Bayview Village 32 units per quarter Hayward Area Planning As



Pro Forma Input Summary 8/27/2011 Absorption time table

per week per month per quarter per year

KEY PARAMETER INPUTS: very slow 1.97 9 26 102

slow 2.46 11 32 128

Residential Product Mix and Base Price moderate 3.28 14 43 171

Unit Type Qty Liv Space Price moderate 3.94 17.1 51 205

Studio - Flat in Mixed Use Bldg 40 441 $170,000 fast 4.92 21 64 256

One Bedroom - Condo 150 523 $225,000

Two Bedroom One Bath - Condo 186 795 $285,000

Two Bedroom Two Bath - Condo 312 859 $290,000

Three Bedroom -Condo 170 1,499 $355,000

Four Bedroom - Condo 102 1,702 $445,000

Five Bedroom - Townhouse 64 2,115 $560,000

Modify Living Space figures above column by 100%

Modify Price figures above by 100%

Total # of units= 1,024 User can vary these inputs

Direct Costs

Component Cost

Modular Fabrication, 2 Br $79 Per square foot of living area

Modular Fabrication, 4 Br $69 Per square foot of living area

Photovoltaic System, 2 Br $19,500 Per system

Photovoltaic System, 4 Br $25,350 Per system

Solar Hot Water, 2 Br $4,000 Per system

Solar Hot Water, 4 Br $5,600 Per system

Café 1,344 sf

Store 2,688 sf

Community Center 7,800 sf





Project Costs

Component Unit Cost Qty

Earthwork $10 53,240 Per cubic yard moved, soil. Assume soil was originally 1.5 feet deep, now overburden

Hard Rock Excavation $35 102,260 Per cubic yard excavated, hard rock. Blasting or heavy equipment; loading, moving.

Perimeter Retaining Walls $20 5,570 Per square foot of surface area of retaining wall

Storm Drain Pipe $60 7,500 Per lineal foot of storage pipe

C3 Storage Drain Pipe $80 3,694 Per lineal foot of storage pipe

General Site Landscaping $6 330,890 Per square foot of landscaped area, including irrigation and soil amendment

Contingency 20% Percentage of total site improvement budget

Developer Overhead $40,000 Average per quarterly expense of developer's office space, office equipment, staff salaries, construction





Event Triggers

Event Value Value 2 Allowable Range

Build Cycle 2 1 to 4 Quarters, time to build a unit

Quarterly Absorption Rate 32 8 years building. Residential units sold each quarter, No less than 10. Goes to Timing B6

Trigger to construct next phase 80% Can be 10% to 80%, representing the percent of units sold in the current phase to trigger start of next ph

Start of Sales 4 1 Year plus quarter that sales begin, must be no sooner than 2 years after entitlements are obtained

Entitlements Obtained 1 0 Can be no sooner than 1 year plus 2 quarters, representing the time required to obtain all government d





Selling Expenses

Item Rate

Model Operating Expense $15,000 Per quarter, represents mortgage payments, utilities, cleaning and maintenance, property taxes on 6 model homes

Sales Commission Rate 1.8% Percent of revenue paid to dedicated sales team (either employees or consultant-specialists)

Broker Coop 1.0% Percent of revenue paid to independent brokers representing buyers, this is a blended rate of commission times proportio

Advertising $10,000 Per quarter expense for website, brochures, newspaper ads, etc.





Interest and Taxes

Property Tax Rate 1.50%

Development Loan Interest Rate 5.25% 2% above 10 year fixed average as of 8/10/2011 from website

www.bankrate.com/finance/mortgages/bankrate-com-averages.aspx

NOTEWORTHY FIXED INPUTS

Model setup costs are $80,000 per model

Design phase will take 4 quarters to complete

Land purchase maintenance deposits are paid quarterly at a rate of .4% of purchase price, applicable to price

Land purchase initial deposit is 2.5% of purchase price, applicable to price

Land purchase will close upon entitlements

Each phase improvements are constructed over a 5 quarter period

The store and Café start construction as part of the MU Bldg in phase 1. Other MU block buildings of phase 1 are based on sales.

The Community Center and its Manager Units start construction 1 year after start of Phase 5 site improvements.

Equity Investor payouts are hard-entries…see Cash Flow Statement

New comparables information used to lower land purchase price

Adjusted grading volumes from Toste June 10, 2011, 164,600 CY of Cut and 146,400 CY of Fill. Assume 155,500, of which 53,240 is soil, remainder of 102,260 is hard rock.

Initial grading gvolumes from Toby Dec. 3, 2010, 125,000 cu yds cut and 106,000 cu yds fill based on a 3% slope in the in-between area.

Wall design for east side of knoll depends on geotechnical; exposed rock may be OK. Walls sf from Toste Jul 19 2011 email

Cash on hand and invesor payout adjusted exogenously.

Hayward Area Planning Association





project years

1,024 10.0

1,024 8.0

1,024 6.0

1,024 5.0

1,024 4.0

p, now overburden

loading, moving.









quipment, staff salaries, construction trailer, stationery, etc.









10. Goes to Timing B6

urrent phase to trigger start of next phase's site improvements

after entitlements are obtained

me required to obtain all government discretionary approvals.









operty taxes on 6 model homes





ed rate of commission times proportion of total sales completed with brokers

mainder of 102,260 is hard rock.

Bayview Village Hayward Area Planning Association



Income Statement

Project-Wide Per Unit

Category - Item Amount Subtotal Units Quantity Per Unit Basis (Worksheet)



REVENUE

Residential Sales - Base $325,620,000 D.U. 1,024 $317,988 Sales

Residential Sales - Options $1,827,625 D.U. 1,024 $1,785 Sales

Sales Incentives -$512,000 D.U. 1,024 -$500

NET REVENUE $326,935,625





COSTS

Land Development Costs

Land Acquisition $22,235,909 D.U. 1,024 $21,715 Land

Site Improvements $27,371,260 D.U. 1,024 $26,730 Site Imp

Project Level Government Fees $1,178,856 D.U. 1,024 $1,151 Proj Fees

Project Level Consultants $4,198,100 D.U. 1,024 $4,100 Proj Cons

Subtotal: Land Development Costs $54,984,125





Building Costs

Direct Costs - Residential-Base+mgr $128,799,565 D.U. 1,024 $125,781 Bldgs

Direct Costs - Green Energy $31,571,557 D.U. 1,024 $30,832 Energy

Direct Costs - Residential-Options $ 1,503,000 D.U. 1,024 $1,468 Sales

Direct Costs - Café, Store $ 458,121 sf 1,832 $250 Bldgs

Direct Costs - Community Center $ 1,370,508 sf 7,800 $176 Bldgs

Building Permit Fees $35,339,426 D.U. 1,024 $34,511 Bldg Fees

Building Consultants #REF! D.U. 1,024 #REF! Bldg Cons

Subtotal: Building Costs #REF!

Village Bus $2,560,000 $2,560,000 D.U. 1,024 $2,500 Bus

Selling Expenses % of Revenue:

Model Expenses $975,000 D.U. 1,024 $952 Cash Flow

Sales Commissions $5,884,841 D.U. 1,024 $5,747 % of Revenue

Broker Coop Fees $3,269,356 D.U. 1,024 $3,193 % of Revenue

Advertising $370,000 D.U. 1,024 $361 Cash Flow

Sellers Closing Costs $1,307,743 D.U. 1,024 $1,277 % of Revenue

Subtotal: Selling Expenses $11,806,940





Other Expenses

Property Taxes & Assessments $2,124,834 D.U. 1,024 $2,075 Cash Flow

Insurance $2,288,549 D.U. 1,024 $2,235 % of Revenue

Developer Administration/Overhead $1,880,000 D.U. 1,024 $1,836 Cash Flow

Warranty Reserve $3,269,356 D.U. 1,024 $3,193 % of Revenue

Subtotal: Other $9,562,739

Subtotal: Hard Costs #REF!





Loan Interest #REF! #REF! D.U. 1,024 #REF! Cash Flow





NET COSTS #REF!





NET OPERATING INCOME #REF!

PRETAX PROFIT MARGIN #REF!







dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Income 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Sales

RESIDENTIAL SALES - BASE (Note 1)



Dwelling Unit Description Quantity Base Price Revenue by Unit Size (SF) Price per SF



Studio Condo in Mixed Use Bldg 40 $170,000 $6,800,000 441 $385

One Bedroom Condo in Mixed Use Bldg 150 $225,000 $33,750,000 523 $430

Two Bedroom One Bath - Condo 186 $285,000 $53,010,000 795 $358

Two Bedroom Two Bath - Condo 312 $290,000 $90,480,000 859 $338

Three Bedroom -Condo 170 $355,000 $60,350,000 1,499 $237

Four Bedroom - Condo 102 $445,000 $45,390,000 1,702 $261

Five Bedroom - Townhouse 64 $560,000 $35,840,000 2,115 $265



Total Dwelling Units 1,024

Total Revenue - Base Residential $325,620,000



RESIDENTIAL SALES - UPGRADES (Note 2)



Upgrade Description Units % Avg. Cost Total Cost Price Revenue Markup



Interior Upgrades

Granite Countertops 205 20% $1,500 $307,500 $1,875 $384,375 25%

Upgraded Cabinets 52 5% $7,000 $364,000 $8,750 $455,000 25%

Molding Package 21 2% $1,500 $31,500 $1,950 $40,950 30%

Technology Wiring Package 52 5% $3,500 $182,000 $4,550 $236,600 30%

Upgraded Floor Coverings 103 10% $6,000 $618,000 $6,900 $710,700 15%



Total Cost - Upgrades $1,503,000

Total Revenue - Upgrades $1,827,625



TOTAL: REVENUES $327,447,625



NOTES

Note 1: Pricing is based on an in-house informal market survey of resales in Hayward, including consulting with local real estate brokers.

Pricing for these units is adjusted upwards reflecting the significant new house premium buyers are willing to pay in this built-out locale.

Note 2: Pricing for upgrades is based on the industry practice of applying a percentage markup to expected costs. "%" is an estimate

of proportion of buyers opting for the particular upgrade.

Note 3: The Community Center is the common facility for the Bayview Village Homeowners Association. It will deeded to the HOA at no cost.

Note 4: The store and café will be deeded to and owned by the HOA, leased to operators, and managed to reduce HOA fees.

The cost is part of the price of the units.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Sales 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Land Acquisition

Property Address of AssemblagePhysical Description APN Units Unit Price Qty Amount



Main Bayview Site (Note 1) Raw Land 445-0180-001-00 Acres $591,419 29.42 $17,399,555

1175 Overlook Ave. (Note 2) 445-0170-020-01

1199 Overlook House Per House $409,500 1 $409,500

1187 Overlook House Per House $409,500 1 $409,500

1175 Overlook House Per House $409,500 1 $409,500

Overlook Ave. (Note 2) Vacant lot Per Vacant Lot $122,850 1 $122,850

1155 Palisade Ave. (Note 2) 445-0170-038-03

1155 Palisade House Per House $409,500 1 $409,500

Vacant

Palisade/Overlook/Carlos Bee (Note 2) lots Per Vacant Lot $122,850 4 $491,400

Palisade (Note 1) Paved Street N/A: Street ROW Vacation Acres $32,967 0.36 $11,868

1174 Overlook (Note 2) 445-0170-017-01

1174 Overlook House Per House $409,500 1 $409,500

1138 Palisade House Per House $409,500 1 $409,500

1198 Overlook Ave. (Note 2) Boarded up house Per Br'd House $122,850 1 $122,850

Overlook (Note 2) Vacant lot Per Vacant Lot $122,850 1 $122,850

Overlook (Note 1) Paved Street N/A: Street ROW Vacation Acres $32,967 0.96 $31,648

1138 Overlook (Note 2) 445-0170-034-01

1138 Overlook House Per House $409,500 1 $409,500

1139 Palisade House Per House $409,500 1 $409,500

25096 Carlos Bee Blvd. (Note 2) Boarded up house Per Br'd House $122,850 1 $122,850

Subotal: Land Purchases $21,701,871 DJ uses 27,235,909



Land Transaction Item Units Unit Price Qty Amount

Land Purchases 30% paid by equity $21,701,871

Buyer Closing Costs % of Purchases 1% $217,019

Legal: Purchase Agreements Lump Sum $100,000 1 $100,000

RE Broker: Negotiations, Establish Pricing % of Purchases 1% $217,019



TOTAL: LAND ACQUISITIONS $22,235,909 DJ uses 28,256,659





NOTES

Note 1: Raw land value is based on an average list price of representative large parcels in the East Bay in 2010 from two websites, as reported

in table below. (Source: Landwatch.com, ziprealty.com, 10/20/2010)



Property Description City Price Size (ac) Price per acre

Landwatch, over 10 acres: http://www.landwatch.com/

Search for vacant land 10 acres or more in Alameda and Contra Costa counties

Rural - vineyard Livermore $1,500,000 18.63 $80,515

Developable, ~21 units Oakland $1,300,000 20.28 $64,103

Subdivide for 2 lots Nr Brentwood $490,000 10.07 $48,659

ZipRealty: http://www.ziprealty.com/

Search for vacant land 10 acres or more in Oakland, Castro Valley, Hayward, Union City, and Fremont

1 Castro Valley $1,500,000 45.50 $32,967

2 Castro Valley $1,699,000 77.00 $22,065

3 Oakland $1,288,000 20.90 $61,627

4 Oakland $998,000 135.80 $7,349

5 Oakland $888,000 22.10 $40,181

6 Oakland $3,300,000 13.70 $240,876

7 Fremont $2,999,888 17.80 $168,533

8 Castro Valley $615,000 21.70 $28,341

9 Castro Valley $1,375,000 104.00 $13,221

10 Castro Valley $2,300,000 115.00 $20,000

11 Castro Valley $1,899,000 159.70 $11,891

12 Castro Valley $248,000 10.30 $24,078

13 Castro Valley $999,800 69.80 $14,324

14 Oakland $999,000 20.30 $49,212

15 Fremont $3,400,000 126.00 $26,984

16 Fremont $4,000,000 57.00 $70,175

Average of Comparable Raw Land Parcels Listed $31,798,688 1,065.58 $29,842

Median of Comparable Raw Land Parcels Listed $32,967

Standard deviation (Huge: bigger than average or median) $58,450

Alternative valuation based on Dobbel Ave.

27355 Dobbel Hayward $150,000 0.25 $591,419



Note 2: House value is based on Data Quick web site for June 2011, $/SqFt for zip code 94542 of $207

Vacant lot uses a rule-of-thumb that a buildable lot should be about 30% of the house cost.

Boarded up houses are assumed to be 30% of house cost.







dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Land 11/5/2011 12:03 PM

http://www.dqnews.com/Charts/Monthly-Charts/SF-Chronicle-Charts/ZIPSFC.aspx



Community Zip Date $/SqFt Median Sq Ft Median Price

Hayward 94542 Jun-11 $207 1,800 $409,500



Estimated Sq Ft of Overlook houses feet by feet sq ft

1138 Overlook 38 48 1,824

1139 Tamalpais 30 58 1,740

1174 Overlook 36 52 1,872









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Land 11/5/2011 12:03 PM

Bayview Village

Site Improvements

from Inputs

Category - Line Item Units Unit cost Qty Amount Subtotal





Site Preparation and Field Expense

Clear and Grub Ac $5,000 24 $120,000

Mobilization LS $60,000 1 $60,000

Demolish or move houses EA $30,000 10 $300,000

Palisade, partial street removal (Note 1) SF $3.00 2,240 $6,720

Utility relocation LF $150 500 $75,000

Erosion Control site $200,000 1 $200,000

Utilities years $300 8 $2,400

Debris Recycling years $2,000 8 $16,000

General site maintenance, cleanup & repairs years $5,000 8 $40,000

Subtotal: Site Preparation and Field Expense $820,120





Grading ( Note 2)

Soil volume estimate CY $10 $53,240 $532,400

Hard rock blasting & grading cut to fill CY $35 $102,260 $3,579,100

Over-excavation of hard rock CY $35 20,000 $700,000

Grinding Bayview aggregate for onsite base CY $2 20,000 $30,000

Perimeter Soil-Nail Retaining Walls SF $20 $5,570 $111,400

Catchment Fence LF $18 550 $9,900

Catchment Wall LF $400 350 $140,000

Pad fine grading , 281 res. buildings, C. Center, CB EA $1,000 283 $283,000

Subtotal: Grading $5,385,800





Concrete and A.C.

3" A.C. over 6" A.B. Overlook Extension (Note 3) SF $8 3,760 $30,080

3" A.C. over 6" A.B. for car ports for 100 cars SF $7 16,120 $112,840

3" A.C. over 6" A.B. for car share/rental area SF $7 2,970 $20,790

3" A.C. over 6" A.B. for 21 spaces public prking SF $7 3,591 $25,137

Pervious walkways, 12' wide H-20 req. (Note 4) SF $10 127,360 $1,273,600

3.5" A.C. over 14.5" A.B. (TI = 6.5) - busway, 24' wide) SF $11 15,720 $172,920

Driveway cut 2 at 20' wide (H-20 req.) 6" PCC over 3" A.B SF $15 192 $2,880

Street curbs and gutters LF $20 600 $12,000

Subtotal: Concrete and A.C. $1,650,247







dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 11 11/5/2011 12:03 PM

Bayview Village

Site Improvements

from Inputs

Category - Line Item Units Unit cost Qty Amount Subtotal





Storm Drain System (Note 5)

Small storm drain inlets to storage cylinders (pipes) EA $2,500 172 $430,000

Reinforced Concrete Pipe (24") with 4" outlet LF $60 $7,500 $450,000

C3 Reinforced Concrete Pipe (24") LF $80 $3,694 $295,520

Storm drain manholes EA $4,000 100 $400,000

Subtotal: Storm Drain System $1,575,520





Sanitary Sewer

Manholes EA $4,000 40 $160,000

8" San Sewer (xRCP)(PVC) LF $65 3,972 $258,180

8" San Sewer Connector Line (Extra Deep) LF $85 1,600 $136,000

Connect to Existing EA $1,500 1 $1,500

6" PVC lateral w/ double cleanout EA $700 283 $198,100

Subtotal: Sanitary Sewer $753,780





Water System

8" distribution main LF $80 8,600 $688,000

Water meter box EA $400 953 $381,200

D.U. Service Lateral EA $1,000 905 $905,000

Building Service Lateral EA $10,000 4 $40,000

Detector Check Valves EA $5,000 94 $471,667

Water Valves EA $2,000 15 $30,000

Fire hydrants EA $4,000 30 $120,000

Subtotal: Water System $2,635,867





Dry Utilities

Joint trench LF $200 7,500 $1,500,000

PG&E: electric mains, meter w/ service laterals Meter $2,200 1,024 $2,252,800

Rule 20 Undergrounding Pole $25,000 5 $125,000

Satellite dish feed and site security w/service laterals LF $10 7,500 $75,000

Low-height street and walkway lights EA $2,500 188 $468,750

Subtotal: Dry Utilities $4,421,550







dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 12 11/5/2011 12:03 PM

Bayview Village

Site Improvements

from Inputs

Category - Line Item Units Unit cost Qty Amount Subtotal





Landscaping and Miscellaneous

Common Area Landscaping and irrigation SF $9 117,925 $1,061,325

Village Square/park SF $15 3,857 $57,855

Other Parks SF $10 81,938 $819,380

Gate, path, footbridge across creek to Highland Blvd. SF $20 200 $4,000

Entry sign / monument EA $35,000 1 $35,000

Front yard and walkway landscaping SF $6 $330,890 $1,985,340

trees EA $175 104 $18,200

Other landscaping (tot lot) EA $30,000 1 $30,000

Street signs EA $300 68 $20,400

Survey Monuments LS $1,000 30 $30,000

Striping day $5,000 1 $5,000

Offsite Traffic Signals (Note 6) EA $250,000 6 $1,500,000

Subtotal: Landscaping & Miscellaneous . $5,566,500





Contingency % 20.00% 22,809,384 $4,561,877 $4,561,877





TOTAL: SITE IMPROVEMENTS $27,371,260









Notes

Note 1: Some of Palisade and Overlook become owned by the project. See Note 6. Palisade mostly becomes road and busway; some becomes part of site.

Note 2: See scoping plan for grading. The scoping plan produces 133,085 cu yds of cut and 106,264 cu yds of fill (James Toby, Senior Project Manger, Lea and Braze, Autocad analysis, Oct. 18, 2010). With available cut in great

excess of initial fill, drainage and utility trench depth can be improved, adjustments to grade are easier, and hard rock can be covered. A grading plan would be developed during entitlement. A small area south of about 300'

elevation has 8% to 16% slopes that cannot be changed much, but already has utilities in the street. The large Bayview pit on the north mostly needs about three to five feet of fill to get depth for utility trenches and 2% slopes

for drainage, with a deeper part on the northwest needing more fill. A knoll with scenic views on the midwest has elevation that will be lowered to create a 8 to 12 percent walking grade. About 80 percent of the project has

easy walking grades below 3.5%. An area between the small southern area and the pit has overburden and bedrock that needs to come down and will mostly or entirely fill the large pit to the north. Some cut is dirt (surface

soil and piles of overburden) and some is hard rock, some of which may need to be ground for good soil. Short stretches of utility trenches (on the knoll and in the in-between area) will have to be in hard rock. (The 7.5 minute

Geo Survey contour lines are pre-Bayview and can't be used, but the pit is outlined.)

Note 3: 100 covered parking spaces for leased parking and additional spaces for shopping and drop off/pick up parking are on Overlook.



Note 4: Roads, parking, busway, and major walkways allow fire trucks, garbage trucks, etc. See data on acres tab. Walkways would use something easy on the feet. www.rubbersidewalks.com may work.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 13 11/5/2011 12:03 PM

Bayview Village

Site Improvements

from Inputs

Category - Line Item Units Unit cost Qty Amount Subtotal

Note 5: Based on civil engineer's estimate dated 1/12/2010, based HydroCAD estimates (10 year event, 3 hour total time event, .01 minute time intervals) for each building cluster type. and for habitat use. Pipes in courtyard hold

storm bursts and trickle out through 4" outlet into city drains. There will also be about 6 metered low-flow discharge points into the creek with the rest below walkways and streets.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 14 11/5/2011 12:03 PM

Hayward Area Planning Association







Comments







Main Bayview site largely free of trees, structures, debris

Includes construction trailer, temp power setup, fencing

8 occupied houses; 2 boarded up houses

14' x 365', sides of existing street, preserve pavement





Includes temporary silt basins to be built first.

construction electricty and water









Per cubic yard moved, soil. Assume soil was originally 1.5 feet deep, now overburden

Per cubic yard excavated, hard rock. Blasting or heavy equipment; loading, moving.

Add soil and aggregate as needed over hard rock

Supplement soil volume to meet need on surface

Per square foot of surface area of retaining wall







Average building footprint =1,492 sq ft









Overlook extension

Carport stalls are 9x18, 170 sq ft each









Crosses from busway to Main Way and Knoll Way

No vertical curbs. Shallow swales as needed.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 15 11/5/2011 12:03 PM

Hayward Area Planning Association







Comments







4/ cluster for 43 building clusters. Clean Water Program

For most building clusters

Length of walkways and streets to storm mains on Overlook,

Palisade, and Carlos Bee Blvd.









Considers hard rock trenching cost

Portions to be bore & jacked





One per bldg









1 meter for studios

1/ unit wet tap





Will need to include at most major buildings.

at end of water line









2'w x5'deep + 6 conduits

Cost shown is net of refunds





HOA maintained equipment (from dish to D.U.'s)

Placed at 40' intervals along walkways and roads









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 16 11/5/2011 12:03 PM

Hayward Area Planning Association







Comments







Includes biofiltration features

High intensity use area calling for identity hardscaping





100 sq ft 200/sq ft







15 gallon trees, # to equal the number of street lights

Based on estimator's recent Pacheco project. 3000 sq ft





Standard survey monuments









ecomes part of site.

Project Manger, Lea and Braze, Autocad analysis, Oct. 18, 2010). With available cut in great

d. A grading plan would be developed during entitlement. A small area south of about 300'

th mostly needs about three to five feet of fill to get depth for utility trenches and 2% slopes

be lowered to create a 8 to 12 percent walking grade. About 80 percent of the project has

me down and will mostly or entirely fill the large pit to the north. Some cut is dirt (surface

nches (on the knoll and in the in-between area) will have to be in hard rock. (The 7.5 minute









e something easy on the feet. www.rubbersidewalks.com may work.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 17 11/5/2011 12:03 PM

Hayward Area Planning Association







Comments

nute time intervals) for each building cluster type. and for habitat use. Pipes in courtyard hold

eek with the rest below walkways and streets.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Site Imp 18 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Project Consultants

Phase - Consultant Work Product Units Unit $ Qty Amt Subtotal



Feasibility Phase Consultants

Real Estate Investment Feasibility Package, Pro Forma Financial Statements LS $20,000 1 $20,000

Feasibility Consultant

Attorney or Finance Private Placement Memorandum, Business Entity LS $25,000 1 $25,000

Professional Formation Documents

Real Estate Appraiser Appraisals for Bayview site, adjacent houses Per Rprt $1,500 15 $22,500

Marketing Specialist Marketing Study: Pricing / Absorption Rate LS $10,000 1 $10,000

Environmental Engineer Phase 1 Environmental Site Assessment LS $3,000 1 $3,000

Geotechnical Engineer Preliminary Report on seismic and soil conditions LS $10,000 1 $10,000

Building Contractor Provide verification of construction cost estimates LS $5,000 1 $5,000

Subtotal: Feasibility Phase Consultants $95,500



Entitlement Phase Consultants

Project Manager Project Management (Note 1) Month $8,000 12 $96,000

Environmental Planner Environmental Impact Analysis (Note 2) Month $18,000 12 $216,000

Biologist Biological assessment (Note 3) LS $20,000 1 $20,000

Arborist Tree Survey LS $5,000 1 $5,000

Traffic Engineer Onsite/Offsite Traffic Impacts and Mitigations LS $6,000 1 $6,000

Dry Utility Consultant Concept Dry Utilities Plan (Note 4) LS $50,000 1 $50,000

Land Planner Site Plan; General Plan Amendment and Zone Change LS $10,000 1 $10,000

(Note 5)

Architect Site Plan Illustrations, Streetscapes (Note 6) LS $40,000 1 $40,000

Landscape Architect Concept landscape plans (Note 7) LS $36,000 1 $36,000 x

Civil Engineer Preliminary Grading and Tentative Map, Hydrology Study, LS $84,500 1 $84,500

Public Utility Study (Note 8)



Attorney Development Agreement LS $50,000 1 $50,000

Reimbursables Plan printing, Photocopies, Courier LS $10,000 1 $10,000

Subtotal: Entitlement Phase Consultants $517,500





Design Phase Consultants

Project Manager Project Management (Note 1) Month $8,000 12 $96,000

Geotechnical Engineer Design-Level Geotechnical Report (Note 9) LS $70,000 1 $70,000

Civil Engineer Final Map, Civil Improvement Plans (Note 8) D.U. $900 1,024 $921,600

Dry Utility Consultant Joint Trench Plans D.U. $300 1,024 $307,200

Landscape Architect Landscaping Construction Documents (Note 7) D.U. $200 1,024 $204,800

Biologist Permit Applications (Note 10) LS $30,000 1 $30,000

Structural Engineer Retaining Wall Plans LS $30,000 1 $30,000

DRE Consultant DRE Applications, Seller's Disclosure Package, HOA LS $20,000 1 $20,000

Budget, Bylaws

Stormwater Specialist Prepare SWPPP, Stormwater Control Plan LS $8,000 1 $8,000

Attorney Investor Communications, Misc Legal Counsel LS $25,000 1 $25,000

Other Other studies, reports, plans as needed LS $30,000 1 $30,000

Reimbursables Plan printing, Photocopies, Courier LS $40,000 1 $40,000

Subtotal: Design Phase Consultants $1,782,600





Site Improvement Phase Consultants

Site Manager Onsite Project Management (Note 11) Quarter $24,000 32 $768,000

Attorney Investor Communications, Misc Legal Counsel LS $25,000 1 $25,000

Interim HOA Manager Interim HOA Operations LS $6,000 1 $6,000

Construction Staking Set property corners, construction Staking, As-Built Plans, LS $350,000 1 $350,000

horizontal control, Grading, Streets and Utilities







dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Cons 19 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Project Consultants

Phase - Consultant Work Product Units Unit $ Qty Amt Subtotal



Civil Engineer Observation, Field Revisions to Plans, interim erosion LS $25,000 1 $25,000

controls, manage Best Management Practices (BMPs)



Dry Utilities Consultant Coordinates with PGE, SBC, Comcast, Dish, needs to know du $50 950 $47,500

CAT-5, fiberoptic, dish, cable, etc. Street lights

Geotechnical Monitoring Observe Grading, Paving, Trench Bedding, etc. Month $6,000 18 $108,000

HazMat Consultant Lead/asbestos survey/report prior to demolition LS $5,000 1 $5,000

Biologist Preconstruction Surveys, construction monitoring Year $4,000 6 $24,000

SWPPP Maintenance Inspect site, Update SWPPP, Prep annual report Year $3,500 6 $21,000

Water Laboratory water sampling Each $50 100 $5,000

Site Security Prevent Theft, Vandalism, Trespassing Year $36,000 8 $288,000

Landscape Architect Observe landscaping, Irrigation installation, plant material Year $15,000 7 $105,000



Reimbursables Plan Printing, Field Office Supplies, Computers LS $25,000 1 $25,000

Subtotal: Site Improvement Phase Consultants $1,802,500





TOTAL: PROJECT CONSULTANTS $4,198,100



Notes:

Note 1: Coordinates other consultants, interfaces with city staff, manages the work, budget and schedule for Environmental Analysis, General Plan Amendment, Zone Change,

Site Plan Application, Grading, Utility and Drainage Plan, Floor Plans and Elevations, Tentative Map, Final Map, and Development Agreement. The Site Plan has 11 parts; the

Project Manager does Site Plan part 11 and consultants do the other parts. The Project Manager manages general administrative functions such as accounting, financial

analysis, insurance. and legal (except where shown separately) for the whole project. Project manager gets bonding and Subdivision Permit, conducts bidding, oversees

contracts and executes Operations and Maintenance Agreement for stormwater with City. Project manager gets "will serve" letters from utilities: PG&E, Comcast/AT&T, and

City, and easements and use permits from PG&E for use of its right-of-way. $12-15k: Art May, Keystone Development Group, Emeryville, phone, 12/21/09





Note 2: Prepares CEQA documents, manages public comment and response. Hayward's 238 Program EIR reviewed this property and approved a designation and zoning in

support of a QV type of project. The EIR covered most issues so a Focused Project EIR would tier off the 238 EIR. Consultant is hired by city based on bids. Consultant likely to

subcontract with a traffic engineer and may subcontract with a geotechnical engineer, biologist, sound engineer, or archeologist.



Note 3: Biological assessment 6, protocol survey for endangered species 10, wetland delineation 4. Patrick Kobernus, Coast Range Ecology, 415-404-6757, email, 12/25/2009



Note 4: The Dry Utilities Consultant coordinates with PGE, SBC, Comcast, Dish, needs to know CAT-5, fiberoptic, dish, cable, etc. Sunny Antonio, utility consultant at BkF. Plan

includes dry trenching, service to all buildings, and street lights and is integrated into the GUD Plan.

Note 5: Bid by Jill Williams, KTGY, Jan 29 10: site plan, building types, and design (8 building types) - $85,000 to $125,000. Use bldg type 13 x 8= $104k total



Note 6: An architect by rule of thumb would charge 1.5% of building costs for plans, elevations; working/construction drawings; blueprints, floor plans, and construction

support, during entitlement, design, and some inspection of construction by building contractors. For this project, Zeta (the modular fabricator) acts as consultant for

entitlement and design, including architectural costs. Silverman Dec. 09. 6 unit types, 4 elevations/type = 24 elevations



Note 7: Native, drought resistant landscaping. Estimate by Gary Lamon, The Guzzardo Partnership, SF, 415-433-4672, 12/22/09

Note 8: More detailed scope: Initial Site Review; Topographic and boundary surveys of land streets, utilities, tie-ins, elevations, property lines, and easements; Computer

generated Site Layout , 3 Supplemental Reports: Offsite wet utility adequacy, preliminary hydrology study, preliminary storm water study; Site Plan Application, Grading,

Utility and Drainage (GUD) Plan, Vesting Tentative Map. Design also includes Conditions of Approval, Subdivision Permit, Engineer's Estimate, misc. documents and plans.





Note 9: Letter proposal from Kamran Ghiassi, AGS, Dec. 7, 2009. $83,000 for geotechnical reports: The Phase 1 Environmental Assessment is part of Investment, shown on the

Investment tab. Phase 2 involves one day of drilling of 5 to 6 borings 20 to 30 feet deep, engineering supervision, and lab tests leading to a report with recommendations for

grading, structures, and drainage.



Note 10: Applications to: Army Corps of Engineers, SF Bay Regional Water quality Control Board, CA Dept. of Fish and Game, US Fish and Wildlife Service. Preconstruction

survey, bio-permitting for outfall structures



Note 11: Manages property and construction: execution of Site Preparation Plan, consultants, contractors, inspectors and building, to end of project. Manages general

administrative functions, including performance bonds, insurance, legal and setting up the initial HOA, and site security. The Site Preparation Plan includes plan for

demolitions, utility relocations, trailer, lay down area, and mobilization of equipment to start work on site.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Cons 20 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Project Consultants

Phase - Consultant Work Product Units Unit $ Qty Amt Subtotal









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Cons 21 11/5/2011 12:03 PM

ning Association









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Cons 22 11/5/2011 12:03 PM

ning Association









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Cons 23 11/5/2011 12:03 PM

ning Association









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Cons 24 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Project Level Fees

Phase - Fee Units Unit $ Qty Total





Entitlement Phase Fees (Paragraph # shown from Hayward Master Fee Schedule)

Pre-application meeting (p.1) LS $1,000 1 $1,000

Environmental Assessment Consultant Oversight (p.4) (Note 1) (Note 2) Per hour $106 50 $5,300

General Plan Amendment [for area west of Overlook Ave.] (p. 5) Per hour $106 50 $5,300

Zone Change (for area west of Overlook Ave.) (p.12e) Per hour $106 50 $5,300

Site Plan Review (includes Planned Develoment fees) (p.13) Per hour $106 500 $53,000

Vesting Tentative Map (p. 21) Per hour $106 500 $53,000

Final Map, improvement plan check Per hour $106 500 $53,000

Development Agreement, filing fee (p. 27) LS 256 1 $256

Development Agreement, staff time to process Per hour $106 100 $10,600

Fire District Pre-Application/General Plan Review/Code Assistance application $821 2 $1,642

Fire District Planning/Engineering Referrals (HWD) meeting $821 1 $821

Subtotal: Entitlement Fees $189,219





Design and Site Construction Phases - Fees SPLIT?

Demolition, Commercial/Residential Per bldg $365 10 $3,650

City engineering staff - preconstruction services (Note 3) Per hour $106 6 $636

City engineering staff - inspections Per hour $106 2000 $212,000

Construction Water {Demand} $4,000

2" Irrigation Services Each $10,000 2 $20,000

Irrigation Water Meters with Radio Read Each $11,670 2 $23,340

Underground Fire Service Plan Check and inspection, pdf p. 57, per plan, $1,847 Per plan $1,847 11 $20,317

Materials Bond Note 4 $3,915,690 2.5% $97,892

Performance Bond Note 5 $23,418,460 2.5% $585,462

Alameda County Flood Control Review LS $10,000 1 $10,000

State Water Board Construction Fee Per year $1,159 10 $11,590

State Water Board Notice of Termination Fee LS $500 1 $500

Final Map County Recorder’s Fee LS $150 1 $150

CC&Rs County Recorder's Fee LS $100 1 $100

Subtotal: Engineering/Construction Phases - Fees $989,637





TOTAL: PROJECT LEVEL FEES $1,178,856





Notes

Note 1: The hourly rate for time in the Planning Dept. varies by employee, including benefits, plus an hourly overhead. The $106 (from Fee Schedule p. 31 top) shown is for estimating. The

hourly rate in the Engineering Division varies by employee, including benefits, with no extra hourly overhead. Fire will charge for the Pre-Application meeting. I assume a second meeting

after Fire review of plans. need to see actual charges from large applications from Finance Dept. And Public Works for Wittek, Stonebrae, and Cannery for total time, hourly rate by

employee, on each item by payer for last 5 years.

Note 2: Environmental Assessment: An existing programmatic EIR on State Route 238 Land Use covers the Bayview Village site. The city may require a nested, Focused Project EIR and

decide what issues it will cover.



Note 3: The hourly rate in the Engineering Division varies by employee, including benefits, with no extra hourly overhead. The $106 is from Fee Schedule p. 32 top and is used for

estimating. For public works permits City requires pre-construction conference, not shown in the Fee Schedule. For a subdivision, all improvements shown individually on the Master Fee

Schedule for Engineering Services on pdf pp. 115-117 --clearing, survey, concrete, drainage, street work, utility services, sewers-- are covered. Also covered are items listed for Planning on

pdf 50-51, item 25 Grading Permit Application and item 37. Encroachment Permit Application-- Major Work. Also covered are Fire Service Lines and Fire Hydrants from Fire Prevention pdf

pp. 57-58. Developer submits plans for curbs, gutters, sidewalks, streets, utilities, fire service, hydrants, and grading base rock (cut sheets) to Engineering Services. The Survey Section

inspects pour forms and string lines before pouring of concrete. When work is approved as complete, the City issues a certificate of completion. [Tim Koonze, Jim Lear, Robert Arteaga]





Note 4: A Material Bond is required for 50% of the cost of supplies used for land improvements, e.g., pipes and conduits; bond is assumed to be renewed to cover a 5 year term.



Note 5: A Performance Bond is required for 100% of the cost of the public site improvements (excludes dry utilities); bond is assumed to be renewed to cover a 5 year term.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Fees 11/5/2011 12:03 PM

g Association









x









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Proj Fees 11/5/2011 12:03 PM

Bayview Village 32 Sales Per Qtr Hayward Area Planning Ass



Building Construction

RESIDENTIAL BUILDINGS



INPUTS TO CONSTRUCTION COST CALCULATIONS

Building ID # B1 B2 B3 B4 B5 B6 B7

2 Bdrm 1 Bath 2 Bdrm 2 Bath 3 Bdrm 4 Bdrm 5 Bdrm

Building Description Studios 1 Bdrm

6-plex 6-plex Townhouse Townhouse Townhouse

Qty Dwelling Units by Type of Building 40 150 186 312 170 102 64

Living Area each Dwelling Unit 441 523 795 859 1,499 1,702 2,115

Gross-up for Common Construction Note 4 Note 4 112.7% 111.8%

Built Space by Unit Type 601 713 896 960 1,499 1,702 2,115





CONSTRUCTION COSTS

Costs per s.f. (Note 1)

Modular Dwelling Unit Fabrication $ 85.93 $ 85.00 $ 78.84 $ 81.18 $ 73.91 $ 68.98 $ 66.91

Onsite Concrete Foundation $ 3.67 $ 3.67 $ 3.67 $ 3.67 $ 3.67 $ 3.67 $ 3.67

Modular Transportation $ 2.75 $ 2.72 $ 2.63 $ 2.61 $ 2.40 $ 2.34 $ 2.20

Crane - Modular Placement $ 1.83 $ 1.81 $ 1.75 $ 1.74 $ 1.60 $ 1.56 $ 1.47

Onsite Balconies / Exterior Stairs $ 7.11 $ 6.83 $ 5.89 $ 5.67 $ 3.47 $ 2.77 $ 2.77

Onsite - Structural / Exterior Finish $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00

Onsite - MEP / Interior Finish $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00

Subtotal: Cost per s.f. $ 113.29 $ 112.03 $ 104.79 $ 106.87 $ 97.05 $ 91.32 $ 89.02

Contingency (@ 10%) $ 11.33 $ 11.20 $ 10.48 $ 10.69 $ 9.71 $ 9.13 $ 8.90

Subtotal: Cost per s.f. with Contingency $ 124.62 $ 123.23 $ 115.26 $ 117.56 $ 106.76 $ 100.45 $ 97.92





Subtotal: Construction Cost by D.U. Type $ 74,931 $ 87,876 $ 103,277 $ 112,859 $ 160,030 $ 170,964 $ 207,104

Subtotal: Const. Cost by D.U. Type $ 2,997,227 $ 13,181,442 $ 19,209,575 $ 35,212,004 $ 27,205,039 $ 17,438,306 $ 13,254,627





Subtotal: Residential Construction Cost





CAFÉ, STORE

Item Units Unit $ Qty Amount

6 modules adjusted sf $ 125.00 1,832 $ 229,061

Tenant Improvements Café, Store sf $ 125.00 1,832 $ 229,061

Direct Costs - Café, Store $ 458,121





COMMUNITY CENTER (Note 2)

Shell Space (Note 3)

Item Units Unit $ Qty Amount

Spread Footings Each $ 483.75 40 $ 19,350

Slab on Grade- Bay level sf $ 9.25 14,528 $ 134,384

10' Poured in Place Columns Each $ 1,800.00 40 $ 72,000

Block Partition Walls sf $ 20.00 6,000 $ 120,000

Concrete Shear Walls at Stairwells, Elev Shaft sf $ 33.75 900 $ 30,375

Concrete Stairs each-per level $ 11,625.00 2 $ 23,250

Mechanical Elevator Each $ 107,500.00 1 $ 107,500

Concrete Headers at Exterior Walls lf $ 45.50 800 $ 36,400

Concrete Deck sf $ 25.00 14,528 $ 363,200

Plumbing rough-in for Café Each $ 25,000.00 2 $ 50,000

Plumbing rough-in for Store lump sum $ 12,000.00 1 $ 12,000

Plumbing rough-in for Community Center lump sum $ 12,000.00 1 $ 12,000

Miscellaneous Plumbing lump sum $ 5,000.00 1 $ 5,000

Fire Sprinklers sf $ 2.38 14,528 $ 34,613

Electrical Stubs for Commercial Units each $ 5,000.00 4 $ 20,000

Communications Stubs for Retail each $ 2,818.75 4 $ 11,275

General interior lighting-rough in sf $ 3.88 14,528 $ 56,296

General exterior lighting-Rough in sf $ 3.19 14,528 $ 46,308

Illuminated signage each $ 2,625.00 4 $ 10,500





dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldgs 27 11/5/2011 12:03 PM

Bayview Village 32 Sales Per Qtr Hayward Area Planning Ass



Building Construction

Security Monitoring System sf $ 1.98 14,528 $ 28,693

Fire Alarms/Smoke Detection lump sum $ 28,625.00 1 $ 28,625

each

Glass/aluminum panel/doors at retail, street side $ 5,025.00 24 $ 120,600

Cementious sheathing sf $ 5.86 14,528 $ 85,134

3-coat stucco sf $ 7.65 14,528 $ 111,139

Exterior Trim lump sum $ 30,000.00 1 $ 30,000

Exterior Paint sf $ 1.74 14,528 $ 25,242

Exterior Light Fixtures (Residential) Each $ 362.50 48 $ 17,400

Sack/patch/paint concrete stairwell sf $ 2.81 900 $ 2,531

Insulation (Ceiling) sf $ 0.76 14,528 $ 11,078

Drop Ceiling sf $ 2.06 14,528 $ 29,964

Clean-Up and Repairs lump sum 30,000 1 $ 30,000

sf $ 115.97 14,528 $ 1,684,857

Contingency @ 20% $ 336,971

Subtotal : Community Center Shell $ 139.17 14,528 $ 2,021,829

Community Center sf $ 139.17 7,800 $ 1,085,508

Carports Each $ 2,850.00 100 $ 285,000

Subtotal: Community Center Construction Cost $1,370,508

Furnishings lump sum $500,000 1 $500,000

Subtotal: Community Center Construction Cost $1,870,508





TOTAL: BUILDING CONSTRUCTION COST





Notes:

Note 1: Construction unit pricing based on an estimate received from Zeta Communities, a modular construction company.

Zeta Estimate

Plan B3 B6

Area SF 795 1,702

D.U. Fabrication $ 81.91 $ 71.60

Foundation $ 3.67 $ 3.67

Transportation $ 2.63 $ 2.34

Crane $ 1.75 $ 1.56

Balconies / Exterior Stairs $ 5.89 $ 2.77

Structure - Structural / Exterior Finish $ 6.00 $ 6.00

Structure - MEP / Interior Finish $ 6.00 $ 6.00

Note 2: The community buildings are the first two floors of the Community Building and the Village Store and Café in the Mixed Use Bldg. They are assumed to be Type 1 reinforce

concrete, forming the base of podiums upon which wood-frame residential units are placed.

Note 3: Shell space unit pricing based on recent bid-estimates for a similar project furnished to Jacobson Consulting by San Jose Construction,

Taisei, Swinerton, D. Ross Construction. Commercial building specification is to be determined; line items shown are for illustrative purposes.

Note 4: Common construction is defined as condominium corridors, stairwells, utility closets, and so forth, or in the case of the walk-up units, the common outdoor stairwell.

Gross-up for Common Construction studios one bedroom café store MU block

Qty 40 150 1 1

Living Space 441 523 1,344 2,688

Unadjusted sf 17,640 78,450 1,344 2,688 100,122

Percent of unadjusted 17.6% 78.4% 1.3% 2.7% 100.0%

Adjusted sf for total floor area 24,051 106,963 1,832 3,665 136,512 136,512

Adjusted per unit 601 713 1,832 3,665

total floor area includes halls, stairs, elevators, rest rooms and service rooms

sixplexes two bed one bath two bed two bath

net area for 6 units 4,770 5,154

gross area incl. stairwell for 6 units 5,376 5,760

percent gross up 112.7% 111.8%









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldgs 28 11/5/2011 12:03 PM

yward Area Planning Association









B8

Community

Center

2

1,500





1,500









$ 68.98

$ 3.67

$ 2.34

$ 1.56

$ 2.77

$ 6.00

$ 6.00

$ 91.32

$ 9.13

$ 100.45





$ 150,673

$ 301,346





$ 128,799,565









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldgs 29 11/5/2011 12:03 PM

yward Area Planning Association









$ 130,628,195









ed to be Type 1 reinforced









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldgs 30 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Green Energy

RESIDENTIAL BUILDINGS



INPUTS TO GREEN ENERGY COST CALCULATIONS

Building ID # B1 B2 B3 B4 B5 B6 B7 B8

2 Bdrm 1 Bath 2 Bdrm 2 Bath 3 Bdrm 4 Bdrm 5 Bdrm Community

Building Description Studios 1 Bdrm

6-plex 6-plex Townhouse Townhouse Townhouse Center

Qty Buildings 6 6 31 52 170 102 64 1

Qty Dwelling Units per Building 6.67 25 6 6 1 1 1 2

Qty Dwelling Units by Type of Building 40 150 186 312 170 102 64 2

Living Area each Dwelling Unit 441 523 795 859 1,499 1,702 2,115 1,500

Conditioned Space by Building Type 601 713 896 960 1,499 1,702 2,115 1,500





GREEN ENERGY CONSTRUCTION COSTS

Costs per D.U. (Note 1)

Extra insulation, moisture barrier, etc. $ 924.76 $ 1,014.13 $ 1,310.54 $ 1,380.29 $ 2,077.73 $ 2,298.95 $ 2,749.03 $ 2,078.82

High efficiency space heating $ 1,225.00 $ 1,225.00 $ 1,225.00 $ 1,225.00 $ 1,225.00 $ 1,225.00 $ 1,225.00 $ 1,225.00

Solar hot water system $ 2,800.00 $ 3,008.92 $ 3,701.91 $ 3,864.97 $ 5,495.54 $ 6,012.74 $ 7,064.97 $ 5,498.09

Photovoltaic system $ 15,112.50 $ 15,876.35 $ 18,410.11 $ 19,006.29 $ 24,968.07 $ 26,859.08 $ 30,706.29 $ 24,977.39

Subtotal: Cost per D.U. $ 20,062.26 $ 21,124.40 $ 24,647.56 $ 25,476.54 $ 33,766.35 $ 36,395.77 $ 41,745.28 $ 36,395.77

Contingency (@ 10%) $ 2,006.23 $ 2,112.44 $ 2,464.76 $ 2,547.65 $ 3,376.63 $ 3,639.58 $ 4,174.53 $ 3,639.58

Subtotal: Cost per D.U. with Contingency $ 22,068.49 $ 23,236.84 $ 27,112.32 $ 28,024.20 $ 37,142.98 $ 40,035.35 $ 45,919.81 $ 40,035.35





# of D.U.'s per Bulding Type 40 150 186 312 170 102 64 2

Subtotal: Cost by Building Type $ 882,740 $ 3,485,525 $ 5,042,891 $ 8,743,550 $ 6,314,307 $ 4,083,605 $ 2,938,868 $ 80,071





TOTAL: GREEN ENERGY CONSTRUCTION COST $ 31,571,557





Notes:

Note 1: Unit pricing based on an estimate received from Zeta Communities, a modular construction company.

Zeta Estimate

Plan B3 B6

Area SF 912 1,540

Extra insulation, moisture barrier, etc. $ 1,438 $ 2,122

High efficiency space heating $ 1,225 $ 1,225

Solar hot water system $ 4,000 $ 5,600

Photovoltaic system $ 19,500 $ 25,350









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Energy 31 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Building Fees



INPUTS TO FEE CALCULATIONS RESIDENTIAL COMMERCIAL

Building ID # B1-R B2 B3 B4 B5 B6 B7 B8-R B1-C B8-C Totals (Residential Only)

2 Bdrm 1 Bath 2 Bdrm 2 Bath 3 Bdrm 4 Bdrm 5 Bdrm Comm Ctr - Comm Ctr-

Building Description Studios 1 Bdrm Café Store

6-plex 6-plex Townhouse Townhouse Townhouse Manager Units Public Rooms



Qty Buildings 6 6 31 52 170 102 64 1 1 1 426

Qty Occupied Units per Building 6.67 25 6 6 1 1 1 2 2 1

Qty Occupied Units by Type of Building 40 150 186 312 170 102 64 2 2 1 1,026

Conditioned Space each Unit 441 523 795 859 1,499 1,702 2,115 1,500 N/A N/A

Conditioned Space each Building 2,940 13,075 4,770 5,154 1,499 1,702 2,115 3,000 1,832 7,800





Qty Townhouses (permit as single family) 170 102 64 336

Qty buildings with flats 6 6 31 52 1 90

Conditioned Space by Building Type 17,640 78,450 147,870 268,008 254,830 173,604 135,360 3,000 1,832 7,800 1,078,762



FEE BREAKDOWN

Category - Item B1-R B2 B3 B4 B5 B6 B7 B8-R B1-C B8-C Information Reference

Fees per Unit

Park In-lieu Fee $ 9,653 $ 9,653 $ 9,653 $ 9,653 $ 9,653 $ 9,653 $ 11,359 $ 9,653 $ - $ - Hayward Planning Dept. Handout

Water Meter Installation $ 2,880 $ 2,880 $ 2,880 $ 2,880 $ 2,880 $ 2,880 $ 3,230 $ 2,880 $ 3,230 $ 3,230 City of Hayward, Master Fee Schedule

Water Facilities Fee $ 5,726 $ 5,726 $ 5,726 $ 5,726 $ 5,726 $ 5,726 $ 8,590 $ 5,726 $ 8,590 $ 8,590 City of Hayward, Master Fee Schedule

Radio Read Upgrade to Water Meter $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 City of Hayward, Master Fee Schedule

Sanitary Sewer Service Connection Fee $ 6,457 $ 6,457 $ 6,457 $ 6,457 $ 6,457 $ 6,457 $ 7,255 $ 6,457 $ 30,000 $ 30,000 City of Hayward, Master Fee Schedule

State Inspections (Modular) $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 Zeta Communities

Hayward Unified School District $ 904 $ 1,072 $ 1,630 $ 1,761 $ 3,073 $ 3,489 $ 4,336 $ 3,075 $ 916 $ 3,900 Hayward USD, Facilities Director

Address Assignment Fee $ 42 $ 42 $ 42 $ 42 $ 42 $ 42 $ 42 $ 42 $ 42 $ 42 City of Hayward, Master Fee Schedule

Subtotal: Fees per Unit $ 26,362 $ 26,530 $ 27,088 $ 27,219 $ 28,531 $ 28,947 $ 35,512 $ 28,533 $ 43,478 $ 46,462

x # of Units in each Bldg 7 25 6 6 1 1 1 2 2 1

= Unit-Fees per Bldg $ 175,747 $ 663,254 $ 162,527 $ 163,314 $ 28,531 $ 28,947 $ 35,512 $ 57,066 $ 86,956 $ 46,462





Fees per Building

Unit-Fees Subtotal $ 175,747 $ 663,254 $ 162,527 $ 163,314 $ 28,531 $ 28,947 $ 35,512 $ 57,066 $ 86,956 $ 46,462 confusing. delete?

Production Unit Plan Review (inc. MEP) $ 1,405 $ 1,558 $ 1,275 $ 1,277 $ 1,370 $ 1,082 $ 1,149 $ 5,386 $ 5,380 $ 5,412 City of Hayward, Master Fee Schedule

Production Unit Inspections (inc. MEP) $ 6,288 $ 6,974 $ 5,235 $ 5,250 $ 5,913 $ 4,139 $ 4,600 $ 9,131 $ 9,112 $ 9,208 City of Hayward, Master Fee Schedule

Fire Plan Review & Inspecton (w/ MEP) $ 1,517 $ 1,682 $ 1,052 $ 1,055 $ 1,187 $ 807 $ 917 $ 3,534 $ 3,528 $ 3,563 City of Hayward, Master Fee Schedule

Fire Alarm System Review & Inspection $ 1,437 $ 1,438 $ 1,437 $ 1,437 $ 1,437 $ 1,026 $ 1,026 $ 1,437 $ 1,437 $ 1,437 Fire Alarm System pdf p. 55

Hayward Unified School District $ 26,804 $ 9,779 $ 9,779 $ 10,566 $ 3,073 $ 5,276 $ 6,557 $ 1,500 $ 916 $ 3,900 Hayward USD, Facilities Director

Subtotal: Fees per Building $ 213,198 $ 684,685 $ 181,303 $ 182,899 $ 41,512 $ 41,277 $ 49,760 $ 78,055 $ 107,329 $ 69,983

x # Bldgs of this Type 6 6 31 52 170 102 64 1 1 1

= Bldg-Fees by Bldg Type $ 1,279,189 $ 4,108,110 $ 5,620,391 $ 9,510,725 $ 7,057,053 $ 4,210,272 $ 3,184,661 $ 78,055 $ 107,329 $ 69,983





Additional Fees by Building Type

Incremental Plan Review (Master Set) $ 5,580 $ 6,189 $ 5,060 $ 5,069 $ 5,444 $ 4,295 $ 4,567 $ - $ - $ - City of Hayward, Master Fee Schedule

Incr. Fire Review (Master Set) $ 2,697 $ 2,991 $ 1,869 $ 1,873 $ 1,955 $ 1,434 $ 1,629 $ - $ - $ - City of Hayward, Master Fee Schedule

Subtotal: Fees by Bldg Type $ 1,287,466 $ 4,117,290 $ 5,627,320 $ 9,517,667 $ 7,064,452 $ 4,216,001 $ 3,190,856 $ 78,055 $ 107,329 $ 69,983





Subtotal: Building Fees $ 35,276,418









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldg Fees 32 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Building Fees



Other Miscellaneous Building Dept. Fees Units Unit $ Qty Amt Information Reference

Carports Each $ 405 100 $ 40,500 City of Hayward, Master Fee Schedule

Trellises Each $ 170 2 $ 340 City of Hayward, Master Fee Schedule

Retaining Walls Per 50 l.f. $ 200 80 $ Move Master Fee Schedule

16,000 Average estimate fromto Proj Cons?

Project Signs Each $ 106 10 $ 1,060 City of Hayward, Master Fee Schedule

Commercial Signs Each $ 277 4 $ 1,108 City of Hayward, Master Fee Schedule

Entry Monument Each $ 1,000 1 $ 1,000 Rough Estimate

Stormwater Treatment Inspections Each $ 250 12 $ Master Proj Cons?

3,000 City of Hayward,Move to Fee Schedule

Subtotal: Miscellaneous Building Fees $ 63,008 assigned to Community Center





TOTAL: ALL BUILDING FEES $ 35,339,426









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldg Fees 33 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Building Consultants

Phase - Consultant Work Product Units Unit $ Qty Amt Subtotal

Entitlement Phase

Architect Conceptual Plans and Renderings - Buildings Building $8,000 8 $64,000

Modular Design Expert Presentation: Modular Design Details Bayview Village LS $8,000 1 $8,000

Subtotal: Entitlement Phase $72,000





Design Phase

D.U. Construction Docs - Res. (included in Zeta hard costs)

Modular Design Expert Plan $0.00 7 $0

Architect Residential Construction Documents (note 1) Building $10,000 8 $80,000

Architect Commercial/Mixed Use Construction Documents SF $4.50 #REF! #REF!

Structural Engineering Commercial/Mixed Use Construction Documents SF $1.13 #REF! #REF!

Energy Consultant Commercial/Mixed Use Construction Documents SF $0.36 #REF! #REF!

Build-It-Green Certifier Commissioning Docs (greenbuilding rating) LS $25,000 1 $25,000

Reimbursables Printing, photocopies, courier services LS $30,000 1 $30,000

Subtotal: Engineering Phase #REF!





Construction Phase

Project Manager Coordinate permitting, subcontracts, etc. by Zeta D.U. $300 1,024 $307,200

Site Superintendent Oversee onsite construction Year $80,000 9 $720,000

Architect/Structural Identify and correct design problems LS $20,000 1 $20,000

Reimbursables Printing, photocopies, courier services LS $25,000 1 $25,000

Subtotal: Construction Phase (2) $1,072,200





TOTAL: BUILDING CONSULTANTS #REF!



Note 1: Modular, factory buiilt units. Construction Documents (CDs, blueprints) and shop drawings for residential buildings; Color and Materials Board, Architectural Plans.

Architect of Record, Title 24, subconsultants for structure, solar energy, HVAC, sound, MEP (Mechanical Electrical Plumbing), Lighting Plan and forensic consultation (by

Zeta and Zeta partner KTGY). Jill Williams, KTGY, Jan 29 10 email: Use bldg types 75k x 8 = $600k



Note 2: Cost is allocated to cash flow on a per residential unit basis $1,047









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldg Cons 11/5/2011 12:03 PM

nning Association









x









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bldg Cons 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Village Bus

Item Units Unit $ Qty Amt

Diesel-hybrid buses (Note 1) Each $550,000 2 $1,100,000

Public transit infrastructure (Note 2) Lump Sum $1,250,000 1 $1,250,000

Traffic signal modifications (Note 3) Lump Sum $160,000 1 $160,000

Easement Acquisition busway, PG&E (Note 4) Each $50,000 1 $50,000

TOTAL: PUBLIC TRANSIT $2,560,000





Reconcile with Village Bus.xlsx

(Estimate for Busway and bus stops adds $300,000, which equals # in Village Bus.xlsx $2,860,000

(As a cost per unit: $2,798



Notes:

Note 1: Specified are ISE-Thunderbolts or equivalent. Cost includes spare parts. Buses are to be owned

by the HOA and run by a contract bus operator like MV Transportation for the benefit of

all Bayview Village residents, who ride for free (ecopass). Unit purchase covers capital; HOA fees cover operating.

Note 2: Consists of 14 bus stop shelters, additional raised sidewalk platforms, and ticket vending machines

as is anticipated to be required by a traffic study as part of the environmental impact report.

This infrastructure is anticipated to be both in-tract and off-tract. In-tract busway costs are

captured in the Site Improvements cost estimate.

Note 3: Traffic signals near the project site are anticipated to be modified to speed up

rapid bus traffic in and out of the project. Upgrades include GPS signal control.

Note 4: Right of way use inside the adjacent PG&E ROW is required for efficient

bus circulation. This cost estimate reflects limited use rights for QV in the corridor and benefit to

PG&E from eliminating maintenance costs and significantly reducing liability.









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bus 11/5/2011 12:03 PM

ning Association









)

)









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx Bus 11/5/2011 12:03 PM

PHASE Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Overall Checksum

Building Breakdown

Studio - Flat in Mixed Use Bldg 15 15 10 40 40

One Bedroom - Condo 50 50 50 150 150

Two Bedroom - Condo 47 22 12 48 57 186 186

Two Bedroom Two Bath - Condo 69 18 36 41 148 312 312

Three Bedroom -Condo 14 54 50 52 170 170

Four Bedroom - Condo 7 36 25 34 102 102

Five Bedroom - Townhouse 3 10 22 29 64 64

Subtotal: Residential Units in this Phase 205 205 205 204 205 1,024 1,024

Managers' Dwelling Units 2 2 2

Community Center 1

Café, Store 1 from income:

REVENUE $57,233,382 $66,343,382 $68,268,382 $75,662,097 $59,428,382 $326,935,625 $326,935,625





COSTS

Land Development Costs

Land Acquisition (Allocated) $4,451,525 $4,451,525 $4,451,525 $4,429,810 $4,451,525 $22,235,909 $22,235,909

Site Improvements (Assigned) (Note 1) $11,068,920 $5,681,622 $4,794,123 $2,463,786 $3,362,809 $27,371,260 $27,371,260

Capitalized Interest (Allocated) 1.1% 1.1% 1.1% 1.0% 1.1% 5.3% 5.3%

Project Level Government Fees (Allocated) $236,001 $236,001 $236,001 $234,850 $236,001 $1,178,856 $1,178,856

Project Level Consultant Fees (Allocated) $840,440 $840,440 $840,440 $836,340 $840,440 $4,198,100 $4,198,100

Subtotal: Land Development Costs $16,596,886 $11,209,588 $10,322,089 $7,964,786 $8,890,775 $54,984,125 $54,984,125





Building Costs (Assigned)

Direct Costs - Residential-Base ############ ############ ############ ############ #REF! $128,799,565 #REF!

Direct Costs - Manager Units (assigned)

Direct Costs - Green Energy $5,638,826 $6,499,967 $6,585,014 $7,074,695 $5,773,054 $31,571,557 $31,571,557

Direct Costs - Residential-Options $300,894 $300,894 $300,894 $299,426 $300,894 $1,503,000 $1,503,000

Direct Costs - Café, Store $458,121 $0 $0 $0 $0 $458,121 $458,121

Direct Costs - Community Center $0 $0 $0 $1,370,508 $0 $1,370,508 $1,370,508

Building Permit Fees $6,510,068 $7,300,497 $7,363,512 $7,848,003 $6,317,347 $35,339,426 $35,339,426

Building Consultant Fees (Allocated) #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Subtotal: Building Costs #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Village Bus $512,500 $512,500 $512,500 $510,000 $512,500 $2,560,000 $2,560,000

Selling Expenses (Allocated)

Model Expenses $195,190 $195,190 $195,190 $194,238 $195,190 $975,000 $975,000

Sales Commissions $1,178,118 $1,178,118 $1,178,118 $1,172,371 $1,178,118 $5,884,841 $5,884,841

Broker Coop Fees $654,510 $654,510 $654,510 $651,317 $654,510 $3,269,356 $3,269,356

Advertising $74,072 $74,072 $74,072 $73,711 $74,072 $370,000 $370,000

Sellers Closing Costs $261,804 $261,804 $261,804 $260,527 $261,804 $1,307,743 $1,307,743

Subtotal: Selling Expenses $2,363,694 $2,363,694 $2,363,694 $2,352,164 $2,363,694 $11,806,940 $11,806,940





Other Expenses (Allocated)

Property Taxes & Assessments (Allocated) $425,382 $425,382 $425,382 $423,307 $425,382 $2,124,834 $2,124,834

Insurance $458,157 $458,157 $458,157 $455,922 $458,157 $2,288,549 $2,288,549

Developer Administration/Overhead $376,367 $376,367 $376,367 $374,531 $376,367 $1,880,000 $1,880,000

Warranty Reserve $654,510 $654,510 $654,510 $651,317 $654,510 $3,269,356 $3,269,356

Subtotal: Other $1,914,416 $1,914,416 $1,914,416 $1,905,077 $1,914,416 $9,562,739 $9,562,739









TOTAL COSTS #REF! #REF! #REF! #REF! #REF! #REF! #REF!





NET INCOME #REF! #REF! #REF! #REF! #REF! #REF! #REF!

PRETAX PROFIT MARGIN #REF! #REF! #REF! #REF! #REF! #REF!

Bayview Village Hayward Area Planning Association



Gross Margin Analysis by Plan



RESIDENTIAL PROJECT Checksum

Building ID # B1-R B2 B3 B4 B5 B6 B7 OVERALL

2 Bdrm 1 Bath 2 Bdrm 2 Bath 3 Bdrm 4 Bdrm 5 Bdrm

Building Description Studios 1 Bdrm

6-plex 6-plex Townhouse Townhouse Townhouse

REVENUE

Unit Count 40 150 186 312 170 102 64 1,024 1,024

Residential Sales - Base $6,800,000 $33,750,000 $53,010,000 $90,480,000 $60,350,000 $45,390,000 $35,840,000 $325,620,000 325,620,000

Residential Sales - Options $71,392 $267,719 $331,971 $556,854 $303,414 $182,049 $114,227 $1,827,625 1,827,625

Sales Incentives -$20,000 -$75,000 -$93,000 -$156,000 -$85,000 -$51,000 -$32,000 -$512,000 -512,000

NET REVENUE $6,851,392 $33,942,719 $53,248,971 $90,880,854 $60,568,414 $45,521,049 $35,922,227 $326,935,625 326,935,625





COSTS

Land Development Costs (Allocated by C.A.R.)

Footprint per unit (SF) 199 239 299 320 512 576 704

Total Unit Type Impact to Land 7,960 35,850 55,614 99,840 87,040 58,752 45,056 390,112

Proportion Footprint 2.04% 9.19% 14.26% 25.59% 22.31% 15.06% 11.55% $1 200%

Land Acquisition $453,710 $2,043,406 $3,169,930 $5,690,758 $4,961,174 $3,348,792 $2,568,137 $22,235,909 22,235,909 ok

Site Improvements $558,494 $2,515,328 $3,902,021 $7,005,031 $6,106,950 $4,122,191 $3,161,245 $27,371,260 27,371,260 ok

Capitalized Interest $0 $0 $0 $0 $0 $0 $0 5.3% 5.3% ok

Property Taxes & Assessments $0 $0 $0 $0 $0 $0 $0 1.5% 1.5% ok

Project Level Government Fees $24,054 $108,333 $168,057 $301,700 $263,021 $177,539 $136,152 $1,178,856 1,178,856 ok

Project Level Consultant Fees $85,660 $385,791 $598,477 $1,074,405 $936,661 $632,246 $484,860 $4,198,100 4,198,100 ok

Subtotal: Land Development Costs $1,121,918 $5,052,859 $7,838,485 $14,071,895 $12,267,806 $8,280,769 $6,350,394 $54,984,125 54,984,125 ok

58711

Building Costs (Assigned)

Direct Costs - Residential-Base #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ok

Direct Costs - Manager Units (assigned) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ok #REF!

Direct Costs - Green Energy $882,740 $3,485,525 $5,042,891 $8,743,550 $6,314,307 $4,083,605 $2,938,868 $31,571,557 31,491,486



Direct Costs - Residential-Options #REF! #REF! #REF! #REF! #REF! #REF! #REF! $1,503,000 #REF! ok

Direct Costs - Café, Store $9,348 $42,100 $65,309 $117,245 $102,214 $68,994 $52,911 $458,121 458,121 ok

Direct Costs - Community Center $27,964 $125,945 $195,378 $350,749 $305,782 $206,403 $158,287 $1,370,508 1,370,508 ok

Building Permit Fees $1,360,753 $4,187,788 $5,705,401 $9,648,629 $7,090,468 $4,229,843 $3,189,853 $35,339,426 35,412,735

Building Consultant Fees (Allocated) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ok

Subtotal: Building Costs #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Village Bus $100,000 $375,000 $465,000 $780,000 $425,000 $255,000 $160,000 $2,560,000 2,560,000 ok

Selling Expenses (Allocated per unit)

Proportion 3.91% 14.6% 18.2% 30.5% 16.6% 10.0% 6.3% 100.0%









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx GMA-Plan 40 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Gross Margin Analysis by Plan

Model Expenses $38,086 $142,822 $177,100 $297,070 $161,865 $97,119 $60,938 $975,000 975,000 ok

Sales Commissions $229,877 $862,037 $1,068,926 $1,793,038 $976,976 $586,185 $367,803 $5,884,841 5,884,841 ok

Broker Coop Fees $127,709 $478,910 $593,848 $996,132 $542,764 $325,659 $204,335 $3,269,356 3,269,356 ok

Advertising $14,453 $54,199 $67,207 $112,734 $61,426 $36,855 $23,125 $370,000 370,000 ok

Sellers Closing Costs $51,084 $191,564 $237,539 $398,453 $217,106 $130,263 $81,734 $1,307,743 1,307,743 ok

Subtotal: Selling Expenses $461,209 $1,729,532 $2,144,620 $3,597,427 $1,960,137 $1,176,082 $737,934 $11,806,940 11,806,940 ok





Other Expenses (Allocated per unit)

Property Taxes & Assessments $83,001 $311,255 $385,956 $647,410 $352,756 $211,653 $132,802 $2,124,834 2,124,834 ok

Insurance $89,396 $335,237 $415,694 $697,292 $379,935 $227,961 $143,034 $2,288,549 2,288,549 ok

Developer Administration/Overhead $73,438 $275,391 $341,484 $572,813 $312,109 $187,266 $117,500 $1,880,000 1,880,000 ok

Warranty Reserve $127,709 $478,910 $593,848 $996,132 $542,764 $325,659 $204,335 $3,269,356 3,269,356 ok

Subtotal: Other $373,545 $1,400,792 $1,736,982 $2,913,647 $1,587,564 $952,538 $597,671 $9,562,739 9,562,739 ok





NET COSTS #REF! #REF! #REF! #REF! #REF! #REF! #REF! $277,876,366 #REF!







NET OPERATING INCOME #REF! #REF! #REF! #REF! #REF! #REF! #REF! $49,059,259 #REF!

PRETAX PROFIT MARGIN #REF! #REF! #REF! #REF! #REF! #REF! #REF! 15.01%





C.A.R. = Coverage Area Ratio









dcb201ea-9eae-4448-817f-c27bf2e2d5b5.xlsx GMA-Plan 41 11/5/2011 12:03 PM

Bayview Village Hayward Area Planning Association



Quarterly Cash Flow Statement (In 1000 dollar increments)

From Inputs: Property Tax Rate= 1.50% Dev. Loan Interest Rate= 5.25%



YEAR Year 1 Entitlement Year 2 Design Year 3 Improvements

QUARTER Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

1 2 3 4 5 6 7 8 9 10 11 12 13

OPERATIONS



Cumulative Residential Units Sold 0 0 0 0 0 0 0 0 0 0 0 0 0



Cash Receipts

Residential Sales (Base + Options) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Sales Incentives $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Sales Commissions $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Broker Coop Fees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Sellers Closing Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Net Sales $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0



Cash Disbursements

Land Acquisition $860 $87 $87 $87 $87 $21,029 $0 $0 $0 $0 $0 $0 $0



Phase 1 Site Improvements x x x $0 $0 $0 $0 $2,214 $2,214 $2,214 $2,214 $2,214 $0

Phase 2 Site Improvements x x x $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Phase 3 Site Improvements x x x $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Phase 4 Site Improvements x x x $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Phase 5 Site Improvements x x x $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Subtotal: Site Improvement Costs x x x $0 $0 $0 $0 $2,214 $2,214 $2,214 $2,214 $2,214 $0



Property Taxes & Assessments $0 $0 $163 $163 $163 $163

Project Level Government Fees $47 $47 $47 $47 $247 $247 $247 $247

Project Level Consultant Fees $129 $129 $129 $129 $446 $446 $446 $497 $52 $52 $52 $52 $52

Subtotal: Land Development Costs $1,036 $263 $263 $263 $780 $21,885 $693 $3,121 $2,265 $2,428 $2,265 $2,428 $52



Direct Costs - Residential Base $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Direct Costs - Energy $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Direct Costs - Residential Options $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Direct Costs - Café, Store $153

Direct Costs - Community Center $0 $0 $0 $0 $0 $0 $0

Building Permit Fees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Building Consultant Fees $36 $36 #REF! #REF! $0 $0 $0 $0 $0

Building Construction Loans

Subtotal: Building Costs $0 $36 $36 $0 $0 $0 #REF! #REF! $0 $0 $0 $0 $153

Model Expenses [adjust for café store] $0 $0 $0 $0 $0 $0 $0 $480 $0

Advertising $0 $0 $0 $0 $10 $10 $10 $10 $0

Warranty Expense $0 $0 $0 $0 $0 $0 $0 $0 $0

Insurance $0 $0 $0 $0 $0 $0 $0 $0 $0

Village Bus System $0 $0 $0 $0 $512 $512 $512 $512 $512 $0

Developer Overhead $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40

Subtotal: Selling & Other Expense $40 $40 $40 $40 $40 $40 $40 $552 $562 $562 $562 $1,042 $40

Net Cash Disbursements $1,076 $339 $339 $303 $820 $21,925 #REF! #REF! $2,827 $2,990 $2,827 $3,470 $244



NET CASH FLOW FROM OPERATIONS -$1,076 -$339 -$339 -$303 -$820 -$21,925 #REF! #REF! -$2,827 -$2,990 -$2,827 -$3,470 -$244



INVESTING & FINANCING

Equity Investor Cash Flow $1,276 $340 $339 $304 $810 $6,309 $0

Development Loan Draw (Paydown) $15,616 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

NET CASH FLOW INVESTING/FINANCING $1,276 $340 $339 $304 $810 $21,925 #REF! #REF! #REF! #REF! #REF! #REF! #REF!



NET CASH FLOW: OVERALL $200 $1 $0 $1 -$10 $0 #REF! #REF! #REF! #REF! #REF! #REF! #REF!



Cash on Hand keep above 200 $200 $200 $200 $200 $190 $190 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Year 4 Year 5 Year 6 Year 7 Year 8

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30





0 0 32 64 96 128 160 192 224 256 288 320 352 384 416 448 480





$0 $0 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233

$0 $0 ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16) ($16)

$0 $0 ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184) ($184)

$0 $0 ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102) ($102)

$0 $0 ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41) ($41)

$0 $0 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890





$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0



$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $1,136 $1,136 $1,136 $1,136 $1,136 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $959 $959 $959 $959 $959 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $1,136 $1,136 $1,136 $1,136 $1,136 $0 $959 $959 $959 $959 $959 $0



$163 $158 $148 $137 $127 $117 $107 $97 $86



$52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52 $52

$214 $52 $209 $52 $199 $1,188 $1,325 $1,188 $1,315 $1,188 $168 $1,010 $1,117 $1,010 $1,107 $1,010 $138



$1,342 $2,683 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025

$329 $658 $987 $987 $987 $987 $987 $987 $987 $987 $987 $987 $987 $987 $987 $987 $987

$16 $31 $47 $47 $47 $47 $47 $47 $47 $47 $47 $47 $47 $47 $47 $47 $47

$153 $153

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$368 $736 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104

$34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34 $34



$2,241 $4,295 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196 $6,196

$15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15 $15

$10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10

$0 $0 $0 $102 $102 $102 $102 $102 $102 $102 $102 $102 $102 $102 $102 $102 $102

$72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72 $72

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40 $40

$137 $137 $137 $239 $239 $239 $239 $239 $239 $239 $239 $239 $239 $239 $239 $239 $239

$2,591 $4,483 $6,542 $6,487 $6,634 $7,623 $7,760 $7,623 $7,750 $7,623 $6,604 $7,445 $7,552 $7,445 $7,542 $7,445 $6,573



-$2,591 -$4,483 $3,348 $3,403 $3,256 $2,267 $2,130 $2,267 $2,140 $2,267 $3,286 $2,444 $2,338 $2,444 $2,348 $2,444 $3,317







#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!



#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!



#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ear 8 Year 9 Year 10

Q3 Q4 Q1 Q2 Q3 Q4 Q1

31 32 33 34 35 36 37





512 544 576 608 640 672 704





$10,233 $10,233 $10,233 $10,233 $10,233 $10,233 $10,233

($16) ($16) ($16) ($16) ($16) ($16) ($16)

($184) ($184) ($184) ($184) ($184) ($184) ($184)

($102) ($102) ($102) ($102) ($102) ($102) ($102)

($41) ($41) ($41) ($41) ($41) ($41) ($41)

$9,890 $9,890 $9,890 $9,890 $9,890 $9,890 $9,890





$0 $0 $0 $0 $0 $0 $0



$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

$493 $493 $493 $493 $493 $0 $0

$0 $0 $0 $0 $0 $0 $0

$493 $493 $493 $493 $493 $0 $0



$76 $66 $56



$52 $52 $52 $52 $52 $52 $52

$544 $621 $544 $610 $544 $107 $52



$4,025 $4,025 $4,025 $4,025 $4,025 $4,025 $4,025

$987 $987 $987 $987 $987 $987 $987

$47 $47 $47 $47 $47 $47 $47



$0 $228 $228 $228 $228 $228 $228

$1,104 $1,104 $1,104 $1,104 $1,104 $1,104 $1,104

$34 $34 $34 $34 $34 $34 $34



$6,196 $6,425 $6,425 $6,425 $6,425 $6,425 $6,425

$15 $15 $15 $15 $15 $15 $15

$10 $10 $10 $10 $10 $10 $10

$102 $102 $102 $102 $102 $102 $102

$72 $72 $72 $72 $72 $72 $72

$0 $0 $0 $0 $0 $0 $0

$40 $40 $40 $40 $40 $40 $40

$239 $239 $239 $239 $239 $239 $239

$6,979 $7,284 $7,208 $7,274 $7,208 $6,771 $6,715



$2,910 $2,606 $2,682 $2,616 $2,682 $3,119 $3,175





-$1,060 -$2,664 -$3,069 -$3,125

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!



#REF! #REF! #REF! #REF! #REF! #REF! #REF!



#REF! #REF! #REF! #REF! #REF! #REF! #REF!

Bayview Village Hayward Area Planning Associ



Event Timing Worksheet

INPUT - ASSUMPTION

Build Cycle (Quarters, Note 1) 2

Absorption Rate (2) 32 from Inputs

% Sales triggering next phase 80% TYPICAL BUILD CYCLE

Yr Qtr Quarter 1

Start of Sales (Year, Quarter) 4 1 Loan Draw(%) 50%

Entitlements Obtained (4) 1 0



YEAR Year 1 Enitlement Year 2 Design

QUARTER Q1 Q2 Q3 Q4 Q1 Q2 Q3

1 2 3 4 5 6 7

Housing Starts, First Pass 0 0 0

Housing Units Remaining 0

Housing Starts 0 0 0 0 0 0 0

First Quarter W.I.P. 0 0 0 0 0 0

Second Quarter W.I.P. 0 0 0 0 0

Third Quarter W.I.P. 0 0 0 0

Fourth Quarter W.I.P. 0 0 0

Housing Completions/ Units sold 0 0 0

Phase 1 Site Improvements

Entitlements Obtained 0 0 0 1 0 0 0

Phase Construction Starts

Phase 1 0 0 0 0 0 0 0

Phase 2 0 0 0 0 0 0 0

Phase 3 0 0 0 0 0 0 0

Phase 4 0 0 0 0 0 0 0

Phase 5 0 0 0 0 0 0 0

=32 qtrs, 8 years, 32 sales/qtr

Community Center Start 0 0 0 0 0 0 0

Commercial Completion 0 0 0 0



Site Construction Period (Qtrs) 35



Notes:

Note 1: Allowable range is from 1 to 4 quarters

Note 2: Units sold per quarter, must be higher than 10 units

Note 3: Computed Phase Triggers are (remaining DU inventory):

Phase 1 Entitlements plus 1 year

Phase 2 860

Phase 3 655

Phase 4 450

Phase 5 246

Note 4: Minimum time allowed is 1 year + 2 quarters

ard Area Planning Association sales B16 is total dweling units









L BUILD CYCLE UNIT QUANTITY BY PHASE

2 3 4 1 2 3 4 5

50% 0% 0% 205 205 205 204 205





Year 3 Improvements Year 4 Q3 sales Year 5

Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

8 9 10 11 12 13 14 15 16 17 18

0 0 0 0 0 0 32 32 32 32 32

1,024 992 960 928 896 864

0 0 0 0 0 0 32 32 32 32 32

0 0 0 0 0 0 0 32 32 32 32

0 0 0 0 0 0 0 0 32 32 32

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 32 32 32





0 0 0 0 0 0 0 0 0 0 0





1 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0





0 0 0 0 0 0 0 0 0 0 0

1,024





Year 5 Year 6 Year 7 Year 8

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

19 20 21 22 23 24 25 26 27 28 29

32 32 32 32 32 32 32 32 32 32 32

832 800 768 736 704 672 640 608 576 544 512

32 32 32 32 32 32 32 32 32 32 32

32 32 32 32 32 32 32 32 32 32 32

32 32 32 32 32 32 32 32 32 32 32

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

32 32 32 32 32 32 32 32 32 32 32









0 0 0 0 0 0 0 0 0 0 0

1 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 1 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0





0 0 0 0 0 0 0 0 0 0 0

Year 8 Year 9 Year 10

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

30 31 32 33 34 35 36 37 38 39 40

32 32 32 32 32 32 32 32 32 32 32

480 448 416 384 352 320 288 256 224 192 160

32 32 32 32 32 32 32 32 32 32 32

32 32 32 32 32 32 32 32 32 32 32

32 32 32 32 32 32 32 32 32 32 32

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

32 32 32 32 32 32 32 32 32 32 32









0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 1 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 1 0 0





0 1 0 0 0 0 0 0 0 0 0

Year 11 Year 12

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

41 42 43 44 45 46 47 48 49 Totals

32 32 32 4 32 996

128 96 64 60 28 0 0

32 32 32 4 32 28 0 1,024

32 32 32 32 4 32 28 1,024

32 32 32 32 32 4 32 28 1,024







32 32 32 32 32 4 32 28









0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0





0 0 0 0 0 0 0 0 0

0





0

0

0



0



0





0



0

0

0

0



0

0

0

0

0



Related docs
Other docs by xiuliliaofz
Dreaming
Views: 2  |  Downloads: 0
Maurice White BDSc Melb
Views: 0  |  Downloads: 0
article-7901
Views: 0  |  Downloads: 0
Application - City of Laramie
Views: 0  |  Downloads: 0
Project Outline - TeacherWeb
Views: 0  |  Downloads: 0
NSSE EDUCATION
Views: 0  |  Downloads: 0
me344_f03
Views: 0  |  Downloads: 0
Experiment_11a
Views: 0  |  Downloads: 0
CHAPTER 16
Views: 0  |  Downloads: 0
Distributed Data Base Systems
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!