scope of work template
							ACG 5th Annual Conference on Total
    Building Commissioning




       InterContinental Chicago O'Hare, Chicago, IL
                     April 15-17, 2009
University of Florida Still Green and
              Growing

              Bahar Armaghani, LEED AP, LEED Faculty
              Assistant Director & Project Manager

              Visiting Professor
              College of Design, Construction & Planning

                        University of Florida

                          www.facilities.ufl.edu


              USGBC Heart of Florida Chapter, President

                           barmagh@ufl.edu
                  AGENDA
   LEED then, now and beyond
   UF Green and Growing
   UF LEED buildings Performance report
   Existing buildings
   Commissioning
   Q&A and Discussion
                 LEED TimeLine

   LEED v2.0      LEED v2.2




LEED v1.0   LEED v2.1
          LEED v3                           LEED v2.2

- Sustainable Sites          26   - Sustainable Sites       14
- Water Efficiency           10   - Water Efficiency         5
- Energy & Atmosphere       35    - Energy & Atmosphere     17
- Materials & Resources     14    - Materials & Resources   13
- Indoor Environmental      15    - Indoor Environmental    15
- Innovation & Design       6     - Innovation & Design     5
- Regional Priority        4
Total                     110     Total                     69
       LEED v3                    LEED v2.2


Certified   40 - 49 points   Certified   26 - 32 points
Silver      50 – 59 points   Silver      33 - 38 points
Gold        60 - 79 points   Gold        39 - 51 points
Platinum    80+ points       Platinum    52 - 69 points
Green Building
    Ripple Effect
U.S. State Emissions Measured Against Countries
    Why Green?

was the question
The better question is . . .
UF Green & Growing




                City within a City
UF is BIG and consumes significant resources
    Facts about University of Florida

 2000 acres main campus
 380 acres are conservation land
 887 buildings on main campus
 17,446,600 square foot main campus
 1932 buildings on and off campus
 20,372,666 square foot on and
  off campus
    Facts about University of Florida

  ~ 52,000 students
 8,100 staff
 4,350 faculty
 We are a city within a city
    Facts about University of Florida

 18,000 tons  per year total waste generated
 Each Home Game day generates additional:
  - 9 tons at the stadium

  - 7 tons tailgating

 Homecoming weekend generates additional:
  - 29 tons
 Facts about University of Florida

Utilities Consumption
Electric: about $3.5 million per month
Water: about $85,000 per month
Steam: about $350,000 per month
 Facts about University of Florida

Construction
$400 million in design, planning and
 construction, new construction and
 major renovation
Minor projects for building upgrades
  University of Florida’s LEED Program

 In 2001, University of Florida officially
  adopted (LEED) for its major renovation
  and new construction projects
 January 2006, Minimum Silver LEED
  certification required
 January 2009, Minimum Gold LEED
  certification required
                                                      UNIVERSITY OF FLORIDA
                                                          LEED PROJECTS
                  A                                                                                                                                                 O
                                                                                                                                                    UF Orthopaedic
 Legal Information
                                                                                                                                                   Surgery & Sports
  & Phase II Law
                                                                                                                                                   Medicine Institute
     Building




                                                                                                                                                                   N
                  B                                                                                                                                Mary Ann Cofrin-
  Baseball Locker                                                                                                                                   Harn Pavilion
   Room Facility
                                                                                                                          Gold




                                                                                                                                                                   M

                                                                                                                                                   McGuire Center For
                  C
                                                                                                                                                     Lepidoptera &
SW Stadium Expansion                                                                                                                                  Biodiversity
                              Certified




                                          Certified
                                                                                                                        IFAS Biological &
                                                                                                                Q Agricultural    Research                            L
                  D           EAST CAMPUS                                                                                    Facility
 Graham Center at                                                                                                       Pathogens Research         Genetics & Cancer
    Pugh Hall                                                                P                                  R             Facility              Research Center



                                                             Powell Structures
                                                                                                                         Not on Map
                                    Certified                  and Materials                                    Outside Main Campus Boundary
                                                                Laboratory
                  E                                                                                                                                                 K
                                            F                        G                       H                      I                          J
   Library West                                                                                                                                    Veterinary Medicine
   Additions &                                                                                                                                     Food Animal Facility
   Renovations



                       Hub Renovation                 Steinbrenner Band                                                      Biomedical Science
                                                                           M.E. Rinker Sr. Hall   Nanoscale Research
                                                           Building                                                              Building
                                                                                                       Facility
   11 certified projects
   2 Gold
   1 Silver
   5 Submitted for Certification         Only
   21 Registered                       university
                                       nation wide


   32 Registered, Portfolio program
     UF’s Green Gross Square Footage (GSF)

 LEED   Certified Green GSF:
  1.3 million GSF
 LEED registered Green GSF:
  2.7 million GSF
            Green Power

Avoided emissions of 4,376,814 pounds of CO2
Taking 326 cars off the road
Planting 353 acres of mature trees
              UF’s LEED Experience




10 certified New Construction and Major Renovation Projects
UF’s LEED Experience
               UF’s LEED Experience




As of October 2008 UF has over 1,800,000 Gross Square Footage of
LEED NC Certified and Registered Projects Space
                 LEED Cost
 How   much does a LEED building cost more
  than your traditional building?
 What standards are associated with your
  traditional building?
 How much more does LEED cost above code?
  How Green is/was your last project?
 What level of certification are you striving for?
 How experienced is your local contractor /
  design community?
       Current Soft Cost Data

 Estimated       soft
  costs
  (www.facilitiesnet.com)
 People costs v.
  Energy or
  Construction
  costs
            Current Cost Data

 Building costs          represent
  less than 10% of the cost
  to own/operate building
  for life of project – 20
  year lifecycle.
  (www.facilitiesnet.com)
       Cost Literature Review
 LEED    costs
    GSA sites a range of less than 0% for LEED certified to
     a mean of 2.5% addition to total budget for LEED
     silver buildings.
    UF Facilities Planning and Construction claim $0
     additional dollars for a LEED certified building.
    Davis Langdon (architect firm) states design firms
     produce LEED buildings as standard program elements
     (no additional design fee).
    Greg Kats – Average Silver rating for schools (n=33)
     cost premium = 1.84%
    Common perception minimum of 10%
       Conclusion on First Costs
 AsUF has gained experience with LEED
 projects the associated first costs and process
 has evolved. Major drivers of lowering costs
 include:
     Experience of project team members and local
      market
     Evolution of building standards to include LEED
      based language
     Outcome based selection of credits and levels of
      certification
                UF Annual Saving
 Review of Annual Construction Performance
 and Building Savings
     10 certified buildings used in summary reports
     Not all buildings achieved credits that are summed
      in the following slides
     Comparisons are based on design estimates. Real
      data forthcoming this year.
                            Water Saving
                            Water Efficiency Savings (gal)




                1,920,578    38,682
      678,810                                                  Annual Usage After
                                                               Savings
                                                               Rinker
1,978,210
                                                               Harn

                                                               OSMI

  657,184                                          9,080,390   Canc./Gen.
      346,879                                                  Library West

                                                               Baseball
                        Water Saving

                        Water Savings ($/yr)


                        $82.78
            $4,110.04

  $1,452.65                                       Annual Usage After Savings
                                                  Rinker
$4,233.37                                         Harn
                                                  OSMI
                                                  Canc./Gen.
                                                  Library West
                                     $19,432.03
$1,406.37                                         Baseball
    $742.32
                    Water Saving

                   Wastewater Savings ($/yr)




       $3,937.18    $79.30
                                               Annual Usage After
  $1,391.56                                    Savings
                                               Rinker
$4,055.33                                      Harn

                                               OSMI

$1,347.23                      $18,614.80      Canc./Gen.

   $711.10                                     Library West

                                               Baseball
Water Saving Combined Water and Wastewater

               Water Efficiency Savings ($/yr)




         $8,047.22   $162.08

   $2,844.21                                Annual Usage After Savings
                                            Rinker
 $8,288.70                                  Harn
                                            OSMI
                                            Canc./Gen.
                                            Library West
                               $38,046.83
 $2,753.60                                  Baseball
   $1,453.42
             Optimizing Energy Performance




                                             Harn
                                             McGuire
                 $1,590,110.                 Powell
                     76                      Vet. FARM
                                             Library West
                                             Baseball
                                             Law Info. Cntr.
                                             Hub
                                             Stadium
$44,313.58                                   Annual Usage After Savigs

  $140.36                      $41,314.03
                $426,222.20     $15,419.52
$65,489.83                      $4,408.10
                                $12,213.07
   $11,012.01
Total Waste Diversion for Completed Projects
      Achieving Waste Diversion Credits
Recycled Content % for Divisions 2-10
          Materials Only

                Recycled Content

35

30

25

20
                                   Recycled Content as % of Total
                                   Materials Cost
15

10

 5

 0
Local Materials % for Divisions 2-10 Materials Only


                                              Local/Regional Materials Used

      40

      35

      30

      25

      20

      15

      10

       5

       0
                                    McGuire
                             OSMI




                                                                                                           Law
             Rinker




                                                                                                                         Pugh
                                                                                                                 Nano.




                                                                                                                                          HUB
                                                                                                                                Stadium
                      Harn




                                               Powell


                                                        Canc./Gen.




                                                                                 Librarw West


                                                                                                Baseball
                                                                     Vet. FARM




     Locally Manuf actured & Extracted Materials as a Percent of Total Materials Cost. Normalized f or LEED -NC v2.2.
Commissioning
                     Why Commission?
   Complex building systems:
       Increased energy efficiency
       New technology
       IAQ
       Reduced environmental impact
       ROI
       Reporting and accountability

   Construction Challenges
       Compressed schedules
       Training
       Labor challenges
       Budgets
         Why Commission?

   Chilled water and steam system
   Renewable source energy
   Heat recovery
   Chiller with heat recovery
   Demand Control Ventilation (CO2)
   M&V
   BAS
Why Commission? – Life-Cycle Perspective
                LEED-NC Cx
   There are 2 components
       EA Prerequisite 1: Fundamental Building
       System Commissioning

       EA Credit 3: Additional ( Enhanced)
        Commissioning

       District Thermal Energy, Central plant (new
        since May 2008), EAp1 and EAc3
  Prerequisite Cx          Vs.   EA3 – Additional Cx
             OPR / BOD
               SD / DD              Design
Construction Documents
             Submittals
      Equipment Arrival
               Start Up
          BAS Controls              Construction
                   TAB              & Acceptance
Performance Verification
               O&M
               Training
       Systems Manual
                                     Post Occupancy
    In-Warranty Review
         Design Review

 Cx performs DD, 60% CD & 100% CD reviews
 Format used encourages 2-way dialogue
 Back-check previous comments
 Cx communicate with A/E to review comments
  and confirm understanding of design
          O&M/Submittal Review

    CxA reviews either prior to or concurrent with AE
    review
    All commissioned equipment reviewed
    BAS control drawings reviewed
    Cx provide facility staff with a list of key
     equipment set points
           Equipment Start up

 CxA   works with the contractors and sub-
  contractors
 CxA verify contractors have a quality control
  process
 Cx observes contractors using process
 Interest in process
 Rework, correct, record
               Training
   Owner, facility staff; CxA discuss training needs
   CxA communicates needs to construction team
   Contractors adjust training plan to match needs
   CxA followed up with staff after training -
        recommended more training if needed
   AE (CxA) review design intent and basis of design
                    Warranty
    Lead by the Owner
    Entire team represented (CxA, AE, GC, MEP,BAS) and
    Maintenance staff
    Discuses warranty issues (open & resolved)
    CxA & A/E, CM, & Owner walk site
    Walk-thru discover unknown warranty and maintenance
    issues
Cx Process Integration to Project phases

                Commissioning Activities/ Documents

                                                                  Prefunctional Checklist
                                          Commissioning                Back check
                                           Specifications
                     Design/             & Design Reviews
       OPR                                                              Functional
                   Construction
                   Commission                                          Performance
      BOD                                Functional Test /               Testing
                      Plan                Pre-Functional
                                       Checklist Development        Operations Manual
                                                                        Assembly

                                                                           Training




                             Design
              Schematic                    Construct.
Programming                 Develop-                        Construction        Acceptance
               Design                      Documents
                              ment


                     Typical Project Delivery Phases
         UF’s Cx Process

 Best Practice, before LEED
 Procurement, selection process, contract
 Enhanced Commissioning for every project
 Commission through Third party for every
  project
 Envelope Commissioning
     Extended Commissioning

2  years out, New construction and major
  renovation
 Quarterly in the first year, New
  Construction and major renovation
       Continuous Commissioning


 Energy Form,   Facilities and Physical Plan
  Division
 In the process of forming in-house
  Commissioning team
 Automation of utilities metering
 Chiller plant optimization
USGBC
LEED-EBOM Portfolio Program
        32 buildings

        ~ 2 million SF
        Re-Commissioning


 Existing HVAC
 Chiller plants
 Controls
 Electrical
 Plumbing
This is why We need
  Commissioning
Where is my T stat
 Thank You
Think Green!!

						
Related docs
Other docs by gZkWBqI
GSA 20Billets
Views: 4  |  Downloads: 0
2011 20Speaker 20Database
Views: 4  |  Downloads: 0
xts5000
Views: 49  |  Downloads: 0
rice
Views: 32  |  Downloads: 0
PSYC 202103 Development_Syllabus
Views: 1  |  Downloads: 0
ES 20Audit 20Checkpoints
Views: 2  |  Downloads: 0
Contingency 20plan 20rev 20Oct 2008
Views: 2  |  Downloads: 0
pardon
Views: 1  |  Downloads: 0