Device Name; Input # ; Input-name Long name ; CIBU rack location; CIBU (or CIBF) ID . Additional info Connection info cable number
1 YES E-400 Flag "SPS Energy=400Gev" Flag from the SPS-SMP controller
2 YES E-450 Flag "SPS Energy=450Gev" Flag from the SPS-SMP controller
3 YES TT40-A User Permits from slave BIC managing TT40-A
4 YES TT40-B User Permits from slave BIC managing TT40-B
CIB.BA4.EXT2
5 YES TED-in TT40 Mobile Transfer Line Dump TED.400354 (end of the TT40 line)
6 YES TT41-A User Permits from slave BIC managing TT41-A
7 YES TT41-B User Permits from slave BIC managing TT41-B
8 YES TI8 Upstream User Permits from slave BIC managing Ti8 UPstream
9 YES TI8 Downstream User Permits from slave BIC managing Ti8 Downstream
10 YES TED-in TI8 Mobile Transfer Line Dump TED.87765 (end of the TI8 line)
11 YES INJ Beam-2 User Permits from BIC managing INJection of Beam-2
12 YES Probe Beam Flag SPS Probe Beam Flag from the SPS-SMP controller
13 YES BPF-2 LHC Beam-2 Presence Flag from the LHC-SMP controller
14 YES SBF-2 LHC Beam-2 Safe Beam Flag from the LHC-SMP controller
1 YES Vacuum TT40 Interlock signal for the Vacuum valve installed in theTT40 line
2 YES WIC TT40 Warm Magnets Interlock: Temperature survey of normal conducting magnets (MSE+MST excepted) in the TT40 line
3 YES Operator Switch Extraction Inhibit Switch in the CCC
4 YES MKE4 Status Extraction Kicker magnets surveillance: Status signal provided in LSS4 (i.e.MKE.416)
CIB.BA4.TT40A
5 YES MSE/MST Status Extraction Septum magnet (MSE.418) surveillance: Temp, cooling and protection devices (TPSG)
6 NO not used
7 NO not used
8 YES TT40 converters currents Performed by ROCS M1SBA4: Current surveillance for converters in the TT40 line (MSE excepted)
9 YES MSE septum current Performed by ROCS-M1SBB4: PC current survey for MSE septum magnet
10 YES Bumpers currents Performed by ROCS M2SBA4: Current surveillance for converters (MPSH/V and MPLH/V) powering Bumpers magnets in LSS4
11 YES FMCM_MSE4183M Fast Magnet Current Change Monitor (CIF.BB4.MSE) protecting the circuit MSE.4183M
12 YES FMCM_RBIH.400107 Fast Magnet Current Change Monitor (CIF.BA4.MBHC) protecting the circuit RBIH.400107
13 YES FMCM_RBIH.400309 Fast Magnet Current Change Monitor (CIF.BA4.MBHA) protecting the circuit RBIH.400309
14 NO not used
1 YES TED TT40 Mobile Transfer Line Dump TED.400354 (end of the TT40 line)
2 NO not used
3 NO not used
4 NO not used
CIB.BA4.TT40B
5 NO not used
6 NO not used
7 NO not used
8 YES BPM Extraction Ti8 Beam excursion Interlock for Ti8
9 YES Screens TT40 Beam profile monitors (BTV) installed in the TT40 line
10 YES BLM TT40 Signal provided by BLMI40T for the Beam Loss Monitors installed in the TT40 line
11 YES BPM LSS4 SPS bumped beam position interlock (at BPCE.418) for LSS4 provided by BMU40S
12 NO not used
13 YES MSE Converter Sum FaultFast internal Interlock Sum Fault of the Converter MSE4183M
14 NO not used
1 YES Vacuum TI8 Interlock signal for the Vacuum valves installed in the TI8 line (the ones behind the TED are linked to INJ-BIC)
2 YES WIC TI8 Warm Magnets Interlock: Temperature survey of normal conducting magnets in the TI8 line
3 YES TBSE TJ8 Beam Stopper used for personel protection (as TBSE80243)
4 NO not used
CIB.BA4.TI8U
5 NO not used
6 NO not used
7 NO not used
8 YES TI8 converters currents Performed by ROCS M1SBA4: Current surveillance for converters in the Ti8-upstream (MBSG excepted). It's including the MBI branch of MBG/MBI converter
9 NO not used
10 YES TT41/TI8 switch current Performed by ROCS M1SBB4: Current surveillance for converter MBSG4100M powering the dipole string MBSG 4100 (switchyard to TT41-Ti8)
11 YES Screens TI8up Beam profile monitors (BTVI) installed in the upstream part of TI8 line
12 YES BLM TI8up Signal provided by BLMI40T for the Beam Loss Monitors installed in TI8-upstream
13 YES FMCM_RBI.81607 Fast Magnet Current Change Monitor (CIF.BA4.MBI) protecting the circuit RBI.81607
14 NO not used
11/10/2011 8ce590ea-7a25-408e-8f2b-123cad0ef91c.xls 1/4
Device Name; Input # ; Input-name Long name ; CIBU rack location; CIBU (or CIBF) ID . Additional info Connection info cable number
1 YES TED TI8 Mobile Transfer Line Dump TED.87765 (end of the TI8 line)
2 NO not used
3 NO not used
4 NO not used
CIB.SR8.TI8D
5 NO not used
6 NO not used
7 YES LHCb Global Inhibit signal from LHCb Experiment
8 YES TI8-down converters currents by ROCS M1SSR8: Current surveillance for converters in the Ti8-downstream line (before TED.87765)
Performed
10 NO not used
11 YES Screens TI8-down Beam profile monitors (BTVI) installed in the downstream part of TI8 line
12 YES BLM TI8-down Signal provided by BLMI87T for the Beam Loss Monitors installed in TI8-downstream
13 NO not used
14 NO not used
1 YES Vacuum TT41 Interlock signal for the Vacuum valves installed in the TT41 line
2 YES WIC TT41 Warm Magnets Interlock: Temperature survey of normal conducting magnets in the TT41 line
3 NO not used
4 NO not used
CIB.BA4.TT41A
5 NO not used
6 NO not used
7 NO not used
8 YES TT41 converters currents Performed by ROCS-M1SBB4: Current surveillance for converters in the TT41 line (MBI excepted)
9 YES MBI current Performed by ROCS M1SBA4: Current surveillance for converter MBI8160M pwering the MBG4101 string
10 YES MBG branch current Performed by MUGEF-M1SBA4: Current surveillance in the MBG branch of MBG/MBI converter
11 YES FMCM_RBI.410010 Fast Magnet Current Change Monitor (CIF.BB4.MBSG) protecting the circuit RBI.410010
12 YES FMCM_RBI.410147 Fast Magnet Current Change Monitor (CIF.BA4.MBG) protecting the circuit RBI.410147
13 YES TCC4 Ventilation Signal given by PLC managing the Ventilation Mode of the CNGS target chamber
14 NO not used
1 YES Shutter CNGS Shutter behind the Target used as personnel protection device
1 YES Shutter CNGS Shutter behind the Target used as personnel protection device
2 YES TBSE TT41 Block extraction used for personel protection (as TBSE410113)
3 NO not used
CIB.BA4.TT41B
4 YES n Target T40 Non Maskable signal from PLC managing neutrino Target's interlocks (Rot., Air-Cool, CAP-Shielding)
5 NO not used
6 NO not used
7 NO not used
8 YES Screens TT41 Beam profile monitors (BTV) installed in the TT41 line
9 YES BLM TT41 Signal provided by BLMI41T for the Beam Loss Monitors installed in the TT41 line
10 YES Beam Position Beam Position in front of the Target
11 YES n Target T40 Maskable signal from PLC managing Neutrino Target's interlocks (Table-Pos and NO-Target)
12 YES Fire Alarm "Centrale Detection" in case of smoke detection anywhere in CNGS (Element name=SFDIN-00286)
13 YES Hadron stop Cooling Signal given by PLC managing pumps for preventing an over-heating of the dump-blocks
14 YES Magnetic Horn Magnetic Horn signal in including cooling water
11/10/2011 8ce590ea-7a25-408e-8f2b-123cad0ef91c.xls 2/4
Device Name; Input # ; Input-name Long name ; CIBU rack location; CIBU (or CIBF) ID . Additional info Connection info cable number
1 NO not used
2 NO not used
3 YES TT60-A User Permits from slave BIC managing TT60A
4 YES TT60-B User Permits from slave BIC managing TT60B
CIB.BA6.EXT1
5 YES TED-in TT60 Mobile Transfer Line Dump TED.610321 (end of the TT60 line)
6 NO not used
7 NO not used
8 YES TI2 Upstream User Permits from slave BIC managing Ti2 UPstream
9 YES TI2 Downstream User Permits from slave BIC managing Ti2 Downstream
10 YES TED-in TI2 Mobile Transfer Line Dump TED.29133 (end of the TI2 line)
11 YES INJ Beam-1 User Permits from BIC managing INJection of Beam1
12 YES Probe Beam Flag SPS Probe Beam Flag from the SPS-SMP controller
13 YES BPF-1 LHC Beam-1 Presence Flag from the LHC-SMP controller
14 YES SBF-1 LHC Beam-1 Safe Beam Flag from the LHC-SMP controller
1 YES Vacuum TT60 Interlock signal for the Vacuum valves installed in the TT60 line
2 YES WIC TT60 Warm Magnets Interlock: Temperature survey of normal conducting magnets in the TT60 line
3 YES Operator Switch Extraction Inhibit Switch in the CCC
4 YES MKE6 Status Extraction Kicker magnets surveillance: Status signal provided in LSS6 (i.e.MKE.616)
CIB.BA6.TT60A
5 YES MSE/MST Status Extraction Septum magnets (MSE.618+MST.617) surveillance: Temp, cooling and protection devices (TPSG)
6 NO not used
7 NO not used
8 YES TT60 Converters currents Performed by ROCS M2SBA6: Current surveillance for converters in the TT60 line (Quads + MDs magnets + Bumpers)
9 YES MSE/MST currents Performed by ROCS M3SBA6: Current surveillance for both converters MST6177M and MSE6183M
10 YES MBB current Performed by ROCS M4SBA6: Current surveillance for the converter MBB6104M
11 NO not used
12 NO not used
13 YES FMCM_MSE6183M Fast Magnet Current Change Monitor (CIF.BA6.MSE) protecting the circuit MSE6183M
14 YES FMCM_MST6177M Fast Magnet Current Change Monitor (CIF.BA6.MST) protecting the circuit MST6177M
1 YES TED TT60 Mobile Transfer Line Dump TED.610321 (end of the TT60 line)
2 NO not used
3 NO not used
4 NO not used
CIB.BA6.TT60B
5 NO not used
6 NO not used
7 NO not used
8 YES BPM Extraction Ti2 Beam excursion Interlock for Ti2
9 YES Screens TT60 Beam profile monitors (BTV) installed in the TT60 line
10 NO not used
11 YES BPM LSS6 SPS bumped beam position interlock (at BPCE.618) for LSS6 provided by BMU60S
12 YES BLM TT60/Ti2up Signal provided by BLMI70S for the Beam Loss Monitors installed in TT60 and in TI2-Upstream
13 YES MSE Convertor Sum Fault Fast internal Interlock Sum Fault of the Converter MSE6183M
14 YES MST Convertor Sum Fault Fast internal Interlock Sum Fault of the Converter MST6177M
1 YES Vacuum TI2 Interlock signal for the Vacuum valves installed in the TI2 line (the ones behind the TED are linked to INJ-BIC)
2 YES WIC TI2 Warm Magnets Interlock: Temperature survey of normal conducting magnets in the TI2 line
3 NO not used
4 NO not used
CIB.BA6.TI2U
5 NO not used
6 NO not used
7 NO not used
8 YES TI2-up converters currents Performed by ROCS M1SBA7: Current surveillance for converters in the Ti2-upstream line (All Upstream quads, Dipoles and orbit correctors)
9 YES TCLI Collimator TCLI Collimator in the Upstream part of Ti2
10 NO not used
11 YES Screens TI2up Beam profile monitors (BTVI) installed in the upstream part of TI2 line
12 NO not used
13 YES FMCM_RBIH.20150 Fast Magnet Current Change Monitor (CIF.BA7.MBIDH) protecting the circuit RBIH.20150
14 NO not used
11/10/2011 8ce590ea-7a25-408e-8f2b-123cad0ef91c.xls 3/4
Device Name; Input # ; Input-name Long name ; CIBU rack location; CIBU (or CIBF) ID . Additional info Connection info cable number
1 YES TED TI2 Mobile Transfer Line Dump TED.29133 (end of the TI2 line)
2 YES ALICE Global Inhibit signal from ALICE Experiment
3 NO not used
4 NO not used
CIB.SR2.TI2D
5 NO not used
6 NO not used
7 NO not used
8 YES TI2-down converters currentPerformed by ROCS M1SSR2: Current surveillance for converters in the Ti8-downstream line (before TED.29133)
9 YES TI2-end converters currentsPerformed by ROCS M1SSR2: Current surveillance for converters in the Ti8-downstream line (beyond TED.29133)
10 NO not used
11 YES Screens TI2-down Beam profile monitors (BTVI) installed in the downstream part of TI2 line
12 YES BLM TI2-down Signal provided by BLMI23S for the Beam Loss Monitors installed in TI2-Downstream
13 YES FMCM_RBI.22134 Fast Magnet Current Change Monitor (CIF.SR2.MBI) protecting the circuit RBI.22134
14 NO not used
11/10/2011 8ce590ea-7a25-408e-8f2b-123cad0ef91c.xls 4/4