Information Services
5 Year Goals & Objectives
February 2010 – July 2010
MISSION
We are a strategic asset for UMKC’s missions of: Teaching and Learning, Research, Service, and
Economic Development.
2014 GOALS
Infrastructure that delivers seamless, secure, reliable, anytime and anyplace user access.
User technologies and support that enhance and facilitate Teaching and Learning, Research,
Service, and Economic Development.
Effective and efficient management of resources.
Accurate, understandable, and accessible communication, documentation and resource
use.
Continuous improvement in services, facilities, and professional development.
The processes for achieving each of the above goals are listed on the following two pages.
2010 IS PROJECT LIST & POINT PERSON
ILE Classroom Lifecycle Upgrades – Guggenmos/Classroom Technology Services
IP Video Distribution – Guggenmos/Classroom Technology Services
Infrastructure improvement (building cabling) – Johnston/Telecomm & Networking
VOIP rollout – Johnston/Telecomm & Networking
E-learning Initiative – Goodenow/Information Access
Expansion of wireless coverage – Johnston/Telecomm & Networking
Disaster Recovery – Schonemann/Networking
Server Virtualization – Schonemann/Networking
Details on each of the above projects can be found in the individual sections for the responsible department.
IS Accomplishment Report: February 2010 – July 2010 Page 1
Educational Technology Services
Goals and Objectives Update
February 2010 – July 2010
ILE Hybrid Classroom Integration – Completed
The ILE Hybrid project consisted of upgrading 62 classrooms with ILE equipment. The project started in
early February, 2009 and ran through July, 2010. This project increased the number of ILE classrooms
from 67 to 129 in just over 17 months and was completed 5 months ahead of schedule. This goal is
being removed from the accomplishments report.
Restructure CTS to adequately support the ILE Classroom systems and campus AV projects
independently – Completed
We have supplemented our team with additional staff which has positioned us to provide adequate
support for both ILE classrooms and campus AV projects going forward. This goal is being removed from
the accomplishments report.
IS PROJECT - ILE Classroom Lifecycle Upgrades – New Goal
Lifecycle upgrades are scheduled to occur in over 50 ILE Classrooms during the next 18 months. The
upgrades focus on replacing worn lecterns, old user interfaces, DVD/VCR units, and enhancing the
overall audio quality.
ILE Maintenance Upgrades
Proposed Implementation Timeline
Percent complete
14% 31% 48% 66% 83% 100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Q3 2010 Q4 2010 Q1 2011 Q2 2011 Q3 2011 Q4 2011
IS Accomplishment Report: February 2010 – July 2010 Page 2
Critical Issues
Project completion is dependent on classroom availability for upgrades. Most classrooms
are occupied from 7am to 10pm daily. Allotting time in rooms for upgrades will be difficult.
Some overtime may be required. There is potential for schedule creep if we run into space
availability issues.
IS Goals Supported
User technologies and support that enhance and facilitate research, service, teaching and
learning and economic development.
Effectively and efficiently manage resources.
IS PROJECT - IP Video Distribution System – New Goal
We are in the early phases of concept design for an IP Video Distribution System for the UMKC campus.
The purpose of this project is to equip UMKC with a video-over-IP digital media system. This system will
improve the University’s ability to communicate through signage displays, televisions, and desktop
computers.
Systems currently on the market provide:
Desktop Video
Enterprise TV delivery
Video-on-Demand (VoD) library access
Pre-scheduled programming
Integration with existing UMKC user-access
Emergency notifications (signage)
Blackboard integration for content delivery
Live-streaming events intra-campus
Group instruction
Dormitory TV service
Campus TV station delivery
Digital signage content distribution
The initial plan is to have the design completed and ready for consideration by the end of Q1,
2011 to be included in FY 2012’s budget.
Critical Issues
Currently, there are a limited number of mature IPTV product lines available. We anticipate
a substantial increase in available product lines in the next 12 to 18 months.
Impact on network bandwidth will need to be researched if all video transport will be done
via the IP infrastructure.
IS Goals Supported
User technologies and support that enhance and facilitate research, service, teaching and
learning and economic development.
Effectively and efficiently manage resources.
IS Accomplishment Report: February 2010 – July 2010 Page 3
Increase professional development opportunities for staff
Professional Development goals have been identified after staff input and included in each staff
member’s performance evaluations. These goals are reviewed bi-annually. Training materials have
been purchased to allow for more in-house training to reduce budget expenses. We have identified
several possible training seminars and campus-offered training events for staff this year. We continue
to search for appropriate training opportunities and schedule them when possible.
Critical Issues:
Making time for our staff to work on their professional development skills has to receive a
higher priority to continue the departments’ capabilities to complete custom AV projects.
Allowing staff to attend training during working hours impacts our level of service and will
need to be accounted for in scheduling tasks and expected completion dates on projects.
IS Goals Supported:
Effectively and efficiently manage resources.
Continuous improvement in facilities, service and professional development.
Increase awareness and feedback surrounding the ILE Classroom systems
During this review period we conducted several one-on-one ILE user training sessions with faculty. We
continue to work with the Registrar’s office to assist in marketing ILE user training to faculty at the start
of classes. During the next review period, we plan to partner with ITS to provide ILE user training in
conjunction with their Instructional Technology classes. We have updated information about ILE
classrooms on our website and will continue to maintain its accuracy. Lastly, we are working on revising
our ILE survey to cover new systems installed and plan to send it out once a year during the fall
semester.
IS Goals Supported
Provide user technologies and support that enhance and facilitate research, service,
teaching and learning and economic development.
Effectively and efficiently manage resources.
Communication, documentation and resources use that is accurate, understandable and
accessible
Continuous improvement in facilities, service and professional development.
IS Accomplishment Report: February 2010 – July 2010 Page 4
Provide advanced technical expertise and services to UMKC academic units, and UMKC
departments
We have worked with several academic units and departments to design, install, and in most cases,
provide ongoing support for large number of complex AV systems during this review period.
Completed Projects
ILE Hybrid Project – IS project to upgrade 62 classrooms with ILE systems
Lifecycle cost - $444,600
Law School Room 028 – AV rich multi-purpose courtroom/classroom
Lifecycle cost - $76,738.57
Law School AV Distribution – System to link rooms 02 – 05 for AV distribution and recording
Lifecycle cost - $4,148.80
Miller Nichols Library Room 121 – ILE Classroom Conversion/Upgrade
Lifecycle cost - $23,235.19
700MHz Microphone Replacements to comply with updated FCC regulations – 10 locations
Lifecycle cost - $4,500.00
Johnson Hall Lounge Kiosks – Added four student computer kiosks
Lifecycle cost - $10,030.78
Partnered with Central Systems to upgrade Lenel Security server and clients to latest
software and renew support contracts
Worked with Lenel to repair parking script for Parking Control
Coordinated numerous campus security hardware installations
Partnered with Support Services to upgrade and transition 5 SCE computer labs to IS
management
Current Projects – Implementation Phase – ($1,277,475.80)
Katz Hall Renovation – 3 Full ILE, 1 ILE Hybrid, and 2 Custom AV Systems
Lifecycle cost - $147,891.22
New Student Union – 13 ILE AV meeting room systems, 17 digital signage locations, and a
building wide video/cable distribution system
Est. Lifecycle cost - $458,000.00
Bloch 12/13 Renovation – Upgrade of Full ILE System to dual projector
Est. Lifecycle - $32,324.05
Durwood Conference Room – Custom AV system
Lifecycle cost - $5,258.29
ILE Maintenance 2010 Project – IS project to upgrade 58 ILE classrooms
Lifecycle cost – $304,346.50
ITS Location-Remote Equipment – Procurement
Lifecycle cost -$157,546.06
Miller Nichols Library 1st & 2nd Floor Renovations – 1 ILE Hybrid AV system, 1 dual partial
AV system, digital signage relocation, and 5 group study areas
Est. Lifecycle cost - $138,272.88
FACET ILE Relocation and 1 Partial AV System
Lifecycle cost - $3,214.00
PAC Green Room LCD – Replacement
Lifecycle cost - $2,215.44
IS Accomplishment Report: February 2010 – July 2010 Page 5
PAC/Grant Digital Signage – Added 4 Scala signage displays
Lifecycle cost -$27,103.57
Toy & Miniature Museum – Upgrade GUI and configuration of existing theater system
Lifecycle cost - $1,304.00
Current Projects – Design/Planning Phase – ($704,556.29)
Flarsheim Hall 310 – distance education classroom
Est. Lifecycle cost - $112,556.29
Grant Hall 227 – Full ILE classroom/recital hall
Est. Lifecycle cost - $37,773.10
Campus IPTV System – UMKC cable-digital signage distribution system
Est. Lifecycle cost- $TBD
Miller Nichols Library 114 & 303 – 1 Full AV system, 1 Partial AV system
Est. Lifecycle cost - $22,466.44
4301 Distance Education Upgrade
Est. Lifecycle cost - $239,000
Scala Digital Signage – Installed new centrally managed Scala digital signage infrastructure
for campus use. Currently working to move existing Scala users to new system.
Collaborating with the School of Dentistry to design and program new classroom AV
systems.
IS Goals Supported:
User technologies and support that enhance and facilitate research, service, teaching and
learning and economic development.
Effectively and efficiently manage resources
IS Accomplishment Report: February 2010 – July 2010 Page 6
Other Notable Accomplishments:
During summer 2010, the average Full ILE classroom utilization was roughly 15% higher than that of
Non-ILE classrooms. Hybrid ILE Classrooms utilization was roughly 6% higher than that of the Non-
ILE classrooms.
Classroom Hour Utilization
100%
80%
60%
Unused
40% Used
20% 44%
35% 29%
0%
Full ILE Classrooms Hybrid ILE Classrooms Non-ILE Classrooms
During summer 2010, 91% of all Support tickets assigned to Classroom Technology Services were
resolved within a 24 hour period. Of this 91%, 46% were resolved within 1 hour.
Ticket Resolution Time
9%
46% 1 Hour
45% 2 - 24 Hours
> 24 Hours
Completed $563,252.54 of AV projects during this review period.
Increased the number of ILE classrooms from 122 – 129
Added four ILE equipped non-classroom spaces
Added four part-time AV Technicians to the team.
Converted maintenance/functionality testing of ILE systems to be covered by part-time staff,
resulting in fewer user trouble tickets.
Completed ILE Classroom system maintenance during break.
Represented IS on the Miller Nichols Library Expansion Committee.
Represented IS on the Campus Security Assessment Committee.
Represented IS on the Student Success Center Concept Committee.
Completed the UM Collaboration Calculator to aid in system wide IT collaboration.
IS Accomplishment Report: February 2010 – July 2010 Page 7
IS Security
Goals and Objectives Update
February 2010 – July 2010
Notable Accomplishments within Information Services Security:
Implemented campus network edge security upgrades. These upgrades primarily prepare us for
upgrade to 10-gigabit inter-campus connections. They also provide better Internet bandwidth
prioritization. (to ensure video conferencing data has more priority over internet gaming traffic,
etc.) Some of the technology updates will also assist with detecting viruses in-transit on the
network.
Implemented initial phases of inter-campus security event correlation. This technology will help
with detection of attacks that span campuses, and also improve tools for detecting attacks within
each campus.
Helped in design and setup of model robotic pharmacy in the School of Pharmacy.
Rebuilt the Forefront/MOM server cluster.
Converted ESX hosts to version 4.
Retired old blade servers and rack.
IS Accomplishment Report: February 2010 – July 2010 Page 8
Support Services
Goals and Objectives Update
February 2010 – July 2010
Support Services’ number one goal is to provide the campus community with prompt, courteous
services and resolve technology questions and problems in a timely manner. As a technology
department that works directly with customers throughout each day, we understand the importance of
customer satisfaction and responsive communication. We continually work on process improvements
and technical documentation to better serve the campus. Customer satisfaction reports and service
metrics for this past 6-month period can be found under the IS Call Center section of this report.
Other notable goals and accomplishments for Support Services this reporting period include the launch
of Remote Labs; completing an agreement for technology support with the School of Computing and
Engineering (SCE) and working to improve their student labs; the opening of a new student computing
lab in the Student Union; and the significant progress made on two separate email migration projects.
A brief update on each of these key initiatives and other important projects are listed below.
Support Services – Key Projects
After several months of piloting Remote Labs with two
academic units and implementing several improvements, final
preparations were made to launch the new service for the start
of the fall semester 2010. Remote Labs provides students,
faculty and staff with 24x7x365 access to key software
applications and systems from any location on or off campus
via an Internet connection. Improvements to Remote Labs
included a new server and system upgrades that featured
failover clustering. Over 50-plus software applications were
added. A pilot project with Adobe was negotiated allowing the addition of even more new software
titles. Some labs have been customized to address the specific needs of the School of Computing
and Engineering, who helped pilot this project. Performance monitoring and detailed reporting
were also developed to ensure the system remained accessible.
Information Services signed a memorandum of
understanding (MOU) with the School of
Computing and Engineering to provide technical
support for faculty, staff and students. The MOU
also included support for six heavily utilized
departmental student computing labs and
classrooms that provide access to 100+
specialized applications. The MOU provided an
opportunity to review all software licensing so
that it could be updated. Numerous A refreshed SCE Lab
improvements were made to the physical labs, including new computers along with new security
and network cabling. Labs were emptied and floors were completely stripped, cleaned and waxed.
IS Accomplishment Report: February 2010 – July 2010 Page 9
To better monitor an expanding infrastructure of servers, systems and other network devices, a
UMKC customized monitoring and notification system was developed during the past six months.
This application allows Information Services to more proactively manage these systems in order to
prevent or reduce system outages.
Much progress was made on two complex and challenging email migration projects during the past
six months. The u-wide student email migration project to Outlook Live was successfully completed
during the spring of 2010. During the same time, planning began for the faculty and staff email
migration. Students were moved to a more feature-rich Microsoft-hosted system over a 6-month
period, while faculty and staff accounts were migrated to a newer Exchange system at MU. Work on
the latter project has continued into the fall months with UM colleagues, as the last phases of the
project are completed. One of the largest challenges with both of these projects was assisting users
with a wide variety of mobile devices so that they continue to receive email messages.
Numerous planning meetings for a new student computing lab in the Student Center took place this
past review period. Nineteen new computers with two high-capacity HP printers were ordered and
installed for the start of the fall semester.
Also available within the lab is a small, multi-
media room designed specifically for students
collaborating on assignments. Laptops can
very easily be connected and displayed on
large monitors so students can work on team
projects.
Desktop Support staff completed the first
phase of a print queue migration project to a
MediaScape system in the Student Union Lab
virtual 64-bit print server. All departments
currently serviced by Support Services staff have been migrated to the new server. Additional print
queue migrations are being planned.
As university budgets continue to be squeezed with the current financial crisis, Information Services
is working to explore new opportunities and alternative approaches to reduce costs, but still
maintain or enhance technology services for the campus. A few areas where we have successfully
collaborated with other campuses to provide technology services are listed below:
Collaborated with MU to host Bomgar services for remote customer support for use by
multiple helpdesks
Developed a UMKC LiveMail Management Tool for use across all UM campuses
Partnered with MU to develop an MOU to provide technical support for Mizzou’s Blue
Springs facility
IS Accomplishment Report: February 2010 – July 2010 Page 10
UMKC IS Call Center
The Call Center responded to 16,091 support requests, resolving 13,099 tickets and escalating 2,992
tickets. The Call Center’s first-call resolution rate was 81%.
Time Period Total Number of Call
Center Support Requests
Q3 & Q4 2007 11120
Q1 & Q2 2008 10644
Q3 & Q4 2008 13673
Q1 & Q2 2009 12810
Q3 & Q4 2009 16564
Q1 & Q2 2010 16091
The last few years have seen a steady increase in support requests, primarily due to the new online
problem report tool. This tool allows users to submit requests 24 x 7 x 365.
Time Period Total Number of Web
Submission Requests
Q1 & Q2 2008 33
Q3 & Q4 2008 783
Q1 & Q2 2009 677
Q3 & Q4 2009 920
Q1 & Q2 2010 671
Over the last five years, the support volume in Support Services has steadily increased. Comparing the
periods of February – July 2009, and February – July 2010, we have seen a 16% increase in support
requests this year as compared to last. The support request volume represents an average of 395
additional requests per month over this same time period last year:
IS Accomplishment Report: February 2010 – July 2010 Page 11
2006 2007 2008 2009 2010
January 3084 2447 2670 2800 3660
February 1886 1595 1712 2118 3330
March 1710 1609 1763 2145 2812
April 1670 1923 1960 2402 2724
May 1761 2300 1880 2264 2362
June 2095 2044 2382 2634 2691
July 1860 2125 2540 2796 2807
August 3802 3673 4010 3654 3977
September 2015 1632 2414 2586 2904
October 1741 1703 2183 2115
November 1306 1667 1658 2771
December 1257 1364 1806 2386
This increase can be attributed to many factors, the most relevant at this time being:
Student e-mail conversion from Exchange to Outlook Live, which went into full effect Spring
2010
PeopleTools 8.5 upgrade
Other factors, including larger on-line interactivity demand (Pathway, on-line applications,
MyHR, etc.), increased use of Blackboard and other classroom technology tools and a
continued increase in campus awareness of the Call Center as the IS contact point.
Customer satisfaction continues to remain high. The following chart represents customer satisfaction
data collected from surveys closed by IS Support Services for the period of February 1st, 2010, through
July 31st, 2010.
IS Accomplishment Report: February 2010 – July 2010 Page 12
Other Call Center Projects:
Added new content to the UMKC RightAnswers Knowledgebase detailing Exchange 2007 migration,
Outlook Live, other changes in technology and UM/UMKC procedures and processes
Worked closely with UM and Registrar’s office to deploy PeopleTools 8.5 upgrade
Participated in numerous New Student Orientations in conjunction with the Admissions Office
Participated in the Faculty New Orientation this past summer
Continued to work with Admissions, Registration and Records and Financial Aid to review and
modify student SSO and e-mail account creation and notification procedures
Continued to maintain and support Remedy Action Request System for tracking support requests
UMKC IS Desktop Support – Central Team
Responded to and resolved 2044 routine desktop support requests:
Affiliation Ticket Count Percent
Faculty 428 5.5%
GRA/WorkStudy 115 4.9%
Other 13 0.6%
Staff 1319 79.4%
Student 269 9.6%
Total 1208
Software deployment progress:
Office 2007
i. 99% for ISSS clients (compared to 84% on 1/31/2010)
ii. 86% for entire campus (compared to 76% on 1/31/2010)
Windows 7
iii. 49% for ISSS clients (compared to 5% on 1/31/2010)
iv. 35% for entire campus (compared to 7% on 1/31/2010)
Added support in Remote Labs to provide alternative branding as potential UMKC shared service for
other UM campuses
Created over 180 application deployment packages (see Appendix for list)
Scheduled, imaged, configured and installed 93 new workstations as part of the 2010 Workstation
Replacement Program
Mentored, assisted, built solutions for and provided backstop support to IT Liaisons on a daily basis
Worked on multiple levels to prepare for the then-pending MOU with the School of Computing &
Engineering
Provided IT support for special events, including the UM Life Sciences Summit, the UM Curator’s
Meeting and several New Student Orientations
Completed migration to Windows 7 on nearly 600 computers in the IS Labs and ILE classroom
environments
IS Accomplishment Report: February 2010 – July 2010 Page 13
Continued development and mastery of Operating System Deployment (OSD) methods to allow for
the complete automation of large-scale operating system deployment and software installation
Integrated OSD deployment methods into PXE boot menu Imaging Service
Provided Visual Studio 2008 training to one staff member
Completed print queue migration phase of Printer Management project to virtual 64-bit print server
for ISSS client departments
Started tracking faculty/staff/departmental print queues with PaperCutMF as part of the second
phase of the Printer Management project
Revamped ISSS server storage infrastructure and backup scheme to use EqualLogic gear for
production use, but administer and manage separate backups to ISSS PowerVault SAN
Setup new Apple Xserve to evaluate option for offering an Apple Mac OS X “terminal services”
experience for remote users
Committed to consistent and timely patching cycle for Adobe Reader, Adobe Acrobat and Java in
light of trends in malware infections
Created lifecycle management plan for ISSS server and related infrastructure
Spent countless hours troubleshooting and communicating with software makers about very buggy
software, most notably, eInstruction CPS and Tegrity
Performed total cost analysis of VMware-based thin client lab model in comparison to current
methods
Integrated Innovation Center into ISSS departmental support model
Upgraded 100+ ImageNow clients via antiquated, manual methods
Cleansed and/or rebuilt dozens of malware-infected computers that were tracked back to Adobe
PDF exploits through Flash-enabled banner ads
Participated on UMKC Server Policy working group
Built and implemented test VSphere environment to evaluate VMware ESX and View 4.0 in
conjunction with thin client devices as potential components in new VDI terminal solutions
Provided pre-deployment consultation services with departments on various IT projects:
Counseling, Health and Testing Center - Titanium Web Entry system
KCUR – server procurement and virtualization topics
Registration & Records – Student PeopleSoft kiosks hardware/software
Created or updated documentation for the following:
Apple iPad VPN instructions
InfoPrint setup procedures
ISSS Server documentation
LAMBS FileMaker installation
Wireless networking steps for multiple operating systems
Created, updated and managed OS images and OSD task sequences for the following:
Special kiosk images for Student Health and Wellness, International Student Affairs,
Registrar’s Office and Human Resources
Special lab images for BSBPA, Physics, Northland Campus and Athletics
IS Accomplishment Report: February 2010 – July 2010 Page 14
Windows 7 for universal use (32-bit and 64-bit)
Windows 7 for IS Labs
Provided workstation and network support for UMKC students living on campus
Updated Workstation Replacement Program ordering website
Assisted with the migration of data from personal shares (e.g., J: drive) to departmental file shares
Affiliation Ticket Count Percent
Faculty 361 43.2%
GRA/Work Study 56 6.7%
Other 6 0.7%
Staff 360 43.1%
Student 53 6.3%
Total 836
UMKC IS Desktop - Arts & Sciences / School of Education/ School of Computing & Engineering
Resolved 836 support requests during this period.
Windows 7 upgrades applied
>50 office workstations – While all new PCs are loaded with Windows 7, we have also begun
proactively targeting remaining instances of Windows Vista. The result for the user is
minimal change in OS functionality but with significant gains in system performance and
reliability.
129 computers across 7 labs – This included all major A&S and SOE Windows-based lab
classrooms
AUPD move to Katz Hall –This was a highly
coordinated effort among the department,
multiple IS divisions, and CFM. Move and
reinstallation was completed in only three
days, less time than originally expected.
Reviewed building blueprints with faculty,
staff, and representatives from CTS and CFM
to plan final arrangement of new lab space.
AUPD thank-you reception for members of IS and CFM
Moved and reinstalled AUPD office & lab computer equipment to
new location in Katz Hall
27 Lab PCs, plus all printing equipment
11 Faculty/staff PCs
Apple iPad – With the emergence of this product last winter, faculty,
especially, were anxious to explore its possible uses in education.
Image Development – Updated OS X disk images for Mac with Office UMKC Exchange E-mail on the iPad
2011 and latest security patches.
Print Queue Migration - Remaining print queues in A&S moved from legacy print servers to kc-
print2.
IS Accomplishment Report: February 2010 – July 2010 Page 15
Laptop Support - Users receiving new or rebuilt laptops now receive documentation with quick
instructions for obtaining technical support while traveling. This is particularly helpful for users
traveling abroad, especially if they must seek emergency hardware support from a Dell or Apple
repair center. The printed form contains vital information about the laptop in addition to contact
information for UMKC Information Services.
Apple Support Website – New instructions added for configuring Entourage and Outlook for Mac for
use with Exchange 2007 and for connecting to network file shares from off campus.
Software Evaluation
Microsoft Office 2010 for Windows
Microsoft Office 2011 for Mac – This is a major new release and includes a full Outlook
client, unavailable for the Mac the last 9 years. Early tests suggest this will significantly
improve the Exchange e-mail and calendar experience for our Mac users.
Technician Certifications – One additional technician earned Dell hardware certification; two
technicians renewed Apple hardware and OS certifications.
Computer Replacement – Deployed 64 computers purchased through the 2009-10 Workstation
Replacement Program.
Document management – Collaborated with UM Procurement Services to review vendor candidates
for document management standardization.
School of Computing & Engineering – Improvements made before start of Fall 2010 semester
Relocated one technician to office space in Flarsheim Hall to establish a support presence in
SCE.
Cleaned out unused office space in RHFH 458 and 459, freeing over 700 square feet of
usable work space.
Prepared a multitude of old equipment for surplus to free up office and storage space,
including:
i. 112 computers, 21 laser printers and 96 CRT monitors
Replaced over 20 CRT monitors still in use in the server room with energy-efficient LCD
monitors.
IS Accomplishment Report: February 2010 – July 2010 Page 16
Disassembled and cleaned all furniture and equipment in 6 computer lab classrooms to
allow Campus Facilities to clean floors and install new carpet in under two weeks’ time.
Thanks also to IS Net/Telecom for all cable replacements and data jack repairs.
IS Accomplishment Report: February 2010 – July 2010 Page 17
Hardware Acquisition
During the period of February 1 – July 31, 2010, hardware purchases totaled $310,120.59. Of that
total, 62% of orders were placed through eProcurement. That translates to $191,055.55. The
remaining 38% of orders were placed using a UMKC Procard credit card. Procard purchases were
$119,065.04 for the six-month period.
The Procard monthly average was almost $19,850. The eProcurement monthly average was nearly
$31,850, making the monthly total average close to $51,700 a month.
Month Procard eProcurement
10-Feb $13,500.59 $ 30,923.78
10-Mar $19,010.89 $ 31,546.47
10-Apr $19,546.24 $ 38,295.56
10-May $27,608.72 $ 38,095.25
10-Jun $15,287.77 $ 16,634.55
10-Jul $24,110.83 $ 35,559.94
$119,065.04 $ 191,055.55 $310,120.59
Feb-July
$191,055.
$200,000.00 55
$150,000.00 $119,065.
04
$100,000.00
$50,000.00
$-
Procard ePro
IS Accomplishment Report: February 2010 – July 2010 Page 18
There were 17 vendors that received orders during the period. As might be expected, Dell received
the most orders, totaling over $172,500. Apple was a distant second—orders totaled about half that
of Dell—at just over $92,600. One other vendor, GovConnection, had orders totaling more than
$10,000. The six month GovConnection total was $31,754.70.
eProcurement vendors CDW-G and OfficeMax received orders for $8,265 and $1,203 respectively.
No other vendor exceeded the $1,000 mark.
Vendor Procard ePro Totals
Amazon.com $ 896.61 ----- $ 896.61
Apple $ 49,906.28 $ 42,696.00 $ 92,602.28
Buydig.com $ 109.92 ----- $ 109.92
CDW-G ----- $ 8,265.06 $ 8,265.06
Crucial $ 299.93 ----- $ 299.93
Dell $ 52,342.38 $ 120,206.35 $ 172,548.73
DiSys ----- $ 197.15 $ 197.15
Genesis Str $ 24.72 ----- $ 24.72
Google $ 324.70 ----- $ 324.70
GovConn $ 13,266.83 $ 18,487.87 $ 31,754.70
Kahlon $ 247.40 ----- $ 247.40
Monoprice $ 85.72 ----- $ 85.72
Newegg $ 296.96 ----- $ 296.96
OfficeMax $ 1,203.12 $ 1,203.12
Pacific
Battery $ 417.60 ----- $ 417.60
Secure-IT $ 809.99 ----- $ 809.99
UPS $ 36.00 ----- $ 36.00
$ 119,065.04 $ 191,055.55 $ 310,120.59
0% Purchases by vendor
3% 1% 0% Dell
10%
Apple
GovConn
30% 56%
CDW-G
IS Accomplishment Report: February 2010 – July 2010 Page 19
Other activities
Approved 117 eProcurement departmental orders
Followed up on the Workstation Replacement project, carried over from January 2010
tracked WRP orders, compiled a master list of WRP order numbers and service tag numbers
Participated in a "thin client" project
obtained thin client quotes from HP, Dell and GovConnection
Attended a number of recurring and special meetings, and one training session
quarterly Procurement meeting
monthly IT liaisons meeting
VPA (Volume Purchase Agreement) quarterly teleconference
quarterly Dell/HP Standards teleconference
Worked with Dell account representative to obtain evaluation hardware for review and use
Worked with Dell account rep to keep our on-line ordering pages correct and up-to-date
Tracked lost orders, amending or cancelling orders at the customer's request
Returned bad or unwanted new hardware
Provided assistance to departments in identifying, pricing and replacing stolen equipment
Provided hardware inventories when requested by departments
Completed Dell transferable-of-ownership forms as required
Began discussions with Procurement regarding a printer standardization contract
Software Acquisition
Obtained approval to serve out EndNote (faculty/staff), SAS, SPSS, Ansys Fluent, FEKO, LabView, MD
Adams, SolidWorks through Remote Labs
Provided user community with access to reduced pricing for personal copies of Microsoft Office
2010 through the Home Use Program
Worked with Bloch School of Business to make Microsoft Developer’s Network Academic Alliance
free software suite available to their students
Upgraded adaptive software in student labs (Jaws and ZoomText)
Increased student counts used by PaperCut (print monitoring software)
Increased student counts used by KeyServer (software monitoring software)
Worked with system campuses to increase efficiency through shared services
Worked with UM System staff to test Microsoft MAK key distribution software
Participated in monthly system-wide conference calls to discuss Microsoft Premier Support
contract issues
Worked with UM Procurement staff to establish best purchasing method for software buyer
– determined ProCard use where possible is most economical - adjusted ProCard limits
upward
Represented IS on the Campus Sustainability Committee
IS Accomplishment Report: February 2010 – July 2010 Page 20
Continued working with Dell representatives to persuade them to stop using non-recyclable #4 LDPE
packaging material
Placed software orders for various departments on ProCard ($156,641.75)
Placed major software orders and renewals through eProcurement ($78,695.00)
Tegrity (podcasting) - $64,795.00
Maple - $13,900.00
Renewed shared system contracts ($32,334.60)
Apple Support - $4,796.00
AutoCAD - $5,000.00
RightAnswers - $3,708.00
SAS - $8,110.00
SPSS - $10,720.60
Placed hardware orders in support of hardware buyer ($59,083.30)
Dell - $44,203.52
Apple - $3,714.00
Wyse - $7,027.12
Printers - $3,889.45
Miscellaneous hardware - $249.21
Renewed licenses for Apple Server Support, AutoCAD, EndNote, Ghost, KeyServer, Learning Objects,
ListServ, Maple, Moodle, PaperCut, RedHat, Respondus, SAS, SPSS, Tegrity
Announced release of Maple 14
Improved relationship with Adobe – we now have a dedicated campus representative
IS Accomplishment Report: February 2010 – July 2010 Page 21
Continued to work with Desktop team to expand software packages available through SCCM
IS Support Services Lab Management Office
Maintained operations in eight IS-managed open-access general use student computer labs, seven
restricted access labs, and supplied one associated classroom. 10,333 people used these sites
during this time:
Lab Name Individuals
Bloch 110 2,100
Health Sciences 1,185
Johnson Hall 431
Miller Nichols 2,954
Oak Place Labs 678
Royall Hall 5,450
School of Education 2,907
University Center 2,084
Worked with Student Affairs to coordinate the opening of the computing lab in the new Student
Union building.
Worked with the School of Computing and Engineering on transitioning management of five
computer labs to the Lab Management Office.
IS Accomplishment Report: February 2010 – July 2010 Page 22
Collaborated with various schools and departments to ensure student computing needs were met.
Scheduled 23 classes in the Royall Hall/Health Sciences Building computer labs.
Staffed MNL for extended hours for Spring Semester finals.
Staffed registration sessions during 8 new student orientations.
Received 48 applications for Student Assistant positions, interviewed 27 prospective new hires, and
hired 26 new Student Assistants for IS-managed labs. Conducted 4 new-hire orientations.
Processed over 6,800 shifts and supervised over 19,000 Student Assistant man-hours. Completed
reviews for 56 Student Assistants.
Supported student printing needs by keeping supplies on hand and printers ready for use. Over
340,000 print jobs were printed in IS-managed general student use computer labs, totaling nearly
two million pages.
IS Accomplishment Report: February 2010 – July 2010 Page 23
Appendix
List of 180+ application packages created by Desktop Support for deployment over the past 6
months
ACT AIM 2.1 - 2010.05.18 Microsoft Visio 2010 Prof 32 - 2010.07.16
Adobe Acrobat 9.3.3 Professional - Microsoft Visual C++ 2008 SP1 Redistributable
2010.07.14 Package - 2010.06.16
Adobe CS5 Master Collection - Microsoft Visual Studio 2008 SP1 - 2010.06.14
2010.06.10 Microsoft Visual Studio 2010 - 2010.05.20
Adobe CS5 Production Premium - Microsoft Visual Studio 2010 Express -
2010.07.15 2010.07.23
Adobe CS5 Web Premium - 2010.06.21 MiniTab 15 - 20010.05.06
Adobe Font Folio 11 - 2010.07.20 Mozilla Firefox 3.6.3 - 2010.04.26
Adobe InDesign CS5 - 2010.06.010 Mozilla Firefox 3.6.7 - 2010.07.21
Adobe Photoshop CS5 - 2010.06.02 Notepad++ 5.7 - 2010.07.23
Adobe Reader 9.3.2 - 2010.04.23 Oracle 10 2 4 Win7 32bit - 2010.02.08
CDBurnerXP 4.3.5.2256 - 2010.07.23 SCE - Abaqus - 2008.08.19
Cisco Agent Desktop 7.0(1) - SCE - Alice 2.2 - 2010.03.19
2010.06.09 SCE - Ansoft Ensemble SV 2.0.57.0 - 2010.04.28
Cisco Supervisor Desktop 7.0(1) - SCE - AutoCAD 2010 - 2010.04.30
2010.06.09 SCE - AutoScreenRecorder 3.1.115 - 2010.06.15
CPS 6.55.0762 - 2010.06.01 SCE - BlueJ 3.0.1 - 2010.07.23
ICF Adobe Web Players - 2010.06.11 SCE - ConTEXTv0_986 - 2010.03.19
ICF AIM 7.2.6.1 - 2010.04.27 SCE - CSIM 19 - 2010.06.14
ICF DragonTag - 2010.03.29 SCE - CUDA Toolkit 3.0 - 2010.04.28
ICF Ebrary - 2010.07.30 SCE - Cygwin 1.7.5 2010.04.28
ICF FileZilla 3.3.3 - 2010.07.23 SCE - Eclipse 3.5.2 - 2010.03.22
ICF Gleim CPA 2010 - 2010.03.17 SCE - Erlang OTP R13B04 - 2010.03.22
ICF Inspiration 9 - 2010.05.21 SCE - Exceed7.1 - 2010.05.05
ICF Jaws 11 - 2010.2.16 SCE - FEKO - 2010.04.28
ICF MatLab Toolbox - 2008.01.16 SCE - GIMP 2.6.10 - 2010.07.23
ICF Paint.NET 3.5.5 - 2010.04.26 SCE - Glut-3.7.6 - 2010.03.22
ICF Peachtree 2010 - SCE - Graphviz - 2010.05.03
2010.04.12.SOURCE SCE - GSview 4.9 - 2010.03.19
ICF PowerDVD DX 8.3.1.6107 - SCE - HEC - 2010.03.23
2010.04.26 SCE - HTMLkit Build292 - 2010.03.19
ICF ProSeries 2009 - 2010.02.05 SCE - Java3D 1.5.2 - 2010.05.25
ICF PuTTY 0.60 - 2010.04.28 SCE - JCreator 4.5 - 2010.05.05
ICF Quicktime 7.6.6 - 2010.04.26 SCE - JDK 6u20 - 2010.05.25
ICF Yahoo! Messenger 10.0.0.1258 - SCE - Jena 2.6.3 - 2010.06.03
2010.04.27 SCE - Jess 7.1p2 - 2010.05.05
ICF ZoomText 9.18.7 - 2010.03.30 SCE - MatLAB R2009b - 2010.03.23
iTunes 9.1 - 2010.04.01 SCE - MD Adams 2010 - 2010.06.17
Java 1.6u20 - 2010.04.16 SCE - Microsoft Robotics Developer Studio 2008
MatLab 2010a - 2010.03.17 R2 Express Edition - 2010.03.23
Microsoft .NET Framework 4.0 - SCE - Microsoft XNA Game Studio 3.1 -
2010.07.23 2010.03.23
Microsoft Communicator 2007 - SCE - MicroStation - 2010.05.05
2010.03.25 SCE - MiKTeX 2.8 - 2010.03.19
Microsoft MapPoint - 2010.07.21 SCE - MRDS 2008 R3 - 2010.06.01
Microsoft Office 2010 - 2010.04.28 SCE - Nonlin 2.5 - 2010.03.23
Microsoft Project 2010 Standard - SCE - NUnit 2.5.5 - 2010.06.15
2010.07.12 SCE - OPNET 16 - 2010.03.19
IS Accomplishment Report: February 2010 – July 2010 Page 24
SCE - OWL-S Editor - 2010.03.23 SCE - SWMM 5.0.0.18 - 2010.06.11
SCE - Petite Chez Scheme - 2010.03.23 SCE - TortoiseSVN 1.6.7 - 2010.03.23
SCE - Protege 3.4.4 - 2010.05.06 SCE - TSIS 6.1 - 2010.05.17
SCE - PSpice 9.1 - 2010.03.19 SCE - VisualAnalysis 7.0 - 2010.06.03
SCE - Python 3.1.2 - 2010.06.08 SCE - VLFeat 9.7 (MatLab) - 2010.05.18
SCE - Risa3D 4.5 - 2010.05.05 SCE - Weka 3.6.2 - 2010.03.23
SCE - SolidWorks 2010 - 2010.07.28 SCE - Wireshark 1.2.8 - 2010.05.14
SCE - Xming 6.9.0.31 - 2010.03.22
SecondLife 2.0.1.203797 - 2010.04.29
SOE - Geogebra 3.2 - 2010.05.14
SOE - Google Chrome 4.1 - 2010.05.14
SOE - Google Earth 5.1 - 2010.05.14
SOE - InspireData 1 - 2010.05.20
SOE - Windows Moviemaker 2.6 - 2010.05.14
Tegrity 7.5.782 - 20010.07.16
VLC 1.1.0 - 2010.06.25
Evaluations for compatibility and performance were completed for the following products:
Apple iPad
Dell FX100 and FX160 tiny desktops
Foxit Reader
HP 5545 thin client
Macintosh OS X Terminal Server iRAPP
Microsoft Office 2010
PaperCutMF web printing
SkillSoft courseware
VMware ESX
VMware View 4.0
Wyse C10LE and C90LEW thin clients
IS Accomplishment Report: February 2010 – July 2010 Page 25
Infrastructure Services
(Networking, Telecommunications & Central Systems)
Goals and Objectives Update
February 2010 – July 2010
IS PROJECT - Expand Wireless Systems (Goals 1, 2, 5)
With 325 wireless access points installed campus wide we are now expanding wireless coverage in
campus buildings to cover classrooms, offices and other usable spaces. In most buildings this would be
80% to 90% of the floor space allowing for seamless network access as you move throughout a building.
We have also upgrading access points to the 802.11n standard. See the appendix for current buildings
with wireless coverage.
Critical Issues
The new wireless standard 802.11N, was just approved in September of 2009, will require
replacing every access point on campus with a new unit. New units may be more costly,
especially when they first hit the market.
The new 802.11N antennas take additional inline power so a new IEEE 802.3 inline power
standard is out as well. This will require replacing at least some blades in network switches
with new blades that support the new power standard. This process was completed over
the last year months.
Projections based on Networking & Telecommunications budget at 2007 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2007 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Accomplishment Report: February 2010 – July 2010 Page 26
IS Goals Supported:
Physical infrastructure that delivers seamless, secure, reliable, anytime and anyplace user
access.
Effectively and efficiently manage resources.
Assessment of and responsiveness to campus information technology needs.
IS Accomplishment Report: February 2010 – July 2010 Page 27
IS PROJECT - INFRASTRUCTURE IMPROVEMENT
Upgrade Building Wiring Infrastructure (Goals 1, 5)
We have completed infrastructure upgrades in the Bloch School of Business, Health Sciences building,
Union Station, Biological Sciences, Spencer Chemistry, Fine Arts, School of Education, Durwood Soccer
Stadium, Johnson Hall, Pershing Place Bld. and are currently working on the Law School. We hope to
complete the Law School upgrade to Category 6 cable in next few months and then move to the Medical
School. See Appendix for status chart by building.
Critical Issues
New cable standards like Category 7 that will support 10 gigabit connections are projected
to be out in 20011. New standards have increased the cable size and made cable stiffer.
These new cables require larger conduit sizes and longer installation times, which increase
cost.
Copper cable prices have more than doubled in the last 5 years driving up the cost of many
of the supplies we use on a daily basis. If this inflation rate continues cost of materials could
cause us to slow or stop some installations due to insufficient budget.
Projections based on Networking & Telecommunications budget at 2007 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2007 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Physical infrastructure that delivers seamless, secure, reliable, anytime and anyplace user
access.
Effectively and efficiently manage resources.
IS Accomplishment Report: February 2010 – July 2010 Page 28
IS PROJECT - VoIP Roll Out (Goals 1, 2, 5)
We started rolling out voice over IP phones first to all of Information Services and then in the new
Health Sciences building. We have now replaced phones in Manheim, Royall, Haag, Flarsheim, Fine Arts,
Old Maintenance, Nursing School, Spencer Chemistry, Biological Sciences buildings, Dental School, Oak
Place, Oak Street, Johnson Hall and are working on the Administrative Center. Each person who
currently has a campus phone will receive a new IP phone similar in functionality at no charge to the
department. See http://www.umkc.edu/is/nt/umkc-phone.asp for more information on phones. See
Appendix for buildings with VoIP phones deployed.
Critical Issues
This project is dependent on both the campus network and each buildings cable plant
infrastructure. IP phones require inline power for greatest functionality which requires a
Category 5 or higher cable plant. This project would slow if the campus infrastructure
project is delayed.
The campus PBX is 25 years old and a catastrophic failure would require an immediate
cutover to IP phones.
Projections based on Networking & Telecommunications budget at 2007 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2007 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Physical infrastructure that delivers seamless, secure, reliable, anytime and anyplace user
access.
Effectively and efficiently manage resources.
IS Accomplishment Report: February 2010 – July 2010 Page 29
IS PROJECT - Disaster Recover (Goals 1, 3, 5)
Existing data centers are not being used redundantly. This project will upgrade the data storage and
backup hardware, using current technologies like virtualization and SAN replication to take advantage of
diverse locations. This will provide high availability and greater fault tolerance for servers.
Critical Issues
Insufficient backup resources to protect existing servers.
Unreliable backup software.
Existing data is vulnerable to a single site disaster.
Projections based on Networking & Telecommunications budget at 2009 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2009 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Infrastructure that delivers seamless, secure, reliable, anytime and anyplace user access.
Effective and efficient management of resources.
Continuous improvement in services, facilities, and professional development.
IS Accomplishment Report: February 2010 – July 2010 Page 30
IS PROJECT – Student Email Migration (Goals 1, 3, 5)
Student Email accounts are being migrated to Microsoft Live Mail partially as cost saving but also to
provide additional services. These include, a permanent account that they can keep after they
graduate, a significant amount of additional storage and Live Mail collaboration tools.
Critical Issues
We lose control of the hardware and application software.
A MOREnet outage will take down student on campus access to E-mail.
Projections based on Networking & Telecommunications budget at 2009 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2009 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Infrastructure that delivers seamless, secure, reliable, anytime and anyplace user access.
Effective and efficient management of resources.
Continuous improvement in services, facilities, and professional development.
IS Accomplishment Report: February 2010 – July 2010 Page 31
IS PROJECT - Server Virtualization (Goals 1, 3, 5)
Existing data centers are nearing capacity for space, power and cooling. Virtualization of over 100
servers will reduce the loads in all three of these areas. Virtualization allows the separation of the host
operating systems from the physical hardware making the systems more reliable, scalable and efficient.
Critical Issues
Existing servers are vulnerable to hardware failures.
Existing servers are vulnerable to a single data center disaster.
Many existing servers are in need of life cycle replacement.
Projections based on Networking & Telecommunications budget at 2009 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2009 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Infrastructure that delivers seamless, secure, reliable, anytime and anyplace user access.
Effective and efficient management of resources.
Continuous improvement in services, facilities, and professional development.
IS Accomplishment Report: February 2010 – July 2010 Page 32
Network Core and Building Electronics Lifecycle (Goals 1, 3, 5)
UMKCnet has over 300 routers, switches and other electronic devices that make it functional. These
systems are replaced on a 5 to 6 year lifecycle plan to keep the network reliable, robust and
maintainable with current hardware and software contracts. See Appendix for building by building
electronics lifecycle status.
Critical Issues
The campus keeps growing and expanding without adding additional resources to support
the voice and data networks. Just in the last few years 8 new buildings have been built and
3 other additional locations added to the network. During that same period the Networking
& Telecommunications budget has been cut.
Network equipment connectivity is dependent on the campus fiber optic cable plant. This
plant is aging and some of the older fiber may have to be replaced to support newer speeds
like 10 Gigabit Ethernet.
VoIP systems are dependent on the campus network and infrastructure for reliable
operation. If funding is insufficient to keep UMKCnet equipment current both voice and
data systems could fail.
Projections based on Networking & Telecommunications budget at 2007 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2007 or higher staff levels. This project would stop or substantially
slow down with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Physical infrastructure that delivers seamless, secure, reliable, anytime and anyplace user
access.
Effectively and efficiently manage resources.
IS Accomplishment Report: February 2010 – July 2010 Page 33
Network new buildings (Goals 1, 5)
UMKC is currently building a new Student Union, expanding the Miller Nichols Library, remodeling Katz
and Cherry Street Halls. The first 3 will open for Fall Semester 2010 and the last for Spring Semester
2011. These projects require extensive planning, engineering and staff time both before and during the
buildings construction. Bringing voice and data systems online when a building is completed requires
the efforts of the entire Networking & Telecommunications staff.
Critical Issues
Additional buildings with additional voice and data equipment put a greater demand on
campus resources. Specific to Information Services, network usage both wired and wireless,
the load on the Internet connections which cost hard dollars to increase, Call Center
support, trouble tickets and onsite visits to repair and trouble shoot issues, network
security, etc. These projects include cost for cable plant and electronics but no additional
resources for staff or ongoing maintenance of infrastructure.
Projections based on Networking & Telecommunications budget at 2007 or higher levels
with no additional projects or funding requirements that would use departmental hard
dollars.
Projections based on 2007 or higher staff levels. Building projects could not make deadlines
for building openings with staff cuts or vacant staff positions for extended periods of time.
IS Goals Supported:
Physical infrastructure that delivers seamless, secure, reliable, anytime and anyplace user
access.
Effectively and efficiently manage resources.
IS Accomplishment Report: February 2010 – July 2010 Page 34
Appendix
Individual Infrastructure Services accomplishments this period:
Internet1 link speed increased from 170M to 250M.
Networking & Telecommunication staff attend over 300 hours of training during this reporting
period.
Upgraded Northland Campus connection from 6M T1’s to 10M Ethernet.
Upgraded the operating systems on over 300 network devices with the latest security patches and
updates.
Staff member served as the campus building liaison representative.
Completed over 306 moves, adds and changes on the voice and data networks.
Responded to, solved and closed 1,060 trouble tickets recoded in Remedy.
Installed 226 Voice over IP phones.
Virtualized over 60 servers.
Upgraded IPCC (Call queueing software) from v.6 to v.7.
Two Staff members served on the ICN committee.
Designed the infrastructure voice and data cables systems for Student Union, Miller Nichols Library
addition, Katz Hall, and Cherry Street Hall.
Processed over 3.1 million calls through voice systems.
Staff member served on the campus recycle program committee.
Tom Tasset presented at the MOREnet Helix conference.
Two staff members served on the System Wide Electronic Mail committee.
Upgraded the operating system on all wireless access points (325) with the latest patches and
updates.
Upgrade Lenel security server software.
Installed voice lines for Cherry street parking lot parking control system.
Install patches on Exchange servers.
Marked University buried cable plant locations as required by law for Missouri One Call over 362
times during this reporting period.
Upgraded Call Manager (VoIP PBX) from v.6 to v7.15.
Serviced on the new Student Union building committee.
Wireless Access Points were added to Swinney Rec. Center, Oak Place Residence Hall, Johnson
Residence Hall, Oak Street Residence Hall, Western Missouri Mental Health, Copenhagen Staff,
Durwood Soccer Complex, Health Sciences Building and the Administrative Center.
IS Accomplishment Report: February 2010 – July 2010 Page 35
UMKC WIRELESS INVENTORY
Average
Monthly Average Cost
Vendor Count Cost per Device
AT&T 179 $13,752.00 $76.83
Sprint/Nextel 188 $8,572.00 $45.60
T-Mobile 16 $997.00 $62.31
Verizon 37 $2,376.00 $64.22
Totals 420 $25,697.00 $61.18
Verizon
T-Mobile 9%
4% AT&T
42%
Sprint
Nextel
45%
IS Accomplishment Report: February 2010 – July 2010 Page 36
Wireless Coverage Map – University of Missouri-Kansas City
IS Accomplishment Report: February 2010 – July 2010 Page 37
IS Accomplishment Report: February 2010 – July 2010 Page 38
Information Access
Goals and Objectives Update
February – July 2010
Efforts of the Information Access Division during the period February through July 2010 were notable for
the improvements made in measurements of customer response times, despite a steady increase in
requests for service. All divisions had singular and combined successes.
Instructional Technologies (ITS) The campus continues an upward usage trend with Wimba and Tegrity.
UMKC has developed an initial iPhone applications and started development on multiple mobile phone
applications.
Information Manipulation Services (IMS) spent resources and time on large projects for the School of
Dentistry, Pharmacy and Arts & Sciences. The Drug Information Center project is a multi-campus effort
where data is stored for faculty, staff and students at multiple campuses in the UM System.
Information Presentation Services (IPS) continued to create a high quality web development UMKC.
Highlight projects during this time period included work on the Black Women Leader’s conference and
the Nursing NCC conference. These ecommerce and event registration projects met the needs of the
event organizers and saved countless man hours while providing the end user a much nicer end product.
Information Access played a key role videotaping and producing many campus wide UMKC events. IA
continues to play a key role in defining and developing distance education solutions for the campus.
IS Accomplishment Report: February 2010 – July 2010 Page 39
ITS Highlights
Projects, Research and Development, and Personnel
Concurrent Blackboard Users
UMKC during the week is getting around 330 concurrent users during peak times of the day
UMKC Cable Network
Stated program to establish relationships with producers
Schedule TV programs to be broadcast
Continue work with Penn Valley Community College to provide Kansas City with educational classes
and programming
Archive TV programs to store for rebroadcast
Provide the public with an online and real-time cable schedule
Seek out new sources of programming
Efficiently find solutions to cable related problems
Increased number of programs significantly
Interactive Video Group
Interactive Video’s primary responsibilities during this period were to support ITV distance learning
events and support video conference meetings. Here is the hourly breakdown of the events we
supported February through July:
ITV distance learning 1033
Staffed video conference meetings 114
Non-staffed video conference meetings 61
Pre-recorded distance learning lectures 25
Secondary support for Rural Nurse Initiative events. The RNI events are similar in concept to ITV
distance learning.
ITV shot footage for an academic video for Dr. Cydney.
The ITV group also assisted on two video projects during this period, including the Student Union
Documentary directed by Brian Lemmons, and a streamed Town hall event on April 29th.
During this period, Ben Zygmunt and Jason Levy specified $157,000 of video production equipment
to either replace or upgrade our existing equipment. Due to the amount of research required, the
project took 4 months to complete (approximately March through June). The list was prepared in
conjunction with Jim Gaar and Scott Mallen, who helped identify necessary components. Dave
Deleersnyder and Jamie Rinehart served as engineering consultants. Ongoing responsibilities were
attended to during this time.
Projections for ITV’s part time staffing needs for the Fall 2010 semester were completed in June.
Interviewing to select 4 new part time employees was completed in July.
A first edition ITV control room manual was completed in July, to aid with training.
Miscellaneous IA News
Tegrity
Third year administering the Tegrity Podcasting project.
Negotiated a multi-year campus-wide Tegrity license in conjunction with UMC
Coordinated the conversion of the old Tegrity server into a Virtual Appliance with larger drive
space
IS Accomplishment Report: February 2010 – July 2010 Page 40
Coordinated the setup of a test appliance
Working on making Tegrity available by default for all courses in Spring 2011
ePortfolios:
Third year of Foliotek ePortfolio project
Continued successful usage by the History and Dental Hygiene departments
132 active Dental Hygiene accounts
120 active History accounts
eCalendar:
Second year administering the UMKC eCalendar
Implemented a new website for the UMKC calendar to act as a one stop shop for event
submission, calendar requests etc.
Currently support 56 calendars that feed into the main UMKC calendar
Approximately 62,098 views in the months of September
Media Outreach:
Continued administration of UMKC’s YouTube channel
Advised and assisted departments in promoting their videos via the YouTube Channel
UMKC is currently among the top 30 most subscribed-to EDU channels on YouTube
Web and Application Development:
Successfully implemented and submitted an iPhone app to the Apple Store – Free app is now
available for download
Working on additional iPhone apps
Researching Android Development
Miscellaneous
Research and Project Coordination for extended hours support
Worked on RFP for Extended Hours support
Co-Chair for Web Liaison Group
Helped establish a Programmers Discussion Group
Updated user support documentation to reflect changes in upgrade to Blackboard 9.
Provided over 50 Blackboard training sessions in multiple locations on Volker campus, Hospital
Hill campus and online.
Provided specialized training sessions for departments (including the Conservatory, Dental
School, School of Pharmacy and Medical School) and individuals.
Organized Instructional Technology Conference for UMKC instructors.
Work continued on this project through February
Additional Exchange Account Clean-up Project involving thousands of accounts (March 26)
Weekly Exchange Account Management and SSO Form printing report information remains
unchanged
Updated and greatly enhanced the Unlawful Discrimination/Sexual Harassment Training
Participant management web site. The web site’s functionality was greatly increased. (It wasn’t
mentioned on the August 2009 thru Jan 2010 Accomplishments.)
Put most of the process together, and in operation, that updates numerous Active Directory
distribution lists. Each distribution list has its own individual VBscript that is ran by a scheduled
task.
IS Accomplishment Report: February 2010 – July 2010 Page 41
Academic Enhancement
The group has started, completed and continued work on many projects of differing sizes. The
projects support faculty, students and staff throughout the university.
Bloch School lecture series Event Coverage (multiple events)
Integra Reality Conference - Bloch School
Division of Diversity, Access & Equity (multiple events)
UMKC Spencer Chemistry Award
Teach & Learning Online Classroom w/Lee Graham (multiple events)
SI Training
Healthcare Debate
Power point conversions to Flash for instructors
UQUEST update
School of Education Summer Immersion Project
E E Thompson Courtroom mini documentary
Black Women’s Leadership Conference Event Coverage (multiple events)
Steve Harvey Morning Show Event Coverage
Event Coverage to commemorate the signing of the Constitution Law School
Swinney Senior Project
Geometrics Learned
Bloch School EOY
General Education Streaming (multiple events)
Alumni Awards
Video Presentation for National Education Seminar
Michel Song Video for VCC
Staff and Faculty Awards
Dean Tan Video
Applied Language Institute ( In-progress)
IS Accomplishment Report: February 2010 – July 2010 Page 42
Instructional Design
The UMKC Instructional Design group has focused on offering training sessions in best practices
related to online courses. ID works with individual departments to incorporate assessment, goals,
and best practices to provide a sound structure for online learning. ID is also certifying online
courses for quality under supervision from the Provost office. ID is offering certification of online
instructors who have the opportunity to experience an online course from the perspective of a
student while studying techniques to communicate effectively with this type of learner.
Courses Being Prepared/Revised/ Supplemented for Online Delivery Currently
Kurz Comm110 Spring
LaFevers Health Assessment Spring
Diane Smith Education Spring
Judy McCormick Mass Comm Spring
Lisa Hill Meteorology Spring
Marszalek, Jacob M. Statistics Spring
Wayne & Eileen Vaught Bioethics Spring
Gus Jacobs Education Spring
Dr. Loyce Caruthers Education Spring
Dr. Donna Davis Education Spring
Dr. S. Marie McCarther Education Spring
Everett Med Music Spring
Prue Social Work Spring
Enrollments for Cert Course
1-Nov 28-Nov 1-Jan
19 7 2
Current Pending Certification
3 Kit Nursing
Henry Computer
Hill Meteorology
Currently Certified Courses
Course Number Name Faculty Start Date Certified
EDUL 5512 School Finance Dr. Jennifer Friend Fall 2010 8/30/2010
EDUL 5510 Planning Educational Dr. Rob Leachman Fall 2010 8/30/2010
Facilities
EDUL 5516 Governmental & Legal Dr. Jennifer Friend Fall 2010 8/30/2010
Aspects of Special
Education
ENGL 3237/327 British Literature Jennifer Pheghley Fall 2010 8/30/2010
IS Accomplishment Report: February 2010 – July 2010 Page 43
HMNTY401PW Culture of the Working Melissa Fiala Fall 2010 8/30/2010
Class
A&S 490B Experience of Health Christine Thurlow Fall 2010 8/30/2010
and Aging
Psych 405 Motivation Tamara Murdock Fall 2010 8/30/2010
Currently Certified Faculty Members
Jennifer Friend
Molly Mead
Jovanna Rohs
Melissa Smith
Katherine Smith
Jennifer Phegley
Patricia Hovis-Smith
Patricia DuFresne
Consistent Template for Programs
School of Nursing Curriculum
Committee(SON)
Ed.S. in Administration Curriculum
(School of Education) Committee(SOE)
New Menu for Bb Instructional
Template at UMKC Technology Services
and Instructional
Design
Regional Presentations Promoting UMKC Online Courses
Midwest Academy of Second Life (2 Sessions)
Management
Workshops
40
Open Labs
17
IS Accomplishment Report: February 2010 – July 2010 Page 44
Promotional/Advocate Activities for UMKC Online Courses
International Faculty
Conference
eLearning Blog Spotlight on Faculty Videos of past workshops Articles
ID Website
Lessons Learned Roundtable for faculty sharing experiences - videotaped and shared on ID
site
Participation in Nursing
Online Task Force
Two System Outcomes Training
Conferences
Instructional Design
Task Force
Extended Hours
Support
Second Life Building, 8
Workshops and
Demonstrations
One-time meetings with faculty to review/improve/discuss courses
26
Tutorials, Webcasts, and Supplemental Materials for faculty
30
IS Accomplishment Report: February 2010 – July 2010 Page 45
Usage Data
Blackboard
Total ITS-related tickets for reporting period: 2683
This number represents a decrease of 13% from the previous 6 month reporting period. The
previous period included August and September, historically our busiest months.
ITS-Related Tickets: Resolution by Department
Department Number Percentage of Total
Central Systems 1 0.04%
Classroom Technologies 1 0.04%
Instructional technologies 2053 76.52%
Networking & Telecom 1 0.04%
Support Services 627 23.37%
2683 100.00%
Support Issues by User Role
Role Number Percentage of Total
Faculty 996 37.12%
GRA/Work-study 51 1.90%
Other 30 1.12%
Staff 463 17.26%
Student 1143 42.60%
2683 100.00%
Support Issues by Origin
Origin Number Percentage of Total
Direct IST Contact 1660 61.87%
Support Services Contact 843 31.42%
Web Form Submission 180 6.71%
2683 100.00%
IS Accomplishment Report: February 2010 – July 2010 Page 46
Support Issues by Software
Program Number Percentage of Total
Blackboard 2216 82.59%
Digital media support 37 1.38%
e-Instruction 8 0.30%
Listserv 222 8.27%
Moodle 10 0.37%
Respondus 3 0.11%
SharePoint 60 2.24%
Tegrity 24 0.89%
Turnitin 19 0.71%
Unsupported 1 0.04%
Wimba 58 2.16%
Miscellaneous 25 0.93%
2683 100.00%
Support Issues by Academic Area (where specified)
School Number Percentage of Total
Arts & Sciences 358 27.64%
Bloch School of Business 72 5.56%
Conservatory 39 3.01%
University Libraries 24 1.85%
School of Biological Sciences 10 0.77%
School of Computing & Engineering 27 2.08%
School of Graduate Studies 8 0.62%
School of Dentistry 102 7.88%
School of Education 102 7.88%
School of Law 14 1.08%
School of Medicine 98 7.57%
School of Nursing 142 10.97%
School of Pharmacy 75 5.79%
Non-Academic Departments 224 17.30%
1295 100.00%
IS Accomplishment Report: February 2010 – July 2010 Page 47
EINSTRUCTION 02/10--07/10
INSTRUCTOR # Students # Classes
Gogol Ed 51 1
Sherman Marte 17 1
GRAND TOTAL 68 2
PERIOD # Students # Classes
02/10 - 07/10 68 2
02/09 - 07/09 1351 16
% Change 0.05% 0.13%
CAMPUS PACK Total #
Users 4537
Groups 232
Enrollments 7834
Concurrent Sessions 45
WIMBA VOICE # Created # 2/09-7/09
Presentations 7 10
Board 11 80
Podcaster 7 80
Email 28 80
Announcements 78 200
WIMBA CLASSROOM
Period # Rooms
02/10 -7/10 1058
02/09 - 7/09 498
% Change 47.07%
WIMBA PRONTO
Users 806
Courses 11,973
IS Accomplishment Report: February 2010 – July 2010 Page 48
Listserver Usage
Term Number of Lists Number of Subscribers
WS2006 637 120,420
FS2006 679 125,876
WS2007 643 125,895
FS2007 677 132,552
WS2008 712 139,405
FS2008 705 169,048
SP2009 759 158,949
SP2010 359 206,943
Between February and the end of July 2010, we had almost 22,783 listserv postings resulting in
7.3 million emails to subscribers.
Maestro
Active accounts: 13
Tracking Events: 103,489
Directly distributed Recipients: 281,177
Moodle
Active course sites: 14
SharePoint
UMKC has 220 sites running for faculty, staff and research purposes.
Total unique users: 1258
Year Number of new sites
2007 1
2008 52
2009 72
2010 95
Total Sites 220
Scanning
Tests 701
Questionnaires 2
Course Evaluations 11,159
Scanning performed for over 20 departments and schools
IS Accomplishment Report: February 2010 – July 2010 Page 49
IMS Highlights
The administrative site for the MDC ecommerce Web application was moved into production.
Created an Ecommerce application for the Women’s Council to accept payment only for new or
renewal memberships.
Created a web survey application for the Registrar’s Office.
Created a grade change form application for the Registrar’s Office. The grade change form (PDF)
resides in an Oracle table and is pulled from the table when the appropriate person authenticates to
the application.
Created an Ecommerce application for the School of Computing and Engineering for their MDM2010
conference. Also created an Administration site for SCE and Greg Hinrichs for transferring the
monies.
Refined and enhanced the CE application for dentistry. This application is used to print out
certificates for attendees that completed the Midwest Dental Conference.
Refined and enhanced an Ecommerce application for Bloch CE.
Created an Ecommerce donation page for the School of Biological Sciences. This was requested by
Marilyn Yoder.
Started working on a Supplemental Application for Conservatory.
Made an enhancement to the BBUR request system to allow users to add other users to
organizational sites.
Started working on a continuing education program for Nursing CE.
For the MDC CE credit application, I added a web survey and a class survey to the site.
Continued working on the Supplemental Application for Conservatory.
Created an application for the Registrar’s Office to allow its administrative users to add/delete users
to their web applications (Ferpa, Grade Change Form, Math Placement and PeopleSoft Links).
Converted the GATS Purchase Order form to be AJAX enabled and submitted.
Create an ecommerce page for David Burford for SCE.
Worked on Blackboard tasks. This involved moving a procedure over from BB8 to BB9 and then
troubleshooting why the procedure wouldn’t compile. I ended up modifying a called procedure to
have the same number of input parameters that the procedure was passing in.
IS Accomplishment Report: February 2010 – July 2010 Page 50
IPS Highlights
Ecommerce
Updated Nursing NCC conference admin site.
Batch email reminders for nursing national conference attendees
Trouble shooting event registration website user errors.
Library membership online sign up page updates
Jazzfriends online donation site update
Black Women Leader conference online donation website set up and admin site for tracking
transactions.
UMKC Advancement scholarship pre population links set up
Fixed Nursing conference registration statistic error.
Questionnaires additions to communiverity online course registration
Fixed new letters international orders problem
Web Development
Facet Conference online registration and registration tracking
Environment Health Material Safety Data Sheet website going production
Built login control for NEH Border Wars website of History Department.
Admin Services Training Sessions Online Registration and Admin site for manage sessions and
tracking registrations.
Replaced WYSISYG editor for PR Feature stories.
Fixed Dental School Email form
Marketing titles admin for UMKC Audience Pages
Database of School of Graduate Access converted to MS SQL
Troubleshooting Communiversity website after its migration from web2 to new server.
Fixed AZ index recapcha problem
IS Accomplishment Report: February 2010 – July 2010 Page 51