Embed
Email

Economics of Sealcoating - Star-Seal of Ohio

Document Sample

Shared by: xiaopangnv
Categories
Tags
Stats
views:
0
posted:
11/7/2011
language:
English
pages:
2
Economics Of sealcoating





35.00









30.00









25.00

Cum. Cost/ Sq. Yard









20.00

Sealed

Unsealed

15.00









10.00









5.00









0.00

2001 2002 2003 2004 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Years

ECONOMIC JUSTIFICATION OF SEALCOATINGS - U.S. Dollars



SEALCOATING WILL SAVE REAL DOLLARS AS SHOWN IN THE FOLLOWING TABULATION. THE COST SAVINGS WILL

BE A SUBSTANTIAL 60% IF THE PAVEMENT IS MAINTAINED ACCORDING TO STAR's RECOMMENDATIONS I.E. SEALCOATING EVERY 3 YEARS.

UNSEALED PAVEMENTS WILL REQUIRE REPAIRS STARTING WITH THE SECOND YEAR AND AN INCH OF OVERLAY EVERY 7TH. YEAR.





ECONOMICS OF SEALCOATING Cost/ Sq. Yard-CUMULATIVE

YEAR MAINTENANCE PERFORMED CTPE/ SQ YD. UNMAINTAINED YEAR Sealed Unsealed

2001 BASE+ 2" ASPHALT $ 11.00 $ 11.00 2001 11.60 11.00

2 SEALCOATS $ 0.60 2002 11.60 11.09

2002 1ST. YEAR MAINTENANCE COST $ - $ 0.09 2003 11.60 11.27

2003 2ND.YEAR MAINTENANCE COST $ - $ 0.18 2004 12.40 11.54

2004 3RD. YR.MAINTENANCE COST+ 2 SEALCOATS $ 0.15 $ 0.27 2004 12.40 11.54

+ 2 SEALCOATS $ 0.65 $ - 2005 12.40 11.99

2005 4TH. YEAR MAINTENANCE COST $ - $ 0.45 2006 12.40 12.53

2006 5TH.YEAR MAINTENANCE COST $ - $ 0.54 2007 13.30 13.16

2007 6TH. YEAR MAINTENANCE COST $ 0.20 $ 0.63 2008 13.30 18.66

+ 2 SEALCOATS $ 0.70 2009 13.30 18.86

2008 7TH.YEAR MAINTENANCE COST $ - $ - 2010 14.30 19.25

1.5 INCH OVERLAY $ 5.50 2011 14.30 19.80

(INCLUDES MILLING @ $1.5/SQ.YD.) 2012 14.30 20.45

2009 8TH. YEAR MAINTENANCE COST $ - $ 0.20 2013 15.45 21.40

2010 9TH. YEAR MAINTENANCE COST $ 0.25 $ 0.39 2014 15.45 22.65

+ 2 SEALCOATS $ 0.75 $ - 2015 15.45 24.10

2011 10TH.YEAR MAINTENANCE COST $ - $ 0.55 2016 16.40 31.65

2012 11TH. YEAR MAINTENANCE COST $ - $ 0.65

2013 12TH. YEAR MAINTENANCE COST $ 0.30 $ 0.95

+ 2 SEALCOATS $ 0.85 $ -

2014 13TH.YEAR MAINTENANCE COST $ - $ 1.25

2015 14TH. YEAR MAINTENANCE COST $ - $ 1.45

2016 15TH.YEAR MAINTENANCE COST $ - $ -

1.5 INCH OVERLAY+ 2 COATS OF SEALER $ - $ 7.55

(INCLUDES MILLING @ $2.5/SQ.YD.) $ 0.95 $ -



TOTAL INSTALLATION & MAINTENANCE COST

PER SQUARE YARD $ 16.40 $ 31.65

FOR AN AVERAGE PARKING LOT OF 10,000 SQ. YARD $ 196,100.00 $ 316,500.00

SAVINGS - FOR AN AVERAGE PARKING LOT OF 10,000 SQ. YARD $ 120,400.00



Related docs
Other docs by xiaopangnv
Synchronicity Performance Group
Views: 4  |  Downloads: 0
Tabelle1 - VfL Bensheim Basketball
Views: 2  |  Downloads: 0
seguridad en un sistema informatico
Views: 0  |  Downloads: 0
2010-216 LUZ amd-Corrected-Not Used
Views: 0  |  Downloads: 0
9768118_9768160
Views: 0  |  Downloads: 0
Applied and Net Force
Views: 0  |  Downloads: 0
MONTAG
Views: 0  |  Downloads: 0
National Taiwan University_Macbeth
Views: 0  |  Downloads: 0
docjeotbAONe1
Views: 0  |  Downloads: 0
TEMPLATE--EAUpdate--Sept2007
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!