Clearance Transmittal C-08-020

Step 1 External Comments



Item #XXXX-XXXX Concrete Maturity Testing

Organization/ Comment Resolution

#

Person

1 BOCM/all None/Approved

District 9-0/Kevin None/Approved

2

Gnegy

District 11-0/Michael None/Approved

3 J. McCart



BOD/Nikki Krise Section I, paragraph 1, remove sentence "The Sentence left in the Description. The reason for

basis of the maturity theory is that for concrete this specification.

4 of a given mixture the same strength will

develop at a given maturity value."



Section I, paragraph 1, last sentence change verb Incorporated.

5 "will" to "does". Added "Quality" before

Acceptance.

Section II.A, paragraph 1 "remove proprietary The task force wanted specific products tested

names". on the pilot project, so proprietary names were

included. More than one was listed, so there

6

was an option. The pilot project has used the

specification, so the names will be removed.



Section II.A, bullet 3, include Fahrenheit Not incorporated, accuracy based on ASTM C

7

equivalent 1074 requirement.

Section II.B, change the order and verbs of the Incorporated.

8

first sentence.

Section II.B, change the verbs and reduce words Incorporated.

9

in the second sentence.

Section II.C.1, change measurement symbols and Incorporated measurement changes. Second

10 include metric. Remove second sentence. sentence changed to its own number.



11 Section II.C.5, include metric. Incorporated.

Section II.C.6, remove descriptive clause in first Left in for clarification.

12

sentence.

Section III. A. Unbold and reword first sentence. Incorporated.

13

Section III. A.1-3, Change "Calibration Curve" to Incorporated.

14 "Strength-Maturity Curve". Also include metric.



15 Section III.B, unbold first sentence. Incorporated.

Section III.B.2, change measurement symbols Incorporated.

16

and include metric.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #XXXX-XXXX Concrete Maturity Testing

Organization/ Comment Resolution

#

Person

BOD/Nikki Krise Section III.B.5, remove "which would be" and Left in clause. Added "Curve as determined in

17

include "Calibration Section II c" Section II C(8)."

Section IV, add "Retain" and remove "will remain Left as was for clarification.

18 the property of the contractor at the completion

of this item of work."

District 12-0/Thomas Section II.A, does not list a computer, or have Added personal computer. Note: then took out

19 P. Boyle specific guidelines for devices that display because pilot project recommended not

maturity values. necessary.

Section II.B, Will need more time than six days The draft had sixty, no change.

prior to construction. If used for structures, the Second sentence in Section II.C is suppose to

bridge department should review where the address this issue. Was made into its own

sensors will be placed for critical structural number.

locations and exposure considerations.

Hopefully in the future, the standards will list the

locations for the sensors on standard structural

elements.

20

- Specification does not address the knock downs

for the water cement ratio on the design, or

changes in the dosage rates of the admixtures.

These are real life changes and should be

addressed in the specification.









Section II.C.6 -Mentions pavements and Removed structures, will work on getting

structures: Not clear if these specifications are pavements approved first.

intended to cover structures and pavements. If

this specification is intended for Structures, in

addition to pavements, then there need to be

more specification addressed for example curing,

21

loading, etc. The district does not foresee that

the maturity meter should ever eliminate the

protection of the concrete surface during cold

weather as outlined in section 1001.3(p) 4 & 5.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #XXXX-XXXX Concrete Maturity Testing

Organization/ Comment Resolution

#

Person

District 12-0/Thomas Section III.B.- The verification test results data not sure how to incorporate this in to the

P. Boyle should be added to the maturity data base and specification.

the maturity model for the concrete mix and

should be continuously recomputed. Confidence

in the prediction increases as more test results

22

become available. (A method should be listed to

provide this information to the supplier and how

the supplier will keep this running average.)





Municipal Section II.A, include Fahrenheit Not incorporated, accuracy based on ASTM C

23 Services/Rich Stirling 1074 requirement.



24 Section II.C, include metric Incorporated.

25 Section III.A and B, include metric Incorporated.

FHWA/dwc Section II.A, need to address proprietary The task force wanted specific products tested

requirements. on the pilot project, so proprietary names were

included. More than one was listed, so there

26

was an option. The pilot project has used the

specification, so the names will be removed.



FHWA/ZS Section III.B.5, What is meant by "previously Was changed into a list of ranges to clarify.

established strength"? I believe the intent would

be better expressed by stating as follows: " if the

27 test results are within 10% of the

PREDICRED/ESTIMATED strength the relationship

is considered verified."



Section IV, This sentence does not Lump sum changed to incidental to pavement

unambiguously/clearly convey the intent that items.

everything required to accomplish the objectives

of this section would be considered incidental to

28

the accomplishment of the objectives and will

not be measured/quantified or paid for

separately.



PACA - Kallie L. Kline Section I, please include a definition of "critical Was changed for pilot project, based on the

29

construction operations". project comments, clarified further.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #XXXX-XXXX Concrete Maturity Testing

Organization/ Comment Resolution

#

Person

PACA - Kallie L. Kline Section III B(4), the curing method should This section is verifying field concrete so the

30 indicate PTM 611 , section 11.1". reference should be PTM 611, section 11.2.



District 4-0/David K. None/Disapproved

31

Elmer

District 8-0/Douglas Disapproved/with comments.

32

Frank

Maturity Testing should be for contractors QC That is what the specification is trying to do.

33

testing only.

34 This should not be a pay item. Pay item is incidental.

Maturity Testing should not be for structures. That is why only a 501 and 516 item were sent

35 Limit use to roadways and roadway patching. out with this CT.



Pilot Project Section I, Opening to traffic based on meter or Reworded third sentence: ...is to be used "by the

Comments cylinders needs clarified. contractor to determine when to perform critical

construction operations such as saw cutting,

36

removing formwork, backfilling, moving

equipment, or breaking cylinders."



Section II, A. Equipment The brand was specified for the pilot project. If

Do we need to specify a brand? What about wireless is commercially available okay. Long

wireless? enough to establish the maturity curve and

How long is continuously logging? obtain the strength needed. Readings should be

What is wrong with reading every hour to begin closer in the beginning to establish the curve.

37 with? Accelerated patching might even need to be 15

Most construction projects have a personal minutes in the beginning after more use we will

computer now, we just need the prpoer license. know if that needs changed. Removed personal

computer and added proper software license.





Section II, B Why submit QC plan 60 days prior? Enough time to verify the plan and to turn

38

around for any changes needed.

Section II, C. 1. & 4., Recommend 11 cylinders, Originally was 17 cylinders then dropped the

but then add another cylinder for the second second sensor cylinder to reduce to 16. Will

39

sensor. word a minimum of 12 cylinders. 10 for breaks

and 2 for sensors.

Section II, C. 3. Could we establish this thru a lab No. When travel time was not taken into

not worrying about travel time? Also, for this consideration in past trials, the established curve

40

part mixing at the plant so take out reword and the verified curve to did not correlate.

taking the sample. Reworded sentence.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #XXXX-XXXX Concrete Maturity Testing

Organization/ Comment Resolution

#

Person

Pilot Project Section II, C. 6. Is this a water bath for all of the Yes changed wording to claify.

41 Comments cylinders? What about the first 24 hours 60

degree to 80 degree time?

Section II, C. 7. Aren't 604 QA samples in No. PTM 604 is for testing all molded cylinders

Harrisburg? for compressive strength. The time table is no

42

longer listed in the PTM, so changed reference

to AASHTO T22-7.

Section III, A.2., include each day. Not sure about Incorporated per day. Will leave dimensions for

43

installation depth. now.

Seciton III, A.3., change structure to pavement Incorporated

44

45 Section III, B.2., add …size"is at" the… Incorporated

Section III, B.3., Why have two sensors? Two readings established the curve. Two

readings to verify the curve. The reason was to

eliminate making two cylinders for verification,

46

so both sensors would go into one. Added extra

cylinder back in to verification.



47 Seciton III, B.4., Reword to clarify. Incorporated

Section III, B.5., delete "which would be" and is Incorporated

48

c verified or not?

Section IV, What about structures? Working on getting pavements approved first

49

then will work on structures.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #XXXX-XXXX Concrete Maturity Testing

Organization/ Comment Resolution

#

Person

Clearance Transmittal C-08-020

Step 1 External Comments



Item #9501-XXXX

Organization/ Comment Resolution

#

Person

BOD/Nikki Krise 501.1 after title insert "add the following" and Incorporated.

1

remove "Add:" in paragraph.

501.3(a)1 after title insert "add the following" Incorporated.

2 and remove "Add:" in paragraph.



501.3(l)2 after title insert "revise to read as Incorporated.

3

follows", remove "until" and spell out psi.

501.3(l)3 after title insert "revise to read as Incorporated.

4

follows" and spell out psi.

501.3(q) after title insert "revise to read as Incorporated.

5

follows", remove "until" and spell out psi.

District 12-0/Thomas Does not address the depth of the sensors in the Addressed in the main guideline.

6

P. Boyle pavement

Municipal Include degree symbol. Incorporated.

7 Services/Rich Stirling



FHWA/ZS 501.3(l)1 second sentence "The contractor… are The change in this paragraph was the curing time

acceptable." Acceptable to whom? frame. The unsatisfactory sentence is part of the

8 original specification and out of the scope of this

proposed specification change.



501.3(l)1 "…if unsatisfactory results are The change in this paragraph was the curing time

obtained." Unsatisfactory is a subjective term. frame. The unsatisfactory sentence is part of the

9 Unsatisfactory to whom? What constitutes original specification and out of the scope of this

"unsatisfactory" results? Where are these proposed specification change.

defined?

501.3(l)2 First sentence, How will the curing If the ambient temperature is not forecasted to

temperature be monitored when the ambient fall below 4C, the curing would be in normal

10

temperature is NOT forecasted to fall below 4C? curing conditions then 501.3(l)1 would apply.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #9501-XXXX

Organization/ Comment Resolution

#

Person

FHWA/ZS 501.3(q) last sentence, It is assumed that the Yes.

correlation between maturity values and

cylinder testing (compressive strength) is

represented by the Strength Maturity Calibration

Curves discussed under 501.3(l)1. In the logical,

and conventional, sequence of events, by the

time you come to the stage represented by

11 501.3(q) you have already passed through state

501.3(l)1 where in you have "approved

/reviewed" the correlation. So, in this last

sentence of 501.3(q) are you indicating that you

could now become dissatisfied with the

correlation that you approved/reviewed under

501.3(l)1?



Pilot Project 501.3(l)1, Cure joints. The change in this paragraph was the curing time

Comments frame. The "cure joints" are part of the original

12 specification and out of the scope of this

proposed specification change.



501.3(l)2, Need to include the rest of the Incorporated.

13 paragraph to include high low thermometers.



501.3(q), curing period reference? Incorporated current specifications time frame.

And/or? Changed "and/or" to "then verified". Not

14 What will be not satisfactory? satisfactory is if the maturity value never reaches

a value on the established curve.

Clearance Transmittal C-08-020

Step 1 External Comments



Item #9516-XXXXX

Organization/ Comment Resolution

#

Person

BOD/Nikki Krise 516.1 after title insert "add the following" and Incorporated.

1

remove "Add:" in paragraph.

516.3 after title insert "add the following" and Incorporated.

2

remove "Add:" in paragraph.

516.3(q) after title insert "revise to read as Incorporated.

3

follows", include metric and spell out psi.

District 12-0/Thomas Does not address the depth of the sensors in the Addressed in main guideline.

4

P. Boyle pavement

Municipal Include metric. Incorporated.

5 Services/Rich Stirling



FHWA/ZS 516.3(q) Will these plastic-concrete samples be Include: ...plastic concrete"for compressive

used to make cylinders (for subsequent testing)? strength testing," from...

6

Is this stated somewhere?



516.1, see comment for 501.1 Comment was not included, so don't know what

7

the request is.

516.3(q) What happens if the cylinder strengths The cylinders results are the primary results.

do not agree with strengths estimated/predicted

8

by the Strength-Maturity Calibration Curve?



District 8-0/Douglas Disapproved/with comment.

9

Frank Best used in accelerated patching. Nothing to incorporate.



Related docs
Other docs by cuiliqing
11.1 Exploring Area and Perimeter
Views: 0  |  Downloads: 0
Volusia County
Views: 2  |  Downloads: 0
choosing_topics_and_y10
Views: 0  |  Downloads: 0
CLE Credit - rscrpubs.com
Views: 2  |  Downloads: 0
Meeting Minutes September 8 Final
Views: 0  |  Downloads: 0
nov2411
Views: 3  |  Downloads: 0
EKG Spreadsheet - Geocities.ws
Views: 0  |  Downloads: 0
Gift from Christ to the Church
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!