PA DEP CEM Harmonization

Study: Project Update



Prepared for the Ad-Hoc Subcommittee on

Monitoring Technical Workgroup





William Balcke, Perrin Quarles Associates, Inc.

February 26, 2004



1

CEM Harmonization Project

Overview

 6 month project beginning in October 2003

 Three main phases:

 Inventory

 Analysis

 Recommendations

 Comprehensive review of substantive

requirements

 Lay the groundwork for formal consideration by

PA DEP of substantive changes to CEM

program requirements

2

Inventory Efforts



 Inventory effort is most time consuming portion

of the overall project

 Comprehensive review is key

 We have focused on details of specific elements

after initial summary where we find multiple sets

of requirements on same topic









3

Inventory Methodology



 Use of Excel spreadsheets to collect and summarize

data

 Can filter based on:

 Pollutant/parameter (Opacity, CO, stack flow, etc.)

 Source type (Fossil Fuel Combustion Source, Hazardous Waste

Incinerator, etc.)

 Program (Acid Rain, NSPS, DEP, etc.)

 Document/system (rule, manual, policy, etc.)



 Provide citation for each element summarized



4

Inventory – Scope of Programs



 CEM requirements in the Inventory:

 PA DEP requirements

 NSPS (general provisions and about 30 subparts)

 NESHAP (general provisions and about 45 subparts)

 Part 51 requirements

 Part 75 (Acid Rain and NOx Budget)



 OTC monitoring not included as no longer

applicable



5

Inventory – Scope of Data Sources



 Inventory includes review of not only regulations,

but also manuals and other materials, such as:

 PA DEP Source Monitoring Manual, Version No. 7

 Part 75 Emissions Monitoring Policy Manual

 PA DEP policy materials

 PA DEP BAQ CEM administrative and data systems

 Similar items







6

Inventory – General Data Categories



 Design

 Installation

 Performance specifications

 Performance testing

 Performance test reporting

 Quality assurance

 Quality assurance reporting

 Reporting

 Other

7

Inventory – General Data

Categories (cont.)

 Within each of these areas, we have collected

information on specific data elements, with

column for citation

 Such as specific COMS design elements under the

Design category

 Within some categories, separate Excel

worksheets for subcategories

 Such as RATA worksheet with multiple specific

elements under Performance Testing category





8

Inventory – Results Overview

 We have identified numerous key elements with

multiple requirements, such as:

 Span and range

 Data validity rules

 We have identified other areas without

significant overlapping requirements, such as:

 Flow to load QA test

 Details of Part 75 missing data provisions







9

Analytical Phase – Overview

 Identify areas with conflicting requirements

 Identify any policy reasons to explain

differences

 Examples of areas analyzed to date









10

Next Steps









11

Complete quality assurance of

Inventory

 Also adding to Inventory based on DEP

feedback, as needed

 Complete Analysis Phase

 Discuss Analysis with DEP and identify

Recommendations

 Prepare final report

 Project completion scheduled for end of March

2004







12



Related docs
Other docs by xiaopangnv
Synchronicity Performance Group
Views: 4  |  Downloads: 0
Tabelle1 - VfL Bensheim Basketball
Views: 2  |  Downloads: 0
seguridad en un sistema informatico
Views: 0  |  Downloads: 0
2010-216 LUZ amd-Corrected-Not Used
Views: 0  |  Downloads: 0
9768118_9768160
Views: 0  |  Downloads: 0
Applied and Net Force
Views: 0  |  Downloads: 0
MONTAG
Views: 0  |  Downloads: 0
National Taiwan University_Macbeth
Views: 0  |  Downloads: 0
docjeotbAONe1
Views: 0  |  Downloads: 0
TEMPLATE--EAUpdate--Sept2007
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!