									                                                    DE.02.RB24
                               Board of Public Works - PAYGO
                                               Towson University

Pay-As-You-Go Capital Budget Summary
                                                    ($ in Thousands)


                                                Prior            FY 2002         Future
                                               Approp.          Allowance        Approp.            Total


 Fine Arts Project*                                  $3,030            $27,443     $21,400            $51,873

 Regional Sports**                                   13,500             18,000             0            31,500

 7800 York Road Renovation*                          17,497              3,011              0           20,508

 Total                                              $34,027            $48,454     $21,400           $103,881



 Fund Source
 General                                            $13,030            $20,793             $0         $33,823

 GO Bonds                                            15,497             21,411      21,400              58,308

 Revenue Bonds                                        2,000                 0               0            2,000
 NBF                                                  3,500              6,250              0            9,750

 Total                                              $34,027            $48,454     $21,400           $103,881
*Includes general obligation bond funding
**Includes nonbudgeted funds



Summary of Recommended Actions

 1. Concur with Governor’s allowance.




For further information contact: Brent E. Johnson                                          Phone: (410) 946-5530

                                                           1
                        DE.02.RB24 - BPW - USM - Towson University - PAYGO

Overview
     Towson University requests a total of $48.5 million for three projects. The projects consist of: 1)
$7.4 million in general funds and $20 million in GO bond funds to construct an addition to its Fine Arts
Building and to renovate the existing building; 2) $1.6 million in general funds and $1.4 million in GO
bond funds to pay additional construction costs and to purchase capital equipment for the 7800 York Road
property; and 3) $11.8 in general funds and $6.3 in nonbudgeted funds (NBF) for the third and final phase
of its Regional Sports Complex.

   The Department of Legislative Services (DLS) recommends approving all three projects.




                                                   2
                          DE.02.RB24 - BPW - USM - Towson University - PAYGO

Fine Arts Building Project

PAYGO GF                   $7,443,000           Recommendation: Approve
GO Bonds                  $20,000,000

Project Description: Construct a 122,000 gross square foot (GSF) addition to the three-story Center
for the Arts located on the campus of Towson University. The building addition will contain offices,
classrooms, theater/dance laboratory space, building support and storage space for the fine arts academic
departments as well as related programs: Asian Arts and Culture Center, the Office of the Dean of the
College of Fine Arts and Communication, and the Office of the Maryland Arts Festival. The addition will
alleviate space shortages which are limiting enrollment in fine arts courses and permit the Department of
Dance to move from Burdick Hall to the Center for the Arts. This new addition will span Cross Campus
Drive. The project also includes construction of a pedestrian bridge across Cross Campus Drive to
connect both components of the addition, to connect the Center for the Arts to the main campus, and to
provide more convenient access to the Union Parking Garage for arts attendees.


Comments: The funds requested for fiscal 2002 will be used to finish the design of both the addition
and renovation phases of this project and to construct the addition. The renovation of the existing building
is scheduled for fiscal 2004 which is one year later than anticipated in last year’s Capital Improvement
Program (CIP). The $7.4 million general fund appropriation represents the increased project cost
attributed to the current market conditions. Last year’s CIP anticipated only the $20 million in general
obligation funding. The estimated cost of the renovation phase of the project has also been increased from
$16 million to $18.4 million. The amount anticipated for equipment to be funded in fiscal 2004 remains
unchanged at $3 million.

     This construction project will provide additional classroom and performance space for programs with
existing space needs and with projected space deficits. It will also consolidate the Departments of Theater,
Art, Music, and Dance into one building. Full-time equivalent student (FTES) enrollment at Towson is
expected to increase by 10.8% by 2010 from 12,757 FTES in 2000 to 14,141 FTES in 2010. A recent
space needs analysis, premised upon a 14% enrollment increase from 1999 to 2009, noted that enrollment
in the departments of the College of Fine Arts and Communication is projected to increase by an average
of 17% over the next ten years. Enrollment in the fine arts curriculum at Towson has already increased
by 25% over the past five years, with corresponding increases in faculty. The space needs analysis noted
existing and projected space deficits for programs in the fine arts. Currently, existing space constraints
limit enrollment in the fine arts programs.

    In fiscal 2004, the existing building will be renovated. Renovation includes upgrading or replacing
building infrastructure (i.e., HVAC, electric, sewer service, etc.); installing state-of-the-art lighting, wiring,
rigging, sound, and communication systems; and improving acoustics in rehearsal and performance areas.
In addition, the project will remedy asbestos and lead paint hazards, improve air circulation efficiency, and
provide improved architectural finishes on public areas. Related site improvements are also included.



                                                        3
                       DE.02.RB24 - BPW - USM - Towson University - PAYGO

   The architect/engineering (A/E) fees exceed the guidelines of 7% for new construction and 7.5% for
renovation due to the need for special A/E services for such elements as lighting and sound systems.



Project Data
                                               ($ in Millions)


                     Prior            2002          2003          2004         2005         2006
  Description     Authorization      Request       Estimate      Estimate     Estimate     Estimate


 Planning                 $3.030       $0.970         $0.000        $0.000        $0.000      $0.000

 Construction              0.000       26.473            0.000      18.400         0.000       0.000

 Equipment                 0.000        0.000            0.000       3.000         0.000       0.000

 Total                    $3.030      $27.443         $0.000       $21.400        $0.000      $0.000


 Total Project Cost:           $51,854,16       Cost Per Square Foot - Base
                                        7       Addition:                                       $145
                                                Renovation:                                      $71

 Gross Square Footage:             287,927      With Escalation & Contingencies
                                                Addition:                                       $179
                                                Renovation:                                      $90

                                                Net Usable Square Footage:                   181,867

 Approved Program Plan:               Yes       Estimated Completion Date:                  July 2004



Recommended Actions
1. Concur with the Governor’s allowance.




                                                     4
                        DE.02.RB24 - BPW - USM - Towson University - PAYGO

Executive’s Operating Budget Impact Statement
                                             ($ in Millions)


                                 FY 2002       FY 2003         FY 2004    FY 2005       FY 2006



 Estimated Operating Cost           $0.000        $0.236         $0.874      $0.874         $0.874

 Estimated Staffing                      0               3           3              3             3

   This operating budget includes only the estimated budget to maintain and run the facility (fuel,
maintenance, building mechanics). It does not include the budget for academic areas including facilities.




                                                   5
                   DE.02.RB24 - BPW - USM - Towson University - PAYGO


                                                                                   Appendix 1
                                 Capital Project Cost Estimate W orksheet

Department:                Towson University
Project Number:            DE.02.RB24A
Project Title:             Construct Addition to Fine Arts Building
Analyst:                   Brent E. Johnson

Structure
New Construction:       122,000 Sq. Ft. X            $145.00 Sq. Ft. =             17,690,000
New Construction:               Sq. Ft. X              $0.00 Sq. Ft. =                      0
Renovation:                     Sq. Ft. X                    Sq. Ft. =                      0
Renovation:                   0 Sq. Ft. X              $0.00 Sq. Ft. =                      0
Built-in Equipment                                                                          0
Demolition                                                                                  0
Information Technology          GSF X                          GSF =                  366,000
Telecommunications                                                                          0
Miscellaneous-Other                                                                         0
Miscellaneous-Other                                                                         0
Miscellaneous-Other                                                                         0
SUBTOTAL                                                                           18,056,000
Regional Factor:        100.0%                                                              0
SUBTOTAL                                                                           18,056,000
Escalation to midpoint:    2.88   Yrs. X                6.1%          =   17.53%    3,164,916
TOTAL COST OF STRUCTURE (Bid Cost)                                                 21,220,916

Site Work and Utilities
Site Improvements:   2,197,800 + regional factor + mid-point escalation             2,583,038
Utilities:             541,680 + regional factor + mid-point escalation               636,627
PROJECT SUBTOTAL (Bid Cost)                                                        24,440,581

Fees and M iscellaneous Costs
Total Construction Contingency                          5.0%                        1,222,023
A/E Fee through construction phase @                    8.6%                        2,219,805
Inspection Cost:                                        2.2%                          537,690
Miscellaneous:              Construction M gmt                                        244,405
Miscellaneous:              CPM /Schedule                                              28,000
Miscellaneous:              Movable Equipment                                       2,800,000
Miscellaneous:              Information Technology Equip.                             200,000
TOTAL COST OF PROJECT                                                              31,692,504

Base cost per new square foot                                                           $145
Adjusted cost per new square foot (includes escalation and contingencies)               $179
Base cost per renovated square foot                                                       $0
Adjusted cost per renovated square foot (includes escalation and contingencies)           $0




                                              6
                    DE.02.RB24 - BPW - USM - Towson University - PAYGO

                                                                                        Appendix 2

                                 Capital Project Cost Estimate W orksheet

Department:                Towson University
Project Number:            DE.02.RB24A
Project Title:             Alterations to Fine Arts Center
Analyst:                   Brent E. Johnson

Structure
New Construction:               Sq. Ft. X                     Sq.   Ft.   =                     0
New Construction:               Sq. Ft. X                     Sq.   Ft.   =                     0
Renovation:             165,927 Sq. Ft. X              $71.00 Sq.   Ft.   =            11,780,817
Renovation:             165,927 Sq. Ft. X               $2.00 Sq.   Ft.   =               331,854
Built-in Equipment                                                                              0
Demolition                                                                                331,854
Information Technology  165,927 GSF X                    $3.00 GSF =                      497,781
Telecommunications                                                                              0
Miscellaneous-Other                                                                             0
Miscellaneous-Other                                                                             0
Miscellaneous-Other                                                                             0
SUBTOTAL                                                                               12,942,306
Regional Factor:        100.0%                                                                  0
SUBTOTAL                                                                               12,942,306
Escalation to midpoint:    3.55   Yrs. X                 5.7%        =        20.20%    2,614,346
TOTAL COST OF STRUCTURE (Bid Cost)                                                     15,556,652

Site Work and Utilities
Site Improvements:     388,269 + regional factor + mid-point escalation                   466,699
Utilities:             776,538 + regional factor + mid-point escalation                   933,399
PROJECT SUBTOTAL (Bid Cost)                                                            16,956,750

Fees and Miscellaneous Costs
Total Construction Contingency                           5.0%                             847,838
A/E Fee through construction phase @                    10.0%                           1,780,458
Inspection Cost:                                         2.2%                             373,049
Miscellaneous:              Construction Mgmt.                                            169,568
Miscellaneous:              CPM/Schedule                                                   34,000
Miscellaneous:                                                                                  0
TOTAL COST OF PROJECT                                                                  20,161,663

Base cost per new square foot                                                                 $0
Adjusted cost per new square foot (includes escalation and contingencies)                     $0
Base cost per renovated square foot                                                          $71
Adjusted cost per renovated square foot (includes escalation and contingencies)              $90




                                                 7
                         DE.02.RB24 - BPW - USM - Towson University - PAYGO

Regional Sports Complex

PAYGO GF                  $11,750,000          Recommendation: Approve
Non-Budgeted               $6,250,000


Project Description: The current request is for funding for the final phase of a three-phase project to
construct a Regional Sports Complex at Minnegan Stadium on the Towson University campus. The entire
project includes construction of a 74,831 gross square foot (GSF), four-story field house; renovation of
existing space; installation of artificial turf; resurfacing the running track; and increasing the seating
capacity of Minnegan Stadium from 4,800 to 11,000 seats.

     The first phase of the project, begun in July 1999 included installation of artificial turf and construction
of improvements to stormwater systems to support the artificial turf. The fiscal 2001 budget included $7
million to complete the second phase of the project, construction of additional seating, an entry plaza with
concessions, ticket booths, and a promenade to connect north- and south-side seating along with necessary
site improvements and infrastructure support.

   The third phase of the project for which funding is requested, involves construction of the field house
which will contain offices, two classrooms, and locker room facilities. The third phase also includes
rebuilding the south-side seating and press box, installation of new stadium lighting, resurfacing of the
outdoor track, and stormwater and other infrastructure improvements.

Comments: There is no request for future funding after fiscal 2002. This project was included in last
year’s Capital Improvement Program (CIP) at the level being requested.

University Meets JCR Conditions for Stadium Expansion: In last year’s Joint Chairmen’s Report,
the committees included narrative to support the expansion of permanent seating at Minnegan Stadium
with the understanding that the university would:

!   secure necessary parking agreements with area hospitals or establish an alternative, adequate parking
    plan by the time the expansion phase of the project is completed;

!   not schedule non-university events larger than current stadium capacity (approximately 5,000) on
    Friday evenings until the Charles Street/Towsontown Boulevard intersection is improved with the
    university working in cooperation with the Maryland State Highway Administration (SHA);

!   form an event scheduling committee to oversee and monitor stadium use for non-university events
    above current stadium capacity; and

!   continue regular contacts with surrounding hospitals in regard to large campus events in order to
    ensure that access to emergency care is not compromised.



                                                       8
                        DE.02.RB24 - BPW - USM - Towson University - PAYGO

     In response, the university has secured the use of 680 additional parking spaces consisting of 300 off-
site parking spaces at Baltimore County facilities, 200 spaces at the Sheppard Pratt facilities, and 180 new
spaces on campus. The university has received a letter from SHA concurring that the intersection between
Charles Street and Towsontown Boulevard needs to be improved. SHA plans to fund engineering for the
project in fiscal 2002 with anticipated construction to begin in fiscal 2003. The university has established
an event scheduling committee with the community. The university has updated its emergency access plan
included within the Memorandum of Understanding for the Coordination of Law Enforcement
Responsibilities between the university and Baltimore County to ensure access to emergency care during
large campus events.



Project Data
                                                ($ in Millions)


                      Prior            2002           2003         2004          2005           2006
   Description     Authorization      Request        Estimate     Estimate      Estimate       Estimate


 Planning                  $2.200        $0.000        $0.000        $0.000         $0.000         $0.000
 Construction              11.300        18.000           0.000       0.000          0.000           0.000

 Total                    $13.500       $18.000        $0.000        $0.000         $0.000         $0.000


 Total Project Cost:             $31,514,71      Cost Per Square Foot - Base:                        $205
                                          1

                                                 With Escalation & Contingencies:                    $237

 Gross Square Footage:               74,831      Net Usable Square Footage:                        48,435

 Approved Program Plan:                 Yes      Estimated Completion Date:                September 2002



Recommended Actions
1. Concur with Governor’s allowance.




                                                      9
                     DE.02.RB24 - BPW - USM - Towson University - PAYGO

Executive’s Operating Budget Impact Statement
                                        ($ in Millions)


                             FY 2002     FY 2003          FY 2004    FY 2005       FY 2006



Estimated Operating Cost       $0.019        $0.216         $0.256      $0.256        $0.256

Estimated Staffing                  0              1            1              1             1




                                              10
                    DE.02.RB24 - BPW - USM - Towson University - PAYGO


                                                                                       Appendix 3
                                 Capital Project Cost Estimate Worksheet

Department:                Towson University
Project Number:            DE02.01.7
Project Title:             Construct Regional Sports Complex
Analyst:                   Brent E. Johnson

Structure
New Construction:        74,831 Sq. Ft. X            $205.00   Sq.   Ft. =           15,340,355
New Construction:             0 Sq. Ft. X              $0.00   Sq.   Ft. =                    0
Renovation:                   0 Sq. Ft. X              $0.00   Sq.   Ft. =                    0
Renovation:                   0 Sq. Ft. X              $0.00   Sq.   Ft. =                    0
Built-in Equipment                                                                    1,412,000
Demolition                                                                              400,000
Information Technology          GSF X                  $2.31 GSF =                      299,679
Telecommunications                                                                            0
Miscellaneous-Other                                                                           0
Miscellaneous-Other                                                                           0
Miscellaneous-Other                                                                           0
SUBTOTAL                                                                             17,452,034
Regional Factor:        100.0%                                                                0
SUBTOTAL                                                                             17,452,034
Escalation to midpoint:    1.82 Yrs. X                  3.2%          =      5.82%    1,015,941
TOTAL COST OF STRUCTURE (Bid Cost)                                                   18,467,975

Site Work and Utilities
Site Improvements:   2,753,063 + regional factor + mid-point escalation               2,913,328
Utilities:             937,557 + regional factor + mid-point escalation                 992,135
PROJECT SUBTOTAL (Bid Cost)                                                          22,373,438

Fees and Miscellaneous Costs
Total Construction Contingency                          9.1%                          2,025,944
A/E Fee through construction phase @                    9.7%                          2,357,379
Inspection Cost:                                        0.0%                                  0
Miscellaneous:              Owner Contingency                                         1,112,972
Miscellaneous:              CM Fees/Gen Cond                                          2,544,978
Miscellaneous:              Movable Equipment                                         1,100,000
TOTAL COST OF PROJECT                                                                31,514,711

Base cost per new square foot                                                             $205
Adjusted cost per new square foot (includes escalation and contingencies)                 $237
Base cost per renovated square foot                                                         $0
Adjusted cost per renovated square foot (includes escalation and contingencies)             $0




                                                11
                         DE.02.RB24 - BPW - USM - Towson University - PAYGO

7800 York Road Renovation

PAYGO GF                  $1,600,000          Recommendation: Approve
GO Bonds                  $1,411,000


Bill Text: Construct renovations to the building located at 7800 York Road.


Project Description: Acquire and renovate a circa-1962, four-story, 115,500 gross square foot (GSF)
office building located at 7800 York Road. Renovation will affect approximately 100,000 GSF and will
provide office and classroom space to accommodate current and projected enrollment growth.
Renovations will include interior and exterior architectural improvements, asbestos removal, and
repartitioning as necessary to accommodate the needs of the departments expected to occupy the building.


Comments: In December 1997 this building was purchased for $6.5 million. The university is currently
occupying the second, fourth, and part of the third floor of this building -- approximately half of its usable
space. The first floor of the building is largely retail, including a pharmacy and a restaurant. The
restaurant will continue to lease its space, 11,489 GSF, and will not be affected by the renovation.

    After renovation is complete, the building will house the following university programs and services:
Computer and Information Science Department (including a floor of classroom and laboratory space); the
College of Extended Programs; the College of Graduate Education and Research; and the Career Service
Center which is already located in the building; and Administrative Services (including a printing center,
tutoring services, and the students with disabilities office). The university has existing and projected space
deficits for office and laboratory space. In addition, enrollment at the university is expected to grow by
approximately 11% between 2000 and 2010. The university expects enrollment in Computer and
Information Science programs to increase by approximately 50% from 1999 to 2007 (student enrollment
in 1999 was 1,040 and is projected to be 1,573 in 2007, a 51% increase; student credit hours in 1999 were
4,507 and are projected to be 7,045 in 2007, a 56% increase). The number of faculty employed by the
department is expected to increase from 21 in 1997 to 35 in 2007.

    Last year’s CIP included only $1.4 million in GO bond funds for equipment. The additional $1.6
million in general funds requested for fiscal 2002 to offset increased construction costs. There is no
request for future funding after fiscal 2002.




                                                     12
                       DE.02.RB24 - BPW - USM - Towson University - PAYGO

Project Data
                                                 ($ in Millions)


                     Prior              2002           2003            2004           2005              2006
  Description     Authorization        Request        Estimate        Estimate       Estimate          Estimate


 Acquisition              $6.500         $0.000         $0.000           $0.000         $0.000                $0.000

 Planning                 $0.663         $0.000         $0.000           $0.000         $0.000                $0.000

 Construction             10.334          1.600             0.000         0.000             0.000              0.000
 Equipment                  0.000         1.411             0.000         0.000             0.000              0.000

 Total                   $17.497         $3.011         $0.000           $0.000         $0.000                $0.000


 Total Project Cost:            $20,508,00
                                         0

 Gross Square Footage:               115,549      Net Usable Square Footage:                                  69,908

 Approved Program Plan:                 Yes       Estimated Completion Date:                          August 2002



Recommended Actions
1. Concur with Governor’s allowance.



Executive’s Operating Budget Impact Statement
                                                 ($ in Millions)


                                    FY 2002       FY 2003           FY 2004       FY 2005           FY 2006



 Estimated Operating Cost             $0.000          $0.250          $0.250         $0.250            $0.250

 Estimated Staffing                       0                   0           0                 0                 0




                                                       13
                                       Object/Fund Difference Report
                                        Towson University - PAYGO
                                                         FY01
                                        FY00            Working           FY02           FY01 - FY02      Percent
                         Object/Fund    Actual        Appropriation     Allowance       Amount Change     Change
     Objects
     14   Land & Structures             $ 3,485,000      $ 10,030,000    $ 20,793,000      $ 10,763,000      107.3%
     Total Objects                      $ 3,485,000      $ 10,030,000    $ 20,793,000      $ 10,763,000     107.3%
     Funds




                                                                                                                                   DE02.RB24 - Towson University - PAYGO
     01   General Fund                  $ 3,485,000      $ 10,030,000    $ 20,793,000      $ 10,763,000      107.3%
     Total Funds                        $ 3,485,000      $ 10,030,000    $ 20,793,000      $ 10,763,000     107.3%