					           IGG Agenda – 29th November 2007

    •      Minutes from last IGG meeting             10.00 – 10.10
    •      Review of Action Items                    10.10 – 10.20

    •      CER Update                                10.20 – 10.30

    •      Gemserv Update                            10.30 – 10.40

    •      Market Operations Update                  10.40 – 10.50

    •      Networks SEM Update                       10.50 – 11.20



    •      Retail Market Design Service Update       11.20 – 11.30


    •      Market Design Update                      11.30 – 11.40



    •      Next Steps                                11.50 – 12.00




                                                 1                   Secretariat: RMDS
IGG Industry Governance Group                                        www.rmdservice.com
                                Minutes




• Minutes from IGG meeting – October 18th 2007




                                   2             Secretariat: RMDS
IGG Industry Governance Group                    www.rmdservice.com
                                Action Items


  •   Actions Addressed in Advance of Meeting
  •   Update on Action Items
  •   Actions to be covered during remainder of presentation
  •   Actions to be carried forward
  •   Other Action Items




                                     3              Secretariat: RMDS
IGG Industry Governance Group                       www.rmdservice.com
             Action Items addressed in advance of meeting
                          (closure proposed)


  • Action Item 54

      To address at a future IGG (to be specified) E. Barr’s query about the

      implications of a potential future change to DST.




                                          4                           Secretariat: RMDS
IGG Industry Governance Group                                         www.rmdservice.com
            Action Items addressed in advance of meeting
                         (closure proposed)


  • Action Item 74
      Use the Transactional Code Change Requests template to document
      request for 10 (plus 6) new Meter Category Codes

  • Action Item 148
      Participants to communicate to RMDS any problems with messages arriving
      in the in the incorrect order or not at all


  • Action Item 150
      Receive feedback on DR 126 Changes to ARIS Data Definitions by the next
      Conference call




                                       5                         Secretariat: RMDS
IGG Industry Governance Group                                    www.rmdservice.com
        Action Items addressed in advance of meeting
          (SEM Cutover Actions - closure proposed)


• Action Item 161

    SEM to advise participants on the status of the Extranet upgrade
• Action Item 162
    Participants to install Release 14.0 of the MPCC and Webforms on their test
    MPCCs by Tuesday 23rd October
• Action Item 163
    Participants to feedback comments on the percentages to be used for the SLA
    for Actual/Estimate Flag on Aggregation messages by cob 22nd October
•    Action Item 164
    Carry out a ‘go-live’ Data Verification exercise with Retail Market Participants



                                           6                            Secretariat: RMDS
IGG Industry Governance Group                                           www.rmdservice.com
        Action Items addressed in advance of meeting
          (SEM Cutover Actions - closure proposed)


• Action Item 167
   Update cutover personnel by email and text on Sunday 28th, as to the progress

   of the SEM cutover.


• Action Item 168
   Reissue the RMDS Approach to Cutover document with updated tasks and
   timings.




                                        7                         Secretariat: RMDS
IGG Industry Governance Group                                     www.rmdservice.com
          Action Items to be covered later in the
                       presentation


• Action Item 156
   Give feedback on the impact the introduction of this new Universal Meter

   Category Code, has on the Change of MCC and Meter Reading processes
• Action Item 160

   Send KPMG Confidentiality Agreement to participants




                                        8                           Secretariat: RMDS
IGG Industry Governance Group                                       www.rmdservice.com
          Action Items to be covered later in the
               presentation (Market Design)
• Action Item 172
   Issue note to participants requesting feedback on the versioning of the 341
   market message


• Action Item 173
   Update the SoLR process to take account of the SoLR decision paper /07/171




                                         9                           Secretariat: RMDS
IGG Industry Governance Group                                        www.rmdservice.com
                        Update on Action Items


  • Action Item 7 (& Action Item 92) – RMDS to
    investigate the procedural issue whereby a duplicate
    MPRN is generated when a quotation is ‘rolled back’

       – Working Practice 13 has been issued by RMDS on 2nd
         November
       – Note that WP will be amended to clearly state that no de-
         energisation messages will issue
       – Feedback received




                                     10                       Secretariat: RMDS
IGG Industry Governance Group                                 www.rmdservice.com
                        Update on Action Items

  • Action Item 41 – Raise a DR to propose the initiation of
    the updates to the Central Market Systems of a QH to
    QH meter replacement at the same time as the MV90 is
    updated

       – Working Practice 16 has been issued by RMDS on 22nd
         November
       – Feedback awaited




                                   11                     Secretariat: RMDS
IGG Industry Governance Group                             www.rmdservice.com
                               Update on Action Items

  • Action Item 95 – Investigate the possibility of addressing
    inconsistencies between the DUoS rules and the MICs and
    DUoS Groups in the MPRN data.
  –   ESBN (Commercial) are preparing a proposal for submission to CER.
  –   Some figures are in the Table below:

      DUoS Group          Consumption Band (MWh)
                          C > 3501           C> 175, < 3502   C> 100, < 1753   MIC > 50 kVA
            DG1                        5                10               97
            DG2                        2                11               49
            DG5                       664              1801                            4256
            DG5A                 -                 -                                      1
            DG5B                 -                 -                                      2




       1   Broadly equivalent to QH threshold
       2 Broadly   equivalent to MIC 50kva
       3Broadly    equivalent to MIC 30kva

                                                          12                                  Secretariat: RMDS
IGG Industry Governance Group                                                                 www.rmdservice.com
                        Update on Action Items

  • Action Item 108 (& Action Item 159) – Issue Data
    Storage and Archiving Document to Market Participants

       – Originally issued on Thursday 22nd November and subsequently
         withdrawn
       – Updated version will be re-issued shortly




                                   13                      Secretariat: RMDS
IGG Industry Governance Group                              www.rmdservice.com
                        Update on Action Items

  • Action Item 117 – All Retail Market Participants who
    intend to use the QH Readings Processor software after
    SEM go-live should notify RMDS before July 26th

       – Formal e-mail issued to all MPs on 14th November 2007
       – All relevant Market Participants have responded confirming that
         the software is not in use at their sites
       – Next Steps: RMDS to propose formal de-commissioning of
         software to CER




                                     14                       Secretariat: RMDS
IGG Industry Governance Group                                 www.rmdservice.com
                        Update on Action Items

  • Action Item 131 – Establish the current status of the
      postcode proposals

       – Position unchanged since last IGG
       – Propose to close this item




                                    15              Secretariat: RMDS
IGG Industry Governance Group                       www.rmdservice.com
                        Update on Action Items

  • Action Item 144 - Review the ‘28 open issues’ from the
    Issues Log at the next conference call

       – 16 open issues

       – Long standing request to MPs to review Issues Log, no
         responses received so far

       – Next steps ?




                                    16                      Secretariat: RMDS
IGG Industry Governance Group                               www.rmdservice.com
                        Update on Action Items

  • Action Item 153 – Give a progress report on Year
    End Arrangements at the next IGG

       – Originally issued on 22nd November and subsequently withdrawn
       – Settlement calendar awaited from SMO




                                   17                      Secretariat: RMDS
IGG Industry Governance Group                              www.rmdservice.com
                        Update on Action Items

  • Action Item 156 – Update on ‘Universal Meter’ (3
    register meter)
     Awaiting outcome of Support Centre analysis. The
       likely approach is:
       – Conventional MCCs will be used i.e. 24hr. or Day/Night
       – The MCC requested will appear on the service order.
       – At new connection, the NT takes the appropriate readings and
         completes the service order.
       – ESBN will do a development to ‘force’ the meter characteristics
         into the relevant mode at completion in database depending on
         the MCC.
       – The Meter Reader will ‘see’ only the relevant registers on his/her
         handheld.                   18                         Secretariat: RMDS
IGG Industry Governance Group                                        www.rmdservice.com
                        Update on Action Items

  • Action Item 156 – Update on ‘Universal Meter’ (3
    register meter) (contd.)

       Change in MCC
       – Conventional MCCs will be used i.e. 24hr. or Day/Night
       – The MCC requested will appear on the service order.
       – The NT takes the appropriate readings and completes the
         service order.
       – On completion in database, the meter characteristics into the
         relevant mode depending on the MCC.
       – The Meter Reader will ‘see’ only the relevant registers on his/her
         handheld.
       Will update at next IGG.
                                      19                        Secretariat: RMDS
IGG Industry Governance Group                                   www.rmdservice.com
                        Update on Action Items

  • Action Item 165 – RMDS to raise the issue of meter roll-
    overs with ESB Networks

       – Examples of this problem provided to the Data Collector
       – Reply awaited




                                     20                      Secretariat: RMDS
IGG Industry Governance Group                                www.rmdservice.com
                        Update on Action Items

  • Action Item 166 – Raise a Discussion Request to
    prevent the use of estimate reads for a Change of
    Supplier

       – Draft DR 0152 issued to originator for review




                                     21                  Secretariat: RMDS
IGG Industry Governance Group                            www.rmdservice.com
                        Update on Action Items

  • Action Item 169 – Examine preventative measure with
    the message reconciliation and resending processes to
    ensure there are no exceptions over the Christmas
    period

       – A process of cross checking by both parties involved in this
         manual process was introduced when a problem was originally
         identified back in July
       – This process will be ongoing




                                    22                      Secretariat: RMDS
IGG Industry Governance Group                               www.rmdservice.com
                        Update on Action Items

  • Action Item 174 – RMDS to Advise IGG of assurance
    measures to detect issues with future schema changes
      by IPT stage

       – In the future, the Hub team will carry out extra tests prior to the
         issue of a new draft schema using a software tool:
            • a compare between the live schema and the new schema to ensure
              that the only differences are those covered by MCRs
            • To validate a sample of real XML messages against the draft
              schema
       – Incorporate dependency for sign-off on completion of internal
         Regression Testing in advance of commencement of IPT

                                       23                         Secretariat: RMDS
IGG Industry Governance Group                                     www.rmdservice.com
             Action Items to be carried forward

  • Action Item 24 (& Action Item 75) – DR 112 - New
    MPD 37 New Transmission Connected Sites

       – Meeting has been arranged to finalise the proposed changes to
         MPD 37




                                    24                      Secretariat: RMDS
IGG Industry Governance Group                               www.rmdservice.com
             Action Items to be carried forward

  • Action Item 39 – To get information on the volumes of
    readings that are currently rejected because they are
    outside of the tolerance ranges for the different DGs

       – In progress




                                25                Secretariat: RMDS
IGG Industry Governance Group                     www.rmdservice.com
             Action Items to be carried forward

  • Action Item 109 – New Commercial Policy required to
    cover Erroneous De-registrations

       – Draft Commercial Policy under discussion in ESB Networks




                                   26                      Secretariat: RMDS
IGG Industry Governance Group                              www.rmdservice.com
             Action Items to be carried forward

  • Action Item 10 – Prepare proposals on addresses in
    the Retail Market

       – Deferred until after SEM go-live at the request of the IGG




                                      27                       Secretariat: RMDS
IGG Industry Governance Group                                  www.rmdservice.com
             Action Items to be carried forward

  • Action Item 88 – Organise TAG meeting in Jan/Feb
    2008 to discuss MPCC architecture

       – Deferred until January at the request of the IGG


  • Action Item 89 – RMDS to contact NIE to discuss the
    EMMA architecture

       – Will be addressed in advance of January IGG




                                     28                     Secretariat: RMDS
IGG Industry Governance Group                               www.rmdservice.com
                                CER Update




                                    29       Secretariat: RMDS
IGG Industry Governance Group                www.rmdservice.com
                                Gemserv Update




                                      30         Secretariat: RMDS
IGG Industry Governance Group                    www.rmdservice.com
               Recalculation of Estimates
 • Existing
      – Recalculation only where present less than previous
      – Only as far back as present ceases to be less than previous

                                      Consumption History with Estimates

                                Actual Reading 1                       Actual Reading 2

                                                    Estimates



                                    A1         E1          E2   E3         A2


                                                                Time
 • Proposed
      – Recalculation of all estimates, subject to a significance threshold
      – DUoS tariff change flag

                                                   31                                 Secretariat: RMDS
IGG Industry Governance Group                                                         www.rmdservice.com
                     Market Operations Update




                                32              Secretariat: RMDS
IGG Industry Governance Group                   www.rmdservice.com
   Retail Electricity Market Issues
                Update




                     Cormac Madden, RMDS




                                      33
RMDS   Retail Market Design Service        www.rmdservice.com
              Retail Electricity Market Issues Log

•   Log continuing to issue on a weekly basis

•   Summary Statistics (as per last release – 28.11.07)

     –   Total Number of Issues Logged                    147

     –   Total ‘Closed’                                   131
     –   Total ‘In Progress’                               10
     –   Total ‘Being Monitored’                            1
     –   Total ‘Logged’                                     5


     –   Total Raised Since Last Issue                     0
     –   Total Closed Since Last Issue                     0




                                         34                     Secretariat: RMDS
IGG Industry Governance Group                                   www.rmdservice.com
  Retail Market Design Service Update




                         C. Madden, RMDS




                                      35
RMDS   Retail Market Design Service        www.rmdservice.com
          Retail Market Design Service Update



  • ESB Networks SAP-ISU outage on 18th November 2007

  • ARIS software upgrade




                                36           Secretariat: RMDS
IGG Industry Governance Group                www.rmdservice.com
          Retail Market Design Service Update

  ESB Networks SAP-ISU outage on Sunday 18th November 2007


            •    ESB Networks SAP-ISU and ESB Customer Supply SAP-ISU are
                 separate applications with separate data stores running on
                 separate processors but located within a single cabinet and
                 sharing the power supply and other services
            •    Unusually, this outage involved the common power supply
                 (memory upgrade to ESBCS SAP)
            •    A gap in the outage agreement procedure meant that ESBN did
                 not agree to the outage prior to its announcement.
            •    ESBN has taken this incident up with its IT service provider and
                 clarified the market impact
            •    A formal procedure has now been implemented to secure prior
                 agreement by the ESBN designated SLA holder to all future
                 planned outages

                                          37                         Secretariat: RMDS
IGG Industry Governance Group                                        www.rmdservice.com
                                ARIS Upgrade


  • Successful upgrade of ARIS software last week
  • About to launch new web features
       –   Improved Interface
       –   Increased Model Information
       –   Zooming and Full-Screen Mode
       –   Printing to PDF
       –   Simple Report
       –   Online Help




                                     38             Secretariat: RMDS
IGG Industry Governance Group                       www.rmdservice.com
                                39   Secretariat: RMDS
IGG Industry Governance Group        www.rmdservice.com
  Discussion Requests & Market Change
               Requests




              Susan Morrissey, RMDS



                                      40
RMDS   Retail Market Design Service        www.rmdservice.com
                  Market Change Request

  MCR 156 - Amending Generator Unit ID and
    Generation Unit ID

  •    Circulated on 31/10/07

  •    No Feedback received

  •    Approval Requested



                                41        Secretariat: RMDS
IGG Industry Governance Group             www.rmdservice.com
                  Market Change Request

  MCR 158 – Changes to ARIS Data Definitions

  • MCR circulated on Thursday 22nd November


  • Approval requested




                                42        Secretariat: RMDS
IGG Industry Governance Group             www.rmdservice.com
                        Discussion Request

  DR 0117 - Proposal to add Acceptance,
   Completion and Cancellation messages to
   Meter Works design

  • Feedback from one participant raised issues about the
    process for cancellation of Meter Works/De-
    energisations/Re-energisations
  • Further internal ESB Networks discussions ongoing
  • Valid ‘cancellation’ codes will be added to 131 message
    when the DR is re-circulated (Action Item 70)
                                43                 Secretariat: RMDS
IGG Industry Governance Group                      www.rmdservice.com
                Market Change Request
MCR 0154 – Versioning of the 341
Propose to rename the MCR from
    ‘Versioning of the 341’ to
    ‘Versioning of the Meter Data on the 341 Market Message’

Question raised – How will the MCR handle version numbers for import and
  export data
• Proposed Solutions for MCR 154
    – Solution 1 Provide a separate Version Number at the MPRN level for Import
      and Export data and a read replacement flag at the Channel Level Details which
      would indicate the channel being updated.
    – Solution 2 Provide a Version Number at the channel level. This would mean
      that the Import QH kW, Import QH kVAr, Export QH kW and the QH Export
      kVAr would each have a version number. The Read Replacement Flag would
      no longer be required as the version would indicate the reading being replaced.
Longer term raise a new DR to build a new message 342 for Export data only
   and use 341 for import data only.
                                     44                    Secretariat: RMDS
 IGG Industry Governance Group                             www.rmdservice.com
                  Market Change Request
DR 0113 Supplier of Last Resort Update
• The Supplier of Last Resort Decision (SoLR) CER/07/171 has
  impacted the Market Design Process in the following ways:
    No. CER 07/171 Impacts on MPD 4 SoLR Process
    1.    The Defaulting Supplier is given an undisclosed amount of time to
          rectify the issue. (This was previously a 5 day rectification period).
    2.    MRSO will supply the SoLR with the percentage market share of the
          defaulting supplier, within 1 working day of the Suspension Notice in
          the wholesale market.
    3.    The SoLR Supplier Unit is sent to the Market Operator.

    4.    The SoLR contacts affected customer within 5 working days of the
          SoLR Direction. Customers then have 14 working days to choose an
          alternative supplier at the end of the 5 day Contact period.
                                           45                           Secretariat: RMDS
IGG Industry Governance Group                                           www.rmdservice.com
                  Market Change Request
DR 0113 Supplier of Last Resort Update
• Issues still outstanding
      – The content of the CSV file to be issued to Suppliers and the
        SoLR.
      – How to handle MPRNs which are not currently practical to
        send in on an 010, for example, denergised sites, sites with
        meter works in progress etc,
      – The creation of a SoLR sub process to handle SoLR
        exceptions plus the interactions between ESB Networks and
        the SoLR along with issues such as disputed reads.




                                      46                       Secretariat: RMDS
IGG Industry Governance Group                                  www.rmdservice.com
    Prioritisation of MCRs/DRs for next schema
                       release


  Top MCRs/DRs
  • DR 117 - Proposal to add Acceptance, Completion and Cancellation
    messages to Meter Works design

  • MCR 0063 - Addition of New Market Message for the Provision of
    Reconciliation Data

  • MCR 0127 - Decouple Connection Agreement requirement from
    Change of Supplier where MIC >=100kVA and there is no Change
    of Legal Entity



                                  49                      Secretariat: RMDS
IGG Industry Governance Group                             www.rmdservice.com
                                Next Steps

  • Proposed Diary dates for subsequent meetings



       – 10.01.08 (Note: there will be a TAG meeting afterwards with a
          designated start time, covering the MPCC strategy)

       – 21.02.2008 – to be confirmed
       – 03.04.2008 – to be confirmed




                                        51                        Secretariat: RMDS
IGG Industry Governance Group                                     www.rmdservice.com
                                Next Steps

  • Propose to continue with conference call every two
    weeks – proposed dates

       -    13.12.2007
       -    03.01.2008 – Proposed date (note: 27th December call cancelled!)


  • Call details have new contingency PIN No:
       – Number: 01-6647602 PIN : 77640
       – Contingency number remains: 01-6647777 New PIN: 80490




                                       52                        Secretariat: RMDS
IGG Industry Governance Group                                    www.rmdservice.com
                                Thank You




                                    53      Secretariat: RMDS
IGG Industry Governance Group               www.rmdservice.com

				