Bid

W
Shared by: linzhengnd
Categories
Tags
-
Stats
views:
2
posted:
11/8/2011
language:
English
pages:
3
Document Sample
scope of work template
							                                                                                                             8bffecc4-9333-4ee6-b5ce-21a072877016.xls




           <====CONTRACTOR NUMBER
           CONTRACTOR NAME====>
              COUNTY(IES)========> STEPHENSON- WINNEBAGO-
             SECTION============> D2 MRS 2002-8                              BLANK PRICES         19
             LETTING DATE=======> April 26, 2002
             ITEM NUMBER========> 128              TOTAL QUANTITY            PAY ITEMS            19 TOTAL BID              $0.00
    64767 <====CONTRACT NUMBER                              60,419.600
 PIN       PAY ITEM DESCRIPTION           U OF M        QUANTITY         X       UNIT PRICE   =        TOTAL PRICE

X4066414   BC SC SUPER "C" N50            TON                1,199.000                                             $0.00




                                                                   2
CONTRACTOR NUMBER                           0
CONTRACTOR NAME               0
ITEM NUMBER                               128
CONTRACT NUMBER                         64767
THIS IS THE TOTAL BID>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>                    $0.00

NOTES:
1. Each PAY ITEM should have a UNIT PRICE and a TOTAL PRICE.
2. The UNIT PRICE shall govern if no TOTAL PRICE is shown or if there is a
   discrepancy between the product of the UNIT PRICE multiplied by the QUANTITY.
3. If a UNIT PRICE is omitted, the TOTAL PRICE will be divided by the QUANTITY
   in order to establish a UNIT PRICE.
4. A bid may be declared UNACCEPTABLE if neither a unit price nor a total price is shown.

ADDITIONAL NOTES WHICH APPLY FOR THE COMPUTER GENERATED (IDOTCBID)
SCHEDULE OF PRICES:
5. Pay item numbers (PIN), descriptions, unit of measure (U OF M), quantities, and Department
   supplied unit prices MUST BE CORRECT and CORRESPOND to the latest
   schedule of prices issued by the Department or the bid may be declared UNACCEPTABLE.
6. Insert this computer generated schedule of prices into the bidding proposal directly
   in front of the Department issued schedule of prices.
                            INSTRUCTIONS FOR CBID SPREADSHEET




To fill out Cbid spreadsheet all you will need to do is make sure your cursor is sitting
in the Contractor Number cell, enter your Contractor Number then hit your tab key or
the down arrow, you will then go to the Contractor Name field, fill that in then hit the Tab
key or the down arrow again and you will then be in the Unit Price column to begin entering
the Unit Price that you are bidding.

After you have completed all the unit price entries you will need to hold
down the CTRL key and the letter A for the contract to print.


If there is an addendum you will need to go to TOOLS, PROTECTION,
UNPROTECT SHEET to be able to delete contents of row. Highlight entire row then
go to Edit, Delete, the remaining rows will automatically move up so there will
be no blank lines. To add a row go to the last line of pay items then enter required information.
The formulas will automatically recalculate the number of line items and the Total Quantity.

!!!! DO NOT ADD A ROW IN THE MIDDLE OF SPREADSHEET !!!!

** There will be a separate sheet that will print out first, that has all the
information needed on it, there will be no need to fill it out separately.
You will also need to send it along with your bid, it will now be the first
sheet of the bid. The information on this sheet was previously the last page of your bid.

						
Related docs
Other docs by linzhengnd
Spec_PUMP
Views: 1  |  Downloads: 0
Sheet1 - Laptop Repair from Laptop Clinic
Views: 42  |  Downloads: 0
modello_cibi_nido
Views: 1  |  Downloads: 0
Math - Laurel County Schools
Views: 24  |  Downloads: 0
Lesson 2 Magic School Bus on the Ocean - CPSB
Views: 29  |  Downloads: 0
In the United States Court of Federal Claims
Views: 1  |  Downloads: 0
B.ED
Views: 20  |  Downloads: 0
Ecodesign and labelling of Boilers
Views: 33  |  Downloads: 0
vfy_m450-05fr
Views: 7  |  Downloads: 0