510ebdf8-3a72-486b-a984-d52fd2036961.xls CIB w78 conference Maribor 2007
Tuesday 26.6. Wednesday 27.6. Thursday 28.6. Friday 29.6. Saturday 30.6.
9:00
Opening Keynote 2 Keynote 4
9:30
10:00
10:30 Workshop summaries
11:00 & discussions
1 2 3 7 8 9 13 14 15
11:30
12:00
12:30
13:00
13:30 Lunch Lunch Lunch Lunch
14:00
14:30 Optional tours:
Keynote 1 Keynote 3 Plenary on publishing
15:00
Workshop summaries
15:30 1. Maribor
GCEC & discussions
16:00 (half day)
16:30 EG- 2. Region
4 5 6 10 11 12 w78
17:00 ICE Integrated Design Ptuj, wineyards,...
17:30 cableway Solutions (full day)
18:00 Closing 3. Country
18:30 Conference excursion Postojna,
19:00 Dinner bus Habakuk - Vinag (Pohorje) Dinner Ljubljana,...
19:30 (full day)
20:00 bus Habakuk - Lent
20:30 Social event: Wine
21:00 testing & Concert
Conference dinner
21:30 (Vinag wine cellar)
Social event: Folkart (Pohorje, Bellevue)
22:00
opening (Lent festival)
22:30
Lent festival
23:00
23:30 cableway
0:00 Lent festival
0:30 Lent festival Lent festival
1:00
panel sessions (Turner hall) social events organized transport
workshops (Priol, Vokač & Teply halls) optional events
Tuesday 26.6. Wednesday 27.6. Thursday 28.6. Friday 29.6. Saturday 30.6.
Track Priol Vokač Teply Priol Vokač Teply Priol Vokač Teply Summaries papers Optional tours
9:00 BIM 19
Opening Keynote 2: Raimar Scherer Keynote 4: Renate Fruchter
9:30 (4 sections)
10:00 ITCEDU 2 ICTEB 3 Ontologies 4
BIM 1 (3) Ind. 1 (3) PM 1 (3) BIM 5 (3) VR 1 (3) ICE 2 (3) Mob. (3)
10:30 (3) (2) EG-ICE 18
11:00 Coffee break Coffee break Coffee break Coffee break
11:30 Industry exp. & chall. 10
ITCEDU 3
12:00 BIM 2 (5) Ind. 2 (4) PM 2 (4) Ont. (4) VR 2 (4) ICE 3 (4) FM (5) Sim. (2) Project management 9
(4)
12:30 ICT enh. building 9
13:00
13:30 Lunch Lunch Lunch Lunch
14:00
14:30 VR, Simulation,
Keynote 1: Steven Fenves Keynote 3: Martin Fischer Panel on publishing 14
15:00 Design Aut., Mobile
1. Maribor, by foot
15:30 ICTEB 1 Open meeting ASCE Global FM 5
BIM 3 (3) Ind. 3 (3) PM 3 (2) DA (2) ICE 4 (3) (half day)
16:00 (3) Center of Excellence in Comp. ITCEDU 12
2. Region, by bus
16:30 Coffee break Coffee break Coffee break
w78 EG-ICE Ptuj, wineyards,...
17:00
ICTEB 2 ITCEDU 1 Integrated Design Solutions (full day)
17:30 BIM 4 (5) ICE 1 (4) ICE 5 (4) cableway
(4) (5) 3. Country, by bus
18:00 Closing
Postojna, Ljubljana,...
18:30
Conference excursion (Pohorje) (full day)
19:00 Dinner bus Habakuk - Vinag Dinner
19:30
20:00
bus Habakuk - Lent
20:30 Social event: "Wine of culture",
21:00 wine tasting & Concert (Vinag
Conference dinner (Pohorje,
21:30 wine cellar)
Bellevue)
22:00 Social event: Folkart opening
22:30 (Lent festival) Lent festival
23:00
23:30 cableway
0:00 Lent festival
0:30 Lent festival Lent festival
1:00
panel sessions (Turner hall) social events organized transport
workshops (Priol, Vokač & Teply halls) optional events
Tuesday 26.6. CIB w78/EG-ICE/ITCEDU conference Maribor 2007
9:00 9:05 - 9:10 Welcome by the organizer of the conference prof.dr. Danijel Rebolj
9:10 - 9:20 J.S.Bach, Ciaconne (violine solo) Eva Kristine Vasarhelyi
9:20 - 9:25 Welcome by the Dean of the Faculty of Civil Engineering prof. dr. Ludvik Trauner
9:25 - 9:30 Welcome by the Rector of the University of Maribor prof. dr. Ivan Rozman
9:30 - 9:35 Welcome by the Major of the city of Maribor Mr. Franc Kangler
9:35 - 9:50 Opening and keynote by Minister of development dr. Žiga Turk
John I. Messner Atul Khanzode, Martinschematic benefits of implementing virtual design Sylvain Kubicki, Gilles Halin for coordination of
to a Fischer, Dean Reed Annie and construction technologies
10:00 Robert M. Leicht,Comparing traditional schematic design documentationChallenges andbuilding information model Guerriero, A model-based approach to develop a dashboard
Building Bjork views on BIM/IFC developments of
Strategic review 4D construction Sun
Survey of benefits – a construction collaboration
10:20 Rob Howard, Bo-Christer information models – experts’N. Shaw, D. Bouchlaghem, D. Kerr the production of a Tejas Oza, Ming sequencing model ofthe lessons learnt
Integrating three-dimensional product models into A. V. CITAX: and construction project for data exchange in the Alain Zarli, Jean-Claude Bignon, Gilles Halin s
10:40 Timo Hartmann, Frank Neuberg, Martin Fischer Hore Ahmed Laaroussi, construction industry supply chain
R. P. West, engineering defining XML standards information platforms Towards a flexible IT-based system for process
11:00 Coffee break
11:30 Tomaž Pazlar, Žiga Turk
Evaluation of IFC Optimization Configurable factors, assessment management
Muhamad AbduhIndonesian contractors’ performance in managing IT: critical successknowledge-based riskmodel, and be
Wael Sharmak, Raimar J. Scherer, Peter Katranuschkov
Real-time activity
11:50 Peter Podbreznik, Danijel Rebolj tracking system – the development process environmentBengt Toolanen, Stefanbuilding projects supportedcollaboration: industrial design ve
Project Xiangyu Wang, Understanding by Jingyu Chen
Thomas Olofsson, Rogier Jongeling, and process design of WokseppMaaike Kleinsmann,virtual design and construction
12:10 Patrick Söderström, Thomas Olofsson Anita Moum, Tore Haugen,you learn from practice today?
Virtual Road Construction - A conceptual model What did Christian Koch Adjusting a tool
Felix Hofmann, Volker Berkhahn for collaborative planning to requ
Alfredo F. use inModeling a project scope sector
José M. Rueda
4D construction sequence planning - new process and data IT-barometer – a decade’s development of itSerpell,the Swedish constructionusing a case-based rea
12:30 Jan Tulke, Jochen Hanff Olle Samuelson The model
12:50 Janne Porkka and Kalle Kähkönen
Software development approaches and challenges of 4D product models
13:10
Lunch
14:30
Steven Fenves: What makes and doesn't make a 'killer app' in Civil Engineering: a retrospective evaluation
15:30 Using 3D and 4D David Hudgens Investigations in the Anders Ekholm, Thomas Olofsson,Juhanibased Kalle Kähkönen, Pekka processes
Anders Robertson, Rogier Jongeling, BICT study Alain Kiiras,
Can Ersen Fırat, for industrialization of house building Huovinen
Claudio Mourgues, Martin Fischer, models to improve jobsite communication – virtual huddles caseproject of state-of-the-art ICTModel Zarli scheduling in building projects – is i
15:50 Trodd Samad (Sami) Kazi, Matti the vision for Bourdeau, Anders Ekholm,ICT
Mustafa R&D in A process Ronny Andersson
construction
Investigating Jason Underwood, Nigelgeospatial environment in order comprehensivefire response management Laptali Oral
Umit Isikdag, Ghassan Aouad,the applicability of IFC in Alain Zarli, AbdulA strategic and to facilitate Hannus, Marc futureOral, Emelcomputer based system for documentation and
16:10 Alvise SimondettiDin
Stefanie Schraufstetter, Christoph directional operators esigner’s toolkit 2020: a vision for building information models
André Borrmann,An octree-based implementation of van Treeck, Ernst Rank a 3D spatial query language for the practice
16:30 Coffee break
17:00 M. M. Nour Manipulating IFC sub-models in collaborative teamwork environments New approaches
Ian Flood, Raymond Issa, Wen Liufor computer-based constructio
17:20 K. U. Gökce, R. J. Scherer, H. A. Dikbaş
IFC based computer-integrated construction project management model Secure dynamic web services composition Bodd
U. M. Mbanaso, G. S. Cooper, Y. Rezgui, M. Wetherill, S. C. in the
17:40 Christer Finne Perceived customer value in construction information services W. Huhnt, F. Enge Consistent information management for structurin
18:00 Building information Underwood, Song Wu
Umit Isikdag, Ghassan Aouad, Jason models: a review on storage and exchange mechanisms Missing fundamental
Ivan Mutis, Raja R.A. Issa, Ian Flood stratum of the current forms
18:20 Managing Pollalis, Dawn with building information modeling
Ivan S. Panushev, Spiro N. design options Korbelak
18:40
Dinner
20:00
special buses Habakuk hotel -> Lent festival
21:00
Social event: Folkart opening (Lent festival)
After bringing everybody to the Lent festival main stage the evening is open. Use local bus or taxi to get back to your hotel.
Wednesday 27.6. CIB w78/EG-ICE/ITCEDU conference Maribor 2007
9:00
Raimar Scherer: Product Model Based Collaboration
10:00 M. Laasonen Jason data Using virtual reality Worlikar A surface mining
Forest belt safety inHaymaker
Recognition of building parts from measured Lucas, Walid Thabet, Poonam(VR) to improve conveyorFlager, Johncomparison of multidisciplinary design, analysis an
10:20 BIM in 2007 – are we there yet?
Robert Amor, Ying Jiang, Xiaofan Chen Information-rich virtual Virtual reality technology applied in engineering educ
A. for design review
Mohd Fairuz Shiratuddin, Walid Thabet environment (VE) Z. Sampaio, P. G. Henriques
10:40 Reduction, simplification, translation and interpretation in the exchange of model data of video-based augmented realityvisualisation as a tool for construction build
Vladimir Bazjanac, Arto Kiviniemi Xiangyu Wang Measuring tracking performance Interactive systems for design and interpreting
Yaqub Rafiq, Martin Beck, Pieter De Wilde
11:00 Coffee break
11:30 Juan Pérez,
José semantic web ontologiesXabier Basogain, Diego Borro for the construction sector
A. Gehre, P. Katranuschkov, R. J. organization processes by Luis Izkara,Mobile augmented reality, an advanced tool Ravindran, Evaluating reliability of multiple-model system identifi
Managing virtual Scherer Suraj Prakash Kripakaran, Ian F. C. Smith
11:50 the Markkanen
Jukka Rönkkö, Jussi facilitation IFC visualization clientTorben GPCore Schnellenbach-Held, for genetic programm
Jakob Beetz, Bauke de Vries,distributed functional part specifications for Lightweight 3Dof service-based architectures Pullmann, Martina– a generic frameworkPeer Lubasch
RDF-based Jos van Leeuwen
12:10 Ahmed Laaroussi, Bruno Fiès, Rémi Vankeisbelckt, Julien Hans
products Thomas and applicability of virtual reality models in design and construction Arciszewski, Kenneth Desystem
Ontology-aided FMEA for constructionStefan Woksepp,CredibilityOlofsson Evolutionary Tomasz
Rafal Kicinger, Artur Winnicki,design for blast of steel structural Jong
12:30 for conformance Envisioning the future: built, natural Yu Zhang, Alan Kwan, generative
Towards an ontology-based approach Leonardo Rischmoller checking modeling Using
Anastasiya Yurchyshyna, Catherine Faron Zucker, Nhan Le Thanh, Celson Lima, Alain Zarli in construction and digital environments John Miles representations for structural design
13:10
Lunch
14:30
Martin Fischer: Tomorrow's workday: spontaneous, creative, and reliable
15:30 IT-based Approach for Effective ManagementL. Schultz, Changes: support software tool for Brenda Lobb C. the subjective impressions Bugmann installation
Faisal Manzoor Arain M. Y. (CMS)
A decision A Change Management System Rafiq, Generality of using correctors to predict the behaviou
Carl P. of Project Robert Amor, Hans W. Guesgen, reasoning about Sui, D. J. Easterbrook, G. of a lighting
15:50 Alan Bridges Computational
Automated progress mesurement framework using Kagioglou, Ammar Kaka Marko steel beam design Haapio, John Miles
architectural design
Yahaya Makarfi Ibrahim, Emanuele Trucco, Aouad Ghassan, Michail computer vision support for early stage Markku Heinisuo,Welded Saikkonen, Jaakko using particle swarm anal
16:10 Per ChristianssonICT Enhamced buildings potential Donald E. GriersonMulticriteria decision making in n-D
16:30 Coffee break
17:00 Ipek Gursel, RudiA computational framework for integration of performance information during rolebuilding lifecycle de Ridder Embedding optimization in the design process of buil
Stouffs, Sevil Sariyildiz Philipp
Towards a consistent the for Dado, Hennes Geyer
Sander van Nederveen, Reza Beheshti, Edwin information technology in civil engineering education
17:20 Ken Thomas, to Learning about A and
the
Incorporating the Progress Measurement DimensionBrian nD system: IT research frameworkJerzy Pokojski Integration of on higher education AEC programmes
Xiaonan Zhang, Song Wu, Nick Bakis, Michail Kagioglou, Ghassan Aouad Graham, John Wall learning using IT - a review of current practice knowledge based approach and multi-c
17:40 Towards intelligent Podbreznik, Marjan Lep, Dušan Z
Z. Ren, L. Sha and T.M. Hassan Construction Material Management - A Linked contents of teaching Project Andrej Tibaut, Branko Kaučič, Peter information system for public inter
RFID facilitated Philipp Baumann
Wolfgang Huhnt, Case Study of Water Supply
18:00 IT support for industrial production of timber houses – the Swedish case4D modeling
Assessement of in construction Scherer
Gerald Faschingbauer, and sensor data management for
Helena Johnsson, Stefan Persson and Linus MalmgrenLingyun Wang, John I. Messner, Robert Leicht for schedule visualizationModel Raimar J.engineering education geotechnica
18:20 SimuSurvey: a computer-based simulator for survey training
Cho-Chien Lu, Shih-Chung Kang, Shang-Hsien Hsieh
18:40
19:00 special buses Habakuk hotel -> Vinag wine cellar
19:30
Social event: "Wine of culture", wine tasting & Concert (Vinag wine cellar)
For "Wine of culture" event have some warm clothing; the temperature in the cellar is around 14 deg. Celsius
After the wine tasting and concert and some more wine tasting... the evening is open. Use local bus or taxi to get back to your hotel.
Thursday 28.6. CIB w78/EG-ICE/ITCEDU conference Maribor 2007
9:00
Renate Fruchter: A2D2A2D… Seamless Transformations from Analog to Digital Worlds in Support of Global Teamwork
10:00 Martin Ebner, Hakkarainen, Jani Jäppinen, Kari six years of experience Effect of Electronic Communication Management
solutions at Graz and Sabouni, A.
Case digitalo Jukka Rönkkö, Petri Honkamaa, Mika Ulrich Walder in civil engineering –Rainio, Sanni Siltanen, Jouko Hyväkkä
Charles Woodward, Jani Lahti,– a range of virtual and augmented realityE-learningin construction application El-Saboni, M., Aouad, G.; university of technology
10:20 Alexander Löfgrenowards mobile lean communication for production management
T Alan Bridges Ronny of ICT in the construction industry
Miklós MOLNÁR,BenefitsANDERSSON, Anders EKHOLM – char
Problem based learning in architectural education
10:40 Ozan Koseoglu, Dino Bouchlaghem, David Kerr Effects Beheshti
Saban Özsariyildiz, Rezaframework environments and the digital
Collaborative mobile visualisation in construction (MobVisCon) of teaching development and validation media: the case of a parametric design systems course
11:00 Coffee break
11:30 Uwe Rueppel, Armin Wagenknecht Ulrike Beißert, Markus König, Hans-Joachim of outfitting
Marisa Ponti, Andrea Jungbecker, Hans Wilhelm Alfen Constraint-based simulationBargstädt processe
Renate dynamic process-modelling
Improving emergency management by formal Fruchter,A scalable working model for cross-disciplinary global teamwork education
11:50 U. Walder, G. Glanzer, A. Merkel, R. Schütz, T. Wießflecker Klinc
Robert
Facility management data in disaster management Positioning FEM
H. Hofmeyer, M. C. integrated in the transformation and ITC d
Comparison of distance learning courses: A/E/C computerM. Bakker global teamwork courseof spatial e
12:10 An empirically-based approach towardEdwincontrol actionBeheshti, Sander van Nederveen upcoming shared master of science in construction management a
A. Mahdavi, A. Mohammadi, E. Kabir, L. Lambeva IT models in buildings
user Dado, Reza education and utilization within the
12:30 Ardeshir Mahdavi Challenges Rebolj
Tomasz Arciszewski, Danijel of civil engineering education
Szucheng Chien,Talking back to buildings: interfacing for sentient environments
12:50 Kimmo Niemi Applying mobile devices to data gathering process in real estate maintenance
13:10
Lunch
14:30
Bo-Christer Björk: Panel on publishing
15:30
Ian Smith, Tomasz Arciszewski: Open Meeting of the ASCE Global Center of Excellence in Computing
16:30
w78 meeting EG-ICE meeting
cableway Habakuk - Pohorje hill
17:30
18:00
Conference excursion (Pohorje hill)
20:00
Conference dinner (Pohorje, Bellevue)
23:30 cableway Pohorje hill - Habakuk
Casual wearing by all times, including all social events
Friday 29.6. (Summaries and discussions) CIB w78/EG-ICE/ITCEDU conference Maribor 2007
9:00 Robert Amor: Building Information Models (incl. subsection by Martin Fischer, Arto Kiviniemi and Vlado Bazjanac)
Raimar Scherer, Peter Katranuschkov: Ontologies
Ian Smith: Intelligent Computing in Engineering (EG-ICE)
11:00 Coffee break
11:30 Alvise Simondetti: Industry experiences and challenges
Nash Dawood: Project management
Per Christiansson: ICT enhanced building
13:10
Lunch
14:30 Wolfgang Huhnt: Simulation
Leonardo Rischmoller: Virtual Reality
Luisa Gama Caldas: Design Automation
Karsten Menzel: Mobile & Wireless Computing in Construction
Ulrich Walder: Facility Management
Andrej Tibaut: ITC in education (ITCEDU)
16:30 Coffee break
17:00
Robert Amor: Integrated Design Solutions (discussion initiated by CIB)
Danijel Rebolj & Leonardo Rischmoller: Closing (incl. invitation for the next w78 meeting 2008 in Chile)
18:40
Dinner
Casual wearing by all times, including all social events
Keynotes: Page
26.6. 14:30 Steven Fenves What makes and doesn't make a 'killer app' in civil engineering: a retrospective evaluation 3
27.6. 9:00 Raimar Scherer Product model based collaboration 11
27.6. 14:30 Martin Fischer Tomorrow's workday: spontaneous, creative, and reliable 21
28.6. 9:00 Renate Fruchter A2D2A2D… Seamless transformations from analog to digital worlds in support of global teamwork 27
Workshop: Robert Amor BIM
Session: Robert Amor Product modelling
26.6. 10:00 Robert M. Leicht, John I. Messner Comparing traditional schematic design documentation to a schematic building information model 39
10:20 Rob Howard, Bo-Christer Bjork Building information models – experts’ views on BIM/IFC developments 47
10:40 Timo Hartmann, Frank Neuberg, Martin Fischer Integrating three-dimensional product models into engineering and construction project information
55
platforms
11:30 Tomaž Pazlar, Žiga Turk Evaluation of IFC optimization 61
Session: Martin Fischer 4D
26.6. 11:50 Peter Podbreznik, Danijel Rebolj Real-time activity tracking system – the development process 67
12:10 Patrick Söderström, Thomas Olofsson Virtual road construction – a conceptual model 73
12:30 Jan Tulke, Jochen Hanff 4D construction sequence planning – new process and data model 79
12:50 Janne Porkka, Kalle Kähkönen Software development approaches and challenges of 4D product models 85
15:30 Claudio Mourgues, Martin Fischer, David Using 3D and 4D models to improve jobsite communication – virtual huddles case study
91
Hudgens
Session: Arto Kiviniemi Managing multiple model space
26.6. 15:50 Umit Isikdag, Ghassan Aouad, Jason Investigating the applicability of IFC in geospatial environment in order to facilitate the fire response
97
Underwood, Nigel Trodd management process
16:10 André Borrmann, Stefanie Schraufstetter, An octree-based implementation of directional operators in a 3D spatial query language for building
105
Christoph van Treeck, Ernst Rank information models
17:00 M. M. Nour Manipulating IFC sub-models in collaborative teamwork environments 111
17:20 K. U. Gökce, R. J. Scherer, H. A. Dikbaş IFC based computer-integrated construction project management model 119
Session: Vlado Bazjanac Data origins and data exchange
26.6. 17:40 Christer Finne Perceived customer value in construction information services 125
18:00 Umit Isikdag, Ghassan Aouad, Jason Building information models: a review on storage and exchange mechanisms
135
Underwood, Song Wu
18:20 Ivan S. Panushev, Spiro N. Pollalis, Dawn Managing design options with building information modeling 145
27.6. 10:00 M. Laasonen Recognition of building parts from measured data 151
10:20 Robert Amor, Ying Jiang, Xiaofan Chen BIM in 2007 – are we there yet? 159
10:40 Vladimir Bazjanac, Arto Kiviniemi Reduction, simplification, translation and interpretation in the exchange of model data 163
Workshop: Raimar Scherer, Peter Katranuschkov Ontologies
27.6. 11:30 A. Gehre, P. Katranuschkov, R. J. Scherer Managing virtual organization processes by semantic web ontologies 177
11:50 Jakob Beetz, Bauke de Vries, Jos van Leeuwen RDF-based distributed functional part specifications for the facilitation of service-based architectures 183
12:10 Ahmed Laaroussi, Bruno Fiès, Rémi Ontology-aided FMEA for construction products
189
Vankeisbelckt, Julien Hans
12:30 Anastasiya Yurchyshyna, Catherine Faron Towards an ontology-based approach for conformance checking modeling in construction
195
Zucker, Nhan Le Thanh, Celson Lima, Alain Zarli
Workshop: Alvise Simondetti, Steven Fenves Industry experiences and challenges
26.6. 10:00 Atul Khanzode, Martin Fischer, Dean Reed Challenges and benefits of implementing virtual design and construction technologies for coordination of 205
10:20 N. Shaw, D. Bouchlaghem, D. Kerr Strategic review of the production of a 4D construction sequencing model – the lessons learnt 213
10:40 R. P. West, A. V. Hore CITAX: defining XML standards for data exchange in the construction industry supply chain 217
11:30 Muhamad Abduh Indonesian contractors’ performance in managing IT: critical success factors, assessment model, and
225
benchmarking system
11:50 Thomas Olofsson, Rogier Jongeling, Bengt Project environment and process design of building projects supported by virtual design and construction
233
Toolanen, Stefan Woksepp methods
12:10 Anita Moum, Tore Haugen, Christian Koch What did you learn from practice today? 239
12:30 Olle Samuelson The IT-barometer – a decade’s development of it use in the Swedish construction sector 247
15:30 Anders Robertson, Rogier Jongeling, Anders Investigations in the BICT project of state-of-the-art ICT for industrialization of house building processes
255
Ekholm, Thomas Olofsson, Alain Zarli
15:50 Alain Zarli, Abdul Samad (Sami) Kazi, Matti A strategic and comprehensive vision for future R&D in construction ICT
Hannus, Marc Bourdeau, Anders Ekholm, Ronny 263
Andersson
16:10 Alvise Simondetti Designer’s toolkit 2020: a vision for the practice 271
Workshop: Raymond Issa Project management
26.6. 10:00 Annie Guerriero, Sylvain Kubicki, Gilles Halin A model-based approach to develop a dashboard tool integrating trust concepts in AEC 281
10:20 Tejas Oza, Ming Sun Survey of benefits of a construction collaboration tool for contract change management 289
10:40 Ahmed Laaroussi, Alain Zarli, Jean-Claude Towards a flexible IT-based system for process steering in architecture design 295
11:30 Wael Sharmak, Raimar J. Scherer, Peter Configurable knowledge-based risk management process model within the general construction project
301
Katranuschkov process model
11:50 Xiangyu Wang, Maaike Kleinsmann, Jingyu Chen Understanding collaboration: industrial design versus constructability review
319
12:10 Felix Hofmann, Volker Berkhahn Adjusting a tool for collaborative planning to requirements in practice - realisation of a client-server
325
architecture
12:30 Alfredo F. Serpell, José M. Rueda Modeling a project scope using a case-based reasoning approach 329
15:30 Can Ersen Fırat, Juhani Kiiras, Kalle Kähkönen, Model based scheduling in building projects – is it oxymoron?
337
Pekka Huovinen
15:50 Mustafa Oral, Emel Laptali Oral A computer based system for documentation and monitoring of construction labour productivity 345
Workshop: Per Christiansson ICT Enhamced buildings
27.6. 15:30 Faisal Manzoor Arain IT-based approach for effective management of project changes: a change management system (CMS) 353
A conceptual progress measurement framework for automatic work-packaging and assessment with
15:50 Y. M. Ibrahim, T. C. Lukins, A. P. Kaka, E. Trucco
367
computer vision
16:10 Per Christiansson ICT enhanced buildings potentials 373
17:00 Ipek Gursel, Rudi Stouffs, Sevil Sariyildiz A computational framework for integration of performance information during the building lifecycle 379
17:20 Xiaonan Zhang, Nick Bakis, Song Wu, Mike Incorporating the progress measurement dimension to an integrated building information system: a
Kagioglou, Ghassan Aouad, Tim Lukins, Yahaya research framework 387
Ibrahim
17:40 Z. Ren, L. Sha, T. M. Hassan RFID facilitated construction material management - a case study of water supply project 401
18:00 Helena Johnsson, Linus Malmgren, Stefan ICT support for industrial production of houses – the Swedish case
407
Persson
28.6. 10:00 M. El-Saboni, G. Aouad, A. Sabouni Effect of electronic communication management systems on the success of construction projects in
415
United Arab Emirates
10:20 Miklós Molnár, Ronny Andersson, Anders Ekholm Benefits of ICT in the construction industry – characterization of the present situation in house-building
423
processes
Workshop: Leonardo Rischmoller Virtual Reality
27.6. 10:00 Jason Lucas, Walid Thabet, Poonam Worlikar Using virtual reality (VR) to improve conveyor belt safety in surface mining 431
10:20 Mohd Fairuz Shiratuddin, Walid Thabet Information-rich virtual environment (VE) for design review 439
10:40 Xiangyu Wang Measuring tracking performance of video-based augmented reality systems for design and construction
447
11:30 José Luis Izkara, Juan Pérez, Xabier Basogain, Mobile augmented reality, an advanced tool for the construction sector
453
Diego Borro
11:50 Jukka Rönkkö, Jussi Markkanen Lightweight 3D IFC visualization client 461
12:10 Stefan Woksepp, Thomas Olofsson Credibility and applicability of virtual reality models in design and construction 467
12:30 Leonardo Rischmoller Envisioning the future: built, natural and digital environments 475
Workshop: Wolfgang Huhnt Simulation
28.6. 11:30 Ulrike Beißert, Markus König, Hans-Joachim Constraint-based simulation of outfitting processes in building engineering
491
Bargstädt
11:50 H. Hofmeyer, M. C. M. Bakker Positioning FEM in the transformation of spatial design to structural design 515
Workshop: Luisa Gama Caldas Design automation
27.6. 15:30 Carl P. L. Schultz, Robert Amor, Hans W. A decision support software tool for reasoning about the subjective impressions of a lighting installation
507
Guesgen, Brenda Lobb
15:50 Alan Bridges Computational support for early stage architectural design 523
Workshop: Karsten Menzel Mobile & wireless computing in AEC
28.6. 10:00 Charles Woodward, Jani Lahti, Jukka Rönkkö, Case digitalo – a range of virtual and augmented reality solutions in construction application
Petri Honkamaa, Mika Hakkarainen, Jani
529
Jäppinen, Kari Rainio, Sanni Siltanen, Jouko
Hyväkkä
10:20 Alexander Löfgren Towards mobile lean communication for production management 541
10:40 Ozan Koseoglu, Dino Bouchlaghem, David Kerr Collaborative mobile visualisation in construction (MobVisCon) framework development and validation 549
Workshop: Ulrich Walder Facility Management
28.6. 11:30 Uwe Rueppel, Armin Wagenknecht Improving emergency management by formal dynamic process-modelling 559
11:50 U. Walder, G. Glanzer, A. Merkel, R. Schütz, T. Facility management data in disaster management
565
Wießflecker
12:10 A. Mahdavi, A. Mohammadi, E. Kabir, L. An empirically-based approach toward user control action models in buildings
573
Lambeva
12:30 Szucheng Chien, Ardeshir Mahdavi Talking back to buildings: interfacing for sentient environments 581
12:50 Kimmo Niemi Applying mobile devices to data gathering process in real estate maintenance 587
Workshop: Ian Smith EG-ICE
26.6. 17:00 Ian Flood, Raymond Issa, Wen Liu New approaches for computer-based construction project planning 595
17:20 U. M. Mbanaso, G. S. Cooper, Y. Rezgui, M. Secure dynamic web services composition in the context of construction e-purchasing
601
Wetherill, S. C. Boddy
17:40 W. Huhnt, F. Enge Consistent information management for structuring construction activities 607
26.6.
18:00 Ivan Mutis, Raja R.A. Issa, Ian Flood Missing fundamental stratum of the current forms of the representation of concepts in construction 615
Session: John Miles
27.6. 10:00 Forest Flager, John Haymaker A comparison of multidisciplinary design, analysis and optimization processes in the building
625
construction and aerospace industries
10:20 A. Z. Sampaio, P. G. Henriques Virtual reality technology applied in engineering education 631
10:40 Yaqub Rafiq, Martin Beck, Pieter De Wilde Interactive visualisation as a tool for interpreting building thermal simulation results 637
Session: Yaqub Rafiq
27.6. 11:30 Suraj Ravindran, Prakash Kripakaran, Ian F. C. Evaluating reliability of multiple-model system identification
643
Smith
11:50 Torben Pullmann, Martina Schnellenbach-Held, GPCore – a generic framework for genetic programming 651
12:10 Rafal Kicinger, Artur Winnicki, Tomasz Evolutionary design for blast of steel structural systems 657
12:30 Yu Zhang, Alan Kwan, John Miles Using generative representations for structural design 663
Session: Tomasz Arciszewski
27.6. 15:30 M. Y. Rafiq, C. Sui, D. J. Easterbrook, G. Generality of using correctors to predict the behaviour of masonry wall panels 669
15:50 Markku Heinisuo, Marko Saikkonen, Jaakko Welded steel beam design using particle swarm analysis
675
Haapio, John Miles
16:10 Donald E. Grierson Multicriteria decision making in n-D 681
Session: Ray Issa
27.6. 17:00 Philipp Geyer Embedding optimization in the design process of buildings – a hall example 689
17:20 Jerzy Pokojski Integration of knowledge based approach and multi-criteria optimization in engineering design 699
17:40 Andrej Tibaut, Branko Kaučič, Peter Podbreznik, Towards intelligent information system for public interurban road passenger transport management
705
Marjan Lep, Dušan Zalar
18:00 Gerald Faschingbauer, Raimar J. Scherer Model and sensor data management for geotechnical engineering application 711
Workshop: Andrej Tibaut ITC in education
Session: Best practice ICT in courses
27.6. 17:00 Sander van Nederveen, Reza Beheshti, Edwin Towards a consistent role for information technology in civil engineering education
717
Dado, Hennes de Ridder
17:20 Ken Thomas, Brian Graham, John Wall Learning about IT and learning using IT - a review of current practice on higher education AEC
723
programmes in Ireland
17:40 Wolfgang Huhnt, Philipp Baumann Linked contents of teaching 731
18:00 Lingyun Wang, John I. Messner, Robert Leicht Assessement of 4D modeling for schedule visualization in construction engineering education 737
18:20 Cho-Chien Lu, Shih-Chung Kang, Shang-Hsien SimuSurvey: a computer-based simulator for survey training
743
Hsieh
Session: ICT for better curriculum
28.6. 10:00 Martin Ebner, Ulrich Walder E-learning in civil engineering – six years of experience at Graz university of technology 749
10:20 Alan Bridges Problem based learning in architectural education 755
10:40 Saban Özsariyildiz, Reza Beheshti Effects of teaching environments and the digital media: the case of a parametric design systems course
763
Session: Global education programmes
28.6. 11:30 Renate Fruchter, Marisa Ponti, Andrea A scalable working model for cross-disciplinary global teamwork education
769
Jungbecker, Hans Wilhelm Alfen
28.6.
11:50 Robert Klinc Comparison of distance learning courses: A/E/C computer integrated global teamwork course and ITC
779
euromaster
12:10 Edwin Dado, Reza Beheshti, Sander van IT education and utilization within the upcoming shared master of science in construction management
785
Nederveen and engineering in the Netherlands
12:30 Tomasz Arciszewski, Danijel Rebolj Challenges of civil engineering education 793
Workshop Session Chair Seq ID First Name Last Name Presenter
1 Steven Fenves
2 201 Raimar Scherer
Keynotes Danijel Rebolj
3 217 Martin Fischer
4 143 Renate Fruchter
1 29 Robert Leicht
Product 2 43 Rob Howard
Robert Amor
modelling 3 108 Timo Hartmann
4 140 Tomaz Pazlar
5 18 Peter Podbreznik
6 78 Patrick Söderström
4D Martin Fischer 7 88 Jan Tulke
8 96 Janne Porkka
9 167 Claudio Mourgues Fischer
BIM 10 68 Umit Isikdag
Managing
11 69 Andre Borrmann
multiple model Arto Kiviniemi
12 73 Mohamed NOUR
space
13 187 Umut Gokce
14 38 Christer Finne
15 68 Umit Isikdag
Data origins
16 70 Ivan Panushev
and data Vlado Bazjanac
17 86 Mauri Laasonen
exchange
18 147 Robert Amor
19 142 Vladimir Bazjanac
1 104 Carl Schultz Amor
Luisa Gama
DA 2 33 Herm Hofmeyer
Caldas
3 49 Alan Bridges
1 57 Ian Flood
2 177 Yacine Rezgui Cooper
3 116 Felix Enge Huhnt
4 182 Raymond Issa
5 31 Forest Flager
6 53 Alcinia Sampaio
7 62 Yaqub Rafiq
8 44 Suraj Ravindran
9 179 Torben Pullmann
EG-ICE Ian Smith
10 137 Rafal Kicinger Arciszewski
11 131 John Miles
12 62 Yaqub Rafiq
13 159 Markku Heinisuo
14 132 Don Grierson
15 66 Philipp Geyer
16 146 Jerzy Pokojski
17 160 Andrej Tibaut
18 163 Gerald FaschingbauerScherer
1 40 Armin G
Wagenknecht öbel
2 20 Thomas Wießflecker
FM Ulrich Walder 3 145 Ardeshir Mahdavi
4 145 Ardeshir Mahdavi
5 112 Kimmo Niemi
1 37 Faisal Arain
2 79 Yahaya Ibrahim
3 156 Per Christiansson
4 41 Ipek Gursel
Per 5 101 Xiaonan Zhang
ICTEnB
Christiansson 6 127 Sushant Sikka Nash Dawood
Per
ICTEnB
Christiansson
7 134 zhaomin Ren Tarek Hassan
8 94 Helena Johnsson Malmgren
9 109 Mahmoud El SABONI
10 135 Miklos Molnar Ekholm
1 107 Atul Khanzode Fischer
2 92 Nicholas Shaw
3 22 Alan Hore
4 58 Muhamad Abduh
Alvise 5 67 Thomas Olofsson
Industry
Simondetti 6 80 Anita Moum
7 90 Olle Samuelson
8 84 Anders Ekholm
9 83 Alain ZARLI
10 171 Alvise Simondetti
1 8 Sander van Nederveen
2 48 Ken Thomas
3 117 Philipp Baumann Huhnt
4 50 Lingyun Wang Messner
5 54 Cho-Chien Lu
6 97 Martin Ebner
ITCEDU Andrej Tibaut
7 49 Alan Bridges
8 129 Reza Beheshti Saban
9 143 Renate Fruchter
10 113 Robert Klinc
11 128 Edwin Dado Beheshti
12 Tomasz Arciszewski
1 118 Charles Woodward
Mobile &
Karsten Menzel 2 75 Alexander Löfgren
wireless
3 45 Ozan Koseoglu
1 105 Ricardo Goncalves
Raimar 2 153 Alexander Gehre Peter Katranuschkov
Ontologies Scherer, Peter 3 87 Jakob Beetz
Katranuschkov 4 60 Ahmed Laaroussi
5 61 Anastasiya Yurchyshyna Zarli
1 76 Annie Guerriero
2 102 Tejas Oza
3 60 Ahmed Laaroussi
4 123 Wael Sharmak Scherer
5 64 Nash Dawood
PM Nash Dawood
6 154 xiangyu wang
7 149 Felix Hofmann
8 106 Alfredo Serpell
9 122 Can Ersen Firat
10 42 Emel Oral
1 59 Ammar Al-Bazi
Wolfgang
Simulation 2 103 Ulrike Beissert
Huhnt
3 115 Raj Kapur Shah Dawood
1 23 Walid Thabet
2 130 Mohd Fairuz Shiratuddin Thabet
3 154 Xiangyu Wang
Leonardo
VR 4 152 Jose Luis Izkara Perez
Rischmoller
5 95 Jukka Rönkkö
6 27 Stefan Woksepp
7 168 Leonardo Rischmoller
Authors Title
Steven Fenves What makes and doesn't make a 'killer app' in Civil Engineering: a retrospective evaluation
Raimar Scherer Product Model Based Collaboration
Martin Fischer Tomorrow's Workday: Spontaneous, Creative, and Reliable
Renate Fruchter A2D2A2D… Seamless Transformations from Analog to Digital Worlds in Support of Global Team
Robert Leicht, John I. Messner Comparing Traditional Schematic Design Documentation to a Schematic Building Information M
Rob Howard, Bo-Christer Bjork Building Information Models – experts’ views on BIM/IFC developments
Integrating three-dimensional product models into engineering and construction project informati
Timo Hartmann, Frank Neuberg, Martin Fischer
Tomaž Pazlar, Žiga Turk Evaluation of IFC Optimization
Peter Podbreznik, Danijel Rebolj Real-time activity tracking system – the development process
Patrick Söderström, Thomas Olofsson Virtual Road Construction - A conceptual model
Jan Tulke, Jochen Hanff 4D construction sequence planning - new process and data model
Janne Porkka and Kalle Kähkönen Software development approaches and challenges of 4D product models
Mourgues, Fischer & Hudgens Using 3D and 4D models to Improve Jobsite Communication – Virtual Huddles Case Study
Investigating the applicability
Umit Isikdag, Ghassan Aouad, Jason Underwood, Nigel Trodd of IFC in geospatial environment in order to facilitate the Fire Resp
André Borrmann, Stefanie Schraufstetter, Christoph van Treeck, Ernst Rank
An octree-based implementation of directional operators in a 3D Spatial Query Language for Bu
Mohamed Nour Manipulating IFC sub-models in Collaborative Team Work Environments
K. U. Gökce, R.J. Scherer, H.A.Dikbaşbased computer-integrated construction PROJECT management model
Ifc
Finne Perceived customer value in construction information services
Building Information Wu
Umit Isikdag, Ghassan Aouad, Jason Underwood, Song Models: A Review on Storage and Exchange Mechanisms
Dawn Korbelak
Ivan S. Panushev, Spiro N. Pollalis,Managing design options with building information modeling
Mauri Laasonen The recognition of building parts from measured data
Robert Amor BIM in 2007 – are we there yet?
Vladimir Bazjanac, Arto Kiviniemi Interpretation, Translation, Reduction and Simplification in the Exchange of Model Data
A Decision Support Software Tool for Reasoning about the Subjective Impressions of a Lighting
Carl Schultz, Robert Amor, Hans Guesgen
Hofmeyer and Bakker Positioning Fem in the Transformation of Spatial Design to Structural Design
Alan Bridges Computational Support for Early Stage Architectural Design
Flood, Issa, Liu New Approaches for Computer-Based Construction Project Planning
Rezgui, Boddy, Cooper and Wetherill Dynamic e-Process support for the construction industry
Information
Wolfgang Huhnt, Felix Enge, Philipp Baumann Management for Modelling Construction Processes
Mutis, Issa, Flood Missing Levels From The Construction Industry Semantic Representation Forms
Flager and Haymaker A Critical Comparison of Multi-Disciplinary Design, Analysis and Optimization Processes in the B
Sampaio, Henriques Virtual reality technology applied in engineering education
Rafiq, Beck and De Wilde How visualisation enhances better understanding of thermal performance of domestic buildings?
Evaluating Reliability Ian F. C. Smith
Suraj Ravindran, Prakash Kripakaran, Sandro Saitta and of Multiple-Model System Identification
GPCore - A generic framework for genetic programming
Torben Pullmann, Peer Lubasch, Martina Schnellenbach-Held, Wilhelm Buschmeyer
Evolutionary Design
Rafal Kicinger, Artur Winnicki, and Tomasz Arciszewski for Blast of Steel Structural Systems
U
Lifu Zhang, Alan Kwan & John Miles sing Generative Representations for Structural Design
Rafiq, Sui, Easterbrook, Bugmann Demonstrating the Generality of using Correctors to Predict the Behaviour of Masonry Wall Pan
Heinisuo, Miles Welded Steel Beam Design using Particle System Analysis
Grierson MULTI-CRITERIA DECISION MAKING IN 4D
Geyer Implementation of optimisation in the design process of buildings
Pokojski Integration of Knowledge Based Approach and Multi-criteria Optimization in Engineering Design
Tibaut Kaučič Podbreznik Lep Towards intelligent information system for public interurban road passenger transport managem
Model
Gerald Faschingbauer, Raimar J. Scherer Management and Interpretation of Sensor Data for Monitoring in Geotechnical Engineerin
Uwe Rüppel, Armin Wagenknecht Improving emergency management of water infrastructure driven by process-models
Wießflecker et. Al. Facility Management Data in Disaster Management
An empirically-based approach toward user control action models in buildings
A. Mahdavi, A. Mohammadi, E. Kabir, L. Lambeva
Szucheng, Chien & Ardeshir, Mahdavi Talking back to buildings: interfacing for sentient environments
Kimmo Niemi Data Gathering Process in Real Estate Maintenance with Mobile Devices
Faisal Manzoor Arain IT-based Approach for Effective Management of Project Changes: A Change Management Syst
Trucco, Aouad Ghassan, Michail framework using computer
Yahaya Makarfi Ibrahim, Emanuele Automated progress mesurement Kagioglou, Ammar Kaka vision
Per Christiansson ICT Enhamced buildings potential
A computational framework for integration of performance information during the building lifecyc
Ipek Gursel, Rudi Stouffs, Sevil Sariyildiz
Incorporating the Progress Measurement
Xiaonan Zhang, Song Wu, Nick Bakis, Michail Kagioglou, Ghassan Aouad Dimension to the nD system: A research framework
Nashwan Dawood and Sushant Sikka Measuring the efectiveness of 4D planning as a valuable communication tool
Z. Ren, L. Sha and T.M. Hassan RFID facilitated Construction Material Management - A Case Study of Water Supply Project
IT support for industrial production of timber houses – the Swedish case
Helena Johnsson, Stefan Persson and Linus Malmgren
Effect of
El-Saboni, M., Aouad, G.; and Sabouni, A. Electronic Communication Management Systems on the Success Factors of Construct
Benefits of ICT in the construction industry – characterisation of the present situation in house-b
Miklós MOLNÁR, Ronny ANDERSSON, Anders EKHOLM
Challenges and benefits of implementing virtual design and construction (VDC) technologies for
Atul Khanzode, Martin Fischer, Dean Reed
Nicholas Shaw Strategic review of the production of a 4D Construction Sequencing Model – The lessons learnt
R.P. West and A.V. Hore CITAX: Defining XML Standards for data exchange in the construction industry supply chain
Muhamad Abduh Indonesian Contractors’ Performance in Managing IT: Critical Success Factors, Assessment Mo
Project Toolanen, Stefan Woksepp
Thomas Olofsson, Rogier Jongeling,Bengt Environment and Process Design of Building Projects Supported by Virtual Design and C
What did You
Anita Moum, Tore Haugen and Christian Koch Learn From Practice Today?
Olle Samuelson The IT-barometer – a decade's development of it use in the Swedish construction sector
Investigation of State-of-the-Art ICT OLOFSSON, and of house-building processes
Anders ROBERTSON, Rogier JONGELING, Anders EKHOLM, Thomasfor industrialisation Alain ZARLI
A strategic and comprehensive vision for Anders EKHOLM, Ronny ICT
Alain ZARLI, Abdul Samad (Sami) KAZI, Matti HANNUS, Marc BOURDEAU, future R&D in constructionANDERSSON
Alvise Simondetti Designer’s Toolkit 2020: a vision for the practice
Towards a Dado and Role for Information
Sander van Nederveen, Reza Beheshti, EdwinConsistent Hennes de Ridder Technology in Civil Engineering Education
Learning
Ken Thomas, Brian Graham and John Wall about IT and learning using IT - A review of current practice on Higher Education AEC
Philipp Baumann, Wolfgang Huhnt Linked contents of teaching
Assessement
Lingyun Wang, John I. Messner, Robert Leicht of 4D Modeling For Schedule Visualization In Construction Engineering Education
and Shih-Chung Kang
Cho-Chien Lu, Shang-Hsien Hsieh,SimuSurvey: A Computer-based Simulator for Survey Training
Martin Ebner, Ulrich Walder e-Learning in Civil Engineering – Six Years of Experience at Graz University of Technology
Alan Bridges COMPUTATIONAL SUPPORT FOR EARLY STAGE ARCHITECTURAL DESIGN
Effects of Dado
Reza Beheshti, Saban Özsariyildiz and EdwinTeaching Environments and the Digital Media: The Case of a Parametric Design Syst
A Scalable Working Hans for Cross-disciplinary Global Teamwork Education
Renate Fruchter, Marisa Ponti, Andrea Jungbecker and ModelWilhelm Alfen
Robert Klinc Comparison of distance learning courses: A/E/C Computer Integrated Global Teamwork Course
IT Education and Utilization within the Upcoming Shared Master of Science in Construction Man
Edwin Dado, Reza Beheshti and Sander van Nederveen
Challenges of Civil Engineering Education
Tomasz Arciszewski and Danijel Rebolj
Case Digitalo Hyväkkä, J. Jäppinen, J. Lahti, S. Siltanen, J. Rönkkö
C. Woodward, P. Honkamaa, M. Hakkarainen, J. – Range of VR/AR Technologies in Construction Application
Alexander Löfgren Tablet computing and lean communication for construction site management
Ozan KOSEOGLU, Dino BOUCHLAGHEM Collaborative Mobile Visualisation in Construction (MobVisCon) System Development and Valid
Grilo & ITC knowledge to work
Ricardo Jardim-Goncalves, AntonioBridging Adolfo Steiger-Garcao with DO, MDA and SOA
Managing Virtual Organization Processes by Semantic Web Ontologies
Alexander Gehre & Peter Katranuschkov
van Leeuwen
Jakob Beetz, Bauke de Vries & JosRDF-based Distributed Functional Part Specifications for the Facilitation of Service-Based Archi
Ahmed Laaroussi, Bruno Fies, Rémi Vankeisbelck & Julien Hans
Ontology-aided FMEA for construction products
Zarli
Yurchyshyna, Zucker, Thanh, Lima,Towards an Ontology-based approach for the compliance checking modeling in construction
Towards a
Annie Guerriero, Gilles Halin, Sylvain Kubicki coordination assistance tool based on the trust for the building construction activity
Tejas Oza, Ming Sun Survey of benefits of a construction collaboration tool for contract change management
Jean-Claude BIGNON, Gilles HALIN
Ahmed LAAROUSSI, Alain ZARLI, Towards a flexible IT-based system for process steering in architecture design
Configurable Knowledge-Based Risk Management Process Model within the General Constructi
Wael Sharmak, Raimar J.Scherer and Peter Katranuschkov
Nashwan Dawood and Innovative
Anfas Thowfeek, Ramesh Marasini,Industrial Case Study of John Dean Managerial Control System applied to site control process (IM
XIANGYU WANG Understanding Collaboration: Industrial Design versus Constructability Review
Felix Hofmann, Volker Berkhahn Adjusting a tool for collaborative planning to requirements in practice
Alfredo Serpell and José Manuel Rueda
Modeling a Project Scope using a Case-Based Reasoning Approach
Can Ersen Fırat, Juhani Kiiras, Kalle Kähkonen, Pekka Huovinen
Model based scheduling in building projects - is it oxymoron?
Mustafa Oral , Emel Laptali Oral A Computer Based System for Documentation and Monitoring of Construction Labour Productiv
Dawood, Al-Bazi Improving the Performance and Reability of Construction Supply Chain Using Simulation: A Cas
Beissert, Koenig, Bargstaedt Constraint-based simulation of outfitting processes in building enigeering
Nashwan Dawood and Raj Kapur Shah Development of detailed Schedules and 4D Visualisation Model in Road Construction
Walid Thabet et. al Using Virtual Reality (VR) to Improve Conveyor Belt Safety in Surface Mining
Visualizing Design Review Information in a 3D Virtual Reality Environment
Mohd Fairuz Shiratuddin, Walid Thabet
XIANGYU WANG Measuring Sensing Performance of Video-based Augmented Reality Systems for Construction
Diego Augmented Reality, an Advanced Tool for the Construction Sector
José Luis Izkara, Xabier Basogain, MobileBorro
Jukka Rönkkö, Jussi Markkanen A lightweight 3D visualization client for IFC data
Stefan Woksepp and Thomas Olofsson Credibility and applicability of virtual reality models in design and construction
Leonardo Rischmoller Envisioning the future built, natural and digital environments
p' in Civil Engineering: a retrospective evaluation
om Analog to Digital Worlds in Support of Global Teamwork
Documentation to a Schematic Building Information Model
ws on BIM/IFC developments
els into engineering and construction project information platforms
process and data model
allenges of 4D product models
te Communication – Virtual Huddles Case Study
spatial environment in order to facilitate the Fire Response Management Process
onal operators in a 3D Spatial Query Language for Building Information Models
tive Team Work Environments
n PROJECT management model
Storage and Exchange Mechanisms
Simplification in the Exchange of Model Data
soning about the Subjective Impressions of a Lighting Installation
Spatial Design to Structural Design
nstruction Project Planning
ustry Semantic Representation Forms
Design, Analysis and Optimization Processes in the Building Construction and Aerospace Industries
anding of thermal performance of domestic buildings?
rectors to Predict the Behaviour of Masonry Wall Panels
gn process of buildings
and Multi-criteria Optimization in Engineering Design
public interurban road passenger transport management
Sensor Data for Monitoring in Geotechnical Engineering
er infrastructure driven by process-models
er control action models in buildings
aintenance with Mobile Devices
ment of Project Changes: A Change Management System (CMS)
ork using computer vision
of performance information during the building lifecycle
Dimension to the nD system: A research framework
g as a valuable communication tool
nagement - A Case Study of Water Supply Project
er houses – the Swedish case
gement Systems on the Success Factors of Construction Projects in United Arab Emirates
y – characterisation of the present situation in house-building projects
virtual design and construction (VDC) technologies for coordination of mechanical, electrical and plumbing (MEP) systems on a large healthcare project
Construction Sequencing Model – The lessons learnt
exchange in the construction industry supply chain
anaging IT: Critical Success Factors, Assessment Model, and Benchmarking System
of Building Projects Supported by Virtual Design and Construction Methods
ent of it use in the Swedish construction sector
dustrialisation of house-building processes
uture R&D in construction ICT
Technology in Civil Engineering Education
A review of current practice on Higher Education AEC Programmes in Ireland
e Visualization In Construction Engineering Education
s of Experience at Graz University of Technology
LY STAGE ARCHITECTURAL DESIGN
Digital Media: The Case of a Parametric Design Systems Course
plinary Global Teamwork Education
A/E/C Computer Integrated Global Teamwork Course and ITC Euromaster
oming Shared Master of Science in Construction Management and Engineering in the Netherlands
ogies in Construction Application
n for construction site management
truction (MobVisCon) System Development and Validation
by Semantic Web Ontologies
ecifications for the Facilitation of Service-Based Architectures
the compliance checking modeling in construction
sed on the trust for the building construction activity
oration tool for contract change management
ocess steering in architecture design
agement Process Model within the General Construction Project Process Model
gerial Control System applied to site control process (IMCS-CON)
esign versus Constructability Review
to requirements in practice
ased Reasoning Approach
ation and Monitoring of Construction Labour Productivity
of Construction Supply Chain Using Simulation: A Case Study for Doorsets Manufacturing
ocesses in building enigeering
D Visualisation Model in Road Construction
veyor Belt Safety in Surface Mining
a 3D Virtual Reality Environment
-based Augmented Reality Systems for Construction
Tool for the Construction Sector
y models in design and construction
g (MEP) systems on a large healthcare project