					                              PRE-BID MEETING AGENDA
                                  UC Project No.:
                                   Project Name:
                                <Date, Time and Location>


A.   INTRODUCTIONS

B.   SIGN-IN SHEET

C.   PROJECT DESCRIPTION & SCOPE OF WORK

D.   BASE BIDS:
       <list all prime contracts and their estimates>

E.   ALTERNATES, ALLOWANCES AND UNIT PRICES
       <list and reference spec section when applicable>

F.   WORK OR SERVICES BY OTHERS
       <list out such as FFE, TAB, Construction Testing, Temporary Utility Costs, etc.>

G.   QUESTIONS DURING BID
       <describe process, time limits, and use of Bid RFI forms if any>

H.   BID ADDENDUM
        1. Acknowledge receipt on Bid Form
           <identify probable release date>

I.   BID OPENING
        <indicate date, time and location>

J.   COMPLETION TIME
       <indicate date and or number of days>

K.   OBTAINING PLANS AND SPECIFICATIONS
       1. Plan Rooms

L.   REQUIRED SUBMITTALS FOR BIDDING
       1. Completed Bid Form
       2. Bid Security Form
       3. Valid Power of Attorney

M.   RECOMMENDED ADDITIONAL BID SUBMTTALS
          <they have to be provided sooner or later …UC prefers sooner>
       1. Bidder’s Qualifications (4-page form, including EDGE Certified Statement of Intent)
       2. Affirmative Action Program (EEO) – Certificate of Compliance
       3. Ohio Department of Insurance – Certificate of Compliance (to support the bond)
       4. Current Ohio Workers Compensation Certificate
       5. Certificate of Good Standing from Ohio Secretary of State
       6. For MEP & Fire Protection Contractors, Proof of Current Licensing from ODOC
       7. Declaration of Material Assistance form (DMA)
PRE-BID MEETING AGENDA
UC Project No.:
Project Name:
<Date, Time and Location>
Page 2



N.     SAFETY <identify applicable program: Supplementary Conditions-Safety or Safety Program>
            Hard Hats & Safety Glasses
            Dig Permit, Welding and Cutting Permit
            Daily Safe Plan of Action Reports
            Weekly Tool Box Meeting
            UC Safety Orientation & hard hat stickers <applicable to all workers & supervisors>
            Fire Alarm System <protocol for working on or around active fire alarm system>

O.     DRUG FREE WORK PLACE
         1. OBWC Drug-Free Work Place Program
            <Bidder must be enrolled in program to bid>
            <Subcontractors must be enrolled prior to starting work on site>
         2. COATS Program (SI 2.10.4.1)

P.     EDGE PARTICIPATION
         1. Edge Requirements are discussed in the Solicitation, Bid Form, Instructions to Bidders,
            General Conditions
            <This project has a ___% EDGE Participation goal>

Q.     BID ESCROW (IB 6.1.10)
          <for contracts over $2,000,000>

R.     SCHEDULING CONSULTANT
         <by UC or Lead Contractor>

S.     SPECIAL BID SUBMITTALS
          <Identify any special technical specification requirements>

T.     COMMISSIONING
         1. Commissioning Agent
         2. Contractor’s role

U.     SPECIAL CONSIDERATIONS
          <such as working in occupied building, shared site or access, shift work, phased bidding
          and/or construction, milestone dates, structured cabling, construction quality, Contractor’s
          LEED related requirements, special warranty requirement(s), UC occupancy and use
          requirement ,web based Project Management System, etc.>

V.     STAGING, ACCESS, PARKING, USE OF FACILITIES
          <refer to Division 01>




Pre-Bid Meeting Agenda                                                                 Feb. 2009
PRE-BID MEETING AGENDA
UC Project No.:
Project Name:
<Date, Time and Location>
Page 3



W.     CLEAN UP, PROTECTION OF THE PREMISES, & ENVIRONMENTAL
       CONSIDERATIONS
         1. Temporary Protection, Barricades, Gates
         2. Ingress / Egress
         3. Air Quality (Odor, Noise, Dust Control, etc.)

X.     INSURANCE (Ref: GC Article 11 & UC Supplementary Conditions)
          <Contractors are to provide & maintain Builders Risk Insurance, in addition to GL and Auto>

Y.     COMMON BIDDER PITFALLS
         1. EDGE Option A, B or C is not selected on the Commitment to Participate in the Edge
             Business Assistance Program form, which is part of the Bid Form.
         2. Bidder fails to indicate a percentage (%) when selecting option B on the Commitment
             to Participate in the Edge Business Assistance Program form.
         3. Attorney-in-fact signature on bond is illegible.
         4. Bidder does not circle the prime contracts (i.e. General, HVAC, Plumbing, Electrical,
             Etc.) that make up his combination bid.
         5. The “Contract Description” on the Bond is missing or does not match exactly what is
             being bid.
         6. Bidder is not enrolled in the OBWC Drug Free Work Place program.
         7. Company name on Bid Form does not match the Secretary of State Business filings.
         8. Company name on Bid Form does not match the Bidders license for HVAC, Plumbing,
             Electrical, Etc.
         9. Incorrect DMA form is used.
         10. EEO Certificate is expired or will soon expire.
         11. Workers Compensation Certificate is expired or will soon expire.
         12. Ohio Department of Insurance Certificate of Compliance (to support the bond) is expired.
         13. Bidder is not responsive to the time sensitive nature of the Bidder’s Qualifications
             Request or Notice of Intent to Award submittal requirements.
         14. Bidder does not provide a complete duplicate of their bid and bond on bid day.
         15. General Liability and Builders Risk Insurance certificate or coverage issues.
         16. Certificate of Good Standing with the Secretary of State is expired or unavailable.
         17. Bidders fail to complete the Sum in Words spaces on the bid form.
         19. Bidder fails to indicate if the Alternate is an “add” or “deduct”.

Z.     PREVAILING WAGE
         <This is a prevailing wage project. Direct Bidders attention to recent (0109) front-end
         language changes concerning registration and ratio of apprentices, pricing and reporting of
         fringe benefits, and Contractor / Subcontractor compliance with prevailing wage
         requirements>

AA.    QUESTIONS

BB.    SITE TOUR