TOC
TABLE OF CONTENTS
Page
I. Base Realignment and Closure Overview 1
Fiscal Year 1996 1
Fiscal Year 1997 3
Fiscal Year 1998 7
Fiscal Year 1999 11
Fiscal Year 2000 14
Fiscal Year 2001 16
Fiscal Year 2002 16
Fiscal Year 2003 16
II. Financial Summary 18
III. Base Realignment and Closure Detail -- By Package
1. Aviation Troop Command 19
2. Baltimore Publications Center 23
3. Bayonne Military Ocean Terminal 26
4. Bellmore Logistics Activity 30
5. Concept Analysis Agency 33
6. Detroit Arsenal 36
7. Fitzsimons Army Medical Center 39
8. Ft. Buchanan 43
9. Ft. Chaffee 46
10. Ft. Dix 49
11. Ft. Greely 52
12. Ft. Holabird 56
13. Ft. Hunter-Liggett 59
14. Ft. Indiantown Gap 62
15. Ft. Lee 65
i
16. Ft. McClellan 68
17. Ft. Meade 72
18. Ft. Pickett 75
19. Ft. Ritchie 79
20. Ft. Totten 83
21. Information Systems Software Command 86
22. Kelly Support Center 89
23. Letterkenny Army Depot 92
24. Minor Ft. Dix 96
25. Minor FORSCOM 100
26. Minor Ft. Lewis 103
27. Oakland Army Base 107
28. Red River Army Depot 110
29. Savanna Army Depot 113
30. Seneca Army Depot 117
31. Sierra Army Depot 120
32. Stratford Engine Plant 123
33. Tri Service Reliance 126
34. Chicago O’Hare 129
35. Hamilton Airfield 131
36. Army Program Management 133
37. BRAC 88 Environmental Restoration/Caretaker 136
38. BRAC 91 Environmental Restoration/Caretaker 139
39. BRAC 93 Environmental Restoration/Caretaker 142
ii
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
The Army will implement BRAC 95 (BRAC IV) as described in
the Defense Base Closure and Realignment Commission’s report to
the President. Consistent with budgets for prior BRAC rounds,
no military end strength savings are shown in this plan, since
those savings already have been made independent of the BRAC
process.
Reductions of civilian personnel took place during FY 96 to FY
01. The resulting savings and eliminations are indicated for
each package.
The FY03 budget submission represents the costs and
savings of implementing all closure and realignment actions
through FY01, and the costs to continue care taking functions
and environmental restoration at the remaining BRAC properties
in FY02 and FY03. The Army continues to cleanup properties to
support property disposal as quickly as available resources
allow. The Army continues to align cleanup resources with
reuse schedules as well as commitments that protect human
health and the environment.
I. Fiscal Year 1996: The first year of implementation was
budgeted at $230.6 million. These funds allowed the Army to
initiate planning and design for all construction projects to
permit accelerated execution. The Army released all FY 96 and
FY 97 projects for 35% concept design in the first quarter of
FY 96. FY 96 projects had minimal requirements for design and
were awarded in FY 96.
The Army funded environmental baseline studies required at
closing or realigning installations where excess real property
exists. National Environmental Policy Act (NEPA) efforts to
support construction and movement schedules began at most
gaining installations.
The Army began funding legally mandated environmental
restoration requirements. However, the Army delayed initiating
the majority of new environmental studies (Site Investigations,
remedial investigations/feasibility studies (RI/FS)) until FY
98.
Exhibit BC-01
1
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
A. MAJOR EVENTS SCHEDULE.
1. Construction.
a. Aviation-Troop Command (ATCOM), MO.
Initiated design and construction for two facilities at
Redstone Arsenal.
(1) $8.5 million Administration
Modernization facility.
(2) $30.8 million Sparkman Building
addition.
b. Fort Ritchie. Initiated design and
construction of a $20.5 million Unaccompanied Enlisted
Personnel Housing facility at Fort Detrick, MD to support
billeting requirements for the 1108th Signal Brigade, the
1111th Signal Battalion and others with duty station at Site R.
2. Moves. Major actions included:
a. Aviation-Troop Command (ATCOM), MO. Began
relocating the advance party in support of the Aviation
Research, Development & Engineering Center, Aviation
Management, Aviation Program Executive Office moves to Redstone
Arsenal.
b. Letterkenny Army Depot, PA. Began relocating
functions related to towed and self-propelled combat vehicle
mission to Anniston Army Depot, AL.
c. Reduced the operations at Fitzsimons Army
Medical Center to a Troop Clinic beginning in June 1996.
B. APPROPRIATION REQUEST. $230.6 million.
C. MISSION IMPACTS. Planned actions had no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS. None.
Exhibit BC-01
2
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
II. Fiscal Year 1997: The second year of implementation was
budgeted at $439.0 million. The majority of BRAC 95
construction was awarded this year to include the facilities to
move the Army’s Military Police and Chemical Schools to Fort
Leonard Wood, MO. The Bio-medical Equipment Repair Training
facility and several projects at Fort Detrick were also awarded
this fiscal year.
The Army accelerated ATCOM disestablishment by completing
new facilities at Redstone Arsenal and moving personnel to the
four gaining locations.
Environmental restoration actions aim to support interim
leasing and accelerated property disposal. The Army expects to
receive economic development conveyance (EDC) applications from
several installations in future years which will require
continued acceleration of environmental actions.
A. MAJOR EVENTS SCHEDULE.
1. Construction. The Army projected a one year
design period for the FY 97 construction projects and exceeded
the goal of awarding 75 percent of the construction contracts
by the end of the third quarter of FY 97.
a. Savanna Army Depot, IL. Began construction
and renovation of a $7.2 million General Instruction Building.
Began Phase I $6.9 million construction project of a total
$14.1 million Administrative, Instruction, Storage, and RDTE
facility to support requirements for relocating the Ammunition
Center and School to McAlester Army Ammunition Plant, Oklahoma.
b. Fort McClellan, AL. Completed design and
awarded contracts at:
(1) Fort Leonard Wood, MO:
(a)$64.2* million General Instruction
Facilities
Exhibit BC-01
3
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
(b) $32.4* million Applied Instruction
Facilities
(c) $64.4* million Unaccompanied
Enlisted Personnel Housing
(d) $29.2 million Chemical Defense
Training Facility
(e)$0.553 million for two General
Officer Quarters
*Additional FY98 funds on this project.
(2) Anniston Army Depot for a $1.3M
Explosive Ordnance Disposal Detachment Operations Building,
Storage and Hardstand.
(3) Fort Jackson, SC for a $6.2M training
facility for the Defense Polygraph Institute.
c. Army Baltimore Publications Distribution
Center. Completed minor modifications to the gaining St. Louis
facility.
d. Concepts Analysis Agency. Began constructing
a $7.3M administrative facility at Fort Belvoir, VA.
e. Fort Ritchie.
(1) At Fort Detrick, MD:
(a) Began constructing a $6.4 million
General Purpose Administrative Facility to house the 1108th
Signal Brigade and ISEC-CONUS elements.
(b) Initiated a $0.8 million
renovation of a modular bay general purpose storage facility
and make minor modifications to existing warehouse facility to
support the 1108th Signal Brigade.
(c) Began constructing a $1.6 million
Military Police Company Headquarters facility to support the
realigning unit.
Exhibit BC-01
4
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
(d) Initiated a $0.9 million
renovation of a secure administrative space within an existing
building to support the Technical Applications Office.
(2) At Letterkenny AD, PA. Initiated a
$1.9 million renovation of a facility to support the Defense
Information Systems Agency Western Hemisphere activity.
f. Fitzsimons Army Medical Center. Using a
design/build contract, constructed a $14.7 million Biomedical
Equipment Repair Training Facility (BMET) at Sheppard AFB, TX.
g. Fort Monmouth, NJ. Initiated a $2.7 million
renovation of administrative space to support transferring
ATCOM elements.
2. Moves. Major actions included:
a. Aviation-Troop Command, MO. Continued
relocating the Aviation Research, Development & Engineering
Center, Aviation Program Executive Office, and Aviation
Management to Redstone Arsenal, AL. Began relocating:
(1) Functions related to the materiel
management of communications-electronics to Fort Monmouth, NJ.
(2) Soldier systems to Natick Research and
Development Center, MA.
(3) Automotive materiel management
functions to Detroit Arsenal, MI.
b. Stratford Army Engine Plant, CT. Began moving
the AGT 1500 Engine Recuperator Manufacturing Process to
Anniston Army Depot, AL.
c. Kimbrough and Kenner Army Community Hospitals
(Fort Meade, MD and Fort Lee, VA). Completed realignments to
terminate inpatient services.
Exhibit BC-01
5
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
d. Fitzsimons Army Medical Center. Relocated
the Office of the Civilian Health and Medical Program of the
Uniformed Services (OCHAMPUS) to leased space in Denver, CO.
e. Fort Dix, NJ. Inactivated the active
component garrison and establish the USAR garrison effective 1
Oct 97.
f. Fort Pickett, VA. Inactivated the USAR
garrison and transfer the enclave to the Virginia Army National
Guard.
g. Camp Kilmer, NJ. Transfer from the active
component to the U.S. Army Reserve.
h. Camp Pedricktown, NJ. Transfer from the
active component to the U.S. Army Reserve.
i. Fort Chaffee, AK. Inactivated the active
component garrison and establish an Arkansas Army National
Guard garrison effective 1 October 1997.
j. Letterkenny Army Depot, PA. Continued
relocating functions related to towed and self-propelled combat
vehicle mission to Anniston Army Depot, AL.
k. Seneca Army Depot Activity, NY. Began
relocating ammunition stocks to other depots based on the Army
Materiel Command (AMC) plan.
l. Red River Army Depot, TX. Began relocating
retained maintenance workload to Anniston Army Depot site and
the private sector (non-core).
m. Army Publications Distribution Center.
Relocated remaining stocks and closed the Baltimore facility.
n. Fort Ritchie, MD. Transfer operational
responsibility for the Alternate National Military Command
Center to MEDCOM (Fort Detrick, MD).
Exhibit BC-01
6
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
B. APPROPRIATION REQUEST. $439.0 million.
C. MISSION IMPACTS. Planned actions had no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS. None.
III. Fiscal Year 1998:
MAJOR EVENTS SCHEDULE.
1. Construction.
a. Oakland Army Base. Began constructing a $2.9
million administrative facility to house the 5th Readiness
Group at Travis Air Force Base, CA.
b. Fitzsimons Army Medical Center.
(1) Initiated a $2.0 million construction
project to divest the sewer treatment plant.
(2) Began $3.1 million renovation of a
headquarters and administrative facility for the Lead Agent and
Readiness Group, Denver at Fort Carson, CO.
(3) Began constructing a $3.8 million
laboratory and administrative space to support Center for
Health Promotion and Preventive Medicine (CHPPM-DSA) West at
Fort Lewis, WA.
(4) Began constructing a $1.1 million Nurse
Training facility at Walter Reed AMC, Washington, DC.
c. Fort Greely. Began constructing a new $1.7
million missile test site at Fort Wainwright.
d. East Fort Baker, CA. Began constructing a
$9.0 million USAR Center at Camp Parks, CA, and a $3.9 million
administrative facility at Nellis AFB, CA for HQ, 6th
Recruiting Brigade.
Exhibit BC-01
7
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
e. Seneca Army Depot. Began renovating
facilities for storage of Industrial Plant Equipment at
Hawthorne Army Ammunition Plant, NV. This project was funded
through O&M.
f. Fort McClellan, AL. Completed design and
awarded contracts and contract modifications at Fort Leonard
Wood for:
(1) A $5.4 million MOUT Facility.
(2) Training Range modification - $22.5M
(3) General Instruction Facility - $.5M
(4) Applied Instruction Facility – $2.0M
(5) Unaccompanied Enlisted Personnel Housing - $.5M
g. Concept Analysis Agency. Continued
administrative facility construction at Fort Belvoir, VA.
h. Fort Ritchie, MD. Completed the
Unaccompanied Enlisted Personnel Housing facility construction
at Fort Detrick, MD. Completed construction of an
administrative facility to support the 1108th Signal Brigade
and the Information Systems Engineering Command-Fort Detrick
Engineering Office. Completed construction of a Company
Headquarters building to support the MP Company. Completed
renovation of existing facilities to support the Technical
Applications Office and the IMA BRAC office. Began
construction of a $5.0 million health clinic at Ft. Detrick.
This is a conjunctively funded project. BRAC cost is $754K.
i. Savanna Army Depot. Began Phase II
construction of Administrative Facility at McAlester AAP
($8.6M).
j. Detroit Arsenal. Began constructing a $6.9
million warehouse storage facility.
k. Bayonne Military Ocean Terminal, NJ.
Completed design and awarded $9.7 million contract for
renovation/construction of MTMC’s CONUS Command headquarters at
Fort Eustis, VA.
Exhibit BC-01
8
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
l. Oakland Army Base, Admin Facility at Travis
AFB($2.9M).
m. Information Systems Software Center. Began
renovating existing administrative facilities at Fort Meade, MD
for the ISSC’s Software Development Center-Washington ($3.7
million) and the Executive Systems Software Directorate ($2.2
million).
n. Sierra Army Depot, CA. Began constructing a
$900 thousand consolidated security facility.
2. Moves. Major actions include:
a. Aviation-Troop Command (ATCOM), MO. By Dec
97, finished moving:
(1) Aviation Research, Development & Engineering Center,
Aviation Management, and Aviation Program Executive Office to
Redstone Arsenal, AL.
(2) Functions related to the materiel management of
communications-electronics to Fort Monmouth, NJ.
(3) Functions related to soldier systems to Natick Research
and Development Center.
(4) Functions related to automotive materiel management
functions to Detroit Arsenal, MI.
b. Savanna Army Depot, IL. Moved the Ammunition
Center and School to McAlester Army Depot. Began moving
ammunition stocks.
c. Seneca Army Depot Activity, NY. Continued
relocating ammunition stocks. Began moving Industrial Plant
Equipment to Hawthorne Army Ammunition Plant.
Exhibit BC-01
9
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
d. Red River Army Depot, TX. Completed
relocation of workload to Anniston Army Depot. Began
consolidating remaining workload into retained footprint.
e. Sierra Army Depot, CA. Continued moving
ammunition stocks to Base X sites.
f. Fort Ritchie, MD. Relocated remaining
personnel and closed the installation.
g. Stratford Army Engine Plant, CT. Ceased
production and operations, and closed the facility.
h. Fort Missoula, MT. Inactivated active
component garrison and transferred to Reserve components (USAR
and NG).
i. Detroit Tank Plant, MI. Ceased operations
and completed closure.
j. Oakland and Bayonne MOT. Began moving
personnel from Oakland and Bayonne to temporary facilities and
established MTMC’s CONUS Command at Ft Eustis, VA. The Navy
delayed move of the Military Sealift Command (Atlantic) to
Norfolk, VA.
B. APPROPRIATION REQUEST. $392.8 million.
C. MISSION IMPACTS. Planned actions had no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS: Ft. Detrick
Health/Dental Clinic (BRAC $0.65 million).
Exhibit BC-01
10
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
IV. Fiscal Year 1999:
A. MAJOR EVENTS SCHEDULE.
The Army closed 25 of the 29 scheduled BRAC 95 closure
actions through FY99.
1. Construction.
a. Fitzsimons Army Medical Center, CO.
(1) Continued construction projects at Fort
Lewis, Sheppard AFB, and Walter Reed.
(2) Completed sewer plant divestiture
construction at Fitzsimons Army Medical Center.
(3) Completed renovating the headquarters
and administrative facilities for the Lead Agent and Readiness
Group, Denver at Fort Carson.
b. Fort Greely, AK.
(1) Began $1.8 million Bolio Lake Munitions
Storage Facility construction.
(2) Began constructing $2.0 million Fort
Wainwright Family Housing project.
(3) Completed Fort Wainwright Missile Test
Facility construction.
c. Concept Analysis Agency. Completed
administrative facility at Fort Belvoir, VA.
d. Fort McClellan, AL.
(1) Began constructing $2.6 million Women’s
Army Corps (WAC) Museum at Ft. Lee, VA.
Exhibit BC-01
11
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
(2) Began $3.2 million Dining Facility
expansion project at Ft. Leonard Wood.
e. Fort Holabird, MD. Began constructing $10.9
million Defense Investigative Service (DIS) [now the Defense
Security Service (DSS)] administrative facility at Ft. Meade,
MD.
f. Fort Ritchie, MD. Began constructing a
conjunctively funded Physical Fitness Center at Ft. Detrick,
MD. BRAC funds $3.0 million of the project.
g. Fort Pickett, VA. Began constructing a $3.1
million addition to USAR facility.
h. Fort Totten, NY. Began constructing $2.2
million storage facility for the retained reserve enclave.
i. Savanna Army Depot, IL. Began constructing
$1.8 million surveillance test facility at Crane Army
Ammunition Plant.
j. Letterkenny Army Depot, PA. Constructed $1.1
million fencing project for Reserve enclave.
2. Moves.
a. Fort McClellan, AL. Closed Ft. McClellan by
moving:
(1) Military Police and Chemical Schools to
Fort Leonard Wood, MO.
(2) 142nd Ordnance Detachment (EOD) to
Anniston Army Depot, MO.
(3) Department of Defense Polygraph
Institute to Fort Jackson, SC.
Exhibit BC-01
12
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
b. Savanna Army Depot, IL. Finished moving
ammunition stocks.
c. Seneca Army Depot Activity, NY. Finished
moving ammunition stocks and industrial Plant Equipment.
d. Sierra Army Depot, CA. Continued relocating
ammunition stocks. Realigned Depot operations to the final
footprint.
e. Fitzsimons AMC, CO. Closed the Medical Center
and moved:
(1) CHPPM-West to Fort Lewis, WA.
(2) BMET School to Sheppard AFB, TX.
(3) RG/Lead Agent to Fort Carson, CO.
f. Oakland Army Base, CA. Moved 5th Readiness
Group to Travis AFB.
g. Concept Analysis Agency. Moved from leased
space in Bethesda, MD to Fort Belvoir, VA.
B. APPROPRIATION REQUEST. $485.9 million.
C. MISSION IMPACTS. Planned actions had no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS. Ft. Detrick Fitness
Center (BRAC $3.1 million) and Ft. Detrick Health Clinic (BRAC
$650 thousand).
Exhibit BC-01
13
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
V. Fiscal Year 2000:
A. MAJOR EVENTS SCHEDULE.
1. Construction.
a. East Fort Baker, CA. Finish projects at Camp
Parks, CA and Nellis AFB.
b. Ft. McClellan, AL.
(1) Complete design and award contract to
realign the Fort McClellan utility system to accommodate the
reserve enclave.
(2) Awarded the Alabama Army National Guard
Enclave project ($12.9 million).
(3) Begin construction of a $2.3 million
ammunition supply point facility on the reserve enclave.
c. Letterkenny Army Depot, PA. Awarded $6.7
million facilities renovation project at Tobyhanna Army Depot,
PA to support movement of the Missile Guidance System workload.
d. Fitzsimons AMC, CO. Began constructing $3.6
million Army Reserve Center in the reserve enclave.
e. Chicago O’Hare. Began construction of a
$15.7 million facility for the Army Reserve.
2. Moves.
a. Savanna Army Depot, IL. Ceased mission and
initiated closure.
b. Seneca Army Depot Activity, NY. Ceased
mission and initiated closure.
c. Information Systems Software Center.
Software Development Center-Washington and Executive Systems
Software Directorate moved into renovated space at Fort Meade,
MD.
Exhibit BC-01
14
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
d. East Fort Baker, CA. Moved HQ, 91st Division
(Training) to Camp Parks, CA and HQ, 6th Recruiting Brigade to
Nellis AFB.
e. Fort Greely, AK. Realigned 50 percent of the
military/civilian mission spaces of Northern Warfare Training
Center (NWTC) & Cold Regions Test Activity (CRTA) to Fort
Wainwright, AK.
f. Sierra Army Depot, CA. Finished moving
ammunition stocks.
g. Red River Army Depot, TX. Finished
consolidating workload into retained footprint. Complete
realignment actions.
h. Letterkenny Army Depot, PA. Began relocating
tactical missile guidance workload to Tobyhanna Army Depot.
i. Bayonne Military Ocean Terminal, NJ. Moved
the Navy Fashion Distribution Center to Pensacola Naval Air
Station.
B. APPROPRIATION REQUEST. $150.7 million.
C. MISSION IMPACTS. Planned actions will have no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS. None.
Exhibit BC-01
15
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
VI. Fiscal Year 2001: All Army BRAC closure and realignment
actions were completed prior to July 13, 2001.
A. MAJOR EVENTS SCHEDULE.
1. Construction. None.
2. Moves.
a. Fort Greely, AK. Finish moving Cold Regions
Test Center (CRTC) and Northern Warfare Training Center (NWTC)
to Fort Wainwright, AK.
b. Defense Security Service. Move into new Fort
Meade, MD facility.
c. Letterkenny Army Depot Activity, PA. Finish
moving tactical missile guidance system workload to Tobyhanna
Army Depot.
B. APPROPRIATION REQUEST. $288.2 million.
C. MISSION IMPACTS. Planned actions will have no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS. None.
VII. Fiscal Years 2002 and 2003:
A. MAJOR EVENTS SCHEDULE. All Army BRAC closure and
realignment actions are complete. The Army began funding all
caretaking functions from the BRAC account on 14 July 2001 at
all remaining BRAC properties. Caretaking will maintain real
property assets at levels to protect against degradation during
transition.
Exhibit BC-01
16
BASE REALIGNMENT AND CLOSURE
ARMY OVERVIEW
(Continued)
The majority of the budget request in fiscal years 2002 and
2003 is for environmental restoration. Having completed a
significant portion of the work through FY 2001 the BRAC
budgets begin to decline in FY 2002 and beyond.
B. APPROPRIATION REQUEST. FY02: $164.7 million
FY03: $149.9 million
C. MISSION IMPACTS. Planned actions will have no adverse
impact on the missions of affected organizations.
D. CONJUNCTIVELY FUNDED PROJECTS. None.
Exhibit BC-01
17
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY ROLLUP
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 85,960 255,856 96,994 30,650 41,174 0 0 0 510,634
Family Housing 0 560 400 2,280 0 0 0 0 3,240
Construction 0 553 0 2,022 0 0 0 0 2,575
Operations 0 7 400 258 0 0 0 0 665
Environment 53,172 59,402 188,839 308,749 104,648 255,362 143,220 146,156 1,259,548
Operation and Maintenance 85,407 117,099 113,980 156,548 25,466 26,442 21,129 18,557 564,628
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 6,097 6,077 9,164 3,772 0 0 0 0 25,110
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 230,636 438,994 409,377 501,999 171,288 281,804 164,349 164,713 2,363,160
Homeowners Assistance Program 0 0 0 0 771 6,373 351 0 7,495
Financing Entry (14,835)
Revenue From Land Sales 0 0 (17,978) (26,460) (24,442) (1,897) 0 0 (70,777)
Appropriation Request 230,636 438,994 391,399 475,539 147,617 286,280 164,700 149,878 2,299,878
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 17,413 16,343 21,397 2,690 2,163 2,092 0 0 62,098
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 17,413 16,343 21,397 2,690 2,163 2,092 0 0 62,098
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 230 2,716 4,184 6,943 7,666 21,739
Construction 0 0 0 0 0 0 0
Operations 0 230 2,716 4,184 6,943 7,666 21,739
Operation and Maintenance 19,910 28,297 135,646 194,694 273,658 304,947 957,152
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 62 2,434 4,431 4,919 5,269 6,330 0
Military ES 0 2 5 5 5 5 0
TOTAL SAVINGS 19,910 28,527 138,362 198,878 280,601 312,613 978,891
NET IMPLEMENTATION COSTS:
Military Construction 85,960 255,856 96,994 30,650 41,174 0 0 0 510,634
Family Housing 0 330 (2,316) (1,904) (6,943) (7,666) 0 0 (18,499)
Construction 0 553 0 2,022 0 0 0 0 2,575
Operations 0 (223) (2,316) (3,926) (6,943) (7,666) 0 0 (21,074)
Environment 53,172 59,402 188,839 308,749 104,648 255,362 143,220 146,156 1,259,548
Operation and Maintenance 82,910 105,145 (269) (35,456) (246,029) (276,413) 21,129 18,557 (330,426)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 6,097 6,077 9,164 3,772 0 0 0 0 25,110
Homeowners Assistance Program 0 0 0 0 771 6,373 351 0 7,495
Revenue From Land Sales (-) 0 0 (17,978) (26,460) (24,442) (1,897) 0 0 (70,777)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 228,139 426,811 274,434 279,351 (130,821) (24,241) 164,700 164,713 1,383,085
* $15,452 Funded in FY95 18 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/ATCOM
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 39,346 2,687 0 0 0 0 0 0 42,033
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 23,636 60,063 6,500 450 0 0 0 0 90,649
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 3,197 1,796 276 0 0 0 0 0 5,269
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 66,179 64,546 6,776 450 0 0 0 0 137,951
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 66,179 64,546 6,776 450 0 0 0 0 137,951
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 2,995 0 0 0 0 0 2,995
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 2,995 0 0 0 0 0 2,995
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 4,266 35,481 43,522 43,522 43,522 170,313
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 153 786 786 786 786 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 4,266 35,481 43,522 43,522 43,522 170,313
NET IMPLEMENTATION COSTS:
Military Construction 39,346 2,687 0 0 0 0 0 0 42,033
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 23,636 55,797 (25,986) (43,072) (43,522) (43,522) 0 0 (76,669)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 3,197 1,796 276 0 0 0 0 0 5,269
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 66,179 60,280 (25,710) (43,072) (43,522) (43,522) 0 0 (29,367)
* $210 Funded in FY95 19 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Missouri/Aviation-Troop Command.
Closure Package: Disestablish Aviation-Troop Command (ATCOM), and
close by relocating its missions/functions as follows:
- Relocate Aviation Research, Development & Engineering Center,
Aviation Management, and Aviation Program Executive Offices to
Redstone Arsenal, Huntsville, AL.
- Relocate functions related to soldier systems to Natick
Research, Development, Engineering Center, MA, to align with the
Soldier Systems Command.
- Relocate functions related to materiel management of
communications-electronics to Fort Monmouth, NJ, to align with
Communications-Electronics Command.
- Relocate automotive materiel management functions to Detroit
Arsenal, MI, to align with Tank-Automotive and Armaments Command.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN $ in 000)
Redstone/Admin Modernization 96 46141 8,500
Redstone/Sparkman Bldg Add’n 96 46310 30,846
Subtotal for FY 96 39,346
Ft Monmouth/Gen Purpose Admin 97 45981 2,687
Subtotal for FY 97 2,687
TOTAL PROGRAM FOR FY 1996 - 2003 42,033
Conjunctively-Funded Construction: None.
Family Housing Construction: None
20 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay,
civilian PCS, transportation of things, real property maintenance,
and equipment purchases required to realign this activity to four
new locations.
Military Personnel: None.
Other: Communication, automation, and high speed printers
required to support functions moving to new locations.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings result from elimination of
786 civilian positions and the BASOPS and real property maintenance
savings resulting from the consolidation and elimination of the St.
Louis lease cost.
Military Personnel: None.
Other: None.
Environmental:
The Army has conducted the following environmental actions prior to
construction and movement actions.
a. NEPA:
An Environmental Assessment was conducted at Redstone Arsenal,
AL, to assess the cumulative impacts of the relocation.
An Environmental Assessment was conducted at Fort Monmouth, NJ,
21 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
to assess cumulative impact of the action.
A Record of Environmental Consideration was prepared at Detroit
Arsenal, MI, for this realignment action.
A Record of Environmental consideration was prepared at Natick
Research, Development, Engineering Center, MA for this realignment
action.
b. Cleanup:
ATCOM: An Environmental Baseline study (EBS) was not required
at the GSA facility that ATCOM vacated.
c. Cultural/Natural Resources. No action required at the GSA
facility.
22 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/BALTIMORE PUBLICATIONS
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 463 2,154 0 0 0 0 0 0 2,617
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 2,350 0 0 0 0 0 0 0 2,350
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 2,813 2,154 0 0 0 0 0 0 4,967
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 2,813 2,154 0 0 0 0 0 0 4,967
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 (798) (5,829) 0 0 0 (6,627)
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 83 83 83 83 83 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 (798) (5,829) 0 0 0 (6,627)
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 463 2,952 5,829 0 0 0 0 0 9,244
Military Personnel 0 0 0 0 0 0 0 0 0
Other 2,350 0 0 0 0 0 0 0 2,350
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 2,813 2,952 5,829 0 0 0 0 0 11,594
23 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Maryland/U.S. Army Publications
Distribution Center.
Closure Package: Close by relocating the U.S. Army Publications
Distribution Center, Baltimore, Maryland, to the U.S. Army
Publications Center St. Louis, Missouri.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS, civilian
severance pay, transportation of things, publications and related
stock transfer.
Military Personnel: None.
Other: Carousel system, Loading dock addition and edge
bumpers; and push-back rack system.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Additional operating costs were
incurred in the closure resulting in a negative savings. These
Exhibit BC-03
24
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
costs were due to extending the lease at the Baltimore
Publications Center, and consolidation of stock at St. Louis.
Military Personnel: None.
Other: None.
Environmental: This was a relocation from one GSA-leased
location to another GSA-leased location.
NEPA: A Record of Environmental Consideration (REC) for this
consolidation action has been completed.
25 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/BAYONNE
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 9,700 0 0 0 0 0 9,700
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,504 1,873 401 1,336 1,760 11,534 140 140 18,688
Operation and Maintenance 17 1,200 8,080 10,024 2,122 657 0 0 22,100
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 1,217 0 0 0 0 1,217
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 1,521 3,073 18,181 12,577 3,882 12,191 140 140 51,705
Revenue From Land Sales 0 0 (193) (85) 0 0 0 0 (278)
Appropriation Request 1,521 3,073 17,988 12,492 3,882 12,191 140 140 51,427
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 1,021 1,021 1,021 3,063
Construction 0 0 0 0 0 0 0
Operations 0 0 0 1,021 1,021 1,021 3,063
Operation and Maintenance 13,798 6,849 12,577 16,806 16,806 16,806 83,642
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 175 175 175 175 175 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 13,798 6,849 12,577 17,827 17,827 17,827 86,705
NET IMPLEMENTATION COSTS:
Military Construction 0 0 9,700 0 0 0 0 0 9,700
Family Housing 0 0 0 (1,021) (1,021) (1,021) 0 0 (3,063)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 (1,021) (1,021) (1,021) 0 0 (3,063)
Environment 1,504 1,873 401 1,336 1,760 11,534 140 140 18,688
Operation and Maintenance (13,781) (5,649) (4,497) (6,782) (14,684) (16,149) 0 0 (61,542)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 1,217 0 0 0 0 1,217
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 (193) (85) 0 0 0 0 (278)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS (12,277) (3,776) 5,411 (5,335) (13,945) (5,636) 140 140 (35,278)
26
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/New Jersey/Bayonne Military Ocean
Terminal.
Closure Package: Close Bayonne Military Ocean Terminal.
Relocate the Military Traffic Management Command (MTMC)
Eastern Area Command headquarters to form a new Deployment
Support Command at Fort Eustis, VA. Relocate the traffic
management portion of the 1301st Major Port Command (now
called the 842nd US Army Transportation Battalion) to Fort
Monmouth, NJ. Relocate the Navy Military Sealift Command,
Atlantic to Camp Pendleton, Norfolk, VA. Navy Resale and
Fashion Distribution Center relocate to Norfolk, VA.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft Eustis/MTMC Headquarters 98 49183
*9,700
Subtotal for FY 98 9,700
Renovate Bldgs for MSCLANT 99 P-001**
1,450
Navy Fashion Distribution Center 99 P-002**
1,797
Subtotal for FY 99 3,247
TOTAL PROGRAM FOR FY 1996 - 2003 12,947
* The Army is consolidating Bayonne and Oakland MTMC
activities to a single facility, and will form a new
Deployment Support Command at Fort Eustis, VA. Funds for this
facility were reprogrammed from FY99 to FY98. This project
accommodates this consolidation.
** Navy project numbers. The Army will fund these projects
and the Navy will execute the construction. This TOA was
transferred to the Navy BRAC account.
Exhibit BC-03
27
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS,
civilian severance pay and transportation of things.
Military Personnel: None.
Other: Investment in IMA support equipment that was not
transferable to the gaining location.
Revenues from Land Sales: Revenues resulting from lease
agreements.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: Savings are achieved with the
elimination of 121 housing units.
Operation and Maintenance: Savings result from reduced base
operations and real property maintenance costs associated with
the closure of the two existing locations, along with the
elimination of the associated civilian personnel. A one time
cost avoidance of $13 million is achieved with the closure of
Bayonne. These savings result from the cancellation of a
dredging project at MOTBY.
Caretaker. Caretaker operations are being accomplished
through a Cooperative Agreement with the City of Bayonne. The
Base Year Agreement ended on September 30, 2000. The Army
executed an Option Year #1 Agreement with the City which
terminated on September 28, 2001 with signature of transfer
deed and lease.
Military Personnel: None.
28 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Other: None.
Environmental:
a. NEPA: An Environmental Impact Statement (EIS) was
completed for property disposal actions at Bayonne. The 30-
day comment period ended on 24 January 2000 for the Final EIS.
A Record of Decision was signed on May 22, 2000 and it was
published in the Federal Register on December 5, 2000. Fort
Eustis was selected as the relocation site and an
Environmental Assessment (EA) was completed with a Finding of
No Significant Impact. The EA results were advertised in the
Federal Register and the 30-day period for comment ended on 15
September 1997.
b. Cultural/Natural Resources: Appropriate studies and
consultation were conducted at the disposal location.
c. Cleanup. An Environmental Baseline Survey was
conducted in January 1997 to determine initial site
characterization. Appropriate studies and remedial actions
are ongoing. The Army was able to transfer About 460 +/- acres
upon determination they were clean and suitable to transfer.
About 190 +\- acres will be transferred using the Early
Transfer authority. The Army and the local redevelopment
authority (LRA) signed an agreement in September 2001 to allow
the LRA to perform required environmental restoration
activities for the Army in conjunction with their
redevelopment planning.
29 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
BELLMORE LOGISTICS SUPPORT ACTIVITY
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 538 521 301 0 13 1 0 0 1,374
Operation and Maintenance 14 0 0 0 0 0 0 0 14
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 552 521 301 0 13 1 0 0 1,388
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 552 521 301 0 13 1 0 0 1,388
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 538 521 301 0 13 1 0 0 1,374
Operation and Maintenance 14 0 0 0 0 0 0 0 14
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 552 521 301 0 13 1 0 0 1,388
30
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/New York/Bellmore Logistics
Activity.
Closure Package: Closure of Bellmore Logistics Activity.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Exhibit BC-03
31
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Environmental:
A Finding of No Significant Impact was signed in July
1998 for the disposal and reuse of Bellmore Logistics
Activity.
Environmental Restoration activities were completed
during FY00.
FOST under review; will be completed in FY02.
32 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/CONCEPT ANALYSIS AGENCY
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 185 7,251 0 0 0 0 0 0 7,436
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 250 642 0 0 0 0 892
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 363 0 0 0 0 0 363
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 185 7,251 613 642 0 0 0 0 8,691
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 185 7,251 613 642 0 0 0 0 8,691
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 39 0 0 0 0 0 0 0 39
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 39 0 0 0 0 0 0 0 39
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 491 506 520 1,517
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 491 506 520 1,517
NET IMPLEMENTATION COSTS:
Military Construction 185 7,251 0 0 0 0 0 0 7,436
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 39 0 250 151 (506) (520) 0 0 (586)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 363 0 0 0 0 0 363
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 224 7,251 613 151 (506) (520) 0 0 7,213
* $39 Funded in FY95 33 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Maryland/Concept Analysis Agency.
Closure Package: Close by relocating Concepts Analysis Agency
from Bethesda, Maryland, to Fort Belvoir, VA.
Costs:
Military Construction: Construction of a new 47,600
gross square foot administrative facility began September 1997
and is now complete.
Amount
Location/Project Title Fiscal Year PN ($ in
000)
Ft. Belvoir/Admin Facility 96 45858 185
Subtotal for FY96 185
Ft. Belvoir/Admin Facility 97 45858
7,251
Subtotal for FY97 7,251
TOTAL PROGRAM FOR FY 1996 - 2003 7,436
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS,
transportation of things, and equipment purchases required to
realign this activity to the new location.
Military Personnel: None.
Other: Purchase of equipment that is required in support
of the new construction that is currently available through
the lease.
Exhibit BC-03
34
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Revenues from Land Sales: None.
Savings:
Military Construction:
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Net savings resulting from the
elimination of the CAA lease versus new BASOPS costs at Fort
Belvoir results in the net annual recurring savings.
Military Personnel: None.
Other: None.
Environmental: There are no known environmental impediments
at the closing site or receiving installation. The closing
site is leased property. The Army documented the
environmental condition of the property prior to termination
of the lease. An Environmental Assessment for Fort Belvoir
was completed December 1996.
35 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/DETROIT ARSENAL
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 6,927 0 0 0 0 0 6,927
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,879 2,468 5,161 1,329 25 162 20 20 11,064
Operation and Maintenance 477 610 5,245 384 0 0 0 0 6,716
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 2,356 3,078 17,333 1,713 25 162 20 20 24,707
Revenue From Land Sales 0 0 (3,715) (600) (1,609) 0 0 0 (5,924)
Appropriation Request 2,356 3,078 13,618 1,113 (1,584) 162 20 20 18,783
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 366 321 379 386 393 0 0 1,845
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 366 321 379 386 393 0 0 1,845
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 (754) (91) 1,944 2,345 2,873 6,317
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 (754) (91) 1,944 2,345 2,873 6,317
NET IMPLEMENTATION COSTS:
Military Construction 0 0 6,927 0 0 0 0 0 6,927
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,879 2,468 5,161 1,329 25 162 20 20 11,064
Operation and Maintenance 477 1,730 5,657 (1,181) (1,959) (2,480) 0 0 2,244
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 (3,715) (600) (1,609) 0 0 0 (5,924)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 2,356 4,198 14,030 (452) (3,543) (2,318) 20 20 14,311
36
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Michigan/Detroit Arsenal.
Closure Package: Realign Detroit Arsenal by closing and disposing
of the Detroit Army Tank Plant.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Detroit Arsenal, MI/Storage 98 46300 6,927
Facility
TOTAL PROGRAM FOR FY 1996 - 2003 6,927
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes information management,
civilian PCS, civilian severance pay, relocation costs associated
with realignment of missions and functions and transportation of
things.
Military Personnel: None.
Other: None.
Revenues from Land Sales: The Army received $3,715,000
during FY98,$600,000 in FY 99, and a final payment in FY 00 of
$1,609,500 for the Detroit Tank Plant property. Total payment
received is $5,924,500.
Savings:
Military Construction: None.
37 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Because of the accelerated
transfer, the Army will realize approximately $2,873,000 per year
in savings. Savings are a result of reduced operating costs of
the Detroit Arsenal Tank Plant.
Military Personnel: None.
Other: None.
Environmental:
a. NEPA: A finding of No Significant Impact (FNSI),
stemming from the Army’s Environmental Assessment of
disposal/reuse impacts for this property was signed in Oct 97.
b. Cultural/Natural Resources: Appropriate studies and
consultation have been conducted at the disposal location. A
Programmatic Agreement (PA) was signed by the State Historic
Preservation Officer (SHPO), the Advisory Council on Historic
Preservation, the Army and the City in Dec 97.
c. Cleanup. An Environmental Baseline Survey (EBS) was
completed in April 97. The EBS identified 33 CERFA category
seven sites as sites needing further investigation and/or
remediation. Remedial investigation has been completed,
identifying concentration levels as well as contaminants present.
Remedial action, limited to intended land use, has been completed
in some areas and continues in others. Affected media are soil
and groundwater.
38 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FITZSIMONS
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 14,668 10,018 0 3,563 0 0 0 28,249
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 3,176 2,564 6,110 4,031 350 6,045 100 100 22,476
Operation and Maintenance 7,359 4,092 5,913 3,412 1,035 1,364 250 75 23,500
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 1,731 0 0 0 0 0 1,731
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 10,535 21,324 23,772 7,443 4,948 7,409 350 175 75,956
Revenue From Land Sales 0 0 0 (172) 0 0 0 0 (172)
Appropriation Request 10,535 21,324 23,772 7,271 4,948 7,409 350 175 75,784
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 1,342 557 295 340 0 0 0 0 2,534
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 1,342 557 295 340 0 0 0 0 2,534
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 1,773 17,910 21,392 23,850 25,169 26,553 116,647
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 752 910 910 1,087 1,087 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 1,773 17,910 21,392 23,850 25,169 26,553 116,647
NET IMPLEMENTATION COSTS:
Military Construction 0 14,668 10,018 0 3,563 0 0 0 28,249
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 3,176 2,564 6,110 4,031 350 6,045 100 100 22,476
Operation and Maintenance 6,928 (13,261) (15,184) (20,098) (24,134) (25,189) 250 75 (90,613)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 1,731 0 0 0 0 0 1,731
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 (172) 0 0 0 0 (172)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 10,104 3,971 2,675 (16,239) (20,221) (19,144) 350 175 (38,329)
39
* $135 Funded in FY95 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Colorado/Fitzsimons Army Medical
Center.
Closure Package: Close Fitzsimons Army Medical Center (FAMC),
except for Edgar J. McWhethy Army Reserve Center. Relocate other
tenants to other installations.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Sheppard AFB/BMET Facility 97 47407 14,668
Subtotal for FY97 14,668
W Reed/Nurse Trng Fac 98 46342 1,078
Ft Lewis/CHPPM 98 46056 3,811
Ft Carson/Readiness Group 98 46413 3,087
Fitzsimons/Sanitary Sewer 98 46341 2,042
Subtotal for FY98 10,018
Fitzsimons/Reserve Center 00 52132 3,563
Subtotal for FY00 3,563
TOTAL PROGRAM FOR FY 1996 – 2003 28,249
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay,
procurement of equipment (systems and barracks furniture), trans-
portation of things, and communications.
Exhibit BC-03
40
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Caretaker: These funds are for the routine maintenance,
repair, and utilities for the vacated buildings until operational
control is assumed by the University or LRA.
Military Personnel: None.
Other: Includes medical equipment (E&F) to support MILCON
requirements.
Revenues from Land Sales: The Army received $172,000 in FY99
on a Quit claim deed sale of 1.6 acres.
Savings: The Department transferred the net savings resulting from
the Fitzsimons closure ($116.6M) from the ASD(HA) programs to the
Army to offset BRAC implementation costs. This budget decision
also states that funding responsibility for Fitzsimons closure is
the Army’s. The ASD(HA) savings numbers were agreed to and used
to develop this implementation package.
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings result due to facilities
reduction plans as the hospital and installation transitions from
a medical center to a clinic.
Military Personnel: None.
Other: None.
Environmental:
a. NEPA: The Environmental Impact Statement for the
disposal of Fitzsimons was completed in Feb of 98. The Record of
Decision was signed in Mar of 98. Fort Lewis, Walter Reed AMC,
Fort Carson, and Sheppard AFB prepared documents for gaining,
discretionary moves, and associated FAMC BRAC MILCON requirements.
41 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
b. Compliance: Remedial investigations and surveys are
complete. Long term monitoring and operations continue.
c. Historical/Cultural & Natural Resources: Programmatic
Agreement is signed.
d. Cleanup: The Environmental Baseline Survey (EBS) was
completed in June 1996. Remedial Investigations/Feasibility Studies
(RI/FS) and landfill restorations are ongoing through Environmental
Services Cooperative Agreement (ESCA). ESCA signed with City of
Aurora 28 Sep. Remedial actions associated with the Waste Water
Treatment Plant and DOL/DPW areas are scheduled for completion in
FY02. Early Transfer scheduled for August 2002.
42 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT BUCHANAN
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 80 154 84 0 0 0 0 0 318
Operation and Maintenance 10 250 49 0 0 0 0 0 309
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 90 404 133 0 0 0 0 0 627
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 90 404 133 0 0 0 0 0 627
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 4 0 0 0 0 0 0 4
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 4 0 0 0 0 0 0 4
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 80 154 84 0 0 0 0 0 318
Operation and Maintenance 10 254 49 0 0 0 0 0 313
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 90 408 133 0 0 0 0 0 631
43 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Puerto Rico/Fort Buchanan.
Closure Package: Realign Fort Buchanan. Dispose of family
housing. Retain facilities as necessary to fulfill mobilization
missions and requirements, and enclave support functions. Retain
an enclave for the Reserve Components, Army and Air Force
Exchange Service (AAFES) and the Antilles Consolidated School.
NOTE: Fort Buchanan, PR, is no longer a BRAC action and there
will be no more expenditure of BRAC funds for this installation.
The Army will retain the Fort Buchanan housing in support of HQ
USA South as authorized in the FY99 DoD Appropriations Act,
Section 8142.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes requirements for real
property maintenance and historical preservation/cultural
resources.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Exhibit BC-03
44
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Environmental: Environmental activities to include a disposal EIS
have been terminated.
45 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT CHAFFEE
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 3,291 4,277 5,848 9,310 1,853 1,772 599 421 27,371
Operation and Maintenance 2,781 1,333 1,980 126 0 226 300 25 6,771
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 6,072 5,610 7,828 9,436 1,853 1,998 899 446 34,142
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 6,072 5,610 7,828 9,436 1,853 1,998 899 446 34,142
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 1,851 (2,240) (1,708) 1,588 (509)
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 191 191 191 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 1,851 (2,240) (1,708) 1,588 (509)
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 3,291 4,277 5,848 9,310 1,853 1,772 599 421 27,371
Operation and Maintenance 2,781 1,333 129 2,366 1,708 (1,362) 300 25 7,280
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 6,072 5,610 5,977 11,676 3,561 410 899 446 34,651
46 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Arkansas/Fort Chaffee.
Closure Package: Close Fort Chaffee, except minimum essential
buildings, and ranges for Reserve Component (RC) training as
an enclave to permit individual and annual training.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance
pay, civilian PCS, utilities disposal, and transportation of
things.
Caretaker: These funds are for the routine maintenance,
repair, and utilities for the vacated buildings.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: The elimination of active
component garrison and reduced base operations costs under the
reserve component operations will generate the savings in this
package.
Exhibit BC-03
47
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Military Personnel: None.
Other: None.
Environmental:
a. NEPA: The Final EIS for the disposal of Fort Chaffee
was published in Aug. of 99.
b. Cultural/Natural Resources: Appropriate studies and
consultation were conducted at the disposal location.
c. Cleanup. An Environmental Baseline Survey has been
conducted to determine initial site characterization and is
being followed up with appropriate studies and remedial action
as necessary. Total projected cost to complete these studies
and remedial actions is approximately $3.2 million.
Exhibit BC-03
48
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT DIX
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 313 1,167 164 1,484 322 695 360 370 4,875
Operation and Maintenance 141 480 0 286 1,000 75 300 0 2,282
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 454 1,647 164 1,770 1,322 770 660 370 7,157
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 454 1,647 164 1,770 1,322 770 660 370 7,157
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 276 2,809 12,244 12,244 12,244 39,817
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 276 2,809 12,244 12,244 12,244 39,817
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 313 1,167 164 1,484 322 695 360 370 4,875
Operation and Maintenance 141 204 (2,809) (11,958) (11,244) (12,169) 300 0 (37,535)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 454 1,371 (2,645) (10,474) (10,922) (11,474) 660 370 (32,660)
49
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/New Jersey/Fort Dix.
Closure Package: Realign Fort Dix by replacing the Active
Component garrison with an Army Reserve garrison. Retain
minimum essential ranges, facilities, and training areas
required for Reserve Component (RC) training enclave.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance
pay, civilian PCS and transportation of things.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings will be generated in
base operating costs in the conversion from an active
component to a reserve component garrison force.
Military Personnel: None.
Other: None.
50 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Environmental: A Final Environmental Assessment (EA) for
disposal and reuse of surplus property was completed in April
2001. The EA concluded that a Finding of No Significant
Impact (FONSI) was appropriate.
There are no historic or National Register eligible facilities
in the areas to be disposed of. No further cultural or
natural resources requirements are anticipated.
An Environmental Baseline Survey (EBS) Report was completed in
March 1997. A Supplemental EBS for Buildings 5651, 5653, and
5654 was completed in November 2000. A Supplemental EBS for the
Walson Hospital Complex was completed in July 2001. (The
supplemental reports were needed for areas not addressed in March
1997 EBS Report).
Completed environmental restoration actions include: ordnance archive
search and intrusive field investigation; radiological archive search
and close-out surveys; asbestos abatement in the State Prison; PCB
survey; Building 8401 and 5881 Tank Investigations; and 6700 Area
Site Investigation.
The following environmental restoration actions are on-going
and will be completed in 2002 with prior year dollars: (1)
Walson Hospital Complex Site Investigation to investigate areas of
concern identified in the EBS including mercury spill sites, two
former incinerators, possible abandoned USTs in a former building
area, and soil contamination at an electrical substation and at a
former UST site (UST No. 5252-4); (2) Asbestos Survey and Abatement
for the Walson Hospital Complex; (3) PCE and Zinc Investigation
Report for the Air Mobility Warfare Center (AMWC); (4) PCB
Investigation/Remediation at the AMWC and State Prison; (5) and
Parcel 23 Final Investigation Report.
Environmental Condition of Property (ECOP) documents were completed
in 1999 and in 2001 for property transfer to the Air Force, Navy,
Coast Guard, and Federal Bureau of Prisons. Finding of Suitability
to Transfer (FOST) documents will be completed for the State Prison
and Walson Hospital in 2002.
51 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT GREELY
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 1,730 1,844 0 0 0 0 3,574
Family Housing 0 0 0 2,022 0 0 0 0 2,022
Construction 0 0 0 2,022 0 0 0 0 2,022
Operations 0 0 0 0 0 0 0 0 0
Environment 506 3,232 9,489 2,882 314 5,438 420 300 22,581
Operation and Maintenance 431 279 48 1,810 1,557 6,075 2,270 2,215 14,685
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 445 0 0 0 0 445
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 937 3,511 11,267 9,003 1,871 11,513 2,690 2,515 43,307
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 937 3,511 11,267 9,003 1,871 11,513 2,690 2,515 43,307
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 8,018 8,018 17,905 17,905 51,846
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 114 114 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 8,018 8,018 17,905 17,905 51,846
NET IMPLEMENTATION COSTS:
Military Construction 0 0 1,730 1,844 0 0 0 0 3,574
Family Housing 0 0 0 2,022 0 0 0 0 2,022
Construction 0 0 0 2,022 0 0 0 0 2,022
Operations 0 0 0 0 0 0 0 0 0
Environment 506 3,232 9,489 2,882 314 5,438 420 300 22,581
Operation and Maintenance 431 279 (7,970) (6,208) (16,348) (11,830) 2,270 2,215 (37,161)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 445 0 0 0 0 445
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 937 3,511 3,249 985 (16,034) (6,392) 2,690 2,515 (8,539)
52 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Alaska/Fort Greely.
Closure Package: Realign Fort Greely by relocating the Cold
Regions Test Center(CRTC) and Northern Warfare Training Center
(NWTC) to Fort Wainwright, Alaska.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft Wainwright/Missile Storage Test Site 98* 46159 1,730
TOTAL PROGRAM FOR FY 98 1,730
Ft Greely/Munitions Storage 99 47461 1,844
TOTAL PROGRAM FOR FY 99 1,844
TOTAL PROGRAM FOR FY 1996 - 2003 3,574
*Construction funded in FY98. Actual construction delayed to
FY99 due to contractor delays and compressed construction
season.
Conjunctively-Funded Construction: None.
Family Housing Construction:
Location/Project Title Fiscal Year PN ($ in 000)
Ft Wainwright Family Housing 99 47530 2,022
Family Housing Operations: None.
Operation and Maintenance: Provides for civilian PCS,
civilian severance, transportation of equipment from Fort
Greely, AK to Fort Wainwright, AK. Provides for minor
53 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
construction and renovation of multiple facilities at Forts
Wainwright and Greely as well as changes in electrical utilities
tie-ins. Also includes mothball costs for vacant facilities and
housing with an anticipated but unexecuted reuse. Uncertainties
surrounding the deployment decision for the National Missile
Defense Ground Based-Interceptor System (GBIS) may affect the
timeframe that the surplus facilities are placed in caretaker
status. During this period the Army has programmed caretaker
funds to protect the vacated facilities from the extreme arctic
environment.
Military Personnel: None.
Other: Communication and information management equipment.
Revenues from Land Sales: None.
Savings: Savings are achieved due to decreased costs in
operations and maintenance of the installation as excess
facilities are mothballed.
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Installation facilities
reduction results in savings beginning in FY98.
Military Personnel: None.
Other: None.
Environmental:
a. NEPA: An Environmental Assessment (EA) for disposal/
reuse at Fort Greely was finalized Aug 99. EAs at the gaining
installation (Fort Wainwright (FWA-BRAC8)) and a MILCON project
at Bolio Lake Test Site are also complete.
b. Compliance: Lead Based Paint (LBP) surveys for Family
Housing were completed in 1997, and a Radon survey was done on
all habitable buildings on Ft Greely many years ago. Radon
54 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
mitigation was done on all Family Housing units that required
it. No Asbestos survey is scheduled.
c. Historical/Cultural & Natural Resources Compliance: The
state historic preservation office (SHPO) concurs that BRAC
actions at Ft Greely and Ft Wainwright will have no adverse
effect. The SHPO has determined that a central complex of 26
buildings at Ft Greely creates a historic district that
represents the Cold War Era and is eligible for the National
Register. All recordation requirements are complete and have
been accepted by the Alaska SHPO.
d. Cleanup: An Environmental Baseline Survey (EBS) was
completed in FY 97. Initial investigation of more than 30
parcels specified in the EBS was completed in FY98 and the
Army’s remedy-in-place/response was completed on Sep 01.
Contaminated soil associated with the nuclear wastewater
pipeline from the decommissioned SM-1A reactor is being
transported to the Northwest Compact facility in the State of
Washington. Disposal was completed in 1st Quarter FY02.
55 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT HOLABIRD
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 10,853 0 0 0 0 10,853
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 152 95 0 0 0 35 0 0 282
Operation and Maintenance 50 0 225 0 2,548 530 0 0 3,353
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 202 95 225 10,853 2,548 565 0 0 14,488
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 202 95 225 10,853 2,548 565 0 0 14,488
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 140 0 0 0 0 0 0 0 140
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 140 0 0 0 0 0 0 0 140
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 170 170 170 170 680
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 170 170 170 170 680
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 10,853 0 0 0 0 10,853
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 152 95 0 0 0 35 0 0 282
Operation and Maintenance 190 0 55 (170) 2,378 360 0 0 2,813
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 342 95 55 10,683 2,378 395 0 0 13,948
56 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Maryland/Fort Holabird.
Closure Package: There were two recommendations affecting Fort
Holabird. These are:
Army: Close Fort Holabird. Relocate the Defense
Investigative Service (DIS), Investigations Control and
Automation Directorate (IC&AD)Fort Meade, Maryland.
Defense Agency: DIS and IC&AD. Relocate the DIS and IC&AD
from Fort Holabird, Maryland to a new facility to be built on
Fort Meade, Maryland. This proposal is a revision to the 1988
Base Closure Commission’s recommendation to retain the Defense
Investigative Service at Fort Holabird. Once DIS vacates the
building on Fort Holabird, the base will be vacant.
Costs:
Military Construction: Construction of a new administrative
facility for DIS/IC&AD, using MCDA funds.
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft. Meade/Admin Facility 99 46307 10,853
TOTAL PROGRAM FOR FY 1996 - 2003 10,853
Conjunctively-Funded Construction: The Defense Investigative
Service (DIS), Investigations Control and Automation
Directorate (IC&AD) funded a move to a temporary location at
BWI airport in July 1996.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes mothball costs
associated with the closure of Fort Holabird.
Exhibit BC-03
57
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Closure of Fort Holabird
results in a recurring savings of $170K per year.
Military Personnel: None.
Other: None.
Environmental: An Environmental Assessment (EA) with Finding
of no Significant Impact was completed in March 1997 for the
disposal and reuse of Fort Holabird DIS and disposal of
Cummins Apartments. There are no known environmental
impediments at the realigning or receiving installations. An
Environmental Assessment (EA) with a Finding of No Significant
Impact was completed in May 1998 for the gaining installation,
Fort Meade, Maryland; it included the movement of DIS to Fort
Meade. Minor environmental remediation was performed and a
FOST was completed in FY01.
Exhibit BC-03
58
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/HUNTER-LIGGETT
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 59 176 0 0 0 0 235
Operation and Maintenance 0 79 0 0 0 112 0 0 191
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 0 79 59 176 0 112 0 0 426
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 0 79 59 176 0 112 0 0 426
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 60 0 1 0 0 0 0 0 61
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 60 0 1 0 0 0 0 0 61
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 359 359
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 359 359
Operation and Maintenance 0 0 0 63 63 1,684 1,810
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 6 6 6 6 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 63 63 2,043 2,169
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 (359) 0 0 (359)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 (359) 0 0 (359)
Environment 0 0 59 176 0 0 0 0 235
Operation and Maintenance 60 79 1 (63) (63) (1,572) 0 0 (1,558)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 60 79 60 113 (63) (1,931) 0 0 (1,682)
59 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/California/Fort Hunter Liggett.
Closure Package: Realign Fort Hunter Liggett (FHL) by relocating
the U.S. Army Test and Experimentation Center (TEC) missions and
functions to Fort Bliss, Texas. Eliminate the active component
mission. Retain minimum essential facilities and training area
as an enclave to support the Reserve Components (RC).
Note: The U.S. Army Test and Environmental Center inactivated as
a downsizing action. This force structure reduction occurred in
place at Fort Hunter Liggett with no movement of personnel or
equipment to Fort Bliss.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes facility mothball costs
and related activities required to transfer the enclave parcel to
the reserve components and to bring the installation down to a
caretaker status.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Exhibit BC-03
60
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: Savings resulted from the
closure of 86 housing units at Ft. Hunter-Liggett. Savings
include civilian pay and base operations support.
Family Housing Construction: None.
Operation and Maintenance: Base operations reductions.
Military Personnel: None.
Other: None.
Environmental:
The Army has completed a reuse and disposal Environmental
Assessment for Fort Hunter Liggett. The Army has completed
environmental studies required to support property transfer.
Furthermore, the asbestos abatement on the property scheduled for
disposal and reuse has been completed.
61 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT INDIANTOWN GAP
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 1,326 0 0 0 0 1,326
Operation and Maintenance 297 1,545 2,879 0 37 0 0 0 4,758
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 297 1,545 2,879 1,326 37 0 0 0 6,084
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 297 1,545 2,879 1,326 37 0 0 0 6,084
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 114 116 119 349
Construction 0 0 0 0 0 0 0
Operations 0 0 0 114 116 119 349
Operation and Maintenance 0 0 0 13,372 13,665 13,980 41,017
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 300 300 300 300 300 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 13,486 13,781 14,099 41,366
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 (114) (116) (119) 0 0 (349)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 (114) (116) (119) 0 0 (349)
Environment 0 0 0 1,326 0 0 0 0 1,326
Operation and Maintenance 297 1,545 2,879 (13,372) (13,628) (13,980) 0 0 (36,259)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 297 1,545 2,879 (12,160) (13,744) (14,099) 0 0 (35,282)
62 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Pennsylvania/Fort Indiantown Gap.
Closure Package: Close Fort Indiantown Gap, except minimum
essential ranges, facilities, and training areas as a Reserve
Component training enclave to permit the conduct of individual and
annual training. Fort Indiantown Gap closed in September 1998 and
is now known as the Fort Indiantown Gap Training Center under the
control of the Pennsylvania National Guard.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS, civilian
severance pay, transportation of things, and real property
maintenance required to close facilities and facilitate
realignment.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: Base support cost reductions due
to a decrease in the number of housing units.
Operation and Maintenance: Base operations cost reductions as
a result of the modification of the lease with the State of
Pennsylvania.
Exhibit BC-03
63
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Military Personnel: None.
Other: None.
Environmental:
The Army has conducted an Environmental Baseline Survey at Fort
Indiantown Gap. The Army funded a preliminary analysis and site
investigation through the National Guard Bureau in FY99.
64 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT LEE, VA-KENNER
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 642 0 0 0 0 0 0 0 642
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 642 0 0 0 0 0 0 0 642
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 642 0 0 0 0 0 0 0 642
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 518 6 0 0 0 0 0 0 524
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 518 6 0 0 0 0 0 0 524
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 3,702 3,702 3,702 3,702 14,808
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 72 72 72 72 72 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 3,702 3,702 3,702 3,702 14,808
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 1,160 6 (3,702) (3,702) (3,702) (3,702) 0 0 (13,642)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 1,160 6 (3,702) (3,702) (3,702) (3,702) 0 0 (13,642)
65 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Virginia/Fort Lee.
Closure Package: Realign Fort Lee, by reducing Kenner Army
Community Hospital to a clinic. Eliminate inpatient services.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Funds civilian PCS, civilian
severance, transportation of things, and other costs related to
the elimination of inpatient services.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings: Net savings are attributable to the Defense Health
Program.
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings are achieved with
civilian eliminations and reduced base operating costs.
Military Personnel: None.
Other: None.
Exhibit BC-03
66
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Environmental: There are no known environmental impediments at
the realigning installation.
a. NEPA: There are no known NEPA requirements associated
with this realignment action.
b. Historical/Cultural & Natural Resources Compliance:
There are no known historical, cultural and natural resource
investigations associated with this realignment.
c. Cleanup: There are no known cleanup actions associated
with this realignment.
67 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/MCCLELLAN
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 197,654 30,916 5,755 15,196 0 0 0 249,521
Family Housing 0 553 0 0 0 0 0 0 553
Construction 0 553 0 0 0 0 0 0 553
Operations 0 0 0 0 0 0 0 0 0
Environment 3,426 3,025 12,879 38,748 18,936 15,343 13,855 16,112 122,324
Operation and Maintenance 1,051 691 16,037 34,991 1,000 0 4,400 3,500 61,670
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 2,169 1,151 0 0 0 0 3,320
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 4,477 201,923 62,001 80,645 35,132 15,343 18,255 19,612 437,388
Revenue From Land Sales 0 0 0 0 (460) (39) 0 0 (499)
Appropriation Request 4,477 201,923 62,001 80,645 34,672 15,304 18,255 19,612 436,889
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 2,488 2,546 5,034
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 2,488 2,546 5,034
Operation and Maintenance 0 0 0 0 22,107 28,947 51,054
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 316 316 316 316 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 24,595 31,493 56,088
NET IMPLEMENTATION COSTS:
Military Construction 0 197,654 30,916 5,755 15,196 0 0 0 249,521
Family Housing 0 553 0 0 (2,488) (2,546) 0 0 (4,481)
Construction 0 553 0 0 0 0 0 0 553
Operations 0 0 0 0 (2,488) (2,546) 0 0 (5,034)
Environment 3,426 3,025 12,879 38,748 18,936 15,343 13,855 16,112 122,324
Operation and Maintenance 1,051 691 16,037 34,991 (21,107) (28,947) 4,400 3,500 10,616
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 2,169 1,151 0 0 0 0 3,320
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 (460) (39) 0 0 (499)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 4,477 201,923 62,001 80,645 10,077 (16,189) 18,255 19,612 380,801
68 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/ Missouri, South Carolina/ Fort
McClellan, Alabama.
Closure Package: Close Fort McClellan, except minimum essential
land and facilities for a Reserve Component enclave and minimum
essential facilities, as necessary, to provide auxiliary support
to the chemical demilitarization operation at Anniston Army
Depot, Alabama. Relocate the U.S. Army Chemical and Military
Police Schools to Fort Leonard Wood, Missouri upon receipt of
the required permits. Relocate the Defense Polygraph Institute
(DODPI) to Fort Jackson, South Carolina. License Pelham Range
and current Guard facilities to the Alabama Army National Guard.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Anniston/EOD Ops Facility 97 34665 1,292
Ft Leonard Wood/Chem Def Trng Fac 97 45893 29,210
Ft Leonard Wood/Gen Instr Fac 97 46090 64,193
Ft Leonard Wood/Applied Instr Fac 97 46091 32,391
Ft Leonard Wood/UEPH 97 46092 64,356
Ft Jackson/DOD Polygraph InstFac 97 45839 6,212
Subtotal for FY 97 197,654
Ft Leonard Wood/MP & Chem Ranges 98 46094 22,500
Ft Leonard Wood/MOUT Facility 98 45892 5,426
Ft Leonard Wood/Gen Instr Fac 98 46090 490
Ft Leonard Wood/Applied Instr Fac 98 46091 2,000
Ft Leonard Wood/UEPH 98 46092 500
Subtotal for FY 98 30,916
Ft Lee/WAC Museum 99 50091 2,600
Ft Leonard Wood/Expanded Din Fac 99 49382 3,155
Subtotal for FY 99 5,755
Exhibit BC-03
69
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Ft McClellan/AL ARNG Enclave 00 52160 12,876
Ft McClellan/Ammo Transfer Point 00 52161 2,320
Subtotal for FY 00 15,196
TOTAL PROGRAM FOR FY 1996 – 2003 249,521
Conjunctively-Funded Construction: None.
Family Housing Construction: Funds the construction of two
sets of General Officer quarters.
Location/Project Title Fiscal Year PN ($ in 000)
Ft Leonard Wood/Gen Off Qtrs 97 38174 553
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay,
civilian PCS, transportation of equipment, real property
maintenance and purchase of equipment.
Caretaker: These funds are for the routine maintenance,
repair, and utilities for the vacated buildings. Caretaker
functions will continue until properties are conveyed to the
local community. Parcels are scheduled to convey in FY’s 2001,
2002 and 2003.
Military Personnel: None.
Other: Includes purchase of IMA support equipment.
Revenues from Land Sales: Army received $460,000 in FY00
for sale of Ft. McClellan’s Electrical and Telecommunications
Facilities and $39,000 in FY01 for sale of Credit Union
building.
70 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: Savings are achieved through the
closure of family housing units at Ft McClellan. Savings
include decreases in civilian pay and reduced base operations
costs.
Operation and Maintenance: Savings are achieved with
civilian eliminations and reduced base operations and real
property maintenance at Fort McClellan.
Military Personnel: None.
Other: None.
Environmental: The Army completed the EIS at Fort Leonard Wood
in the spring of 97. The Final EIS for the disposal of Fort
McClellan was published in Sep of 98. The Record of Decision
was signed on 25 Jun 99. The Army completed the environmental
baseline study at Fort McClellan to determine the environmental
condition of the property that will become available for reuse
with the closure of Fort McClellan in Sep of 99. The Army has
followed the EBS with the appropriate studies needed to
determine the remedial actions as required based on reuse
scenarios. Numerous sites have been identified for remedial
action to include sites with Unexploded Ordnance and HTRW
contaminants. Total cost to complete these studies and the
associated remedial actions that may be required is currently
estimated at $129 million.
71 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT MEADE, MD-KIMBROUGH
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 575 0 0 0 0 0 0 0 575
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 575 0 0 0 0 0 0 0 575
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 575 0 0 0 0 0 0 0 575
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 172 6 0 0 0 0 0 0 178
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 172 6 0 0 0 0 0 0 178
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 3,507 3,507 3,507 3,507 14,028
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 71 71 71 71 71 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 3,507 3,507 3,507 3,507 14,028
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 747 6 (3,507) (3,507) (3,507) (3,507) 0 0 (13,275)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 747 6 (3,507) (3,507) (3,507) (3,507) 0 0 (13,275)
72 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Maryland/Fort Meade.
Closure Package: Realign Fort Meade by reducing Kimbrough Army
Community Hospital to a clinic. Eliminate inpatient services.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Funds civilian PCS, civilian
severance, transportation of things, and other costs related
to the elimination of inpatient services.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings: Net savings are attributed to the Defense Health
Program.
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings are achieved through a
reduction of civilian personnel and base operating costs.
Military Personnel: None.
Other: None.
Exhibit BC-03
73
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Environmental:
a. NEPA: There are no known NEPA requirements
associated with this realignment action.
b. Historical/Cultural & Natural Resources: There are no
known historical, cultural and natural resource investigations
associated with this realignment.
c. Cleanup: There are no known cleanup actions
associated with this hospital realignment.
74 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT PICKETT
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 3,100 0 0 0 0 3,100
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,116 1,817 2,397 3,190 1,485 1,300 5,118 315 16,738
Operation and Maintenance 1,248 2,338 64 719 20 8,483 150 150 13,172
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 2,364 4,155 2,461 7,009 1,505 9,783 5,268 465 33,010
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 2,364 4,155 2,461 7,009 1,505 9,783 5,268 465 33,010
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 20 0 0 0 0 0 0 20
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 20 0 0 0 0 0 0 20
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 88 88 88 264
Construction 0 0 0 0 0 0 0
Operations 0 0 0 88 88 88 264
Operation and Maintenance 0 0 4,688 4,789 4,894 6,907 21,278
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 267 267 267 267 267 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 4,688 4,877 4,982 6,995 21,542
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 3,100 0 0 0 0 3,100
Family Housing 0 0 0 (88) (88) (88) 0 0 (264)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 (88) (88) (88) 0 0 (264)
Environment 1,116 1,817 2,397 3,190 1,485 1,300 5,118 315 16,738
Operation and Maintenance 1,248 2,358 (4,624) (4,070) (4,874) 1,576 150 150 (8,086)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 2,364 4,175 (2,227) 2,132 (3,477) 2,788 5,268 465 11,488
75
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Virginia/Fort Pickett.
Closure Package: Close Fort Pickett, except minimum essential
ranges, facilities, and training areas as a Reserve Component
training enclave to permit the conduct of individual and annual
training.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft Pickett/Reserve Ctr Bldg 99 46354 3,100
Sub total for FY99 3,100
TOTAL PROGRAM FOR FY 1996 - 2003 3,100
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay,
civilian PCS and transportation of things.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Exhibit BC-03
76
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Construction: None.
Family Housing Operations: Recurring savings resulting from
the termination of family housing operations and maintenance.
Operation and Maintenance: The closure of the USAR garrison
command and transfer of the enclave to the Army National Guard
will result in base operations cost reductions.
Military Personnel: None.
Other: None.
Environmental:
The Fort Pickett BRAC Cleanup Team was formed in December 1995
and utilized an Environmental Baseline Survey (EBS), a historical
aerial photographic review, and site inspections to identify
seventy-seven (77) environmental sites which warranted further
investigation. The Fort Pickett BRAC Environmental Restoration
Program received Community Environmental Response Facilitation
Act (CERFA) Category 1 and 2 concurrence from the Virginia
Department of Environmental Quality (VADEQ) and the U.S.
Environmental Protection Agency (USEPA) Region III in August
1998. The Environmental Assessment for the disposal and reuse of
excess property at Fort Pickett was completed in November 1998.
Currently, sixty-nine (69) of the sites have closure letters on
file from the regulators. A Finding of Suitability to Transfer
(FOST) document was finalized in January 2000 to certify that
2,786 acres were suitable for transfer. Environmental
investigations and clean-up activities continue on the remaining
71 acres of excess property.
The Fort Pickett BRAC Environmental Restoration Program is
focusing on six remedial investigation/feasibility studies
(RI/FS). Five of the RI/FS’s (combined with interim removal
actions) should result in “no action” or “no further action”
designations. The remaining RI/FS is being completed on the
Former Salvage Yard (EBS-13). This site will require a more
77 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
complex remediation effort through a for a guaranteed fixed price
remediation contract being prepared by HQ FORSCOM.
Recordation and stabilization of the mural in the officers’ club
is complete. The Programmatic Agreement for excess National
Register eligible properties was signed by the State of Virginia
and the National Historical Council. No further natural
resources requirements are anticipated.
78 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT RITCHIE
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 20,502 11,531 754 2,982 0 0 0 0 35,769
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 2,113 578 4,394 6,190 561 263 4,591 1,285 19,975
Operation and Maintenance 139 1,670 5,370 2,393 0 0 35 35 9,642
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 446 392 428 0 0 0 0 0 1,266
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 23,200 14,171 10,946 11,565 561 263 4,626 1,320 66,652
Revenue From Land Sales 0 0 (39) (15) 0 0 0 0 (54)
Appropriation Request 23,200 14,171 10,907 11,550 561 263 4,626 1,320 66,598
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance * 572 292 212 0 0 0 0 0 1,076
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 572 292 212 0 0 0 0 0 1,076
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 606 0 0 0 606
Construction 0 0 0 0 0 0 0
Operations 0 0 606 0 0 0 606
Operation and Maintenance 0 0 2,748 11,201 11,447 12,411 37,807
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 164 164 164 182 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 3,354 11,201 11,447 12,411 38,413
NET IMPLEMENTATION COSTS:
Military Construction 20,502 11,531 754 2,982 0 0 0 0 35,769
Family Housing 0 0 (606) 0 0 0 0 0 (606)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 (606) 0 0 0 0 0 (606)
Environment 2,113 578 4,394 6,190 561 263 4,591 1,285 19,975
Operation and Maintenance 711 1,962 2,834 (8,808) (11,447) (12,411) 35 35 (27,089)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 446 392 428 0 0 0 0 0 1,266
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 (39) (15) 0 0 0 0 (54)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 23,772 14,463 7,765 349 (10,886) (12,148) 4,626 1,320 29,261
79
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Maryland/Fort Ritchie.
Closure Package: Close Fort Ritchie except for a National Guard
enclave. Relocate the 1111th Signal Battalion and 1108th Signal
Brigade to Fort Detrick, Maryland. Relocate Information Systems
Engineering Command elements to Fort Huachuca, Arizona.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft Detrick/UEPH 96 46200 20,502
Sub total for FY96 20,502
Ft Detrick/Admin Facility 97 46197 6,393
Ft Detrick/General Purpose Storage 97 46204 798
Letterkenny ADA/Admin Renov (DISA) 97 48197 1,858
Ft Detrick/Secure Admin Facility 97 47910 932
Ft Detrick/Company HQ Bldg 97 48178 1,550
Sub total for FY97 11,531
Ft Detrick/Health Clinic 98 46329 754
Sub total for FY98 754
Ft Detrick/Physical Fit Center 99 48153 2,982
Sub total for FY99 2,982
TOTAL PROGRAM FOR FY 1996 - 2003 35,769
Conjunctively-Funded Construction:
Fiscal Tot Cost Conj Fund
Location/Project Title Year ($ in 000) ($ in 000) Source
Ft Detrick/Health Clinic 98 5,000 4,350 FY98 DHP
(PN 46205)
Ft Detrick/Physical Fit 99 6,550 3,500 FY99 MCA
Center
Exhibit BC-03
80
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS, civilian
severance pay and transportation of things. Also included are
costs to transfer utility control to appropriate local bodies and
to meter the ARNG enclave.
Caretaker: These funds are for the routine maintenance, repair,
and utilities for the vacated buildings during transition. The
caretaker function was being executed through a cooperative
agreement with the LRA; it is now being performed through a
contract managed by MDW.
Military Personnel: None.
Other: The Alternate National Military Command Center (Site
R) and associated communications site transferred and became a
sub-post of Fort Detrick, Maryland, with associated BASOPS and
other operating costs, effective 30 Sep 97.
Revenues from Land Sales: Revenues generated in FY98 and
FY99 are derived from the lease of buildings at Fort Ritchie.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: Reduction in family housing
operations and personnel with the closure of the Fort Ritchie
housing.
Operation and Maintenance: Savings result from reduced base
operations and real property maintenance costs, and elimination
of civilian personnel positions.
Military Personnel: None.
Other: None.
81 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Environmental: The Army funded an Environmental Baseline Survey
in FY96 to determine the extent of asbestos, lead-based paint,
underground storage tanks and grounds cleanup associated with the
installation, to include the former impact area and skeet range.
The BRAC Clean Up Plan, Version I has been completed. The UXO
Archive Search Report was complete in December 1996. The draft
Risk Analysis report was completed in 1998. An Ordnance &
Explosives Site Engineering Evaluation/Cost Analysis (EE/CA) for
UXO was initiated in 1998 and the final document was completed in
September 1999. Review and approval of EE/CA and Explosive
Safety Submission by USATCES and DDESB were completed in FY01 and
UXO cleanup began later that year and is ongoing.
NEPA/Historical/Cultural and Natural Resources: An
Environmental Impact Statement (EIS) was completed for disposal
of excess real property at Fort Ritchie, Maryland with a Record
of Decision signed in July 1998. An Environmental Assessment
(EA) was prepared with a Finding of No Significant Impact (FNSI)
signed in June 1996 for realignment action to Fort Detrick,
Maryland. A Supplemental Environmental Assessment, which
addressed changes in construction subsequent to the June 1996
FNSI was been completed and a FNSI signed in March 1997. A
separate Environmental Assessment was completed for realignment
actions to Fort Huachuca, Arizona with a FNSI signed May 1997.
82 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/FORT TOTTEN
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 2,197 0 0 0 0 2,197
Family Housing 0 7 0 0 0 0 0 0 7
Construction 0 0 0 0 0 0 0 0 0
Operations 0 7 0 0 0 0 0 0 7
Environment 593 531 155 25 240 42 0 0 1,586
Operation and Maintenance 242 153 12 430 0 0 0 0 837
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 835 691 167 2,652 240 42 0 0 4,627
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 835 691 167 2,652 240 42 0 0 4,627
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 884 884 884 1,134 3,786
Construction 0 0 0 0 0 0 0
Operations 0 0 884 884 884 1,134 3,786
Operation and Maintenance 0 0 812 812 812 812 3,248
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 3 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 1,696 1,696 1,696 1,946 7,034
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 2,197 0 0 0 0 2,197
Family Housing 0 7 (884) (884) (884) (1,134) 0 0 (3,779)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 7 (884) (884) (884) (1,134) 0 0 (3,779)
Environment 593 531 155 25 240 42 0 0 1,586
Operation and Maintenance 242 153 (800) (382) (812) (812) 0 0 (2,411)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 835 691 (1,529) 956 (1,456) (1,904) 0 0 (2,407)
83
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/New York/Fort Totten.
Closure Package: Close Fort Totten, except an enclave for the
U.S. Army Reserve. Dispose of Family Housing.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft Totten/Storage Facility 99 *46258 2,197
Subtotal for FY99 2,197
TOTAL PROGRAM FOR FY 1996 - 2003 2,197
*Deferred from FY98
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay,
civilian PCS, transportation of things, real property
maintenance, and related costs to facilitate realignment.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Exhibit BC-03
84
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: Savings will result from the
disposal of the family housing units. Savings include civilian
pay and base operations support.
Operation and Maintenance: Savings result from decreased
base operations costs.
Military Personnel: None.
Other: None.
Environmental:
Ft Totten: An Environmental Assessment (EA) was prepared
for disposal and reuse of the excess property; associated
Cultural/ Natural Resource studies were completed in May 1999.
An Environmental Baseline Survey conducted to determine initial
site characterization was completed and followed up with
appropriate studies and remedial action. Remediation was
completed in FY01 and a Finding of Suitability to Transfer
(FOST) will be completed in FY02.
85 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/INFORMATION SYSTEMS SOFTWARE CENTER
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 5,904 0 0 0 0 0 5,904
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 15 317 1,946 0 0 0 2,278
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 112 0 200 0 0 0 0 312
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 0 112 5,919 517 1,946 0 0 0 8,494
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 0 112 5,919 517 1,946 0 0 0 8,494
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 459 1,215 1,215 2,889
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 459 1,215 1,215 2,889
NET IMPLEMENTATION COSTS:
Military Construction 0 0 5,904 0 0 0 0 0 5,904
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 15 (142) 731 (1,215) 0 0 (611)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 112 0 200 0 0 0 0 312
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 0 112 5,919 58 731 (1,215) 0 0 5,605
86
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Virginia/Information Systems
Software Center (ISSC).
Closure Package: Close by relocating Information Systems Software
Center (ISSC) to Fort Meade, MD.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Ft. Meade/Admin Facility(SDC-W) 98 47237 3,700
Ft Meade/Admin Facility (ESSD) 98 47770 2,204
Subtotal for FY98 5,904
TOTAL PROGRAM FOR FY 1996 - 2003 5,904
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Provides for civilian PCS,
civilian severance, transportation of things and movement of
equipment from current leased space to Fort Meade, MD.
Military Personnel: None.
Other: Provides for specialized equipment required to
support the movement of ISSC.
Revenues from Land Sales: None.
Exhibit BC-03
87
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Termination of lease costs at
current location will generate savings.
Military Personnel: None.
Other: None.
Environmental: There are no known environmental impediments at
the closing site or receiving installations.
NEPA/Historical/Cultural & Natural Resources: An
Environmental Assessment (EA), with a Finding of No Significant
Impact was completed in May 1998 for the realignment of ISSC, in
conjunction with other BRAC 95 actions relocating to Fort Meade,
Maryland.
Exhibit BC-03
88
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/KELLY SUPPORT CENTER
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 338 829 320 175 34 125 0 0 1,821
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 338 829 320 175 34 125 0 0 1,821
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 338 829 320 175 34 125 0 0 1,821
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 459 700 700 700 2,559
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 13 13 13 13 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 459 700 700 700 2,559
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 338 829 320 175 34 125 0 0 1,821
Operation and Maintenance 0 0 (459) (700) (700) (700) 0 0 (2,559)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 338 829 (139) (525) (666) (575) 0 0 (738)
89
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Pennsylvania/Kelly Support Center.
Closure Package: Realign the Kelly Support Center by
consolidating Army Reserve units on to four of its six parcels.
Dispose of the remaining two parcels.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Reduction in base operation and
real property maintenance costs will generate savings.
Military Personnel: None.
Other: None.
Exhibit BC-03
90
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Environmental:
There are no environmental impediments at the realigning
installation. The Army has conducted two Environmental
Assessments at the Kelly Support Center (one for each parcel
since the two parcels are 40 miles apart). The only
environmental restoration requirement remaining at the Irwin
parcel is GW monitoring for the next two years as agreed upon
with the State of Pennsylvania regulators.
91 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/LETTERKENNY
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 1,104 6,700 0 0 0 7,804
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 2,368 1,899 7,924 3,263 2,492 5,086 2,118 407 25,557
Operation and Maintenance 6,518 11,083 19,044 26,941 2,837 288 450 225 67,386
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 104 2,600 2,496 638 0 0 0 0 5,838
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 8,990 15,582 29,464 31,946 12,029 5,374 2,568 632 106,585
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 8,990 15,582 29,464 31,946 12,029 5,374 2,568 632 106,585
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 603 0 0 0 0 0 603
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 603 0 0 0 0 0 603
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 14,777 17,416 40,343 41,273 113,809
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 62 80 293 293 293 1,281 0
Military ES 0 2 5 5 5 5 0
TOTAL SAVINGS 0 0 14,777 17,416 40,343 41,273 113,809
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 1,104 6,700 0 0 0 7,804
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 2,368 1,899 7,924 3,263 2,492 5,086 2,118 407 25,557
Operation and Maintenance 6,518 11,083 4,870 9,525 (37,506) (40,985) 450 225 (45,820)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 104 2,600 2,496 638 0 0 0 0 5,838
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 8,990 15,582 15,290 14,530 (28,314) (35,899) 2,568 632 (6,621)
92
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Pennsylvania/Letterkenny Army Depot.
Closure Package: Realign Letterkenny Army Depot by transferring
the towed and self propelled combat vehicle mission to Anniston
Army Depot (ANAD). Retain an enclave for conventional ammunition
storage and tactical missile disassembly and storage. Change the
1993 Commission’s decision regarding the consolidating of
tactical missile maintenance at Letterkenny by transferring
missile guidance system workload to Tobyhanna Army Depot (TYAD).
Note: This package includes funding to disestablish the Defense
Distribution Depot, Letterkenny, PA, by relocating to the Defense
Distribution Depot-Susquehanna (formerly New Cumberland AD),
Susquehanna, PA and to optimize storage space within the DoD
Distribution System. This package also includes funding for all
BRAC 95 DLA actions supported by Army.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in000)
Letterkenny/Enclave Fencing 99 49714 1,104
Subtotal for FY99 1,104
Tobyhanna AD/Missile Maint Fac 00 50298 6,700
Subtotal for FY00 6,700
TOTAL PROGRAM FOR FY 1996 - 2003 7,804
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Exhibit BC-03
93
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Operation and Maintenance: Includes civilian severance pay,
civilian PCS, transportation of things, real property
maintenance, and contractor costs to facilitate realignment to
Anniston and Tobyhanna Army Depots. Includes support to DLA as a
tenant organization to relocate defense depot equipment,
remaining stocks, and personnel costs.
Caretaker: These funds are for the routine maintenance,
repair, and utilities for the vacated buildings. There are no
employees Letterkenny specifically assigned to the caretaker
staff; these costs will reimburse the Army Working Capital Fund
for in-house employees as the need arises.
Military Personnel: None.
Other: Includes purchase of manufacturing equipment not
available at ANAD and TYAD, or available for realignment from
Letterkenny.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings are achieved with the
elimination of excess depot capacity and the more efficient
utilization of the remaining facilities. This action will
eliminate 1281 civilian positions and reduce the base operations
and real property maintenance costs for the Army. The savings
should result in lower AWCF rates for the customers serviced by
the Army depots after the Army implements this action.
Military Personnel: None.
94 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Other: None.
Environmental: The Army completed the Environmental Assessment
(EA) at Anniston Army Depot in support of the towed and wheeled
vehicle workload transition in June 1996, and the Letterkenny
Disposal and Reuse EA was completed in January 1998. The
Record of Environmental Consideration at Tobyhanna Army Depot for
relocation of the tactical missile guidance system workload was
completed in September 1998.
The Army is continuing to execute cleanup of the BRAC parcel
to include groundwater contamination, and is pursuing a limited
depth transfer of 400 plus/minus acres to the local redevelopment
authority.
95 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/MINOR FORT DIX SITES
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,253 2,052 1,378 1,400 3,084 129 68 32 9,396
Operation and Maintenance 135 312 39 26 0 82 33 0 627
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 1,388 2,364 1,417 1,426 3,084 211 101 32 10,023
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 1,388 2,364 1,417 1,426 3,084 211 101 32 10,023
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 177 0 0 0 0 0 0 177
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 177 0 0 0 0 0 0 177
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 400 400 400 400 1,600
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 400 400 400 400 1,600
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,253 2,052 1,378 1,400 3,084 129 68 32 9,396
Operation and Maintenance 135 489 (361) (374) (400) (318) 33 0 (796)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 1,388 2,541 1,017 1,026 2,684 (189) 101 32 8,600
96 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/New Jersey/Minor Fort Dix Sites
(Camp Kilmer/Camp Pedricktown). Minor Ft. Dix Sites.
Closure Package: Includes closure and disposal of:
o Close Camp Kilmer, except an enclave for minimum necessary
facilities to support the Reserve Components.
o Close Camp Pedricktown, except the Sievers-Sandberg Reserve
Center.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS, civilian
severance and transportation of things.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Recurring savings resulting from
reduced base operations at these installations.
Exhibit BC-03
97
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Military Personnel: None.
Other: None.
Environmental:
Environmental Assessments were completed in FY 00 for the
disposal and reuse of excess property at Camp Kilmer and Camp
Pedricktown. Archeological surveys and historic building
inventories have been completed. Recordation of the Nike Missile
Master complex at Camp Pedricktown was completed in FY 00. No
further cultural or natural resources requirements are required
for Camp Pedricktown. A metes and bounds survey and deed notice
is required for the Smalley Cemetery at Camp Kilmer.
Environmental Baseline Surveys (EBS) were completed in 1997 for
each installation. A Supplemental EBS was completed for the
Kilmer Softball Field Complex in 1998 (because this area was not
included in the initial EBS). EBS are being prepared and will be
completed in FY02 for the Kilmer and Pedricktown Reserve Enclaves
(to support BRAC transfer of the installation-wide utilities).
Completed environmental restoration actions at both installations
include: tank removals, asbestos survey and abatement (except
for Pedricktown Buildign 432); PCB survey; ordnance archive
search or inspection; and radiological archive search and close-
out surveys. The following restoration actions have been also
completed in all areas at both installations except for
groundwater at the Kilmer Building 1072 Area: Environmental
Investigation/Alternatives Analysis (EI/AA), remediation Proposed
Plan and Decision Document, and Remedial Action Workplans.
Additionally, soil remediation was completed at Camp Kilmer in
2001, and an air quality and safety survey was completed for
Pedricktown Building 432 in 2000.
The following environmental restoration actions are on-going and
will be completed in 2002: soil and groundwater remediation at
Camp Pedricktown (under a 3 Feb 00 Fixed-Price Guaranteed
Remediation contract); and groundwater remediation at Camp
Kilmer. The groundwater contaminants at both installations are
chlorinated solvents, and the soil contaminants at both
installations are predominantly heavy metals and polycyclic
aromatic hydrocarbons. For Pedricktown Building 432, the
98 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
following actions are being conducted in FY02: asbestos abatement
and a feasibility study to address elevated levels of microbes.
Soil sampling and remediation is required for lead contaminated
soil near former housing units at Pedricktown. Because the
contamination originated from lead-based paint, DA has not funded
these actions and intends fully disclose this condition to the
Local Redevelopment Authority (LRA).
Finding of Suitability to Transfer (FOST) documents for the
parcels at Kilmer and Pedricktown that require no further action
will be completed in early FY 02. FOSTs for the parcels at
Kilmer and Pedricktown that are currently undergoing remediation
are projected to be completed in late FY02. Over ten Finding of
Suitability to Lease (FOSL) documents have been prepared for
leasing actions at Camp Pedricktown.
Long-term groundwater monitoring is projected to continue at Camp
Pedricktown until FY 08 and at Camp Kilmer until FY10. Long-term
cap inspection and maintenance will continue at Camp Kilmer for
perpetuity at an estimated cost of $4K per year.
99 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/MINOR FORSCOM SITES
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 5,269 1,109 616 850 632 2,150 150 100 10,876
Operation and Maintenance 89 163 900 0 0 25 25 0 1,202
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 5,358 1,272 1,516 850 632 2,175 175 100 12,078
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 5,358 1,272 1,516 850 632 2,175 175 100 12,078
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 313 0 0 0 0 0 0 313
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 313 0 0 0 0 0 0 313
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 37 0 0 0 37
Construction 0 0 0 0 0 0 0
Operations 0 0 37 0 0 0 37
Operation and Maintenance 0 0 96 96 500 500 1,192
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 117 117 117 117 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 133 96 500 500 1,229
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 (37) 0 0 0 0 0 (37)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 (37) 0 0 0 0 0 (37)
Environment 5,269 1,109 616 850 632 2,150 150 100 10,876
Operation and Maintenance 89 476 804 (96) (500) (475) 25 0 323
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 5,358 1,585 1,383 754 132 1,675 175 100 11,162
100
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Montana/Florida/Massachusetts/North
Carolina/Fort Missoula/Big Coppitt Key/Hingham Cohasset/Sudbury
Training Annex/Recreation Center #2. Minor FORSCOM sites.
Closure Package: Includes closure and disposal of:
o Close Fort Missoula, except an enclave for minimum essential
land and facilities to support the Reserve Component units.
o Close Big Coppitt Key, Florida
o Close Hingham Cohasset, Massachusetts
o Close Sudbury Training Annex, Massachusetts.
o Close Recreation Center #2, Fayetteville, N.C.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: Includes civilian pay and
additional base operating costs for temporary personnel.
Operation and Maintenance: Includes civilian PCS, civilian
severance pay and transportation of things. Also includes costs
to transfer utilities to appropriate local authorities.
Caretaker: These funds are for the maintenance of real
property assets at Hingham Cohasset.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Military Construction: None.
Savings:
Family Housing Construction: None.
101 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: Reduction of civilian pay due
to loss of personnel.
Operation and Maintenance: Base operations and real
property maintenance costs are reduced with the closure of these
installations which generates annual savings.
Military Personnel: None.
Other: None.
Environmental:
Environmental Assessment and Finding of Suitability to Transfer
have been completed for the disposal and reuse of excess
property at Fort Missoula and the installation has been closed.
EA has been completed for Hingham Cohasset. At Recreation
Center #2, EA is in final process and will be completed in FY
01. Records of Environmental Consideration have been completed
at Sudbury Training Annex with parcel transferred to USFWS in
FY01; remaining Sudbury Training Annex transfers expected to be
completed in FY02. Environmental and transfer actions at Big
Coppitt Key are complete.
The Army has completed an environmental baseline survey at each
of these closing locations. All restoration work has been
completed for Fort Missoula, Recreation Center # 2, and Sudbury
Training Annex. GW work at Recreation Center # 2 will be done
by the city of Fayetteville, which has been identified as the
PRP. A Guaranteed Fixed Price Guaranteed Remediation contract
was executed during FY01 to complete the remaining assessment
and cleanup work at Hingham Cohasset.
A National Historic Preservation Act Section 106 Memorandum of
Agreement (MOA) has been concluded for Fort Missoula, Montana.
In accordance with this agreement document, the Army will attach
a historic preservation covenant to the deeds of all National
Register properties transferred to non-federal entities. This
covenant will require the new owner to preserve the historic
properties and to consult with the Montana SHPO prior to
undertaking any actions that might affect their integrity. This
MOA does not require the Army to conduct any other preservation
measures for Fort Missoula National Register properties.
102 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/MINOR FORT LEWIS SITES
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 12,892 0 0 0 0 0 12,892
Family Housing 0 0 400 258 0 0 0 0 658
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 400 258 0 0 0 0 658
Environment 2,161 6,349 3,358 4,366 5,208 5,185 1,432 3,432 31,491
Operation and Maintenance 268 223 430 1,287 0 0 15 15 2,238
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 26 101 0 0 0 0 127
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 2,429 6,572 17,106 6,012 5,208 5,185 1,447 3,447 47,406
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 2,429 6,572 17,106 6,012 5,208 5,185 1,447 3,447 47,406
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 49 0 0 0 0 0 0 49
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 49 0 0 0 0 0 0 49
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 759 1,519 1,519 1,519 5,316
Construction 0 0 0 0 0 0 0
Operations 0 0 759 1,519 1,519 1,519 5,316
Operation and Maintenance 39 0 59 1,997 478 478 3,051
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 8 8 8 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 39 0 818 3,516 1,997 1,997 8,367
NET IMPLEMENTATION COSTS:
Military Construction 0 0 12,892 0 0 0 0 0 12,892
Family Housing 0 0 (359) (1,261) (1,519) (1,519) 0 0 (4,658)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 (359) (1,261) (1,519) (1,519) 0 0 (4,658)
Environment 2,161 6,349 3,358 4,366 5,208 5,185 1,432 3,432 31,491
Operation and Maintenance 229 272 371 (710) (478) (478) 15 15 (765)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 26 101 0 0 0 0 127
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 2,390 6,621 16,288 2,496 3,211 3,188 1,447 3,447 39,088
103 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Washington/California/Minor Ft Lewis
Sites (Camp Bonneville/East Fort Baker/Rio Vista Army Reserve
Center/Branch U.S. Disciplinary Barracks, Lompoc). Minor
Ft. Lewis Sites.
Closure Package: Includes closure and disposal of:
o Close Camp Bonneville, Washington.
o Close East Fort Baker, California. Relocate all tenants to
other installations that meet mission requirements. Return all
real property to the Golden Gate National Recreation Area.
o Close Rio Vista Army Reserve Center, California.
o Close Branch U.S. Disciplinary Barracks, Lompoc, California.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Nellis AFB/Admin Fac 98 46291 3,889
Camp Parks/Army Resv Ctr Fac 98 46206 9,003
Subtotal for FY 98 12,892
TOTAL PROGRAM FOR FY 1996 – 2003 12,892
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: Includes civilian pay and
additonal base operating costs for temporary personnel.
Exhibit BC-03
104
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Operation and Maintenance: Includes civilian severance pay,
civilian PCS, transportation of things, RPMA, and Management of
Environmental for Camp Bonneville.
Caretaker: These funds are for the routine maintenance of
real property assets at Camp Bonneville.
Military Personnel: None.
Other: Installed equipment to support construction projects
to include communications and information management equipment.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: Recurring savings resulting from
the termination of family housing at East Fort Baker.
Operation and Maintenance: Recurring savings from the
closure of Camp Bonneville (BASOPS and RPMA). Recurring savings
resulting from the elimination of civilian personnel, RPMA, and
BASOPS at East Fort Baker.
Military Personnel: None.
Other: None.
Environmental:
Environmental Assessments will be completed for the disposal and
reuse of excess property at each location except Branch, U.S.
Disciplinary Barracks, Lompoc where the Army will do RECs for
transfers to the U.S. Bureau of Prisons and the Air Force.
The Army has completed an environmental baseline survey at each
of these closing locations. A fixed Price Guaranteed Remediation
contract was awarded for Rio Vista Army Reserve Center on 10 Nov
00. All environmental restoration work should be completed at
105 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
the site by February 2002. A fixed Price Guaranteed Remediation
contract was awarded in September 2001 and will complete the
remaining assessment and cleanup work at Branch U.S. Disciplinary
Barracks, Lompoc. At Camp Bonneville all HTRW should be
completed during FY01 with the exception of: drum burial site,
landfill # 4/demo area # 1, demo area # 3, and lead in ranges.
The UXO EE/CA is scheduled to be completed during fall 2002.
East Fort Baker restoration work was completed in FY01 and a “No
Further Action” Record of Decision is scheduled for completion
toward the end of 2001.
An archeological survey of approximately 3,000 acres of open land
is required at Camp Bonneville.
If, as expected, the Branch USDB, Lompoc, is transferred to the
Federal Bureau of Prisons and the Air Force, no additional
cultural resources requirements are anticipated.
Most of the buildings at East Fort Baker are part of an existing
National Register Historic District. Since this property will
transfer to the National Park Service under existing law, there
will be no additional cultural resource requirements.
There are no further cultural resources surveys requirements at
Rio Vista.
106 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/OAKLAND
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 2,944 0 0 0 0 0 2,944
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,126 720 11,703 1,533 351 1,992 9,036 1,915 28,376
Operation and Maintenance 1,210 1,590 3,944 6,481 0 0 0 0 13,225
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 20 0 0 0 0 20
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 2,336 2,310 18,591 8,034 351 1,992 9,036 1,915 44,565
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 2,336 2,310 18,591 8,034 351 1,992 9,036 1,915 44,565
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 5,287 7,896 10,504 10,504 34,191
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 113 113 113 113 113 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 5,287 7,896 10,504 10,504 34,191
NET IMPLEMENTATION COSTS:
Military Construction 0 0 2,944 0 0 0 0 0 2,944
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 1,126 720 11,703 1,533 351 1,992 9,036 1,915 28,376
Operation and Maintenance 1,210 1,590 (1,343) (1,415) (10,504) (10,504) 0 0 (20,966)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 20 0 0 0 0 20
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 2,336 2,310 13,304 138 (10,153) (8,512) 9,036 1,915 10,374
107
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/California/Oakland Army Base.
Closure Package: Close Oakland Army Base, California. Relocate
Military Traffic Management Command - Western Area Command
headquarters to form a new Deployment Support Command at Fort
Eustis, Virginia. Relocate the 1302nd Major Port Command (now
called the 834th US Army Transportation Battalion) to Naval
Weapons Station-Concord, California. Enclave Army Reserve
elements.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Travis AFB/Admin Facility 98 47187 2,944
Sub total for FY98 2,944
TOTAL PROGRAM FOR FY 1996 - 2003 2,944
Note: The Army consolidated MTMC’s Oakland and Bayonne
Area Support Command Headquarters into a single facility, and
form a new Deployment Support Command at Fort Eustis, Virginia.
The funds for this facility were reprogrammed from FY99 to FY98
and programmed in the Bayonne package.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian PCS, civilian
severance pay, transportation of things and purchase of
equipment required to relocate and consolidate to one CONUS
location.
Military Personnel: None.
Other: Installed equipment to support construction projects
to include communications and information management equipment.
Exhibit BC-03
108
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Revenues from Land Sales: None.
Savings:
Military Construction: None
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings are the result of the
elimination of personnel when the consolidation of the Oakland
and Bayonne activities occur and base operations and maintenance
from the disposal of Oakland Army Base.
Military Personnel: None.
Other: None.
Environmental:
NEPA: An Environmental Impact Statement (EIS) is being prepared
for property disposal actions at Oakland Army Base. The Draft
EIS comment period ended on 18 January 2000. Completion delayed
pending resolution of local reuse issues. Supplemental Draft
EIS was published in July 2001 followed by the Final EIS and
Record of Decision. Completion anticipated by January 2002.
Fort Eustis, VA, has been selected as the relocation site and an
Environmental Assessment (EA) has been completed with a Finding
of No Significant Impact. The EA results were advertised in the
Federal Register and the 30-day period for comment ended on 15
September 1997.
b. Cultural/Natural Resources: Appropriate studies and
consultation is ongoing at the disposal location. A Memorandum
of Agreement will be included in the FEIS.
c. Cleanup. An Environmental Baseline Survey has been
conducted at Oakland to determine initial site characterization.
Appropriate studies and remedial actions are ongoing. An early
transfer under the Section 334 legislation is being pursued at
Oakland. Expected Early Transfer scheduled for completion Jun
02.
109 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/RED RIVER ARMY DEPOT
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 640 1,121 2,393 1,943 1,219 3,949 2,079 4,958 18,302
Operation and Maintenance 10,711 9,816 3,230 3,035 301 0 0 0 27,093
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 11,351 10,937 5,623 4,978 1,520 3,949 2,079 4,958 45,395
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 11,351 10,937 5,623 4,978 1,520 3,949 2,079 4,958 45,395
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 159 163 163 163 0 0 648
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 159 163 163 163 0 0 648
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 7,589 8,112 7,513 8,557 31,771
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 133 386 595 595 595 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 7,589 8,112 7,513 8,557 31,771
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 640 1,121 2,393 1,943 1,219 3,949 2,079 4,958 18,302
Operation and Maintenance 10,711 9,816 (4,200) (4,914) (7,049) (8,394) 0 0 (4,030)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 11,351 10,937 (1,807) (2,971) (5,830) (4,445) 2,079 4,958 14,272
110 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Texas/Red River Army Depot.
Closure Package: Realign RRAD by moving all maintenance missions
except for that related to the Bradley Fighting Vehicle series to
other depot maintenance activities including the private sector.
Retain the conventional ammunition storage mission, the Intern
Training Center, the Civilian Training Education, and the Rubber
Production Facility at RRAD.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay
and civilian PCS costs associated with the realignment of RRAD.
In addition, costs cover the transfer and installation of
equipment used in those maintenance missions moving to another
depot activity as well as consolidation of equipment at RRAD.
Several facility engineering projects are planned to accommodate
workload transfer and consolidation.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Exhibit BC-03
111
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Operation and Maintenance: Primary savings listed will be
from the elimination of 595 civilian personnel spaces and
reduction of required base operations support for the excess
facilities and land.
Military Personnel: None.
Other: None.
Environmental: The Army has completed an Environmental Baseline
Survey in March 1998 (required by Community Environmental
Response Facilitation Act, CERFA) for those parcels which will be
excess under the BRAC realignment. Upon regulatory review of this
survey, the Army will determine additional environmental actions
and develop appropriate milestone schedules. An environmental
assessment was completed on September 1998, to address the
consequences of disposal and reuse of the excess property. All
environmental activity based on BRAC realignment will complement
the ongoing restoration efforts in the DERA program and support
future reuse and redevelopment by the local community.
112 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/SAVANNA
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 14,120 8,559 1,815 0 0 0 0 24,494
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 2,684 5,537 11,581 22,385 1,115 19,939 13,430 16,645 93,316
Operation and Maintenance 7,645 295 12,503 20,023 0 145 439 453 41,503
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 1,177 0 0 0 0 0 0 1,177
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 10,329 21,129 32,643 44,223 1,115 20,084 13,869 17,098 160,490
Revenue From Land Sales 0 0 0 (8) 0 0 0 0 (8)
Appropriation Request 10,329 21,129 32,643 44,215 1,115 20,084 13,869 17,098 160,482
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 212 13 13 8 5 0 0 0 251
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 212 13 13 8 5 0 0 0 251
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 124 127 251
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 124 127 251
Operation and Maintenance 0 0 0 462 11,074 11,210 22,746
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 30 60 90 120 172 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 462 11,198 11,337 22,997
NET IMPLEMENTATION COSTS:
Military Construction 0 14,120 8,559 1,815 0 0 0 0 24,494
Family Housing 0 0 0 0 (124) (127) 0 0 (251)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 (124) (127) 0 0 (251)
Environment 2,684 5,537 11,581 22,385 1,115 19,939 13,430 16,645 93,316
Operation and Maintenance 7,857 308 12,516 19,569 (11,069) (11,065) 439 453 19,008
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 1,177 0 0 0 0 0 0 1,177
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 (8) 0 0 0 0 (8)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 10,541 21,142 32,656 43,761 (10,078) 8,747 13,869 17,098 137,736
113 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Illinois/Savanna Army Depot
Activity.
Closure Package: Close Savanna Army Depot Activity. Relocate the
Defense Ammunition Center & School to McAlester Army Ammunition
Plant, Oklahoma (MCAAP).
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
McAlester/Gen Instruct Facil 97 45956 7,214
McAlester/Admin Facility 97 45955 6,906
Subtotal for FY97 14,120
McAlester/Admin Facility 98 45955 8,559
Subtotal for FY98 8,559
Crane/Surveillance Test Facil 99 50057 1,815
Subtotal for FY99 1,815
TOTAL PROGRAM FOR FY 1996 - 2003 24,494
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay
and civilian PCS costs associated with the closure of SVDA and
transfer of DAC from SVDA to MCAAP. Other costs include the
transfer of general supplies as well as BRAC related movement of
Exhibit BC-03
114
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
ammunition and sale or relocation of Defense National Stockpiles
materials. Additional O&M costs will be for facility layaway and
property disposal actions.
Caretaker: These funds are for the routine maintenance,
repair, and utilities for the vacated buildings. There are no
employees Savanna specifically assigned to the caretaker staff;
these costs will reimburse the Army Working Capital Fund for in-
house employees as the need arises.
Military Personnel: None.
Other: Includes purchase of IMA support equipment.
Revenues from Land Sales:
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: Savings resulted from a reduction
of base operating costs due to a decrease in family housing.
Operation and Maintenance: Primary savings listed will be
from the elimination of 172 civilian personnel spaces and
reduction of required base operations support. Master lease
placed caretaker responsibilities and related cost on Local
Redevelopment Authority (approx. $750,000 per year from this).
Military Personnel: None.
Other: None.
Environmental: SVDA is on the Federal Facilities National
Priorities List. The Army completed an Environmental Baseline
Survey for SVDA and forwarded the report to the EPA on 29 October
1996. The Army is implementing an extensive environmental cleanup
program at Savanna to address contamination resulting from past
Exhibit BC-03
115
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
military operations. The Army has also prepared an Environmental
Impact Statement to address environmental consequences of
disposal and subsequent reuse of the installation. All
environmental activity based on BRAC realignment will complement
the planned reuse of the property where practicable and
affordable. The current program includes several investigations
and associated remedial actions as follows: the removal of a
large pesticide burial; location and removal of unexploded
ordnance (UXO); and removal of soil contaminated as a result of
the conduct of varied types of ammunition testing and
demilitarization operations. Total projected cost to complete
studies and to conduct remedial actions associated with the
findings of those studies is approximately $128 million.
Exhibit BC-03
116
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/SENECA
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 10,027 5,647 11,834 18,548 2,683 11,611 18,317 38,256 116,923
Operation and Maintenance 7,960 5,002 5,316 14,444 3,575 322 776 776 38,171
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 17,987 10,649 17,150 32,992 6,258 11,933 19,093 39,032 155,094
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 17,987 10,649 17,150 32,992 6,258 11,933 19,093 39,032 155,094
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 45 0 0 0 0 0 45
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 45 0 0 0 0 0 45
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 7,315 7,581 15,465 22,287 52,648
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 140 190 240 269 269 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 7,315 7,581 15,465 22,287 52,648
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 10,027 5,647 11,834 18,548 2,683 11,611 18,317 38,256 116,923
Operation and Maintenance 7,960 5,002 (1,954) 6,863 (11,890) (21,965) 776 776 (14,432)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 17,987 10,649 9,880 25,411 (9,207) (10,354) 19,093 39,032 102,491
117 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/New York/Seneca Army Depot
Activity.
Closure Package: Close Seneca Army Depot (SEDA), except an
enclave to store hazardous material and ores. SEAD closed on
30 Sep 00.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Includes civilian severance pay
associated with the closure of SEDA. Additional O&M costs
will be facility layaway and property disposal actions.
Caretaker Costs: These funds will provide for caretaker
staff payroll, travel, rents, communications, supplies, and
various maintenance contracts. Seven personnel remain for
caretaker operations.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Exhibit BC-03
118
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: None.
Operation and Maintenance: None
Military Personnel: None.
Other: None.
Environmental: SEDA is on the Federal Facilities National
Priorities List. The Army has completed an Environmental
Baseline Study and Community Environmental Response
Facilitation Act (CERFA) report for SEDA. An Environmental
Impact Statement to address environmental consequences of
disposal and subsequent reuse of the installation was signed
in May 1998. Additionally, the Army continues with cleanup
efforts to include UXO and HTRW sites.
119 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/SIERRA
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 900 0 0 0 0 0 900
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 540 1,045 3,050 1,095 1,125 125 150 150 7,280
Operation and Maintenance 2,193 2,886 503 20,062 40 0 0 0 25,684
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 2,733 3,931 4,453 21,157 1,165 125 150 150 33,864
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 2,733 3,931 4,453 21,157 1,165 125 150 150 33,864
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 12 16 19 16 12 0 0 75
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 12 16 19 16 12 0 0 75
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 230 430 558 703 753 2,674
Construction 0 0 0 0 0 0 0
Operations 0 230 430 558 703 753 2,674
Operation and Maintenance 0 548 1,852 1,347 2,333 7,715 13,795
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 65 109 109 109 109 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 778 2,282 1,905 3,036 8,468 16,469
NET IMPLEMENTATION COSTS:
Military Construction 0 0 900 0 0 0 0 0 900
Family Housing 0 (230) (430) (558) (703) (753) 0 0 (2,674)
Construction 0 0 0 0 0 0 0 0 0
Operations 0 (230) (430) (558) (703) (753) 0 0 (2,674)
Environment 540 1,045 3,050 1,095 1,125 125 150 150 7,280
Operation and Maintenance 2,193 2,350 (1,333) 18,734 (2,277) (7,703) 0 0 11,964
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 2,733 3,165 2,187 19,271 (1,855) (8,331) 150 150 17,470
120 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/California/Sierra Army Depot.
Closure Package: Realign Sierra Army Depot by reducing the
conventional ammunition mission to the level necessary to support
the conventional ammunition demilitarization mission. Retain a
conventional ammunition demilitarization capability and an enclave
for the Operational Project Stocks mission and the static storage
of ores.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Sierra/Consolidated Security Fac 98 45872 900
Sub total for FY98 900
TOTAL PROGRAM FOR FY 1996 - 2003 900
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Transportation of things, real
property maintenance, and other O&M costs required to realign
depot operations. Realignment completed on 30 June 00.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Exhibit BC-03
121
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Family Housing Operations: Savings resulted from a decrease
in base operating costs due to the closure of family housing
units.
Operation and Maintenance: Primary savings listed will be from
the elimination of 109 civilian positions and reduction of
required base operations support. Remaining savings will accrue
due to elimination of depot operations costs.
Military Personnel: None.
Other: None.
Environmental: The Army completed an Environmental Assessment
(EA) in Mar 1998 for disposal of property at Sierra Army Depot.
An Environmental Baseline Survey (EBS) was completed in Mar 97.
RI/FS is currently underway. Supplemental EA for Utilities was
completed in Nov 99.
122 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/STRATFORD ENGINE PLANT
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 414 1,752 3,295 10,800 170 161 347 347 17,286
Operation and Maintenance 17 2,900 0 0 0 1,796 7,230 6,789 18,732
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 431 4,652 3,295 10,800 170 1,957 7,577 7,136 36,018
Revenue From Land Sales 0 0 (117) (6,065) (368) (196) 0 0 (6,746)
Appropriation Request 431 4,652 3,178 4,735 (198) 1,761 7,577 7,136 29,272
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 602 604 613 618 624 0 0 3,061
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 602 604 613 618 624 0 0 3,061
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 5,977 5,977 5,977 5,977 23,908
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 5,977 5,977 5,977 5,977 23,908
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 414 1,752 3,295 10,800 170 161 347 347 17,286
Operation and Maintenance 17 3,502 (5,373) (5,364) (5,359) (3,557) 7,230 6,789 (2,115)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 (117) (6,065) (368) (196) 0 0 (6,746)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 431 5,254 (2,195) (629) (5,557) (3,592) 7,577 7,136 8,425
123 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Connecticut/Stratford Army Engine
Plant.
Closure Package: Close Stratford Army Engine Plant.
Costs:
Military Construction: An FY 97 renovation project at
Anniston Army Depot ($1.6M) for the relocation of the
recuperator production capability is funded with Army
Production Base Support (PBS) funds.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Includes DOD civilian PCS,
civilian severance pay and transportation of things, and the
one-time costs to transition this facility to a caretaker
status. Caretaking requirements exist for the maintenance of
all facilities at minimum levels to preclude degradation of
industrial structures and mechanical systems.
Caretaker: These funds are for the routine maintenace,
repair, and utilities for the vacated buildings. The
caretaker efforts at Stratford are extensive and are designed
to maintain the extensive physical plant that includes
industrial buildings and manufacturing equipment.
Military Personnel: None.
Other: None.
Revenues from Land Sales: Revenues resulting for the
lease of warehouse space at Stratford.
Savings:
Exhibit BC-03
124
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: Savings are achieved with the
elimination of excess manufacturing capacity and the more
efficient utilization of the remaining facilities. This
action will reduce the base operations and real property
maintenance costs for the Army. The savings should result in
lower DBOF rates for the customers serviced by the Army after
this action is implemented.
Military Personnel: None.
Other: None.
Environmental:
NEPA: The Final Environmental Impact Statement (FEIS) was
completed in June 99. Record of Decision completed on 31
January 01 for 71 of 75 acres.
An EBS was completed Dec 96. An RI/FS is currently underway.
There are no known environmental impediments at the receiving
locations.
125 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/TRI SERVICE RELIANCE
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance 263 0 3,539 0 0 0 0 0 3,802
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 1,675 0 0 0 0 0 1,675
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 263 0 5,214 0 0 0 0 0 5,477
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 263 0 5,214 0 0 0 0 0 5,477
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 11 29 18 0 0 0 0 58
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 11 29 18 0 0 0 0 58
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 4,300 0 0 0 0 0 4,300
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 4,300 0 0 0 0 0 4,300
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 0 0 0
Operation and Maintenance (4,037) 11 3,568 18 0 0 0 0 (440)
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 1,675 0 0 0 0 0 1,675
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS (4,037) 11 5,243 18 0 0 0 0 1,235
126 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Maryland/Tri-Service Project
Reliance.
Closure Package: Change the recommendation of the 1991
Commission regarding Tri-Service Project Reliance. Upon
disestablishment of the U.S. Army Biomedical Research
Development Laboratory (USABRDL) at Fort Detrick, MD, do not
collocate environmental and occupational toxicology research
with the Armstrong Laboratory at Wright-Patterson Air Force
Base, OH. Instead relocate the health advisories environmental
fate research and military criteria research functions of the
Environmental Quality Research Branch to the U.S. Army
Environmental Hygiene Agency (AEHA), Aberdeen Proving Ground,
MD, and maintain the remaining functions of conducting non-
mammalian toxicity assessment models and onsite biomonitoring
research of the Research Methods Branch at Fort Detrick as part
of Headquarters, U.S. Army Medical Research and Materiel
Command.
NOTE: The organizational title of U.S. Army Environmental
Hygiene Agency (AEHA) was changed to U.S. Army Center for Health
Promotion and Preventative Medicine (USACHPPM). Additionally,
the health advisories environmental fate research and military
criteria research functions will be absorbed into the Health
Effects Research Program (HERP) of USACHPPM.
To execute the Tri-Service Project Reliance Study, BRAC 91
directed the collocation of infectious disease research at the
Naval Medical Research Institute (NMRI) to the Walter Reed Army
Institute of Research (WRAIR). The recommendation was in the
Army section of the Commission Report. BRAC 95 directed the
relocation of Infectious Diseases, as well as the Combat
Casualty Care and Operational Medicine Programs, from NMRI to
WRAIR. The Navy proposed these BRAC 95 recommendations in their
section of the Commission Report. OSD, in discussion with the
Army and Navy, concluded the Army will fund the NMRI move to
WRAIR as part of the BRAC 95 program.
Costs:
Military Construction: None.
Exhibit BC-03
127
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: Program will fund the PCS of up
to nine civilian personnel, transportation of things, and a
small renovation project at Aberdeen Proving Ground, MD.
Program will fund additional equipment required in new WRAIR
facility, replacement of scientific equipment, office furniture,
transport of HAZMAT and a small renovation project required for
NMRI administrative support.
Military Personnel: None.
Other: Investment in specialized medical testing,
evaluation and research equipment that could not be moved from
losing locations.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: The Army will realize a one time
cost avoidance of $4.3 million by not moving these Tri-Service
Project Reliance functions described above to Wright-Patterson
Air Force base.
Military Personnel: None.
Other: None.
Environmental: The Aberdeen Proving Ground environmental office
has prepared the Record of Environmental Consideration necessary
to support realignment of the Environmental Toxicology, Health
Effects Research Division.
128 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/CHICAGO O'HARE
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 15,715 0 0 0 15,715
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 250 140 0 0 0 0 390
Operation and Maintenance 0 0 1,676 0 75 185 0 0 1,936
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 0 0 1,926 140 15,790 185 0 0 18,041
Revenue From Land Sales 0 0 0 (140) (15,840) 0 0 0 (15,980)
Appropriation Request 0 0 1,926 0 (50) 185 0 0 2,061
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 15,715 0 0 0 15,715
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 250 140 0 0 0 0 390
Operation and Maintenance 0 0 1,676 0 75 185 0 0 1,936
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 (140) (15,840) 0 0 0 (15,980)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 0 0 1,926 0 (50) 185 0 0 2,061
129 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Chicago O’Hare Field
Closure Package: The City of Chicago has chosen to exercise
their option to take over the US Army Reserve Center at the
O’Hare Airport. The BRAC IV commission included this option
for the City of Chicago.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Chicago/Reserve Center Fac 00 10886 $15,715
Sub total for FY00 $15,715
TOTAL PROGRAM FOR FY 1996 - 2003 $15,715
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Revenues from Land Sales: The City of Chicago funds all
costs associated with this action which appear as revenues.
Environmental: The Army has completed environmental studies
necessary to determine the presence of potential hazardous
materials.
Exhibit BC-03
130
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/HAMILTON AIR FIELD
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 7,065 327 425 7,817
Operation and Maintenance 38 194 0 0 51 0 0 0 283
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 38 194 0 0 51 7,065 327 425 8,100
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 38 194 0 0 51 7,065 327 425 8,100
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 7,065 327 425 7,817
Operation and Maintenance 38 194 0 0 51 0 0 0 283
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 38 194 0 0 51 7,065 327 425 8,100
131 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Hamilton Army Airfield, CA
Closure Package: Close Hamilton Army Airfield, California.
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Environmental Restoration: Costs include: Long term
monitoring of soil and ground water at POL Hill; Coastal Salt
Marsh and High Marsh remediation plus the long term monitoring
of those sites; and removal action of the East Levee
construction debris disposal area burn pit. In general the
costs are cumulative for returning the airfield to its natural
state of being a coastal wetlands area.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Exhibit BC-03
132
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
ARMY/ARMY PROGRAM MANAGEMENT
(DOLLARS IN THOUSANDS)
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 25,927 7,945 5,750 1,000 0 0 0 0 40,622
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 7,414 8,158 19,261 18,653 22,017 14,421 12,022 10,463 112,409
Operation and Maintenance 8,787 5,698 10,188 6,575 7,322 4,931 0 0 43,501
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 42,128 21,801 35,199 26,228 29,339 19,352 12,022 10,463 196,532
Revenue From Land Sales 0 0 (13,914) (19,375) (6,165) (1,662) 0 0 (41,116)
Appropriation Request 42,128 21,801 21,285 6,853 23,174 17,690 12,022 10,463 155,416
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 14,358 13,916 16,104 1,150 975 900 0 0 47,403
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 14,358 13,916 16,104 1,150 975 900 0 0 47,403
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 25,927 7,945 5,750 1,000 0 0 0 0 40,622
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 7,414 8,158 19,261 18,653 22,017 14,421 9,022 7,463 106,409
Operation and Maintenance 23,145 19,614 26,292 7,725 8,297 5,831 0 0 90,904
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 (13,914) (19,375) (6,165) (1,662) 0 0 (41,116)
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 56,486 35,717 37,389 8,003 24,149 18,590 9,022 7,463 196,819
133 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/Program Management.
Closure Package: Program management and planning and design
costs associated with all Army BRAC 95 actions.
Costs:
Military Construction:
Amount
Location/Project Title Fiscal Year PN ($ in 000)
Planning and Design 96 25,927
Subtotal for FY 96 25,927
Planning and Design 97 7,945
Subtotal for FY 97 7,945
Planning and Design 98 5,750
Subtotal for FY 98 5,750
Planning and Design 99 1,000
Subtotal for FY 99 1,000
TOTAL PROGRAM FOR FY 1996 - 2003 40,622
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Environmental Restoration: Costs include the reimbursable
program management costs associated with the management of
environmental restoration at the U.S. Army Corps of Engineers and
the U.S. Army Environmental Center.
Exhibit BC-03
134
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Operation and Maintenance: Costs identified in this package
are required by the U.S. Army Corps of Engineers for reimbursable
costs associated with the management of BRAC 95 real estate,
construction, cultural resource actions. In addition these funds
are used by the U.S. Communications Electronics Command (CECOM)
to manage Information Management Area (IMA) actions in concert
with the U.S. Army Corps of Engineers. (CECOM took over this
mission upon the dissolution of the Army’s Information Systems
Command (ISC) in 1996.)
Military Personnel: None.
Other: None.
Revenues from Land Sales: Revenues shown are sale and lease
collections from prior BRAC rounds properties that have been
allocated to the BRAC 95 account.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
135 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
BRAC 88 ENVIRONMENTAL RESTORATION
AND CARETAKER
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 186 882 36,394 93,945 23,656 86,208 17,750 17,754 276,775
Operation and Maintenance 0 0 0 0 0 396 1,556 1,499 3,451
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 186 882 36,394 93,945 23,656 86,604 19,306 19,253 280,226
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 186 882 36,394 93,945 23,656 86,604 19,306 19,253 280,226
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 186 882 36,394 93,945 23,656 86,208 17,750 17,754 276,775
Operation and Maintenance 0 0 0 0 0 396 1,556 1,499 3,451
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 186 882 36,394 93,945 23,656 86,604 19,306 19,253 280,226
136
Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/BRAC 88 Environmental Restoration
and Caretaker.
Closure Package:
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Environmental Restoration: Includes expected costs to
implement the remedial actions and long term monitoring
requirements at the remaining 13 BRAC 88 installations:
Installation FY 03
Alabama 658
ARL Watertown 170
Ft. Meade 234
Cameron Station 53
DMA-Herndon 4
Ft Sheridan 240
Ft Wingate 2,381
Jefferson 1,271
Lexington 439
Livingston 18
Pueblo 11,505
Tacony 33
Umatilla 748
Total: $ 17,754
Operation and Maintenance: Costs identified in this
package are required for caretaker. The following facilities
require caretaker funding since they are awaiting transfer to
support local reuse.
Exhibit BC-03
137
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Installation FY 03
Ft Wingate 627
Jefferson 430
Pueblo 442
Total: $ 1,499
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
138 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
BRAC 91 ENVIRONMENTAL RESTORATION
AND CARETAKER
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 65 0 28,040 59,626 15,003 54,586 36,496 29,300 223,116
Operation and Maintenance 0 0 0 1,690 0 750 2,900 2,800 8,140
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 65 0 28,040 61,316 15,003 55,336 39,396 32,100 231,256
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 65 0 28,040 61,316 15,003 55,336 39,396 32,100 231,256
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 65 0 28,040 59,626 15,003 54,586 36,496 29,300 223,116
Operation and Maintenance 0 0 0 1,690 0 750 2,900 2,800 8,140
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 65 0 28,040 61,316 15,003 55,336 39,396 32,100 231,256
139 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/BRAC 91 Environmental Restoration
and Caretaker.
Closure Package:
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Environmental Restoration: Includes expected costs to
implement the remedial actions and long term monitoring
identified during the studies phase at the remaining four
BRAC 91 installations.
Installation FY 03
ARL Woodbridge 193
Ft Devens 7,544
Ft Ord 20,612
Sacramento 951
Total: $ 29,300
Operation and Maintenance: Costs identified in this package
are required for caretaker. The following facilities require
caretaker funding since they are awaiting transfer to support
local reuse.
Installation FY 03
Ft Ord 2,700
Ft Ben Harrison 100
Total: $ 2,800
Military Personnel: None.
Exhibit BC-03
140
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
(Continued)
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
141 Exhibit BC-03
BASE REALIGNMENT AND CLOSURE 95
FINANCIAL SUMMARY
BRAC 93 ENVIRONMENTAL RESTORATION
AND CARETAKER
TOTAL
FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 96-03
ONE-TIME IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 4,295 2,909 7,204
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Military Personnel - PCS 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
TOTAL ONE-TIME COSTS 0 0 0 0 0 0 4,295 2,909 7,204
Revenue From Land Sales 0 0 0 0 0 0 0 0 0
Appropriation Request 0 0 0 0 0 0 4,295 2,909 7,204
FUNDING OUTSIDE THE ACCOUNT:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
TOTAL OUTSIDE THE ACCOUNT 0 0 0 0 0 0 0 0 0
SAVINGS:
Military Construction 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0
Operation and Maintenance 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
Civilian ES 0 0 0 0 0 0 0
Military ES 0 0 0 0 0 0 0
TOTAL SAVINGS 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS:
Military Construction 0 0 0 0 0 0 0 0 0
Family Housing 0 0 0 0 0 0 0 0 0
Construction 0 0 0 0 0 0 0 0 0
Operations 0 0 0 0 0 0 0 0 0
Environment 0 0 0 0 0 0 4,295 2,909 7,204
Operation and Maintenance 0 0 0 0 0 0 0 0 0
Military Personnel 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
Homeowners Assistance Program 0 0 0 0 0 0 0 0 0
Revenue From Land Sales (-) 0 0 0 0 0 0 0 0 0
Financing Entry 0 0 0 0 0 0 0 0 0
NET IMPLEMENTATION COSTS 0 0 0 0 0 0 4,295 2,909 7,204
142 Exhibit BC-02
BASE REALIGNMENT AND CLOSURE
PACKAGE DESCRIPTION
Army/Location/Package: Army/BRAC 93 Environmental Restoration
and Caretaker.
Closure Package:
Costs:
Military Construction: None.
Conjunctively-Funded Construction: None.
Family Housing Construction: None
Family Housing Operations: None.
Environmental Restoration: Includes expected costs to
implement the remedial actions and long term monitoring
requirements for the remaining 3 BRAC 93 installations.
Installation FY03
Tooele 2,529
Ft. Monmouth 20
Vint Hill Farms 360
Total: $2,909
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Revenues from Land Sales: None.
Savings:
Military Construction: None.
Family Housing Construction: None.
Family Housing Operations: None.
Operation and Maintenance: None.
Military Personnel: None.
Other: None.
Exhibit BC-03
143