Histogram for Sample Data - Critical Defect No. 1

Cost Data Integrity Project

Once Trend Charts have been completed, enter the same observation data into a Histogram to check for

Normality - may need to revise and change sample plan before moving to Statistical Process Control.

Additional Instructions > Making Histograms

Observation Value Describe the Sample Test and Defect Measured:

1 27 Nine observations were made over a 9 month period regarding the posting of

2 22 vendor invoices into the Project Management System. Compare the invoices

3 20 that were processed and paid per the General Ledger with invoices that were

4 26 posted in the Project Management System. Count the number of invoices that

5 21 were not posted in the Project Management System.

6 28

7 25

8 22

9 28



Maximum 28.0

Minimum 20.0

Range 8.0



Number of Intervals based on Square Root of Observations > 3 5 Making Histograms

Observation Value Describe the Sample Test and Defect Measured:

1 41 For all active employees assigned to projects, how many employees did

2 37 not enter a timesheet into the Project Management System for the

3 35 two week pay period.

4 33

5 36

6 40

7 38

8 36

9 34



Maximum 41.0

Minimum 33.0

Range 8.0



Number of Intervals based on Square Root of Observations > 3 5 < Minimum Intervals

Width of each interval based on Range / (No of Intervals - 1) 2



Histogram Table based on above data: Simple Side Ways Plot



Interval Freq

1 Less than or Equal to 33 1

2 Between 34 and 35 1

3 Between 36 and 37 3 Need additional samples

4 Between 38 and 39 1

5 Between 40 and 41 2

More Formal Histogram Bar Chart:





Frequency Distribution



3.5

3

2.5

Frequency









2

Freq

1.5

1

0.5

0

1 2 3 4 5

Intervals

Histogram Results

Cost Data Integrity Project

Summarize the results of the histograms for each of the three critical defects:



Critical Defect No. 1:



The frequency distribution for vendor invoices is bi-modal indicating that stratified sampling needs to be performed. This is most likely due to the

fact that each IT investment is managed seperately and as a result, each IT project has its own unique defect rates; i.e. some projects do a good

job of processing and posting their invoices, but others do a very poor job. Therefore, each project should represent a sub-group and observations

should be taken from each sub group to arrive at proper measurement of defects.



Critical Defect No. 2:



Similar to defect 1, probably need to conduct subgroup samples on a project by project basis to reach normality.


Share This Document


Related docs
Other docs by ChrisCaflish
g{x VtÑàtÄ TÜxt V{ÉÜtÄx
Views: 2  |  Downloads: 0
Word-Datei - Brown University
Views: 6  |  Downloads: 0
SWORN STATEMENT
Views: 365  |  Downloads: 5
S709V12 - DATASHEET - US
Views: 3  |  Downloads: 0
BHAJAN 02 CD
Views: 67  |  Downloads: 1
1 From Carrboro, take Hwy 54W seven miles west
Views: 51  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!