Cost Data: 360 Closure of Waste Impoundments

Typical Implementation Scenario

Close a earthen animal manure lagoon or storage facility. Typical scenario includes cost to remove manure by pumping or hau

The closure of waste impoundments that are no longer used for their intended purpose, in an environmentally safe manner.



Practice Description



Earth fill used to close structure. (Maximum cost not to exceed $25,000).

Geographic Area: Statewide



Unit for Cost Estimate: CuYd

Practice Life (Years): 15

Discount Rate (%/Year): 5%



Materials

Waste/Contaminated Waste/Contaminate

Soil Moved with d Soil Exported with

Excavator Dump Truck

Soil/Fill Material Cost ($/CuYd):

Units Moved per hour: 35 35

Units CuYd CuYd

Equipment Cost w/Operator ($/Hr) $90.00 $60.00

Total Excavation Cost/Unit (CuYd): $3.60 $1.71





Scenario Example: Units Unit

Length (ft): 200 Ft

Width (ft): 150 Ft

Storage Depth (ft): 8 Ft

Depth of Waste/Contaminated Soil: 2 Ft

Waste/Contaminated Soil Moved with Excavator 2,222 CuYd

Waste/Contaminated Soil Exported with Dump Truck 2,222 CuYd

Storage Area to be Filled with Imported Soil: 8,889 CuYd





Total Cost per CuYd Original Storage Area: $10.46 Multiplied times 1.07 for 2009

based on Cost Increase Factor for machine



Data Source: RS Means Data Page Number 410 G-1030 120" Item Number 1000 and G1030 155 Item Number 4900" Page N

Determined by SC State Engineer, Assistant State Engineer and State Resource Conservationist on 9/29/09.

Equipment/Installation

(Included in Materials cost)



Labor

(Included in Materials cost)



Mobilization

2% or materials, equipment and labor



Operation & Maintenance (Annual)

None



Acquisition of Technical Knowledge

None



Forgone Income (Annual)

None, possible land brought into production.



Risk

Reduced risk, change in land use



Administration & Permit Costs

None



Total Cost Estimate:



Associated Practices:

633-Waste Utilization, 378-Pond, 342-Critical Area Planting.

remove manure by pumping or hauling and then earthwork

n environmentally safe manner.







cost not to exceed $25,000).









Cost/Unit



$10.46 6



Soil/Fill Imported

with Dump Truck

$6.05

25

CuYd

$60.00

$8.45





$/Unit









$3.60

$1.71

$8.45



$86,921

d times 1.07 for 2009

n Cost Increase Factor for machinery



30 155 Item Number 4900" Page Number 421.

ionist on 9/29/09.

$0.00





$0.00





$0.21





$0.00

$0.00





$0.00





$0.00





$0.00





$10.67

Cost Data: 360 Closure of Waste Impoundments

Typical Implementation Scenario



The closure of waste impoundments that are no longer used for their intended purpose, in an environmentally safe manner.



Geographic Area: Statewide



Unit for Cost Estimate: CuYd

Practice Life (Years): 15

Discount Rate (%/Year): 5%



Materials

Soil/Fill

Waste/Contaminated Imported

Waste/Contaminated Soil Moved with Soil Exported with with Dump

Excavator Dump Truck Truck

Soil/Fill Material Cost ($/CuYd): $6.00

Units Moved per hour: 20 20 20

Units CuYd CuYd CuYd

Equipment Cost w/Operator ($/Hr) $80.00 $80.00 $90.00

Total Excavation Cost/Unit (CuYd): $4.00 $4.00 $10.50





Scenario Example: Units Unit $/Unit

Length (ft): 200 Ft

Width (ft): 60 Ft

Storage Depth (ft): 8 Ft

Depth of Waste/Contaminated Soil: 2 Ft

Waste/Contaminated Soil Moved with Excavator 889 CuYd $4.00

Waste/Contaminated Soil Exported with Dump Truck 889 CuYd $4.00

Storage Area to be Filled with Imported Soil: 3,556 CuYd $10.50

$44,444

Total Cost per CuYd Original Storage Area: $12.50

Data source: Local contractors.



Equipment/Installation

(Included in Materials cost)



Labor

(Included in Materials cost)



Mobilization

2% or materials, equipment and labor



Operation & Maintenance (Annual)

None



Acquisition of Technical Knowledge

None



Forgone Income (Annual)

None, possible land brought into production.



Risk

Reduced risk, change in land use



Administration & Permit Costs

None



Total Cost Estimate:

Cost/Unit



$12.50 6









$0.00





$0.00





$0.25





$0.00





$0.00





$0.00





$0.00





$0.00





$12.75

Cost Data: 360 Closure of Waste Impoundments

Typical Implementation Scenario

Close a 1 Acre-Foot Waste Storage Lagoon.

The closure of waste impoundments that are no longer used for their intended purpose, in an environmentally safe manner.



Geographic Area: Statewide



Unit for Cost Estimate: CuYd

Practice Life (Years): 15

Discount Rate (%/Year): 5%



Materials

Soil/Fill

Waste/Contaminated Imported

Waste Moved with Soil Exported with with Dump

Irrigation equipment Dump Truck Truck

Soil/Fill Material Cost ($/CuYd): $3.00

Units Moved per hour: 40 25 25

Units CuYd CuYd CuYd

Equipment Cost w/Operator ($/Hr) $50.00 $70.00 $90.00

Total Excavation Cost/Unit (CuYd): $1.25 $2.80 $6.60





Scenario Example: Units Unit $/Unit

Length (ft): 200 Ft

Width (ft): 60 Ft

Storage Depth (ft): 8 Ft

Depth of Waste/Contaminated Soil: 2 Ft

Waste/Contaminated Soil Moved with Excavator 889 CuYd $1.25

Waste/Contaminated Soil Exported with Dump Truck 889 CuYd $2.80

Storage Area to be Filled with Imported Soil: 3,556 CuYd $6.60

$27,067

Total Cost per CuYd Original Storage Area: $7.61

Data source: Local contractors.



Equipment/Installation

(Included in Materials cost)



Labor

(Included in Materials cost)



Mobilization

2% or materials, equipment and labor



Operation & Maintenance (Annual)

None



Acquisition of Technical Knowledge

None



Forgone Income (Annual)

None, possible land brought into production.



Risk

Reduced risk, change in land use



Administration & Permit Costs

None



Total Cost Estimate:

Cost/Unit



$7.61 6









$0.00





$0.00





$0.15





$0.00





$0.00





$0.00





$0.00





$0.00





$7.76



Related docs
Other docs by xiuliliaofz
Dreaming
Views: 2  |  Downloads: 0
Maurice White BDSc Melb
Views: 0  |  Downloads: 0
article-7901
Views: 0  |  Downloads: 0
Application - City of Laramie
Views: 0  |  Downloads: 0
Project Outline - TeacherWeb
Views: 0  |  Downloads: 0
NSSE EDUCATION
Views: 0  |  Downloads: 0
me344_f03
Views: 0  |  Downloads: 0
Experiment_11a
Views: 0  |  Downloads: 0
CHAPTER 16
Views: 0  |  Downloads: 0
Distributed Data Base Systems
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!