2011Railway _ Subway_20110117-20110121_.en

Document Sample
2011Railway _ Subway_20110117-20110121_.en Powered By Docstoc
					The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




                                  Railway & Subway
                                       -20110117-20110121




          Project Name: Railway passenger special joint mussels and Hefei Project ............................ 2
          Project Name: Second Lan-Xin Railway from Xining section of two-Ping .............................. 3
          Project Name: Lanzhou to the airport railway project in Sichuan ......................................... 4
          Project Name: Railway Project Tongren to Yuping .............................................................. 6
          Project Name: Changzhou Dragon Area Road Network Project -the first project ................... 7
          Project Name: Beijing Railway Line Yan room -update ........................................................ 8




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :            +86-10-82743720
         E-Mail :         contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




Project Name: Railway passenger special joint mussels and Hefei Project


Stages of progress: preliminary design

Construction period: 2011 -2013

Major equipment: Electric railway equipment, power equipment, signal equipment, communications
equipment, electric aircraft vehicle computer, command and control systems, lightning protection and
grounding, automatic train control system, geographic information systems, railway maintenance
equipment, ticket sale and reservation systems, passenger broadcasting system, ticket office and bus quartz,
inspection wells, passengers carrying articles Security Tester -small, diesel generators, cranes, pressure
vessels, clean car bridge bearings, round steel, steel, water reducer, powder ash, anchor, steel, cement, steel
wire, bridge bearings, bridge expansion joints, bridge deck waterproofing material, turnouts, concrete
sleepers, emulsified asphalt, non-ballasted track sliding layer material, buckle accessory rail tunnel
waterproof board, water-stop, safety helmets, concrete poles, catenary concrete pillars, steel catenary pillars,
high voltage cables, communication cables, communication cable, signal cable, integrated grounding cable,
ACSR, catenary wire, catenary wire , equipment, vehicles and other OCS operations.

Project:
  The project is located in central Anhui Province, Bengbu City, north, south Hefei, passes through
Fengyang County, Huainan City and Changfeng County. Mussels off the north combined expertise is
building the Beijing-Shanghai high speed railway hub in the south and the Hefei-Nanjing, Hefei, Wuhan
Railway dovetail joint is the Beijing-Shanghai Express Railway and Shanghai-Wuhan-Chengdu fast
passenger lines between channels, fast connectivity, but also Beijing-Fuzhou Railway the important part.
Line is line length 110km.

  The total investment is about 9.5 billion.

Owner:*******
Post Code:*******
Contact:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




Tel :*******




Project Name: Second Lan-Xin Railway from Xining section of two-Ping


Stages of progress: survey and design

Construction period: 2011 -2014

Major equipment: Electric railway equipment, power equipment, signal equipment, communications
equipment, electric aircraft vehicle computer, command and control systems, lightning protection and
grounding, automatic train control system, geographic information systems, railway maintenance
equipment, ticket sale and reservation systems, passenger broadcasting system, ticket office and bus quartz,
inspection wells, passengers carrying articles Security Tester -small, diesel generators, cranes, pressure
vessels, clean car bridge bearings, round steel, steel, water reducer, powder ash, anchor, steel, cement, steel
wire, bridge bearings, bridge expansion joints, bridge deck waterproofing material, turnouts, concrete
sleepers, emulsified asphalt, non-ballasted track sliding layer material, buckle accessory rail tunnel
waterproof board, water-stop, safety helmets, concrete poles, catenary concrete pillars, steel catenary pillars,
high voltage cables, communication cables, communication cable, signal cable, integrated grounding cable,
ACSR, catenary wire, catenary wire , equipment, vehicles and other OCS operations.

Project:
  Haidong Prefecture in Qinghai Province, the project, the new two-lane Lanxin railway in Qinghai
Province is the second line of the line length of 267.3 km, the line is safe to Xining section length
23.004km, the main works to roadbed, bridges, tunnels based.

  The total investment is about 28.23 billion yuan.

Owner:*******
Postal address:*******
Post Code:*******
Contact:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




Tel :*******

Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal Code:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Lanzhou to the airport railway project in Sichuan


Stages of progress: Feasibility study report

Construction period: 2011 -2014

Major equipment: Electric railway equipment, power equipment, signal equipment, communications
equipment, electric aircraft vehicle computer, command and control systems, lightning protection and
grounding, automatic train control system, geographic information systems, railway maintenance
equipment, ticket sale and reservation systems, passenger broadcasting system, ticket office and bus quartz,
inspection wells, passengers carrying articles Security Tester -small, diesel generators, cranes, pressure
vessels, clean car bridge bearings, round steel, steel, water reducer, powder ash, anchor, steel, cement, steel
wire, bridge bearings, bridge expansion joints, bridge deck waterproofing material, turnouts, concrete
sleepers, emulsified asphalt, non-ballasted track sliding layer material, buckle accessory rail tunnel
waterproof board, water-stop, safety helmets, concrete poles, catenary concrete pillars, steel catenary pillars,
high voltage cables, communication cables, communication cable, signal cable, integrated grounding cable,
ACSR, catenary wire, catenary wire , equipment, vehicles and other OCS operations.

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




  Project is located in Lanzhou City, the new line from Lanzhou Railway Station leads to inter-city games,
new west beneath the second double line into the existing Lan Lan-Xin Railway channel, the Chen
government-run after the break to the north west across the city fixed the Yellow River, After crossing the
red top of the line along the east coast to the Shagou Li Ma Nakagawa Airport, located in the River in
Lanzhou Airport Airport Station. Line length of approximately 63 km. Lanzhou, Lanzhou-Line to North
Station cargo tie-line leads west from the North Marshalling Station of Lanzhou, north off walking along
the line of Li Ma Shagou and subsequently tunnel through the mountain to take direct charge of the tower
connecting Lanzhou line, length of 21.7 km. Number of major projects: Lanzhou to the airport railway line
Nakagawa long 63.0km, bridge and tunnel length of 44.656km, of which the bridge 18 40.881km, Tunnel 7
3.775km, Lanzhou Blue Line to North Station, the new truck tie-line length of 21.659km, bridge and tunnel
General 16.258Km, including single-line bridge 2.28km / 4 seat, two-lane bridge 2.858km/10 seats, the
tunnel 10 11.12km.

  Line Item Level: National Railway Ⅰ line; is the number of lines: double; minimum curve radius:
3500m; Limiting Grade: 20 ‰; traction types: electric traction; to the effective length of Lines: 650m;
occlusion type: automatic block. Traffic control methods: the CTC.

  The total investment is about about 130 billion.

Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Contact:*******
Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




Project Name: Railway Project Tongren to Yuping


Progress stage: feasibility study being prepared

Construction period: 2011 -2015 Nian

Major equipment: Electric railway equipment, power equipment, signal equipment, communications
equipment, electric aircraft vehicle computer, command and control systems, lightning protection and
grounding, automatic train control system, geographic information systems, railway maintenance
equipment, ticket sale and reservation systems, passenger broadcasting system, ticket office and bus quartz,
inspection wells, passengers carrying articles Security Tester -small, diesel generators, cranes, pressure
vessels, clean car bridge bearings, round steel, steel, water reducer, powder ash, anchor, steel, cement, steel
wire, bridge bearings, bridge expansion joints, bridge deck waterproofing material, turnouts, concrete
sleepers, emulsified asphalt, non-ballasted track sliding layer material, buckle accessory rail tunnel
waterproof board, water-stop, safety helmets, concrete poles, catenary concrete pillars, steel catenary pillars,
high voltage cables, communication cables, communication cable, signal cable, integrated grounding cable,
ACSR, catenary wire, catenary wire , equipment, vehicles and other OCS operations.

Project:
  Project located in Guizhou Province, the railway station leads from Tongren, the line leads to the
Tongren station, towards the southwest by the Tin Ping, connection length -sand Queensland -Ming
passenger line, the bulk Ping station, the new line length of 47.6 km . New inter-city passenger rail for the
double post, targeted speed of 200 km / h, electric traction, the construction period of 3.5 years.

  The total investment is about 4.742 billion yuan.

Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Changzhou Dragon Area Road Network Project -the first project


Stages of progress: environmental impact assessment

Construction period: 2011 -2012

Major equipment: excavators, bulldozers, rollers, tamping machine, stirring hug, paver, hoist, boring
machine, tunnel boring machines, drilling rig, mud circulation reserve tank

Project:
   Dragon Project Area is located in Changzhou City, the road network project -first batch, including
Qingfeng Road, the new way, Xinfeng Road, three roads. General section of Tsing Fung Road planning red
line width of 16 meters, from the bamboo Beitang North East Road, the road to the length of 1686.95
meters, the road has been excavated across the Jia-River, Jia-Tong River were planning a span of 22 and 16
of the proposed m simply supported plate girder bridge; new red line all the way to the general road
planning and 30 meters wide, from the Church Beitang North East Road to the new road length of 1035.46
meters, Xinfeng Road, the general section of the planning red line width of 16 meters, practitioners Feng
Road to E road length of 858.33 meters 120, road planning Jia-Tong River across a span of 16 meters
proposed simply supported plate girder bridge. Simultaneous implementation of roads, bridges and
drainage, sewage, telecommunications, gas, water supply, electricity, street lights and other municipal
pipelines and other related facilities.

  The total investment is not detailed.

Construction Unit:*******
Postal Address:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




Contact:*******
Tel:*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Beijing Railway Line Yan room -update


Stages of progress: preliminary design

Construction period: September 2011 -2013 Nian September

Major equipment: Electric railway equipment, power equipment, signal equipment, communications
equipment, electric aircraft vehicle computer, command and control systems, lightning protection and
grounding, automatic train control system, geographic information systems, railway maintenance
equipment, ticket sale and reservation systems, passenger broadcasting system, ticket office and bus quartz,
inspection wells, passengers carrying articles Security Tester -small, diesel generators, cranes, pressure
vessels, clean car bridge bearings, round steel, steel, water reducer, powder ash, anchor, steel, cement, steel
wire, bridge bearings, bridge expansion joints, bridge deck waterproofing material, turnouts, concrete
sleepers, emulsified asphalt, non-ballasted track sliding layer material, buckle accessory rail tunnel
waterproof board, water-stop, safety helmets, concrete poles, catenary concrete pillars, steel catenary pillars,
high voltage cables, communication cables, communication cable, signal cable, integrated grounding cable,
ACSR, catenary wire, catenary wire , equipment, vehicles and other OCS operations.

Project:
   Since the project is located in Fangshan District, Beijing Yanshan Petrochemical Industry at the southern
tip, the way southeast along the Yan house courses, into the terminus of the West Extension Fangshan Line,
the extension to the Beijing Zhoukoudian area starting from the week of road access to the main line,
construction of a 21.2 km-long rail lines, of which about 15.2 km main line, branch line of about 6 km, the
design speed of 100 km / h, a total of 12 elevated stations. Project will be divided into main and feeder,
main line station will be located Yanhua, Hung Temple Station, Old Town North Station, Rao Yuefu

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries

You can choose the suitable Journal according to your needs.




station, Gu eight stations, Star City Station, Yan Village Station, Tai Lithospermum docking station, depot
station; Zhixian station will be located the town of Zhoukoudian, Gu books Station, Old Town Station.

  The total investment is about 1 billion yuan.

Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:11/9/2011
language:English
pages:9