									                                                             SCHEDULE OF RATE FOR PIPE LAYING AND ASSOCIATED W ORKS
                                                                                     PART A



TENDER NO- 110287/W GI/BGL/04-R0                                                                                                  BIDDER -
                                                                                                                                                                                              Rev 1


                                                                                                                                                       Unit Price Including Taxes   Total Price Including Taxes
    Sl. No.                                                    Description                                                         Unit       Qty
                                                                                                                                                          and Duties (in INR)          and Duties (In INR)


      1        PIPELINE LAYING / INSTALLATION (CARBON STEEL PIPES)
               "Receiving and taking over" as defined in the specifications, handling, loading,transportation and
               unloading of Owner supplied 3-Layer PE coated line pipes along with associated fittings and valves from
               Owner's designated stock-yard at Vijaywada to Contractor's stockyard/ workshop/ worksite including
               preliminary activities, preparation of drawings, wherever required for crossing etc. including, Handling,
               stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of
               company supplied materials including line pipes at the time of taking over, laying/ installation of coated
               line pipes, associated fittings and accessories, including execution of all works, “taking over”, handling,
               including loading and unloading, transportation of Owner supplied materials including line pipe from
               Owner’s designated place(s) of issue to work site, arrangement of all additional lands required for
               Contractor’s storage, fabrication, access for construction, procurement and supply of all materials
               (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out
               all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per
               drawings, specifications, other provisions of Contract document and instruction of
               Engineer-in- Charge, including but not limited to carrying out the following:-
               Detail Survey of 12" diameter pipeline, Surveying of the detours if required at the time of construction
               including marking the same in topographical sheet, preparation of AFC drawings showing survey
               details, and submit same to Owner for review.

                Installation of construction markers, clearing, fencing, grubbing, cutting of trees,
               fulfilling all the requirements of various statutory/environment authorities to the entire satisfaction of
               concerned authorities, grading of work area. Shifting of all obstruction within the ROU/Pipeline route
               alignment viz. electrical lines/poles, telephone line/poles, foreign pipeline, coordination with concerned
               authorities and obtaining permissions from these authorities.


               Trenching to all depths by excavation in all types of soils including soft/hard rock,
               chiseling or otherwise cutting different types of pavement, footpath, roads etc. as required and storing
               excavated soil, reusable materials at designated area as per direction by Engineer-in-Charge and to a
               width to accommodate the pipeline and HDPE conduit for OFC as per the relevant standard/specification
               etc. The minimum depth of the top of pipeline shall be 1.2 m measured from top of pipeline coating to the
               top of undisturbed surface of the soil. Dewater of trenches if required as per site condition.
               Carrying out repairs of pipe defects/replacement in case of irreparable defects and
               repairs to defects of pipe coating not attributable to Owner including defects/ damages occurring during
               transportation/handling.

               Checking, cleaning, aligning, bending, cutting and beveling (as required) of pipes for
               welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of
               welds as required including 100% radiography and providing all requisite equipment, labour,
               supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and
               interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by
               Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.
               Carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open
               cut/jacking/boring after pre hydrotest of the section as defined in specification (except at cased crossing
               or crossings carried out by HDD method).

               Carrying out installation of carrier pipe, in the casing pipe at cased crossing after pre hydrotest of the
               section as defined in specification (excluding installation of casing pipes which is covered separately).

               Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating
               materials etc.
               Counting the number and type of trees cut in presence of DFO/concerned authorities and keeping record
               thereof, stacking and handing over of all cut tress.
               Installation/lowering the pipeline in trench to required depth, supply and placement of PE warning mat,
               Anti-Rodent type, (width-300mm, thickness-1mm)over the pipeline along the complete route, padding
               around pipeline with suitable approved soil including supply of padding material, PE warning mat,
               backfilling with available/borrowed earth, approved excavated material and/or other suitable soil by
               crowning.

               Laying of 40 mm OD, 6Kg/cm2 permanently lubricated HDPE conduits, in same pipeline trench direct
               buried or through CS/ HDPE conduit, excavation as required, padding, backfilling etc. including
               cleaning and sealing of ducts at the end of laid drum lengths, preparation of cable blowing pit, jointing of
               HDPE conduit including supply of all material, coupler for jointing of HDPE Duct, RCC Pit for HDPE,
               HDPE conduit testing after laying, joint location marking all complete as per specifications provided in
               the bid document and as per direction of consultant.

               Repair of Holiday in Coating – Supply of all coating repair materials as per requirements of
               specification to be compatible with line pipe coating material, supply of all consumables, utilities,
               equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating
               defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes,
               performing all works necessary for the completion of the works strictly in accordance with relevant
               specification and instructions of Engineer-in-Charge.

               Crossing the all-foreign pipeline with necessary concrete / PVC protection including co-ordination with
               all agencies and obtaining NOC.
               Including Crossing of pipeline with the trench less method wherever required with the approval /
               permission of authority. (No separate payment shall be made for trench less method)

               Supply and installation of slope breakers, bank protection wherever required and as directed by Engineer-
               in-Charge.
               Carrying out air cleaning, gauging, pigging, flushing, cleaning and hydrostatic testing of complete
               pipeline with required quantity of corrosion inhibitor including pre-testing of designated sections
               complete as per specification and approved by Engineer-in-Charge to specified pressures indicated
               elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings,
               instruments, dead weight tester, pressure recorder, thermocouples, etc., and services, supervision,
               labour, consumables, water including supply of corrosion inhibitor, air etc., as required, location of leaks
               and rectification of defect attributable to Contractor (rectification of defects in linepipe material not
               attributable to Contractor shall be paid separately as per other item of schedule of rate), re-testing after
               rectification, dewatering after successful completion of hydro testing of entire section and as approved by
               Engineer-in-Charge complete.



               De-watering, swabbing, drying of the entire pipeline as per specification.
               All tying-in, including the tie-ins with adjacent section of the pipeline including welding, Golden Tie –In
               NDT and other test, joint coating.
               Protective coating of 500 micron thick two component (applied with the help of minimum three coats)
               liquid epoxy including supply of materials duly approved by Owner for all piping valves, fittings, structural
               steels etc. for buried installation and inside the valve pit as approved by the Engineer in charge.

               Final clean-up and restoration of right-of-use and disposal of debris and surplus material to designated
               disposal areas and reinstalling the area to its earlier state as per satisfaction of concerned authority and
               as directed by Engineer-in-Charge.
               Restoration after completion of crossing as per direction of Statutory authority / Owner / PMC and
               obtaining NOC.
               Preparation of as-built drawings pipe-books (1 set of tracing on polyester film and 6 sets of as-built
               drawings and 2 soft copy and 6 hard copies of pipe book). All the works shall be executed in accordance
               with the provision of contract including carrying out all temporary/ ancillary/ auxiliary works required for
               the performance of the works and all other acts, deeds, matters and things necessary to make the
               pipeline ready for pre commissioning activities.

               Preparation of all detail job Procedure as per Specification, Drawings, Scope of Works and guideline
               provided in the tender document. All job procedures shall be approved by WGI.

               Specified OD                  Thickness              Material
               mm (inch)                       (mm)
      1.1      323.9 (12")                WT 6.4 mm             API 5L Gr. X-52 (PSL 2)                                           METER      27500
               Laying pipeline parallel to main pipeline in the same trench
      1.2      323.9 (12")                WT 6.4 mm             API 5L Gr. X-52 (PSL 2)                                           METER       500
      1.3      168.3 (6")                WT 6.4 mm             API 5L Gr. X-52 (PSL 2)                                            METER       500
      1.4      Supply of HDPE conduit as per specification                                                                        METER      28500
               Errection of suitable barricading as per HSE norms across the pipeline stretch as per scope of work
      1.5                                                                                                                         METER      28500
               specification and as directed by Engineer-in Charge.

               Assistant in liasioning with the central/state government office viz. R&B, Canal, Forest, Defence, traffic,
               Gram Panchayat, Municipal authorities, Cantonment board, fire and safety department permission
      1.6                                                                                                                          Mtrs      28500
               obtaining, various clearances for working round the clock in the city area to complete the work in
               schedule area.

               Note: -
               This item shall be applicable for the underground steel grid main pipeline including distribution
               pipelines, fittings, valves & accessories etc. from existing/ proposed underground / aboveground tap-off
               points (i.e. including arrangement for making provision for tap-off except hot tapping and their hook-up)
               on existing aboveground installation at proposed CNG/ DRS Station.

               All crossings installed by HDD/ Boring/Moling method without any casing pipe shall be paid separately
               as per the rates quoted for the same elsewhere in the SOR
               The Repair of All types of Coating defects (attributable / not attributable to owner) in the pipes supplied
               by Owner are included in above item and No separate payment shall be made to the contractor for the
               same.
      2        CROSSING (CASED)



               Installation of casing pipe by Jacking/ Boring/ Open cut for rail, road and canal
               crossings wherever required in all types of soils and terrain, including all associated works as per
               permission from Authority including supply of all other contractor supplied materials viz. casing
               insulators and casing end seals as per standard drawing, materials for casing vents and drain with
               proper plugging to fill the petroleum jelly / wax, bentonite etc. including supply of all other materials,
               equipment, consumables, manpower, welding including visual inspection of all weld joints, installation of
               casing insulators end seals, vent and drain-off pipes with threaded plugs, Installation of 2 Nos. 50 mm
               dia HDPE pipes in the casing pipe, backfilling and restoration as original of the facility crossed and
               performing all works as per drawings, specifications and instructions of Engineer-in-Charge and
               provisions of contract document.
               Filling of the Casing pipe with Petroleum jelly / Wax Bentonite as per direction of
               Engineer in charge
               Restoration after completion of crossing as per direction of Statutory authority /
               Owner / PMC and obtaining NOC.
      2.1      Installation By Thrust boring / Drilling with 18" Steel casing pipe                                                METER       210
      2.2      Installation of 18” Steel casing pipe by open cut.                                                                 METER        25
      2.3      Installation By Thrust boring / Drilling with 6" Steel casing pipe                                                 METER       210
      2.4      Installation of 6” Steel casing pipe by open cut for HDPE duct..                                                   METER       25
      2.5      Installation of 12" NB PE coated Carbon Steel pipeline without casing by Moling                                    METER       55
      2.6      Installation of 6" NB PE coated Carbon Steel pipeline without casing by Moling                                     METER       55
               Note: -
               Payment shall be made on the actual length of casing pipe. However, payment for carrier pipe inside
               casing shall be paid separately as per item no. 1.0 of mainline laying.
               Lengths of casing shown above are tentative. Actual length may vary considerably as per site condition.

               Payments for the lengths of final tied-in carrier pipeline string with mainline laid by Moling are inclusive
               in this above item rate. No any separate payment shall be made under other clauses mentioned
               elsewhere.
               The rate for supply of steel casing pipe is given separately in SOR
               The Installation of 6” casing pipes shall be done for separate boring for HDPE duct if required with the
               approval of Owner / PMC otherwise the 2- Nos HDPE duct to be installed in the casing pipe of carrier
               pipe.
       3       SUPPLY OF STEEL CASING PIPE
      3.1      18" NB 6.4 mm thick – IS: 3589 /API 5L Gr.B/IS: 2062 Gr.B                                                          METER       235
      3.2      6" NB 6.4 mm thick – IS: 3589 /API 5L Gr.B/IS: 2062 Gr.B                                                           METER       265
               Note: -
               The quantity of above pipes are tentative. Actual quantity of pipes shall be as per actual execution.

               The 6" NB shall be supplied only after approval of owner / PMC

      4        CONTINUOUS CONCRETE COATING (FOR CS PIPES)
               Supply of all consumables, materials and application of 50 mm thick for 12" pipe continuous concrete
               weight coating of 2500 kg/m3 and field joints thereof in all areas of work wherever required as per site
               condition and performing all works as per specification on the line pipe for following sizes: -

      4.1      Specified OD 323.9 mm x 6.4 W.T.                                                                                   METER       60
               INSTALLATION OF CARRIER PIPE CROSSING BY HDD METHOD AT CROSSING W ITHOUT
      5
               CASING PIPE.
               Complete work of installation of carrier pipe along with installation of 2 nos. HDPE duct at crossings
               (between the limits as defined in approved drawings) by HDD method for road, nala, drain and canal
               wherever required in all types of soils and terrains including "Receiving and taking over" Owner
               supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and
               transportation to Contractor's stock yard/ work shop/ work site including all handling, loading, unloading,
               aligning etc. supply of all Contractor supplied material including manpower, equipment, other resources
               and acquiring the required land for storage, fabrication including string preparation of pipes, welding,
               welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve and repair of
               pipeline coating with special repair patch materials as per Specification, pre-testing etc. of complete
               string made for crossing access for Contractor etc. and execution of, but not limited to, following works
               in accordance with specifications and instruction of Engineer-in-Charge and as per all provision of
               Contract Document.



               Pre-Construction survey based on site visit, collection of data (if required) from concerned Authority
               including design and detail engineering and making of crossing drawings for getting their approval
               from concerned Authority/ Engineer-in-Charge, getting work permit/ NOC for crossings as well as
               utility crossings (if any) encountered during crossings prior to start of the execution of work.

               Installation of HDPE conduit ( for OFC). HDD Method rail, road and canal crosssings or wherever in all
               types of soils and terrain, including all assciated works including supplly of all other contractor supplied
               materials including supply of all other nmaterial and, equipment, consumables, manpower, conduit
               joining (if required) including visual inspections of all joints, backfilling and restoration as original of the
               facility crssed and performing all instructions of Engineer-in-Charge and provions of contract document.

               Drilling to required depth including maintenance of drill hole in all types of strata, all depth to
               accommodate the pipeline and HDPE duct at all conditions encountered during crossing by approved
               HDD methods procedure for providing minimum cover specified in code/ specification or as decided by
               concerned authority, whichever is more.

               Backfilling of the ditch/ trench including restoration and cleanup of area and all other works including
               cleaning, gauging and final hydro testing etc. along with mainline works (as mentioned in clause no. 1.0
               above) required as per specification, approved drawings, calculations, methods and to the satisfaction of
               Engineer-in-Charge and/ or as directed by concerned Authority.

               Specified OD                  Thickness                Material
               mm (inch)                       (mm)

               323.9 (12”)                     6.4             API 5L Gr. X52
      5.1                                                                                                                         METER       55
               Note: -
               The length of HDD mentioned is tentative and may vary to the considerable extent depending upon
               requirements as per site conditions. The length mentioned in SOR is indicative for all the crossing to be
               done by HDD, numbers and locations shall be decided by Engineer-in-Charge depending upon site
               condition.
               Payment for the length of final tied-in carrier pipeline string with mainline laid by HDD are inclusive in
               this above item rate. No separate payment shall be made under other clauses mentioned elsewhere.

      6        INSTALLATION OF HDPE CONDUIT BY HDD METHOD AT CROSSING
               HDD Method for rail, road and canal crossings wherever required in all types of soils and terrain,
               including all associated works including supply of all other contractor supplied materials including
               supply of all other materials, equipment, consumables, manpower, conduit jointing (if required)
               including visual inspection of all joints, backfilling and restoration as original of the facility crossed and
               performing all instructions of Engineer-in-Charge and provisions of contract document.

               Installattion of 40mm " HDPE conduit for OFC cable requiring separate boring by HDD method.
      6.1                                                                                                                         METER       55

               Note : -
               Payment shall based on the actual length of crossings by HDD
               PIPELINE LAYING/ INSTALLATION OF ABOVE GROUND / UNDER GROUND PIPELINE AT
      7
               HOOK- UP STATION/ SV STATION / TAP OFF POINT ETC
               Preparation of Final Construction drawings as per the Preliminary / Indicative drawings supplied with the
               Tender
               Receiving and taking over of all company supplied materials from company's designated place of issue,
               handling including lifting, transportation from Owner and/or contractor's storage point to work sites/
               workshop as applicable for fabrication and/or work site for field fabrication and erection for all piping
               items supplied by Owner.
               Including Supply, Fabrication, Erection / installation of Transition pieces wherever required to match the
               different grade of materials.
               Complete work of fabrication, erection, painting, testing and making ready for further commissioning /
               start-up the carbon steel piping system along with pipes, fittings, flanges valves etc. of all sizes and
               ratings/ thickness including calibration and installation of pressure gauges (wherever required)
               including supply of all consumables, equipment, manpower and other resources and execution of but not
               limited to the following works in accordance with relevant specifications, drawings, scope of work and
               instruction of Company/ Engineer-in-Charge and as per all provisions of the contract document.

               Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings,
               flanges etc. to match with the matching edges of uneven/ different thickness wherever required, fit-up,
               bending, preheating wherever required, welding threading etc. pipe fittings like elbows, tees, reducers,
               weldolets, sockolets, etc. flanges, vent and drain point connection etc. including providing stub-in
               connections, fabricated fittings and reinforcement pads etc. as required.

               Erection of pipes of all types and thickness over sleepers, overhead on racks and at all elevation,
               connecting with equipment nozzle, aligning, installation and carrying out connected activities for all
               types of valves, all online instruments and fittings of size elbow, reducers, tees, flanges, blind flange,
               spectacle blind flanges, branch connection/ tapping, vents and drains, required for process and hydro
               testing, tapping for pressure gauges thermo wells sample connections etc. including fixing of types of
               gaskets (including spiral wound with graphite filler gaskets for RTJ flanges) bolts and nuts
               (A193Gr.B7/A194Gr.2H) for all sizes.

               Performance of radiographic inspection by gamma radiation as per scope of work and as per
               specifications in piping of all types and thickness including providing/hiring of all necessary equipments,
               supply of all consumables, and whatever else even though not expressly mentioned but required to
               perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-
               radiography of the repaired joint and additional radiography necessitated due to poor performance of
               Contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by
               COMPANY). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose
               decision shall be final:

               Preparation of drawings, Supplying and erection of pipe supports including Civil Foundation of M-20
               grade Concrete with 1:4:8 PCC at required locations as per instruction of the Engineer-in-Charge.

               De- coating of Pipes (3LPE) of any dia supplied by the Owner for station piping as per requirements.

               Painting of entire system (including all pipes and accessories) as per specification, including supply of
               approved Epoxy paints and primers, preparation of surface and application of Epoxy primer one coat and
               two coat HB epoxy finish paints, identification etc. as specified including rub down and touch up with
               primer and paint wherever required by COMPANY and providing scaffolding for all heights etc.

               Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic
               and any other type testing as specified, draining, and drying by compressed air / other methods approved
               by OWNER / PMC.
               Completion of all such work in all respects as per scope of work and as per drawings, specifications and
               instructions of the OWNER /PMC and keeping the system ready in all respects for further
               commissioning and start-up.
               Hooking up with other system piping at battery limit.
               Preparation of isometric, fabrication drawings, bill of materials as per specifications, drawings and
               instructions of the Engineer- Charge.
               Preparation of as-built drawings pipe-books (1 set of tracing on polyester film and 6 sets of as-built
               drawings and 2 soft copy and 6 hard copies).
      7.1      12" NB, 300 #                                                                                                      Metres      30
      7.2      4" NB, 300 #                                                                                                       Metres      30
      7.3      2" NB, 300 #                                                                                                       Metres      80
               Note: -
               Transition pieces wherever required Bolts, nuts, washer, U-clamps, gaskets etc. required for piping
               facilities shall be procured and supplied by the contractor within the rate quoted. These items shall not
               be separately measured and paid.
               Assorted pipes of all ratings/ thickness types, pipes fittings, flanges, valves blinds etc. as required shall
               be supplied by Contractor as per technical specification enclosed with tender and payment shall be made
               as per SOR. 6” and above 3-LPE coated pipes shall be free issue by Owner. Flanges fittings/LR bends
               shall be supplied by the Contractor and payment shall be made separately as per SOR.

               De- coating of pipes supplied by owner if required shall be done by contractor and No separate payment
               shall be made to the contractor.
               For payment purpose, measurement shall be done in running meter from centre to centre along the pipe
               including length pipes, fittings, flanges and valves.
               For pipe supports and other structural items No separate payment shall be made to the contractor all
               Civil Foundations with preparation of design and drawings, Structural Steel pipe supports are included
               in the above station piping Items of different dia of piping.
      8        SUPPLY OF FOLLOW ING ITEMS AS PER SPECIFICATION AND DATA SHEET ENCLOSED
               W ITH THE TENDER

      8.1                                                                                                                          Meter      60
               2" NPS PIPE SIZE Sch 80 (ASTM A106 Gr B)
      8.2
                                                                                                                                   Meter      20
               4" NPS PIPE SIZE Sch 80 (ASTM A106 Gr B)
               2"-300# Ball Valve-One endFlanged, One end Butt welded Above Ground (BODY:A 216 Gr WCB, BALL
      8.3                                                                                                                           No.       10
               A 216 Gr WCB With ENP orequal)
      8.4      2"-300# Globe Valve-B.W-Above Ground (BODY:A 216 Gr WCB, TRIM A 182 F6 )                                             No.       10
      8.5      2"-300# Globe Valve-Flanged-Above Ground (BODY:A 216 Gr WCB, TRIM A 182 F6)                                          No.        5
      8.6      2"X2"-Equal BW TEE-(ASTM A 234 Gr.WPB)                                                                               No.        5
      8.7      12"X6"-Equal BW TEE-(ASTM A 234 Gr.WPB)                                                                              No.        2
      8.8      2"-90˚ - Elbow-B.W-(ASTM A 234 Gr. WPB)                                                                              No.       10
      8.9      2"-300# WNRF (ASTM A 105) with Gaskets, nuts & bolts.                                                                No.       20
     8.10      4"-300# WNRF (ASTM A 105) with Gaskets, nuts & bolts.                                                                No.        4
     8.11      4"-300# WNRF (ASTM A 105) with Gaskets, nuts & bolts.                                                                No.        3
     8.12      2"-300# Blind Flange-RF-(ASTM A 105)                                                                                 No.       15
     8.13      2" Flapper                                                                                                           No.        5
     8.14      12"X4" Weldolet sch 80 (ASTM A 105)                                                                                  No.        3
     8.15      12"X2" Weldolet sch 80 (ASTM A 105)                                                                                  No.       10
     8.16      12"X4"Concentric Reducer,B.W.,Sch.80x40-(ASTM A 234 Gr. WPB)                                                         No.        1
     8.17      4"X12" concentric expander, BW, Sch.40X80-(ASTM A 234 Gr. WPB)                                                       No.        1
     8.18      12"-300# WNRF (ASTM A 105) with Gaskets, nuts & bolts.                                                               No.        1
     8.19      12"-300# IJ ( Material as per Pipe)                                                                                  No.        2
               Note: -
               The quantities mentioned above are tentative.
               For all the supply items mentioned above, procurement shall be made as per specification after due
               approval of Engineer-in- Charge.
      9        Supply of 3D Bends
               12" (323.9mm) LR bends, API 5L, Gr X-52
      9.1      22.5 deg, 3D Bends                                                                                                   No.       10
      9.2      45 deg, 3D Bends                                                                                                     No.       10
      9.3      90 deg, 3D Bends                                                                                                     No.       10
      10       REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)
               Repair of defects on Owner supplied line pipes of all grades and wall thickness as specified in following
               items, noted and recorded at the time of "receiving and taking over" by Contractor in the presence of
               Engineer-in-Charge.
               Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:

     10.1      12" NB                                                                                                               No.       40
     10.2      6" NB                                                                                                                No.        4
               Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:
     10.3      12" NB                                                                                                               No.       30
     10.4      6" NB                                                                                                                No.        5
      11       Installation of Metering Skid at CGS:
               Receiving and taking over, handling, loading, transportation and unloading of Metering Skid (Approx 20
               Ton) from Owner's designated stockyards to site, installation and hooking up including installation of IJ
     11.1                                                                                                                           No.        1
               & reducer with Steel pipe.

      12       PERMANENT MARKERS
               Supply, fabrication and installation of all types of permanent markers along the route including all
               associated civil works such as excavation in all types of soil, construction in all types of soil, construction
               of pedestals and grouping with concrete, clearing, supply and numbers, direction, change etc.,
               restoration of area to original condition and performing all works as per drawing, specification and
               instruction of Engineer-in-Charge.
               Markers as per drawing ( as per Company requirement / standard drawing)
     12.1      Warning markers                                                                                                      No.       30
     12.2      Direction Marker                                                                                                     No.       80
     12.3      Kilometer Marker                                                                                                     No.       30
     12.4      Aerial Marker                                                                                                        No.        6
      13       PRE-COMMISSIONING AND COMMISSIONING
               Purging with nitrogen network of the complete pipeline network and the associated facilities including all
               station piping being installed to the specified acceptance criteria, carrying out the pre-commissioning
               works,Providing all necessary assistance during the complete duration of commissioning operations for
               entire pipeline and making the entire pipeline system ready for commissioning and gas-In of the system
               including supply of all equipment, man-power, consumables (including nitrogen required for purging)
               materials for all temporary works and performing all associated works, complete as per the relevant
               specifications, other provisions of Contract document and instructions of Engineer-in-Charge.



     13.1      For 12" Line and associated piping.                                                                                 Mtrs      28000
     13.2      For 6" Line and associated piping.                                                                                  Mtrs       500
      14       FILLING UP W ITH NITROGEN FOR PRESERVATION
               Filling up with nitrogen for preservation of complete pipeline network and the associated facilities being
               installed to 1.5 kg/cm2 as per the relevant specifications, other provisions of Contract document and
               instructions of Engineer-in-Charge.
     14.1      For 12" Line                                                                                                       METER      28,000
     14.2      For 6" Line                                                                                                        METER       500
               Note:-
               The above item will be executed after approval of Owner / Engineer-in –Charge only, If the entire Pipeline
               is to be filled with nitrogen for preservation only.
               The above quantity are tentative only, the actual payment shall be made to contractor as per actual length
               of the pipeline to be filled with Nitrogen.
      15       CATHODIC PROTECTION SYSTEM (TCP & PCP)
               Temporary Cathodic Protection
               Design, detailed engineering, supply of all materials including spark gap arrestors/zinc grounding cell
               across all insulating joints, installation, testing and commissioning of sacrificial cathodic protection
               system of underground main pipeline for design life of 1 year including all related civil works for
               completion of system, collecting the CP system related data along the pipeline routee as per
               specification i.e. route survey, identification of various crossings, measurement of soil resistivity of anode
               ground bed by 4 pin - wenner method, Supply installation of corrosion measurement probe, interference
               detection and mitigation of the same and monitoring of cathodic protection system for 3 months after final
               commissioning of TCP system as per schematic drawing, specifications enclosed with contract, SCC,
               approved procedures, approved drawings and instructions of Engineering-in-Charge.



     15.1      12" NB Line                                                                                                        METER      28,000
      15.2     6" NB line                                                                                                         METER       500
               Permanent Cathodic Protection
               Design, detailed engineering, supply of all materials including spark gap arrestors/zinc grounding cell
               across all insulating joints, installation, testing and commissioning of impress current protection
               system(including TR unit and Anode Bed Grpoound) of underground main pipeline for design life of
               (1+40) years including all related civil works for completion of system, collecting the CP system related
               data along the pipeline routee as per specification i.e. routee survey, identification of various crossings,
               measurement of soil resistivity of anode ground bed by 4 pin - wenner method, interference detection and
               mitigation of the same , as per schematic drawing, specifications enclosed with contract, SCC, approved
               procedures, approved drawings and instructions of Engineering-in-Charge.



     15.3      6" NB Line                                                                                                         METER       500
     15.4      12" NB Line                                                                                                        METER      28,000
     15.5       Monitoring of cathodic protection system for 3 months after final commissioning of PCP system
                                                                                                                                  METER      28,500

               Notes: Both TCP and PCP shall be designed by the contractor and approved by Owner/ WGI for the
               complete network as per network of steel pipeline drawing. Submission of the design report FOR THE
               TOTAL DESIGN shall be deemed to be included in unit rates mentioned above. No separate payment
               shall be made for overall design..


               Post Commissioning Surveys for all the pipelines (12" & 6")

               Final clean-up and restoration of right-of-use and disposal of debris and surplus material to
               designated disposal areas and reinstalling the area to its earlier state mainly for built up                       METER      5000
      16
               surfaces like pavements,roads,footpaths etc as per satisfaction of concerned authority and as
               directed by Engineer-in-Charge.
      17       OFC – SUPPLY & BLOW ING
               Supply & Blowing of Optical 24 Fiber Cable (after testing of drum at site) in same pipeline trench inside
               HDPE Duct or through CS/ HDPE conduits at crossing as required, testing of OFC after Blowing/
               Laying cable sealing, cable jointing, jointing pit, padding, backfilling etc. using all materials required,
     17.1      including warning mats,testing, commissioning etc. all complete as per specifications provided in the               Mtrs      29300
               bid document and as per direction of consultant.

               Supply and installation of special 3-way jointing closures (3M / RAYCHEM / TYCO/ SIEMENS make)
               and mechanical duct couplers, jointing chambers, and any other item required for jointing of 24 OFC
     17.2      cable, including supply and installation of jointing markers and all accessories etc. for jointing, testing,         No.        7
               commissioning in all respects and submission of as built drawings for jointing pits.

               Supply and installation of cable markers at all pipeline marker locations as per specification provided in
     17.3                                                                                                                           No.        7
               the Bid Documents and as per the direction of the Consultant.
               Supply, installation, testing and commissioning of portable electronic sensor/ indicator/ hasher with
     17.4                                                                                                                           No.        7
               beep sound of approved compatible make.
               Note: The quantities of individual item can vary as per site requirement. The payment will be made as per
               actual certified measurement at site.
      18       Temperature Gauge
               Supply, installation and caliberation of temperature gauges and their accessories inclusive of supply of
     18.1      necessary piping/tubing along with necessary valves,snubbers, fittings, manifold, fabrication and                    No.        3
               installation of impulse lines/manifolds, hydraulic testing
      19       Pressure Gauge
               Supply, installation and caliberation of pressure gauges and their accessories inclusive of supply of
     19.1      necessary piping/tubing along with necessary valves,snubbers, fittings, manifold, fabrication and                    No.        3
               installation of impulse lines/manifolds, hydraulic testing
      20       CIVIL W ORKS
               VALVE PITS
               All civil and structural works including supply of all materials, excavation,PCC and RCC works for valve
               pits including removable chequered plate cover with locking facility, with insert plates as required,
               sealing of pipe at valve pits, providing pavement all round; finishing, clean-up and restoration of site,
               filling and grading of area around valve station for avoiding any local flooding of area as per drawings
               and specification enclosed in the Bid document;

     20.1      Valve Pit Type -1 of size 4500 X 3200 X 1600 mm                                                                      No.        5

                                                                                                                                                            GRAND TOTAL

   Notes:
      1         Bidders should quote the complete SOR

      2         The qty mentioned in the SOR are tentativ e and w ill be measured as per actual execution.


      3         Bidder to consider the rate considering full rate of serv ice tax (presently 10.3%)


                                                                                                                                                      SEAL AND SIGNATURE OF THE BIDDER
                                                             STATEMENT OF EXTENDED STAY COMPENSATION
                                                                                FOR
                                                                  PIPELAYING &ASSOCIATED WORKS
                                                                              PART - A

TENDER NO- 110287/WGI/BGL/04-R0                                        NAME OF BIDDER:____________________________________

                                                                    EXTENDED STAY COMPENSATION

                                                                                                                                             RATE
 Sl.No.                                                     ITEM
                                                                                                                                          CURRENCY INR

          Rate of Extended Stay Compensation per week beyond the Time Schedule and grace period mentioned in
  1.0                                                                                                                             ________________ (Per Week)
          Bidding Document for reasons solely attributable to Owner


 Note:
   1      Extended stay compensation shall be loaded on the quoted prices as per clause no. 13.0 of SCC

          In case no rate for extended Stay Compensation is stipulated,it will be considered that Extended Stay Compensation is not required by the Bidder and the rates quoted
   2
          by them shall be valid till completion of works in all respects.



                                                                                                                                            STAMP & SIGNATURE OF BIDDER
                                                       STATEMENT OF TAXES & DUTIES
                                                              FOR PART - A


      TENDER NO- 110287/WGI/BGL/04-R0               NAME OF BIDDER:____________________________________

                                                                                                              TOTAL AMOUNT OF
                                                    BASE CEILING PRICE ON
                                                                                   PERCENTAGE (%) RATE OF          TAXES
Sl.No.                DESCRIPTION                    WHICH TAXES/DUTIES
                                                                                        TAXES/DUTIES                 &
                                                     SHALL APPPLY (in INR)
                                                                                                                DUTIES (in INR)


  1      TOTAL EXCISE DUTY                                                                 --------%


  2      TOTAL SERVICE TAX                                                                 --------%

  3      TOTAL VAT                                                                         --------%

  4      TOTAL CENTRAL SALES TAX                                                           --------%




         NOTES:

         1. Variation in taxes & duties shall be dealt with as per Tender Clause



                                                                                                   STAMP & SIGNATURE OF BIDDER

								