Quality Assurance









An Integral Part of Software

Systems Development Life Cycle



by MGD Services, Inc.

The QA Philosophy

The inherent philosophy of Quality

Assurance for software systems

development is to ensure the system

meets or exceeds the agreed upon

requirements of the end-users; thus

creating a high-quality, fully-functional

and user-friendly application

Quality Assurance

Is More Than Just Testing



 Quality Assurance is involved in the entire

project development life cycle



 Quality Assurance is a commitment by all

project participants to the Total Quality of the

Project

Quality Assurance Focus Early In Life Cycle

Machine-based testing performed



No machine-based testing performed





30



25 Project The objective

% Defects Removed









Data

20

Target

is to

15

“buy” time and

10

reduce costs

5 by finding

0 problems

Function System Quality

Requirements High Level

Design

Low Level

Design

Code Unit Test

Development

Test Integration Assurance Regression earlier

Test Test

by focusing

Development Life Cycle

here





Relative Cost

Of Defect Repair - $1 $100 $1000+

The QA Process Cycle

 Phase I: Requirements Gathering,

Documentation and Agreement



 Phase II: Establishing Project

Standards



 Phase III: Test Planning



 Phase IV: Test Case Development



 Phase V: QA Testing



 Phase VI: User Acceptance Testing



 Phase VII: System Validation

Phase I:

Requirements and Project Scope

 The system requirements are collected

and analyzed based on input and direction

from each of the project groups

 The requirements documents are drafted,

reviewed, finalized and agreed upon by all

project participants

 The scope of the project is established

and agreed upon

Phase II:

Establishing Project Standards



 The QA team will assist in establishing

and setting the standards for the project

 The standards will be established for:

 Development Methodology

 System Design

 Quality Assurance Methodology

 Methodology Compliance

Phase III:

Test Planning

The Quality Assurance Team will:

 Write the Test Plans which detail the QA

involvement for the entire project life cycle



 Develop test conditions based on the

business needs and business scenarios



 Implement a defect-tracking mechanism

Phase III (con’t):

QA Methodology





 The QA team will establish Quality

Assurance methods, practices and

standards

 The overall QA methodology will assist

in creating a controlled product release

and greatly reduce the risk of errors

being introduced into the product

Phase IV:

Developing Test Cases

 Write test cases that entirely test the

scenarios covered in the test conditions



 Review the test conditions and

subsequent test cases with the project

users



 Write test cases that will cover all

phases of the QA life cycle

Phase V:

QA Testing



QA Life Cycle consists of 5 types of

testing regimens:

1. Unit Testing

2. Functional Testing

3. System Integration Testing

4. Regression Testing

5. User Acceptance Testing

1. Unit Testing



The testing, by development, of the

application modules to verify each unit

(module) itself meets the accepted user

requirements and design and

development standards

2. Functional Testing



The testing of all the application’s

modules individually to ensure the

modules, as released from development

to QA, work together as designed and

meet the accepted user requirements

and system standards

3. System Integration

Testing

Testing of all of the application modules in

the same environment, database

instance, network and inter-related

applications, as it would function in

production. This includes security,

volume and stress testing

4. Regression Testing



This is the testing of each of the

application’s system builds to confirm

that all aspects of a system remain

functionally correct after program

modifications. Using automated

regression testing tools is the preferred

method

Testing Automation



MGD Services, Inc. Partners with the following

Automated Testing Tools Companies



Mercury Interactive

http://www.mercury.com









Compuware

http://www.compuware.com/solutions/3592_ENG_HTML.htm

Phase VI:

User Acceptance Testing

(UAT)



The testing of the entire application by the

end-users ensuring the application

functions as set forth in the system

requirements documents and that the

system meets the business needs

Phase VII:

Validation



All systems should go through a validation

process which maintains the project

documentation library

Validation Documentation



All software systems that are developed

or used for FDA submissions are

subject to review by the FDA. All

phases of the Project Life Cycle are

required to maintain FDA validation

documents. MGD Services is

experienced in FDA Validation and 21

CFR Part 11.

Staffing

The Staffing Requirements For The QA Functions:



 QA Manager

 Business Analyst

 Quality Assurance Analyst

 Technical Writer

 Instructional Designer/System Trainer

QA Manager

 Established and implements the QA

Methodology for project Total Quality

 Acts as the project lead liaison between

all project areas to ensure all areas are

completely and correctly engaged

 Oversees the entire QA Life Cycle and

QA staff

Business Analyst

 Writes the User Requirements and

Functional Specs and assists in writing

the system documentation

 Acts as a liaison between the QA Team

and the other project team members

 Assists in the QA test conditions

development

Quality Assurance Analyst

 Develops test conditions

 Writes test cases

 Performs Functional, Regression, and

System Integration Testing

 Assists in development of user guides and

training manuals

 Assists or performs the System Training

Technical Writer

 Assists in writing the user and system

documentation



 Maintains validation documentation



 Writes on-line help



 Writes the User Guide and Training

Manuals

Instructional Designer/

Systems Trainer

 Assists in writing the user guides and

training manuals



 Trains users on production system



 Subject Matter Expert on Adult Learning

Theories and learning assessment

In Closing...

QA’s involvement must be from the beginning to

the end of the project life cycle. Properly

managed, the QA process will bring the system

to production with cost and time savings.







P: 877-MGD-TEST

Web: mgdservices.com

E-Mail: mgdservices@tellurian.net


Related docs
Other docs by HC11111108523
73912 7225 MBABANGALORE UNIVERSITY 20syllabus
Views: 0  |  Downloads: 0
report_task3_part3
Views: 0  |  Downloads: 0
rggiallc
Views: 0  |  Downloads: 0
BRIEF11March
Views: 0  |  Downloads: 0
Parasitic_worms
Views: 1  |  Downloads: 0
Network LIANIA FFY12USDAApprovedMaterials
Views: 0  |  Downloads: 0
HWS12 31 10
Views: 0  |  Downloads: 0
AttachmentIIISCEEEPlansPart1of2
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!