APPENDIX 3









CASE STUDIES

1 Demand Responsive Transport Schemes (Countywide)

2 Worthing Station Enhancements

3 Cycling - Worth Way & Worthing Sea Front

4 East Grinstead Town Centre Enhancements

5 Burgess Hill Town Centre Enhancements

6 Bognor Regis Town Centre Enhancements

7 School Travel/Safer Routes to School (Countywide)

8 Council Travel Plan

9 Parking in Horsham

10 Traffic Information & Control Centre

11 Road Safety Education,Training & Publicity (Countywide)

12 Bognor Regis Home Zone

13 Intelligent Transport Schemes (Countywide)









Case Study Locations East Grinstead

43



9 Horsham







1 Midhurst

Travel

Centre Burgess Hill

5









2 Worthing

10 Chichester 3

8 6 Bognor Regis

12









120

APPENDIX 3



CASE STUDIES These schemes have proved equally popular. Increased demand

for Service 99 has resulted in a larger low-floor vehicle being

1. DEMAND RESPONSIVE TRANSPORT SCHEMES introduced.



Funding: Rural Bus Challenge Funding - £466,000 to Bookings for all these services are accessed through the Travel

set up and operate DoRIS for two years. We receive Centre in Midhurst – which is currently processing 3,000

around £800,000 pa Rural Bus Grants and provide bookings per month. The centre is now also co-ordinating the

£120,000 pa to our Accessible Transport Schemes. bookings for Surrey’s Demand Responsive Services in Tandridge

and Mole Valley and has recently won commercial contracts to

Description of Schemes deal with bookings for community bus services run by Surrey and

East Sussex County Councils.

DoRIS (a demand responsive service) was launched in September

2003, to serve residents in the vicinity of Midhurst and Petworth.

Surveys carried out in the Midhurst area as part of the EU Benefits for LTP Objectives

SAMPLUS project showed an appreciable number of households Choice - These services are playing an important role in widening

without a car and many more with only one car leaving other travel choices for residents in rural Sussex. Customer satisfaction

members of a household stranded at home when the car is in use. surveys show that 98% of passengers using DoRIS are satisfied

with the service and the price of the fare (Feb 2004).

The service operates using a combination of fixed and flexible

routes. The buses can divert from the main routes within pre- Environment - Passenger surveys indicate that 22% of people

determined limits, so passengers have as short a walk as possible travelling on Route 100, and 35% of people travelling on

to the pick-up point/bus stop.They can also be set-down as near DoRIS/Route 99 would have made the same journey by car

as possible to their destination along the same route. (2003/04). (Feb 2004)



The key to the success of the service is the Travel Centre, based Accessibility – These services improve access to services and

in Midhurst, which is responsible for taking passenger bookings. facilities for all, whether or not they have a car available. 18% of

The reservation clerks at the Travel Centre use state of the art the passengers using DoRIS and 11% using Route 99 stated that

technology to transfer passenger bookings to the bus drivers in they didn’t or couldn’t make the same journey prior to the

real time. introduction of these services. Three quarters of passengers

surveyed stated that they did not have a car available for the

The service has been a major success story in a large rural area journey they were making. (Feb 2004)

where there are few commercially operated bus services.

Patronage has grown so strongly that a second vehicle has now

been introduced, which has also reached capacity. The total

number of trips undertaken in 2005/06 exceeded 17,000. In

contrast, in its last month with a fixed route, about 10% of this

number used the previous conventional bus service. DoRiS will

be expanded to include Fernhurst, Cocking and Henley in June

2006.



The maximum adult DoRiS fare is £1.50. Children aged 5-15 and

holders of a Sussex County Card travel at half the adult price.

Under fives travel free.The buses are fully wheelchair accessible.



Other similar services which have been set up include Bus4U

(launched in 2004/05) operating in the

Petworth/Ashington/Storrington area, Route 99 (launched in

2002/03, initially as a semi-flexible service) operating between

Petworth and Chichester, and South Downs Route 100 (launched

in 2003).



A new flexible pre bookable service has recently been introduced

serving Billingshurst and surrounding villages and communities,

providing links to other transport services, access to shops,

leisure, health facilities and education. This is run through our

Midhurst Travel Centre and is part of our wish to improve

accessibility for rural areas.







121

APPENDIX 3



2.WORTHING STATION ENHANCEMENT During the 3-year period prior to implementation there were 22

road casualties (7 drivers, 1 passenger and 14 pedestrians). 10

A partnership project utilising LTP funding, providing better months after scheme implementation this figure was 1.

access to Worthing Central Station. The arrangements for

pedestrians, bus users, cyclists and mobility impaired people were

unsatisfactory and the area suffered from congestion and a poor Delivery of LTP Objectives:

road safety record. Choice – Encourages greater use of rail and promotes access to

the station by sustainable means.

The following improvements were provided:

Safety – casualties on access routes much reduced.

■ Re-positioned bus stops to enable passengers to wait in the

shelter of the station canopy and to reduce the need for

Integration – Improved integration of rail service with walking,

passengers to cross moving traffic to board the bus.

cycling, bus and taxi modes.

■ Clear drop-off point and improved station concourse;

Economic Performance – Lower levels of congestion in

■ Repositioned taxi rank to allow good access, especially for

vicinity.

people with disabilities;



■ Traffic signal controlled junction at Oxford Road/Teville Road Environment – Improved visual appearance, with greater

to improve access from the station area and reliability of bus priority given to those using sustainable modes.

and taxi services, with full pedestrian crossing facilities and an

advanced cycle stop line; Accessibility – Level access provided across the forecourt.

Over 80% of wheelchair users thought that access to the rail

■ Improved overall visual appearance of the station station had improved.

environment.



These measures integrate with the Bus Quality Partnership for

Worthing. This includes selective vehicle detection for buses on

traffic signals at junctions, passenger information systems and

improved waiting/boarding facilities at bus stops. The scheme cost

in the region of £300,000.



A questionnaire survey of public transport users at the station

revealed that:



■ 95% thought that safety on the access roads had improved,

and 83% that congestion had reduced;



■ 94% thought that safety outside the station entrance had

improved;



■ 87% thought that the attractiveness of the station had

improved;



■ 97.% thought that the new crossing points had improved

pedestrian safety.









122

APPENDIX 3



CYCLING The scheme cost £310,000 and there were contributions from,

Worthing BC, Section 106 and the DfT Cycle Projects Fund.

3.WORTH WAY & FOREST WAY CYCLE ROUTE

The scheme was supported at consultation by2/3 of respondents

Between 1997 and 2002 we carried out work on the old East at both concept and design stage.

Grinstead to Three Bridges railway. The resulting 7 mile long

Worth Way forms a valuable wildlife corridor and a shared use Opened in July 2004, the track is well used by walkers and cyclists,

route for walkers, horse-riders and cyclists. A second route, with over 300 cyclists and 800 pedestrians each day.

Forest Way, was implemented from East Grinstead to

Groombridge, in conjunction with East Sussex County Council.









These routes, are linked through the centre of East Grinstead, via

the town centre 20mph zone, and are designed as part of the

National Cycle Network status by Sustrans, who helped with DELIVERY OF LTP OBJECTIVES:

funding and construction, and form part of route 21 from London

to Eastbourne. Other partners included Crawley Borough Choice – Promotion of cycling.

Council, Mid Sussex District Council and Eurobell.

Safety – Much of the Worth Way route is off-road, providing a

Total cost of the scheme was £1.2 million. safe environment for cyclists. The Worthing scheme provides a

safer alternative to the busy Brighton Road.

WORTHING SEA FRONT CYCLE ROUTE

Environment – Worth Way cycle track provides a safe

2.3 km of cycle track convenient route for pupils at Imberhorne School, encouraging

from the east of use of a sustainable transport modes for the journey to school.

Worthing Town Centre During summer months around 100 school children use the route

to Lancing. The scheme every day.

forms Phase I of a three

stage scheme to

complete the National

Cycle Network Route 2

in West Sussex.









123

APPENDIX 3



4. EAST GRINSTEAD TOWN CENTRE A survey of town centre visitors/users revealed that:

ENHANCEMENT ■ 95% thought the visual appearance of the town centre had

Developed, in partnership with Mid Sussex District Council and improved;

East Grinstead Town Council and local traders, to make East

■ 51% thought pedestrian safety in the town centre had

Grinstead town centre more attractive and safer for pedestrians

improved;

whilst retaining existing vehicular access. Full pedestrianisation

was discounted due to the inability of the surrounding road ■ 72.% thought wheelchair and pram access had improved;

network to take diverted traffic and the access requirements of

■ 73.% thought access to the town centre by public transport

residents and traders.

had improved;



Street lighting improvements bring the level of lighting up to ■ 82% thought access to the town centre by foot had

modern standards and improve the quality of the CCTV coverage improved;

at night. Work on the scheme commenced in October 2002 and

■ 71% thought access to the town centre by bicycle had

was completed in May 2003.

improved;



The scheme included: ■ 78% thought the new traffic calming features had reduced the

speed of cars;

■ Traffic calming features to encourage motorists to keep to

the new 20mph speed limit; ■ 77% thought their journey to East Grinstead had improved;



■ New crossing points for pedestrians, including a new zebra ■ 76% thought that overall, the scheme had made the town

crossing; widened footways at several locations to give more centre safer and more pleasan; and

space to pedestrians and reduce traffic speeds into side ■ 79% thought that overall, the scheme had addressed the

roads and a new wide paved area for community use or needs of local people.

street markets;



■ A ramp to help people with mobility difficulties between the Delivery of LTP Objectives:

upper and lower walkways; Choice – Improved environment for pedestrians, cyclists and

■ Semi-mature tree planting to soften the street scene; new public transport users.

walling around the flowerbeds and new seating; new block

paving in front of the flowerbeds to match the upper Safety – Personal safety improvements due to lower speeds.

walkway;

Integration – Improved integration of buses into the town

■ New bus stops in London Road and Railway Approach; centre.

■ New decorative street lighting.

Economic – an informed freight quality partnership enabled

During the 3-year delivery problems to be addressed, with additional loading bays

period prior to scheme provided.

implementation the

average casualty rate in Environment – Promotion of sustainable travel modes with

this study area was 11.3 priority being given to non-car users, streetscape improvements

(16 drivers, 10 and and air quality benefits.

passengers and 8

pedestrians). This Accessibility – Increased access to services and facilities for the

reduced significantly mobility impaired.

after the scheme was

completed to around 3. The scheme was commended by the RTPI in its annual design

awards.

The proportion of vehicles driven at under 20mph has

significantly increased and there are no speed enforcement issues.

The scheme cost nearly £1m (including £430, 000 from partners).









124

APPENDIX 3



5. BURGESS HILL TOWN CENTRE ENHANCEMENTS The overall cost of the scheme was £308,000, of which £65,000

came from the Town Council and £47,000 from developer

We worked with Burgess Hill Town Council on a range of contributions.

schemes, from small routine highway maintenance works up to a

large scale engineering project.

Delivery of LTP Objectives:

Routine highway maintenance activities and their budgets are Choice – Improved environment for pedestrians within the town

delegated to the Town Council to undertake with their own centre and for pedestrians and cyclists on the journey to school.

workforce. They carry out weed control, road sign and bollard

cleansing, removal of low tree growth, weeding of tree wells, and Safety - Personal safety improvements through improved

maintenance of planted areas within the highway. The Town lighting.

Council contributes additional funding for an enhanced service

and uses the local knowledge of parish councillors to target Economic – Maintenance of the local road network to a high

problem areas. standard, resulting in high public satisfaction.



The Town Council sends out letters to residents, keeps an eye on Environment – Streetscape improvements.

public utility activities in the town and generally acts as local eyes

and ears. The resulting high level of local ownership and Accessibility - Street furniture was designed to cater for the

community pride can be seen in a noticeable improvement to the needs of disabled users.

street scene. Complaints regarding highway issues are markedly

lower than in other parts of the County and we want to role out

this model wherever we can.



The Twittens

Project - a twitten

being a Sussex

term for an urban

footpath remote

from a road. Over

a period of time

parts of the rural

public rights of way

network were consumed within a growing urban area. By

combining county and parish funds the team has upgraded these

footpaths to encourage walking and cycling and to provide Safer

Routes to School.



The most

significant part of

this work the

refurbishment of

the town’s

pedestrianised

shopping area,

known as Church

Walk. This was

o r i g i n a l ly

pedestrianised

over 30 years ago

and was showing

its age.We needed to repave the area and the Town Council was

not only heavily involved in the design of the scheme but made a

contribution so that higher quality materials could be used. The

result is a very attractive shopping area with high quality paving,

new streetlights and street furniture such as seats and hanging

baskets.









125

APPENDIX 3



6. BOGNOR REGIS TOWN CENTRE In the 3 years before the start of

ENHANCEMENTS the scheme (2000 - 2003) there

were 8 Personal Injury Accidents in

A part-pedestrianisation scheme in the 1980’s had left the High London Road/High Street/York

Street heavily trafficked. Efforts to regenerate the town Road. For two years since the

highlighted the poor shopping environment and lack of scheme (1/3/04 - 28/2/06) there

connectivity for pedestrians between shops and seafront. have been just 3. This was not a

casualty led scheme but has

A scheme for the High Street was designed to:

demonstrated clear benefits. An

attitudinal survey will be

undertaken early in 2007 to

coincide with the 3 year

anniversary of completing the

scheme.





Delivery of LTP Objectives:

Choice – Improved environment for pedestrians and bus users.



Safety – Personal safety improvements through lower speeds.





■ Create a coherent, high quality environment, with a strong Economic – designed to improve town centre viability.

local identity and sense of place;

Environment – streetscape improvements and air quality

■ achieve streets and spaces which respect the history of the benefits.

area whilst looking to the future;



■ reduce conflicts between pedestrians and vehicles; and Accessibility – Increased access to services and facilities for the

mobility impaired.

■ improve facilities for bus users and the disabled.



The scheme cost £550,000.



Pedestrian movements through the High Street were improved

through re-aligned footpaths and increased widths. Improved

access for people with mobility impairments; improved road

crossing facilities and vehicular speed restrictions were

introduced through signage and threshold design devices.



To improve the

night time

experience of

the town centre

we placed new

light fittings on

the buildings,

feature lights at

the gateways,

banner poles,

up-lighting to

trees and lights

within the tree canopies. To encourage social activity areas for

street cafe space were designed into the scheme with widened

pavements and space for organised events and informal

performances.Additional trees soften the views and add seasonal

change. The tree positions were co-ordinated with CCTV

positions and the species have light foliage, a small canopy and are

tolerant of salt air.







126

APPENDIX 3



7. SCHOOL TRAVEL/SAFER ROUTES TO SCHOOL Thakeham Village Primary School - An example of

Improving Accessibility

We work with schools,Young Transnet, our Youth Committee and

our Education Service on transport issues. Parents of children travelling to Thakeham Primary School were

put off walking to school because they had to negotiate the busy

Our School Travel Plan Team, brings together the School Travel B2139 that had no footpath.

Advisory Service, Schools Transport and Safer Routes to School

to encourage sustainable, healthy and safe travel to schools across

the County.



To secure quality travel plans and changes in travel behaviour we

developed an accreditation scheme that grades plans in 3 levels.

This process has helped deliver the Healthy Schools initiative

across the County (72 schools now accredited).









Before After



The school prepared a travel plan that identified that over 50% of

pupils would prefer to walk as opposed to the 4% who actually

were. A new rural footpath was provided which runs along the

edge of a local field completely avoiding the road and the numbers

walking immediately rose to over 25%.The scheme has been

welcomed by the rest of the village community and has improved

Children of Lyndhurst First School and their new crossing access to local services.



By the end of LTP1, 232 schools have submitted travel plans. Of The scheme cost around £60,000.

these, 154 plans were at Travelmark accreditation level 1, 8 with

level 2 and two at the top level.



We have introduced safer routes to school measures at 80

schools including 12 safety zones, 10 new entrances and new cycle

parking at 30 schools.



Our new Local Area Agreement (LAA) includes stretch targets

for cycling and walking to school and for bus patronage. Though

not primarily casualty driven, savings have been achieved through

our Safer Routes to School measures with excellent rates of

return being achieved.









127

APPENDIX 3



8. COUNCIL TRAVEL PLAN Delivery of LTP objectives:



We have invested in our Staff Travel Plan both to encourage Choice – promotion of cycling, motorcycling, car-sharing and

sustainable travel and provide a good practice example to other public transport use, by making it more affordable, providing

businesses in the County. appropriate facilities and promoting the benefits.



This has involved: Safety – Through driver training programmes.



■ Encouraging staff to use pool vehicles, where car is Environment – Encourages use of more sustainable transport

the only practical option. In 2005, we demonstrated the modes for journeys to work and business travel.

financial benefits of LPG vehicles, saving £9,000 from our car

mileage budget. This was spent for staff Travelwise measures. Accessibility – Provision of adult cycle training for staff with

■ Car park management measures to reduce short Special Educational Needs. Use of technology (through

distance lone car commuters. We introduced car share www.westsussex.org.uk) to make car-sharing more accessible.

bays and a charging scheme implemented in 2006, with staff

paying between £100 and £200 pa for entry to the car park.

Income will be used for further staff Travelwise initiatives.We

have developed and promoted our internet car share scheme

(www.westsussexcarshare.com) together with a separate

system for staff based at schools. We currently have 120 staff

registered (with about 670 in the public scheme). Current

performance suggests that the scheme is saving 250,000

miles per year and reducing annual CO2 emissions by over

50 tonnes.



■ Driver Awareness Training aimed at high mileage car

drivers with 2 or more blameworthy crashes during an 18

month period. Over the last 5 years we have run 18 courses

for 144 staff. In addition, younger staff are given the option

of attending our Young Driver Training course, funded from

our PSA.



■ Cycling and Motorcycling – We supported national

Bike2Work day events throughout the life of the plan. We

worked extensively with Evans Cycles who have attended

many of our events and undertaken bike safety checks as part

of our biker breakfast events. During spring 2003, the

County Hall staff shower facilities were upgraded and

expanded and opened on Bike2Work day. To further

encourage cycling on business journeys we have invested in

three pool bikes and increased our cycle mileage allowance

in line with the Inland Revenue tax threshold. In addition, we

reviewed our motorcycle/scooter loan criteria by linking this

to insurance grouping rather than engine capacity. This

enabled staff to select from a broader range of Powered Two

Wheelers. We have made improvements to covered bicycle

and motorcycle parking at County Hall, and introduced cycle

racks, motorcycle parking and pool bikes at our new office in

Bognor. Over the last 5 years we have supported 20 bike

loans and 4 motorcycle loans and 94 passenger transport

season ticket loans.



■ Rail – We offer staff interest free loans to assist with the

purchase of tickets. Staff can now claim back the cost of a

rail Network Card, provided that the savings made on

business journeys covers the cost of the card. Staff can also

use the card for private journeys.









128

APPENDIX 3



9. PARKING IN HORSHAM

Throughout the Plan period we continued to introduce CPZs and

develop strategies for public parking with our District Councils to

manage traffic. The work in Horsham demonstrates how a

package of measures can achieve the best results.









After - Example of how CPZ has been effective in reducing on-street all

day parking



■ Variable Message Signing across the town – to provide

information about parking availability.



■ The introduction of Local Authority Parking

New Horsham Bus Station Enforcement (Jan 2006).



■ Park-and-Ride - Hop Oast Park-and-Ride opened in Delivery of LTP objectives:

October 2002. 6 buses an hour terminate at a new-state-of-

the-art Bus Station, which was opened in March 2003 with Choice – Provision of a high quality bus service into the town

developer funding. The Park & Ride service has proved very centre.

successful and was used by 82,000 passengers in 2004/05.

Safety – Effective enforcement reduces incidents of

A survey of users (March 2004) showed that 75% used the inappropriately parked vehicles.

service due to ‘convenience’, 59% because of the ‘cost’ and

39% due to limited parking in the town centre. 94% of users Economy – Increased availability of short stay parking around

were satisfied with the service, and 72% stated that they the town centre, for shoppers and visitors.

would like to see more park and ride facilities in West

Sussex. Environment – Encourages use of more sustainable transport

modes for journeys to the town centre. Less circulating traffic

■ Management of on-street and off-street parking – In searching for a parking space. Visual improvement and streetscape

June 2003, a Controlled Parking Zone (CPZ) was introduced enhancements to streets around town centre.

in Horsham Town Centre. This was designed to stop all day

commuter parking in the town, whilst improving conditions Accessibility – Appropriate parking provision for residents in

for residents. At the same time off-street charges were residential areas. Greater availability of disabled parking bays

increased to encourage use of the park-and-ride scheme and through enforcement. Improved short-stay parking availability

more sustainable modes. around Horsham Hospital.









Before - Example of parking in Horsham









129

APPENDIX 3



10.TRAFFIC INFORMATION & CONTROL CENTRE

As the number of our ITS systems increased it became apparent

that the systems would provide better value for money if

managed and maintained in an integrated manner. This not only

ensures that systems are fully utilised and maintained, but also

assists our response to the requirements of the Traffic

Management Act (2004).



An opportunity arose with refurbishment of one of the Council’s

main offices. The Travel Information and Control Centre was

completed in December 2005, with a full-time operator starting

in March 2006.





Benefits of the Control Centre:

To enable the integration of ITS systems to achieve improved

management of the transport network and to facilitate the co-

ordinated dissemination of reliable information to the travelling

public. Data is collated and analysed within the Centre and

information disseminated via the website and, in time, by the

media and variable message signs.





Other benefits

■ Highways and Transport Area Offices – weather

observation/‘Snow watch’



■ District/borough Councils – sharing of CCTV functionality



■ Emergency planning and response – integration with the

Council’s emergency centre and links with the emergency

services



■ Integration with neighbouring authorities and other agencies

(e.g. Highways Agency)



UTMC Compliant Common Database

A Common Database based on Urban Traffic Management and

Control (UTMC) standards brings together the data from the

stand-alone ITS systems in order to achieve improved

management and the co-ordinated collation of information. This

enables the exchange of data between the Council, neighbouring

authorities and third parties, as well as providing improved map-

based information via the Council’s website.





Benefits to Customers (road users)

The establishment of the Centre allows us to share up-to-date

information on the condition of the road network including road

traffic incidents and congestion hotspots. The availability of

reliable information will enable the public and businesses to make

informed, planned decisions on when and how to travel and/or

any extra time that might be required for their journey. From a

commercial point of view, businesses should benefit from more

efficient delivery of goods by identifying the best route to take

and avoiding congestion hotspots.









130

APPENDIX 3









New Traffic Control and Information Centre layout









Control Centre in operation









131

APPENDIX 3



11. ROAD SAFETY EDUCATION,TRAINING AND This was boosted by a series of high profile assessment days

PUBLICITY funded from our pathfinder status, as reported in the Surveyor.



Priority activities for education have been: In addition, we undertook publicity campaigns to give guidance on

avoiding risks and worked closely with Sussex Police at known

■ footsteps - a training programme for child pedestrian safety.

rider gathering points. We now work in partnership with Sussex

Over 2,550 pupils received Footsteps training.

Police to run an ongoing BikeSafe scheme, so the Pathfinder

■ cycle training - offered to all primary schools across the project continues on a permanent basis.

county. Nearly 35,000 children participated.



■ walking bus - new schemes were introduced.



■ driver training - expansion of training includes pre-driver,

employee, mature drivers and our driver improvement

scheme run jointly with Sussex Police.



■ motorcycling - rider assessment schemes. 58 people were

assessed.



■ speed commitment - widespread participation in

conjunction with community speed watch and engineering

schemes (around 20 communities each year).



■ publicity - 44 campaigns targeting drivers and motorcyclists

were undertaken.



■ senior drivers assessment programme - a joint scheme

with primary care trusts to assess senior drivers and to

advise their GPs



■ young driver training scheme - this focussed on the

highest risk user group, and has involved over 1,200 17 – 25

year olds. Feedback from drivers on the course indicates that

attitudes to risk and speed awareness can be significantly

improved, with the potential to lower the likelihood of

involvement in crashes.









Motorcycle Assessment Scheme









Young Driver Training in action at Goodwood



In 2003 the percentage of fatalities from motorcycles was 15% but

in 2004 it was almost 26%, almost exclusively on machines in the

600cc-1000cc range. Actions to reduce casualties amongst

motorcyclists included encouraging more training for riders of all

ages, particularly for people returning to motorcycling after a

break.









132

APPENDIX 3



12. BOGNOR REGIS HOME ZONE

Our first Home Zone scheme was in Bognor Regis and cost

£510,000.



A steering group of residents,Town, District and County Council

representatives, the emergency services, local schools, and local

groups oversaw the project. Following extensive consultation, the

vast amount of residents supported the introduction of the Home

Zone.



Extensive consultation included leaflet distribution to all homes in

the area; establishment of a local resident’s group, exhibitions and Bognor Regis Home Zone area ‘After’

workshops, household and business surveys and ‘design a logo’

Delivery of LTP Objectives:

competition. An important aspect of the scheme was to engage

the community throughout design and development. Choice – 54% of residents in the Home Zone now walk or cycle

more often.

There’s been a dramatic

transformation of the Safety – Casualty rates are improving. Most Home Zone

street scene from the residents feel safer walking (70%), cycling (60%) and crossing the

traditional road flanked road (76%). Fewer residents in the Low Speed Zone consider

by pavements with traffic speeds to be a problem (90% in 2002, 80% in 2005).

indiscriminate parking

to a new, safer, Environment – Priority is given to pedestrians and cyclists in

pedestrian friendly the Home Zone. Streetscape improvements mitigate the impact

landscape where cars are compelled to travel at speeds no higher of transport. Fewer residents in the Low Speed Zone perceive

than 10mph. There are over 35 roads within the Home Zone traffic noise to be a problem. (50% in 2002, 40% in 2005)

incorporating low-speed zones of 20mph.



The injury accident rate for the area has fallen, in particular the

number involving children (a principal objective of the Zone).



In the three years prior to work there were 41 injury accidents

in the Low Speed Zone and Home Zone area, 16 of which

involved children. In the 13 months since completing the scheme

there have been 6 injury accidents, 1 of which involved a child.

There have been no injury accidents in the Home Zone.



The scheme has been completed too recently to make firm

conclusions, on the accident data but the early indications are

encouraging.



Extent of Scheme and Safety Zone incorporating

4 schools









Bognor Regis Home Zone area ‘Before’









133

APPENDIX 3



13. INTELLIGENT TRANSPORT SCHEMES Delivery of LTP objectives:



Our ITS Strategy covers applications for traffic management, Choice - provision of information to the travelling public to

payment systems, public transport management and information enable better travel choice and better bus facilities

systems, and supports a number of related transport strategies

including our Passenger Transport and Road Safety. Safety - better signing and traffic control reduces conflicts





To spread the costs schemes are phased in, such as with Real Time Environment - reduction in unnecessary car travel through

Passenger Information (RTPI). The first phase covered buses better information and technology

operating out of Stagecoach’s Worthing depot and twelve on-

street displays. Subsequent phases will take in other coastal Accessibility - good information improves access to town

towns. centres by all modes.





The introduction of car park variable message signs in Worthing,

Crawley and Horsham has been successful. They were

implemented in partnership with the relevant district/borough

councils, with installation and ongoing maintenance jointly funded.



■ We started in Worthing in 2002. At 4 car parks we located

12 LED signs at a cost of £116,000.









■ Next was Crawley in 2003. At 4 car parks (NCP and County

Mall Shopping Centre), we located 11 LED signs in the town

centre at a cost of £117,000.









■ Most recent was Horsham District Council in 2004. At 4 car

parks, we located 11 LED signs at a cost of £99,000.



Information on the availability of spaces within car parks is

displayed on street via variable message signs and will be provided

on our Council’s website so that the travelling public can check

before leaving home.









134



Related docs
Other docs by xiang
The Parable of the Rich Fool
Views: 23  |  Downloads: 0
14838-Nat.Equest Summer 08-2
Views: 7  |  Downloads: 0
kompendium_februar_01
Views: 1  |  Downloads: 0
Antimikrobielle Wirkung ausgewhl
Views: 2  |  Downloads: 0
Vietnamese BULLETIN vietnamien
Views: 1  |  Downloads: 0
Information Retrieval Models and
Views: 19  |  Downloads: 0
Download our Menu - Aveda Institutes
Views: 2  |  Downloads: 0
Journ茅e mondiale de l'hydrograph
Views: 2  |  Downloads: 0
SJSAS
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!