CAPITAL IMPROVEMENT PROGRAM

City of Missoula CIP Project Request Form FY 2007-2011

1. Program Category: 2. Project Title: 3. Project No.: WW-11





Wastewater Facilities Russell Street Interceptor (6th - Idaho) Was WW-15 in FY06

4. Description: 7. Justification of Project and Funding Sources:

Reconstruction of an existing interceptor. The reconstruction of Russell Street will cause evaluation of the existing 21" to 30" Russell Interceptor

sewer line. Portions of the existing sewer are planned to be reconstructed or relined. Televised inspection

has rated portion of the pipe for relining or reconstruction.



5. Is this equipment prioritized in an equip- Funding would come from the Sewer R&D Fund.

ment replacement schedule?





Yes

No

N/A X





6. Site Requirements:









8. Schedule of Prior Spent in

Funding Sources Authorization Prior Years FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

Sewer R&D 50,000 450,000









Totals - - - - 50,000 450,000 -

9. Impact on Operating Budget First Year Succeeding Supplemental Cost Data

Operations Years

Personnel A. Land Cost

Supplies B. Construction Cost 400,000

Purchased Services C. Contingencies (10% of B) 40,000

Fixed Charges D. Design & Engineering (15% of B) 60,000

Additional Capital Outlay E. Percent for Art (1% of B) -

Other Costs F. Other Costs

Estimated Annual Debt Service

Total Annual City Cost - Operating Budget - - Total Capital Costs 500,000

11. Descriptions of impacts on Operating Budget:









Original Date Responsible Responsible

Submitted: 17-Feb-06 Person: Steve King Department: Public Works





Version 11/4/2011 7:35 AM CJK Total Score 45

CAPITAL IMPROVEMENT PROGRAM

Project Rating

WW-11

(See C.I.P. Instructions For Explanation of Criteria)

Qualitative Analysis Yes No Comments

1. Is the project necessary to meet federal,

state, or local legal requirements? This cri-

terion includes projects mandated by Court

Order to meet requirements of law or other X

requirements. Of special concern is that the

project be accessible to the handicapped.





2. Is the project necessary to fulfill a con-

tractual requirement? This criterion includes

Federal or State grants which require local X

participation. Indicate the Grant name and

number in the comment column.





3. Is this project urgently required? Will de-

lay result in curtailment of an essential ser-

vice? This statement should be checked

"Yes" only if an emergency is clearly indi- X

cated; otherwise, answer "No". If "Yes",

be sure to give full justification.





4. Does the project provide for and/or im-

prove public health and/or public safety?

This criterion should be answered "No" un-

less public health and/or safety can be X

shown to be an urgent or critical factor.





Raw

Quantitative Analysis Score Total

Range Comments Weight Score

(0-3)

5. Does the project result in maximum

benefit to the community from the 3 City Sewer R&D funds are being used for this interceptor replacement. 5 15

investment dollar?





(0-3)

6. Does the project require speedy

This project must be completed prior to site redevelopment and Russell and 3rd Street

implementation in order to assure its 2 4 8

improvements.

maximum effectiveness?





(0-3)

7. Does the project conserve energy,

cultural or natural resources, or reduce 2 Sanitary sewer reduces pollution. 3 6

pollution?





(0-2)

8. Does the project improve or expand

upon essential City services where such 2 4 8

Sanitary sewer is an essential City service.

services are recognized and accepted as

being necessary and effective?





(0-3)

9. Does the project specifically relate to the

City's strategic planning priorities or other 2 Sanitary sewer has been identified as necessary to a livable community. 4 8

plans?





Total Score 45



Related docs
Other docs by xiuliliaofz
Dreaming
Views: 2  |  Downloads: 0
Maurice White BDSc Melb
Views: 0  |  Downloads: 0
article-7901
Views: 0  |  Downloads: 0
Application - City of Laramie
Views: 0  |  Downloads: 0
Project Outline - TeacherWeb
Views: 0  |  Downloads: 0
NSSE EDUCATION
Views: 0  |  Downloads: 0
me344_f03
Views: 0  |  Downloads: 0
Experiment_11a
Views: 0  |  Downloads: 0
CHAPTER 16
Views: 0  |  Downloads: 0
Distributed Data Base Systems
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!