NSF
Shared by: cuiliqing
-
Stats
- views:
- 2
- posted:
- 11/11/2011
- language:
- English
- pages:
- 1
Document Sample


National Science Foundation (NSF)
Grant General Conditions (GC-1) http://www.nsf.gov/home/grants/grants_gac.htm RSP=Research and Sponsored Programs
Grant Policy Manual (GPM) http://www.nsf.gov/cgi-bin/getpub/gpm ** RSP will refer to the special terms & conditions of the award when
determining the proper course of action.
CATEGORY/REGULATION SUMMARY MTU INTERNAL PRACTICE
1 TIME EXTENSION
a. Internally Approved
Article 4 of GC-1 ** MTU may authorize a one-time no-cost extension, not to exceed 12 months, at least 10 days prior to PI is responsible to complete a Request for Modification form, including a technical justification for the extension,
expiration date. and submit to RSP. RSP will inform NSF (via FastLane).
b. Sponsor Approved
Section 253 of GPM If additional time beyond the MTU authorized extension is needed, a formal request must be submitted to PI is responsible to complete a Request for Modification form, including a technical justification for the extension, the
NSF at least 45 days prior to the expiration date. amount of unobligated funds remaining and a plan for their use. The PI should submit the form to RSP. RSP will
send request to NSF (via FastLane). If approved by NSF, an official modification will be issued by the NSF Grants
Office and the PI will be notified by RSP
2 BUDGET FLEXIBILITY
Article 2 & 7 of GC-1; Sections 312 ** Written prior approval from the grants officer is required for budget modifications that involve 1) the PI is responsible to complete a Request for Modification form, including a technical justification, and submit to RSP.
and 618 of GPM transfer of project effort; 2) change in the objective or scope; 3) the absence or change of PI. Written prior RSP will review the request and determine whether NSF approval is required or if it can be internally approved.
approval from program officer is required to reallocate funds budgeted for participant costs.
3 CARRYFORWARD OF UNSPENT
FUNDS
N/A N/A Carryforward of unspent funds is automatic for continuing grants. If carryforward is anticipated on standard grants,
refer to 1a.
4 REPORTING REQUIREMENTS:
a. Technical
1) Progress/Annual
Article 14 of GC-1 For incrementally funded grants of 2 or more years, an annual project report is required 3 months prior to PI is responsible for the preparation & submission to NSF. RSP receives an e-mail notification of submission from
the end of the current budget period. NSF for the file.
Article 14 of GC-1 and Sect. 341 of For standard grants awarded for 2 or more years, progress reports (Form 1328) are required annually PI is responsible for the preparation & submission to NSF. RSP receives an e-mail notification of submission from
GPM (submitted through FastLane) no later than 90 days following the anniversary of the grant effective date. NSF for the file.
Sect. 263(c.) of GPM For continuing grants, the progress report (Form 1328) is part of the annual request for continued support PI is responsible for the preparation & submission to NSF. RSP receives an e-mail notification of submission from
and is due 3 months before the end of the period currently being funded. NSF for the file.
Article 21(d) of GC-1 If cost-sharing is $500,000 or more, it must be documented on an annual & final basis. PI is responsible for contacting Research Accounting with details on the cost-share documentation. The cost share
document must be certified by MTU (obtained by Research Accounting) and reported to the program officer by the
PI (as part of their progress report).
2) Final
Sect. 342 of GPM NSF Form 98A must be sent to the Program Officer via FastLane within 90 days following the grant's PI is responsible for the preparation & submission to NSF. RSP receives an e-mail notification of submission from
expiration. NSF for the file.
b. Inventions/Patents
Sect. 731.3 of GPM MTU will disclose each subject invention to NSF within 2 months after the inventor discloses it in writing to PI is responsible to disclose their invention to MTU's Intellectual Property office. Within two months after disclosure
MTU's Intellectual Property office. to MTU's Intellectual Property Office, RSP, in coordination with the PI and the Intellectual Property Office, will
disclose the invention to NSF.
c. Financial
1) Progress Billing
Sects. 434 & 436(c.)(3.) of GPM By electing to submit an electronic cash request, MTU is certifying to its truthfulness as stated in the Research Accounting requests reimbursement (via FastLane) bi-weekly.
certification in section 13 of SF270.
2) SF-272 Expenditure Report
Sect. 451 of GPM Form SF272 is due by the 10th day of the 2nd month following quarter's end. Research Accounting submits (via FastLane) the SF272 within 40 days after quarter's end.
3) Final Financial Report
Sect. 451 of GPM The final expenditure report (Form SF272) is due 90 days after the expiration of the grant. Research Accounting submits (via FastLane) the final reporting of expenditures within 90 days following the
expiration of the grant.
5 PREAWARD COSTS
Article 3 of GC-1 ** MTU may approve pre-award costs incurred within 90 calendar days pior to the effective date of the PI is responsible to complete a Request for Advance form, including a technical justification for the expenditures,
award. Pre-award expenditures are made at MTU's risk. and submit to RSP. Expenditures incurred prior to receiving the official award are the responsibility of the PI &
Department Chair.
6 COST SHARE
Article 21 of GC-1 MTU is required to provide cost sharing of at least the amount indentified on line M. of the NSF award PI is responsible for identifying and processing the required cost share information. The PI is also responsible for
budget. If the cost sharing requirement cannot be met, written notification to the NSF Grants Officer and submitting a Request for Modification form, including a technical justification for any change in cost share (an
approval is required. increase, a decrease or a change in source), and submitting it to RSP. RSP will review the request and determine
whether NSF approval is required or if it can be internally approved. In addition, the PI/Department Chair is
responsible to develop a plan for any cost share shortfall. After this plan is developed, the PI needs to submit a
Request for Modification form as previously mentioned.
e11cd779-f7d7-42ab-816a-d565c02dc20b.xls-NSF
11/11/2011-3:31 AM
Get documents about "