbreviation for your unit and a number (e.g. PRIE-1, HIST-1, EOPS-1). Be

careful to keep the same formatting for all objective IDs.

Unit objective: A unit plan objective is a specific measurable action that you plan to accomplish over the year that the plan

is implemented or over a few years including the planning year. If you have a multi-year objective, you’ll be asked to indicate

the year you began working on the objective and the year you plan to complete the objective.

Outcome measure: The outcome measure is the indicator that you have achieved the objective. When you’ve accomplished

this, you know you’ve completed your objective.

Multi-year plan: If you have a multi-year objective, you’ll be asked to indicate the year you began working on the objective

and the year you plan to complete the objective. If you have a multi-year objective, use the drop down menus to show the

start year and the end year for the objective.

Resources required: There are several types of resources that you need to indicate in this set of boxes. These are labelled –

Financial Resources, Facility Resources, IT Resources, Hire FT faculty, and Hire Classified. Put an X in the box for each type of

resource that you are requesting. (This “X” is what triggers the autofill to the other worksheets.)

Prioritization: These columns allow the priority assigned to each objective by the department and division to be recorded.

The College Service Area (CSA) priorities will be filled in later.

Type of change: The unit plan allows you to indicate some important types of actions:

Curriculum changes such as modifying course outlines, adding pre-requisites, developing new courses, etc.

Teaching method implementation such as different classroom practices, new teaching materials, use of supplementary

instruction or tutors, etc.

Administrative processes such as modifications to paperwork, data collection, staff processes, etc.

Outreach to community outside of the college – work with high schools, transfer universities, local community groups,

advisory boards, industry partners, etc.

College Goals: Put an X in the box for each College Goal that is supported by the objective. If you place the cursor over the

number of the goal, you will see the wording of the goal. You should check all of the goals with which an objective is aligned,

but remember that there are no “bonus points” for checking off a large number of goals.

Financial Resources Worksheet Fill out the main unit plan worksheet before you do this one. On this worksheet you will enter

the details of your financial resource requests. The objID, objective, and outcome measures will automatically be filled in from

the main unit plan page for those objectives with financial resource requests (there will be some blank rows where objectives

didn't have financial resource requests; this is OK). Enter the details of your financial resource requests (columns with green

headers).

Description: Briefly describe what financial resources will be needed and what they will be used to purchase.

Rationale: Briefly describe how the financial resources will support the unit objective; i.e. why are the resources needed at

this time.

Nature of Request: Use the drop down menu to chose from the following: Maintenance of effort, New Initiative, or

Emergent/urgent.

General Funding Type: Indicate the general funding type(s) being requested; choose from the list shown below. You may

enter more than one type of funding. (A pop up box will remind you of the list below)

Continuing CDF base augmentation – request for an ongoing increase in the base budget for the unit. (Used for

supplies, repairs, software, travel, student help, temporary classified staff, etc.)

One time only (OTO) base augmentation – request for a one time only increase in the base budget for the unit.

Continuing IR base augmentation – request for an ongoing increase in the “IR” monies used to support extensions of

classroom instruction such as athletics, theatre, forensics, student newspaper, student-centered cultural activities,

etc.

Equipment – tangible property which can be used for a year or more and has a purchase price of over $200.

VTEA funds – request for VTEA (Vocational and Technical Education Act) funding.

Basic Skill Initiative funds

Matriculation funds

EOPS funds

DSPS funds

CalWORKS funds

TANF funds

Health Grant funds

Specific Expenditure Type: Choose from the list below. You may enter more than one type of funding. (A pop up box will

remind you of the list)

Dues and membership fees

Equipment purchase

Repair

Instructional supplies

Non-instructional supplies

Marketing costs

Operating base

Personal/Consulting services

Postage

Printing

Rents & Leases

Software

Student Help

Temporary Staffing

Travel/Conference

Hours or Quantity: Indicate the number of hours or quantity of the item requested.

Unit Cost: Indicate the cost of one hour or one item.

Total financial request for objective: Enter the total amount for the item - the combined total of what will be requested

from the budget committee and what will come from other sources of funding. (Note: The entire amount may be

requested from the budget committee).

Amount requested from the Budget Committee: Enter the amount of financial resources that you are requesting from the

Budget Committee. This may be less than the total financial request if the only part of the total cost is being requested

from the Budget Committee.

Grand total project cost = Financial + IT + Facilities: This column specifies the grand total of the project, including financial

resources needed and the cost of the IT and/or facilities resources requested.



A note on long term financial commitments: If a resource request results in a long term resource commitment on the part of the

college this should be made clear at the meeting with IT and Facilities and should be part of the presentation provided to the

Budget Committee. If a resource request results in ongoing intermittent costs to the department/division (e.g. a software update

every three years) the department/division may work with the VPA to put aside a part of the money each year toward the coming

expenditure.

Facilities Resources Worksheet

Fill out the main unit plan worksheet before you do this one. The objID, objective, and outcome measures will automatically be

filled in from the main unit plan page for those objectives with facilities resource requests (there will be some blank rows where

objectives didn't have faciilities resource requests; this is OK). Enter the description and rationale for your facilities resource

request (columns with orange headers).



Description: Briefly describe what facilities resources will be needed and what they will be used to purchase.



Rationale: Briefly describe how the facilities resources will support the unit objective; i.e. why are the resources needed at this

time.



Facilities and the IT department will conduct a mandatory meeting in October for all departments which have objectives with

facilities or IT components. You may also want to schedule a meeting with the Facilities staff earlier in the process. They can help

you figure out how to meet your resource needs in the most effective way and avoid unnecessary costs.



A note on long term financial commitments: If a resource request results in a long term resource commitment on the part of the

college this should be made clear at the meeting with IT and Facilities and should be part of the presentation provided to the

Budget Committee. If a resource request results in ongoing intermittent costs to the department/division (e.g. a software update

every three years) the department/division may work with the VPA to put aside a part of the money each year toward the coming

expenditure.



The following columns are completed by Operations:

ASF Impacted: Available Square Footage



Estimated Cost: Enter estimated cost for all IT components needed to meet the unit's objective



Time Required: Enter estimated time to complete project. Alt-Enter for multiple timelines.



Feasibility/Target Date: Enter assessment of feasibility to complete the project based on time, funding, and personnel.



Funding Assessment: Potential funding sources that are eligible to support this project.



Options for Funding Assessment: (more than one may be indicated) College Discretionary Funds (CDF): Formula-driven funds

allocated to the College for spending during the annual budget development process. Institutional: Historic base allocation

used to fund institutional requirements. Categorical Funds: Restricted funds that must be used in accordance with guidelines

dictated by the funding source. Examples include but are not limited to VTEA, EOP&S and DSP&S. Foundation/Trust: Funds

provided by SCC Foundation or Trust Account . Other = Can include but not limited to HAZMAT, Americans with Disabilities Act

(ADA), Scheduled Maintenance/Special Repairs (SMSR), and Type II.



Comments: Enter additional comments required to complete this project

IT Resources Worksheet:

Fill out the main unit plan worksheet before you do this one. The objID, objective, and outcome measures will automatically be

filled in from the main unit plan page for those objectives with IT resource requests (there will be some blank rows where

objectives didn't have IT resource requests; this is OK). Enter the description and rationale for your IT resource request (columns

with orange headers).



Description: Briefly describe what IT resources will be needed and what they will be used to purchase.



Rationale: Briefly describe how the IT resources will support the unit objective; i.e. why are the resources needed at this

time.



Facilities and the IT department will conduct a mandatory meeting in October for all departments which have objectives with

facilities or IT components. You may also want to schedule a meeting with the IT staff earlier in the process. They can help you

figure out how to meet your resource needs in the most effective way and avoid unnecessary costs. (Note: Smart classrooms

are moving to a replacement cycle on a regular basis and so will not often be requested through the unit planning process in the

future.)



A note on long term financial commitments: If a resource request results in a long term resource commitment on the part of

the college (e.g. ongoing IT support) this should be made clear at the meeting with IT and Facilities and should be part of the

presentation provided to the Budget Committee. If a resource request results in ongoing intermittent costs to the

department/division (e.g. a software update every three years) the department/division may work with the VPA to put aside a

part of the money each year toward the coming expenditure.



The following columns are completed by the IT Department:

Component Assessment: List all IT components needed to meet the unit's objective. Alt-Enter to list individual

components in the same cell.



Estimated Cost: Enter estimated cost for all IT components needed to meet the unit's objective



Feasibility/Target Date: Enter expected dates of completion



Funding Assessment: Potential funding sources that are eligible to support this project. Options for Funding Assessment:

(more than one may be chosen)

College Discretionary Funds (CDF): Formula-driven funds allocated to the College for spending during the annual budget

development process.

Institutional: Historic base allocation used to fund institutional requirements.

Categorical Funds: Restricted funds that must be used in accordance with guidelines dictated by the funding source. Examples

include but are not limited to VTEA, EOP&S and DSP&S.

Foundation/Trust: Funds provided by SCC Foundation or Trust Account

Other = Can include but not limited to HAZMAT, Americans with Disabilities Act (ADA), Scheduled Maintenance/Special Repairs

(SMSR), and Type II.



Comments: Enter additional comments required to complete this project

Sacramento City College

2011-12 Planning Year Unit Plan



Unit Description Data: Use the drop-down menus for College Service Area, Division and Department/Unit by clicking in

the cell and then clicking on the arrow that appears to the right of the cell. Then click on the appropriate selection.

College Service Area (CSA): VPI

Division: DAVIS

Department/Unit: DAVIS

Point of Contact Name: Don Palm

Phone: (530) 747-5220

Email: palmd@scc.losrios.edu

Date/Revision Date: 10/1/2010

Planning Year 2011-12



Unit Mission: (Note: Align with College Mission)

The Davis Educational Center primarily serves students from Davis and the local region, providing a bridge to the programs, services

and culture of SCC’s main campus. We provide the greatest range of student services possible and we provide students with a quality

higher education program in their community; this is green on many levels. We emphasize personal service, accessibility, and easy

access to faculty, staff, and administrators. We encourage personal initiative and responsibility in our students. Our program emphasizes

transfer-oriented courses, but we also offer courses for career and technical education and for personal enrichment. Wherever possible

we encourage green consciousness (curriculum and practices) and global awareness.









College Mission: Sacramento City College is an open-access, comprehensive community college, serving a diverse student

population. We provide a wide range of educational opportunities and support services leading to transfer, career advancement,

basic skill development, degree and certificate attainment, and personal enrichment. Our commitment to continuous

improvement thruogh outcome-guided assessment, planning, and evaluation promotes student learning. Through these efforts,

we contribute to the intellectual, cultural, and economic vitality of the community.

11/11/2011



Sacramento City College

2011-12 Planning Year - Unit Plan

If multi-yr objective, use Resources(s)

the drop down menu

below for start date and Required (Place Xs Prioritization

end date appropriately)









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year



Go Print purchased and installed and

To allow students to print their operating.

assignments and complete their work in

the Center (similar to the opportunities

DVS1 available on the main campus), 1 1

purchase and install GoPrint for the

computer lab. (Note: There is no

associated budget request because this

falls under the bookstore budget.)

For this year the hiring will include a

new admin assist, new library tech, and

To ensure a proper environment for an additional SPA, along with new

students in the new site, complete the custodial support provided and

DVS2 classified staff hiring as described in increased presense from a business 2 2

the Center Staffing Plan. (Note: No clerk, financial aid clerk, and senior IT

need for additional classified staff Tech. This is budgeted through the

request because the DO has budgeted Educational Center Staff Plan adopted

for Center staff.) May 2008.

To support and enhance the growth of Programs will be established at the

the educational program at the Davis new site for spring semester 2012.

Center, continue to work with Los Rios

DVS3 3 3

CCD and UCD to develop and

implement plans for the new building in

West Village.









Page 6

11/11/2011









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year



To better respond to students' Productivity maintained above 535 for

academic and career development the site as a whole; new courses

DVS4 needs, continue to revise the offered strategically in response to 7 7

curriculum offered through the Davis student requests and specific program

Center. needs.

To enhance student accesss to Textbooks added to the collection in

textbooks, increase the available response to needs as measured by

reserve book collection. (Note: These collection use data.

DVS5 books are donated by faculty. The LRC 8 8

reserve budget has also been

augmented to allow them to buy books

for outreach.)

Continue "open conversation"

To broaden students' sense of their meetings for students and faculty;

place at the Center and at SCC, and Facebook page up to date; Twitter

DVS6 9 9

increase our knowledge of students' used appropriately; webpage up to

needs and interests, increase date.

communication via a variety of media.

To improve students' access to classes Information available for students,

in Davis and on the main campus, especially regarding transportation

develop a greater range of options at the new site. All media

DVS7 10 10

transportation options (at least more updated with transportation

information available for students and information.

faculty).

Equipment provided for new and Specific needs include 20 microscopes

continuing programs at the new site. (for biology and psychology) and art

equipment. (This is a part of the

DVS8 11 11

Program Plan, type 2 money from

building budget will be the primary

source).

To enable faculty to teach effectively in Technology training for full- and part-

DVS9 the new building, we'll provide time faculty. 12 12

technology training for faculty.









Page 7

11/11/2011









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year



To enable students to take advantage Orientation days

of the new learning environment, we

DVS10 13 13

will provide a site-based orientation for

students

To encourage appropriate connections Community days

between SCC Davis Center's new West

DVS11 Village site and the local community, 14 14

we will provide orientation for the

community.

To encourage faculty to take full Faculty days

advantage of the new Davis Center

DVS12 15 15

learning environment we will provide

orientation for faculty.

To build a greater sense of community Program of cultural awarness, student

for students and faculty, and to take success and faculty development

advantage of the location on the UC events, coordinated with UC Davis

Davis campus, we will build a program faculty and staff.

of cultural awareness, staff

DVS13 development, and community building 2010-11 2015-16 X 4 4

activities. To complete this objective we

will need a stipend to support planning

for spring 2012 and we will request

release time for the year after.



To support the signicant efforts The continued success of the

engaged in by the lead faculty for the Chemistry and Mathematics courses

DVS14 X 5 5

UCD/SCC Cooperative program for offered at UC Davis.

Chemistry and Math programs.









Page 8

11/11/2011









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year



Hire 1 FTE LMTA to be housed .5 at 1. Increased services to the Centers,

West Sac and .5 at Davis. including processing of reserve items,

Note this position is being requested by checking in and charging out materials,

West Sac, Davis and the SCC/LRC. registering new patron, collecting fines,

This position will be supervised by the handling interlibrary loans, etc.

DVS 15 x 6 6

Lead LMTA at SCC/LRC. However, 2. More students able to access

the work will be carried out at the resources directly at the Centers

centers. 3. User satisfaction survey









Page 9

11/11/2011









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year







ADD NEEDED ROW(S) ABOVE THIS LINE.









Page 10

11/11/2011



Sacramento City College

2011-12 Planning Year - Unit Plan



Type of change (Place

Xs appropriately) Identification

College Goals

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9



To allow students to print their

assignments and complete their work in

the Center (similar to the opportunities

DVS1 available on the main campus), x x x DAVIS DAVIS VPI

purchase and install GoPrint for the

computer lab. (Note: There is no

associated budget request because this

falls under the bookstore budget.)





To ensure a proper environment for

students in the new site, complete the

DVS2 classified staff hiring as described in x x x x DAVIS DAVIS VPI

the Center Staffing Plan. (Note: No

need for additional classified staff

request because the DO has budgeted

for Center staff.)

To support and enhance the growth of

the educational program at the Davis

Center, continue to work with Los Rios

DVS3 x x x x DAVIS DAVIS VPI

CCD and UCD to develop and

implement plans for the new building in

West Village.









Page 11

11/11/2011

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9

To better respond to students'

To allow students to print their

academic and career development

DVS4 assignments and complete their work in

needs, continue to revise the x x x x DAVIS DAVIS VPI

curriculum (similar to the opportunities

the Center offered through the Davis

DVS1 available on the main campus),

Center.

To enhance student GoPrint to

purchase and install accesss for the

computer lab. (Note:the available

textbooks, increase There is no

associated budget request because this

reserve book collection. (Note: These

DVS5 falls under donated by faculty. The LRC

books are the bookstore budget.) x x x x DAVIS DAVIS VPI

reserve budget has also been

augmented to allow them to buy books

for outreach.)



To broaden students' sense of their

place at the Center and at SCC, and

DVS6 x x x x x x DAVIS DAVIS VPI

increase our knowledge of students'

needs and interests, increase

communication via a variety of media.

To improve students' access to classes

in Davis and on the main campus,

develop a greater range of

DVS7 x x x DAVIS DAVIS VPI

transportation options (at least more

information available for students and

faculty).

Equipment provided for new and

continuing programs at the new site.

DVS8 x x x x DAVIS DAVIS VPI







To enable faculty to teach effectively in

DVS9 the new building, we'll provide x x x DAVIS DAVIS VPI

technology training for faculty.









Page 12

11/11/2011

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9

To enable students to take advantage

Tothe new learning environment, we

of allow students to print their

DVS10 assignments and complete their work in x x x DAVIS DAVIS VPI

will provide a site-based orientation for

the Center (similar to the opportunities

students

DVS1 available on the main campus),

To encourage appropriate connections

between and Davis Center's new West

purchaseSCC install GoPrint for the

DVS11 computer lab. (Note: There is no

Village site and the local community, x x x DAVIS DAVIS VPI

associated budget requestfor the

we will provide orientation because this

falls under the bookstore budget.)

community.

To encourage faculty to take full

advantage of the new Davis Center

DVS12 x x DAVIS DAVIS VPI

learning environment we will provide

orientation for faculty.

To build a greater sense of community

for students and faculty, and to take

advantage of the location on the UC

Davis campus, we will build a program

of cultural awareness, staff

DVS13 development, and community building x x x x x x DAVIS DAVIS VPI

activities. To complete this objective we

will need a stipend to support planning

for spring 2012 and we will request

release time for the year after.



To support the signicant efforts

engaged in by the lead faculty for the

DVS14 x x x DAVIS DAVIS VPI

UCD/SCC Cooperative program for

Chemistry and Math programs.









Page 13

11/11/2011

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9

Hire 1 FTE LMTA to be housed .5 at

To allow studentsat Davis.their

West Sac and .5 to print

assignments and complete their workby

Note this position is being requested in

the Center Davis and the opportunities

West Sac, (similar to SCC/LRC.

DVS1 available on the main campus), by the

This position will be supervised

DVS 15 purchase and install GoPrint for the x x x x x DAVIS DAVIS VPI

Lead LMTA at SCC/LRC. However,

the work lab. (Note: There is no

computerwill be carried out at the

associated budget request because this

centers.

falls under the bookstore budget.)









Page 14

11/11/2011

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9



To allow

ABOVEprint their LINE.

to

EEDED ROW(S) students complete their work in

assignments and

THIS ADD NEEDED ROW(S) ABOVE THIS LINE.

the Center (similar to the opportunities

DVS1 available on the main campus),

purchase and install GoPrint for the

computer lab. (Note: There is no

associated budget request because this

falls under the bookstore budget.)









Page 15

11/11/2011



Sacramento City College

2011-12 Planning Year - Financial Unit Plan







Description of Financial Rationale for Financial

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









To build a greater sense of community Program of cultural awarness, student Stipend of $500 for a faculty This stipend will compensate a

for students and faculty, and to take success and faculty development events, project. faculty member for their time

advantage of the location on the UC coordinated with UC Davis faculty and staff. creating and implementing a

Davis campus, we will build a program program of cultural awareness,

of cultural awareness, staff staff development and

DVS13 development, and community building community building events

activities. To complete this objective (working in coordination with

we will need a stipend to support appropriate faculty and staff

planning for spring 2012 and we will from the main campus, and with

request release time for the year after. the staff of the Davis Center).



To support the signicant efforts The continued success of the Chemistry and Stipends of $500 for chemistry The lead faculty offer support

engaged in by the lead faculty for the Mathematics courses offered at UC Davis. facilitator and $200 for math for 22 sections of the Chemistry

UCD/SCC Cooperative program for facilitator. course and 7 sections of the

DVS14

Chemistry and Math programs. math course. In each case they

commit significant time to the

project.







16

11/11/2011







Description of Financial Rationale for Financial

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









ADD NEEDED RO









17

11/11/2011



Sacramento City College

Identification

2011-12 Planning Year - Financial Unit Plan





Nature of Amount

Total

Request Specific Requested

General Hours or Financial

Obj ID Unit Objective (use drop Expenditure Unit Cost from

Funding Type Quantity Need for

down Type Budget

Objective

menu) Committee









To build a greater sense of community Personal services

OTO Base Augmentation

for students and faculty, and to take

advantage of the location on the UC

Davis campus, we will build a program

of cultural awareness, staff

New

DVS13 development, and community building 1 $500.00 $500.00 $500.00

Initiative

activities. To complete this objective

we will need a stipend to support

planning for spring 2012 and we will

request release time for the year after.



To support the signicant efforts Personal services

Cont. CDF Base Augmentation

engaged in by the lead faculty for the

UCD/SCC Cooperative program for Maintenance

DVS14 1 $700.00 $700.00 $700.00

Chemistry and Math programs. of Effort









18

11/11/2011



Nature of Amount

Total

Request Specific Requested

General Hours or Financial

Obj ID Unit Objective (use drop Expenditure Unit Cost from

Funding Type Quantity Need for

down Type Budget

Objective

menu) Committee









ADD NEEDED ROW(S) ABOVE THIS LINE. ADD NEEDED RO









19

11/11/2011



Sacramento City College

Objective

2011-12 Planning Year - Financial Unit Plan

Prioritization



Grand Total

Project Cost

Obj ID Unit Objective (Financial + Dept. Div CSA Dept Div CSA

IT+Facilities)

Once Known









To build a greater sense of community

for students and faculty, and to take

advantage of the location on the UC

Davis campus, we will build a program

of cultural awareness, staff

DVS13 development, and community building $500.00 DAVIS DAVIS VPI 4 4 0

activities. To complete this objective

we will need a stipend to support

planning for spring 2012 and we will

request release time for the year after.



To support the signicant efforts

engaged in by the lead faculty for the

UCD/SCC Cooperative program for

DVS14 $700.00 DAVIS DAVIS VPI 5 5 0

Chemistry and Math programs.









20

11/11/2011



Grand Total

Project Cost

Obj ID Unit Objective (Financial + Dept. Div CSA Dept Div CSA

IT+Facilities)

Once Known









ADD NEEDED RO









21

11/11/2011



Sacramento City College

2011-12 Planning Year - Facility Resource Request Unit Plan Form







Description of Facility Rationale for Facility

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









22

11/11/2011



Description of Facility Rationale for Facility

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









ADD NEEDED ROW(S) ABOVE THIS LINE.









23

11/11/2011



Sacramento City College

2011-12 Planning Year - Facility Resource Request Unit Plan Form

To be Completed by Operations Identification





ASF Estimated Time Feasibility/ Funding

Obj ID Unit Objective Comments

Impacted Cost Required Target Date Assessment









24

11/11/2011



ASF Estimated Time Feasibility/ Funding

Obj ID Unit Objective Comments

Impacted Cost Required Target Date Assessment









ADD NEEDED ROW(S) ABOVE THIS LINE. ROW(S) ABOVE THIS LINE.

ADD NEEDED









25

11/11/2011



Sacramento City College

2011-12 Planning Year - Facility Resource Request Unit Plan Form

Identification Objective

Prioritization



Campus

Obj ID Unit Objective Dept. Div CSA Dept Div CSA

Development









26

11/11/2011



Campus

Obj ID Unit Objective Dept. Div CSA Dept Div CSA

Development









ROW(S) ABOVE THIS LINE. ADD NEEDED LINE.

ADD NEEDED ROW(S) ABOVE THISROW(S) ABOVE THIS LINE.









27

11/11/2011



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form







Description of IT Rationale for IT

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









28

11/11/2011



Description of IT Rationale for IT

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









ADD NEEDED ROW(S) ABOVE THIS LINE.









29

11/11/2011



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form

To be Completed by IT Identification



Component Estimated Time Feasibility/T Funding

Obj ID Unit Objective

Assessment Cost Required arget Date Assessment









30

11/11/2011



Component Estimated Time Feasibility/T Funding

Obj ID Unit Objective

Assessment Cost Required arget Date Assessment









LINE.

ADD NEEDED ROW(S) ABOVE THIS ADD NEEDED ROW(S) ABOVE THIS LINE.









31

11/11/2011



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form

Objective

Identification Prioritization





Obj ID Unit Objective Comments Dept Div CSA Dept Div









32

11/11/2011



Obj ID Unit Objective Comments Dept Div CSA Dept Div









ADD NEEDED ROW(S) ABOVE THIS LINE.

ADD NEEDED ROW(S) ABOVE THIS LINE. ADD NEEDED ROW(S) ABOV









33

11/11/2011



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form







IT

Obj ID Unit Objective CSA

Committee









34

11/11/2011



IT

Obj ID Unit Objective CSA

Committee









ADD ABOVE ROW(S) ABOVE THIS LINE.

ADD NEEDED ROW(S)NEEDEDTHIS LINE.









35



Other docs by linzhengnd
i-Health
Views: 0  |  Downloads: 0
State employees recall events of September 11
Views: 7  |  Downloads: 0
0804050421330_2110
Views: 4  |  Downloads: 0
Listino2009 - Meetup
Views: 0  |  Downloads: 0
TwoSurveyCalculator
Views: 0  |  Downloads: 0
Guidelines.xlsx
Views: 0  |  Downloads: 0
APPALACHIA AND THE OZARKS
Views: 2  |  Downloads: 0
Proliferation Studies
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!