Embed
Email

BD Head in the Clouds Initiatives 101016 EN - Wikispaces

Document Sample

Shared by: xiuliliaofz
Categories
Tags
Stats
views:
0
posted:
11/3/2011
language:
English
pages:
30
Head in the Clouds

Synthesis / Packages of initiatives







We could foresee 2 projects and 4 enablers/CSFs.





Projects Axis

Full paperless material - ALL

LEAVES









Collaborative platforms - ALL

FORREST









Enablers Axis

IT Capacity Working

WATER



ERP system Working

ROOTS









HR (incl. Future Offices) Working

policy & management style

JACKS





KU Working

SUN

e Clouds

Synthesis / Packages of initiatives







s and 4 enablers/CSFs.





PAIN

We are seen not 'competitive / modern / flexible / CSR enough'

compared to competitors. We lack real interactive material for our clients

(videos, e-learning, serious games). We are scared about intellectual

property rights on our training material, and we need a proper protection,

a good storage/delivery process and the appropriate pricing grid. We

lack a good analysis of the mix paper / online to keep the best delivery

impact. We spend days retyping things (scoring, attendance). We need

to also address BLC needs for material, a total different concept and

approach (procedures, brown paper...).



We lack profesional communication tools to meet, exchange, push,

share content with our clients and colleagues - and support/guide them

in doing that. Skype is not profesional, Livemeeting is not well known,

Intranet and P/drive are static, not appealing and sometimes confusing.



PAIN

Quality of internet broadband already complicate the Skype and

livemeeting calls, so has chances to complicate further dvpts.



Spine is over, and its replacement must connect the above projects (or

keep them connectable) to our regular working processes.









At the moment, there are no real coaching style, nor specific process

and equipment to embark everyone on "Jack's beanstalk"







KU is a face-to-face training/developing/meeting platform, apart from

preparation and evaluation. Besides, personal formation on ICT tools,

even basic, is not covered.

Sub projects

Dematerialising training material (creating the list with D&T and the scenarios,

selecting supplier, revising storage, pricing, communicating and training internally),

broadening KM4U, Creating apps for A&E & attendance sheet, shooting videos. E-

learning / serious games modules (partnering, selecting, communicating, financing,

install an internal process of selection).









All virtual platforms to work, learn and share documents with clients and colleagues.

Could consist in 1/ livemeeting facility to MEET with colleagues and clients 2/ social

medias strategy to EXCHANGE and PUSH content 3/ wikis to SHARE working

documents 4/ Creating apps to PUSH content 5/ portals and training to GUIDE

employees and clients.

Sub projects

Hi speed mobile connection on all devices (laptops, iphones, ipads) - may be included

in IT vision 2005.



Accurate management information, client relations, HR data, link to Finance and easy

to build Portals. Link to Smartphones to have access to CRM and time registration.

Includes HR e-processes.





New way of coaching colleagues, home and office equipment, dematerialised HR

processes (include all available documents in digital format: evo sessions, target

setting, pay sheets, contracts, CVs… etc.)





Blended KU sessions, Intro on virtualisation deliverables in Induction programmes +

PLCs and local formation on virtualisation deliverables.

GAIN (time - money)

Brand image gains (CSR, modern, flexible,

collaborative). Training impact increased. Pricing

more flexible. Time saved.









Saving in travels money and time, Better

communication quality, Faster decision making,

better involvement of colleagues, partners and

clients.



GAIN (time - money)

see 2 projects gains. Check investments costs /

savings (ex: having cloud software in our laptops).



See 2 project gains. Less risk, less time consuming

for TC's and CA's, ICT policy becomes "enabler" (eg

connecting systems of information - empowering

colleagues to address future challenges themselves).



See 2 project gains. Easier and earlier adoption of

the above







See 2 project gains. Easier and earlier adoption of

the above. Increased personal performance,

decreased travel time/budget.

Draft planning of releases (only ALO consulted so far)

Initiatives Project Axis 2010 Q4 2011 Q2 2011 Q3

ERP ERP ALL

HR and New Way of Working (NWW) HR Working

Working space of the future HR Working 1

Hi-speed mobile connections ICT ALL 1

IT Vision 2015 ICT ALL 1

KU online KU Working 1

A&E sheet on-line LEAVES Delivering

attendance sheets (attestation présence France) LEAVES Delivering

Electronic training materials 5 (release) LEAVES ALL

Full paperless support 1 (HR) LEAVES Working 1

Full paperless support 2 (finance) LEAVES Working & Selling 1

Full paperless support 3 (commercial and admin) LEAVES ALL

Full paperless support 4 (contracts) LEAVES Working & Selling

KM4U broadened to a Virtual library LEAVES Delivering

Recommended providers LEAVES Selling & Delivering

Shooting videos LEAVES Selling & Delivering 1

Client portal TREE ALL

Employee portal TREE Working

Interactive coach TREE ALL

K Apps for smartphones TREE Delivering

Livemeeting facility (external) TREE ALL

Livemeeting facility (internal) TREE Working 1

Shared working documents 1 (Internal) TREE Working

Shared working documents 2 (External) TREE ALL

Social medias TREE Selling 1

Total 1 3 5

2011 Q4 2012 Q1 2012 Q2 2012 Q3 2012 Q4 2013 Q1 2013 Q2 2014 Q3 Total

1 1

1 1

1

1

1

1

1 1

1 1

1 1

1

1

1 1

1 1

1 1

1 1

1

1 1

1 1

1 1

1 1

1 1

1

1 1

1 1

1

2 6 2 1 0 1 1 3 25

Initiative Project Axis

ERP ERP ALL





HR and New Way of HR Working

Working (NWW)





Working space of the HR Working

future









Hi-speed mobile ICT ALL

connections



IT Vision 2015 ICT ALL

KU online KU Working









A&E sheet on-line LEAVES Delivering









attendance sheets LEAVES Delivering

(attestation présence

France)

Electronic training LEAVES ALL

materials 1 (material

list)

Electronic training LEAVES ALL

materials 2 (ordering,

storage & pricing

systems)







Electronic training LEAVES ALL

materials 3 (project

plan, announcement)





Electronic training LEAVES ALL

materials 4

(execution, pricelist,

scenario work out)



Electronic training LEAVES ALL

materials 5 (release)



Full paperless LEAVES Working

support 1 (HR)

Full paperless LEAVES Working &

support 2 (finance) Selling









Full paperless LEAVES ALL

support 3

(commercial and

administrative)

Full paperless LEAVES Working &

support 4 (contracts) Selling



KM4U broadened to a LEAVES Delivering

Virtual library

Recommended LEAVES Selling &

providers Delivering









Shooting videos LEAVES Selling &

Delivering









Client portal TREE ALL









Employee portal TREE Working









Interactive coach TREE ALL



K Apps for

smartphones TREE Delivering

Livemeeting facility

(external) TREE ALL





Livemeeting facility

(internal) TREE Working

Shared working

documents 1

(Internal) TREE Working

Shared working

documents 2

(External) TREE ALL









Social medias TREE Selling

Social networking 2: TREE

internal L'in group for

CSR

Social Media TREE

Pain Money Time

Spine is over. 400,000 € IT time + X

days DI



Cascade the consequences of the "Working space of the future" TBC HR time.

at employee level.





A pain linked to our "Identity" and "Look and feel" pains. The 3,000€ 2 x 20 days

organisation has evolved, as our new way of working (NWW) workshop.

has integrated the consequences of a more international scope, Moving cost, will

an extended expertise (Change) and distance working. We be their anyway

need to find out and define how our offices of the future will look since most

like to reach the next step. offices need

change

Broadband is limiting access to mobile services in office/home. TBC TBC

We currently experience difficulties with Skype and livemeeting ,

what about next dvpts?

TBC TBC TBC

KU is a face-to-face training/developing/meeting platform, apart TBC 10 days GR +

from preparation and evaluation. Besides, personal formation on 2 days TTT

ICT tools, even basic, is not covered. We propose KU to be the faculty and 2

change. days coaching

faculty



Current paper version means a lot of manual intervention to TBC involvement of

retrieve data into database & possibly benchmark - also very MW or any

time consuming for TC & CA - 5 mn per training day x 10000 = other D&T

840 working hours. What if we were dedicating this 0,5 FTE to member +

selling? Weblab for

development -

difficult to

evaluate

number of

days at this

stage

attendance sheets produce a massive amount of paper and TBC Externals

manual delivery without any ROI



We are seen not 'competitive / modern / flexible / CSR enough' 0 € 2 days P&L,

compared to competitors. We are scared about intellectual 1,5 day D&T

property rights on our training material, and we need a proper

protection, a good storage/delivery process and the appropriate

pricing grid. We lack a good analysis of the mix paper / online to

keep the best delivery impact. We need to also address BLC

needs for material, a total different concept and approach

(procedures, brown paper...).

see electronic material 1 0€ 2 days

Finance, 1 day

Pricing team

0,5 day

weblab, 4 days

P&L team



see electronic material 1 TBC To be

concretized

after the intake

sessions.



idem TBC TBC









idem TBC KU Jan. 2012

?



We work with almost only paper! HR Finance

ERP?

As part of the project led by Griet (Paperless office), Finance 0€ 1 day Finance

will offer the possibility to bill electronically. (meeting

around Inge),

0,5 days CPI

(communicatio

n)



We do it already and have not systematised it. 0€ D&T network?









Technical and legal progresses are needed to organise an 0€ RI, P&L

online "signature". network



A growing part of our training material is dispersed and implicit. TBC (licence D&T, P&L,

We need to go beyond scenarios and training material, to fees?) ICT, WebLab

include videos, articles & surveys, list of recommended

providers (see dedicated project).

We don't have the ressources nor the wish to produce and 0€ 2 day D&T

maintain e-learning material on our own. We better go for (search &

partners, and provide our colleagues and clients a list of selection

recommended "stuff" (companies or modules). criteria,

stample

process,

revision

process) , 1

day weblab, 1

day RI / TRO

(contract

templates), 1

day DE and

faculties (?)

integrating

selection

process.

We only have 1 video in EN, and click rates when it was sent 30,000 € 5 days JCH, 1

showed how attractive it is. We need more not only for day at KU (for

Inspiration e-newsletter, but for an extensive usage on Social scenarios &

medias, websites, even to be shown in the classroom. ideas)





All tools will need a platform that will guide the user to the K e-

planet - applicable to TPs (BLD, BLL) and to customised

assignements TBC Weblab + BL's

Weblab + KU

+ HR +

Intranet has shown serious limits, and will be replaced by the employees

new ERP. TBC themselves

At the moment, we don't formally address TPs needs for

help/advices/refresh between 2 training days or at the end of a

trainind/coa.TPs don't dare to ask / don't get an answer - C's

and K may spend too much time to answer this (Catch up day

NL) - we may narrow the relationship with the TP so much that

we lose opportunities for ARs. TBC WebLab / ICT



current access to our on-line offer currently only via Web - we

must broaden this to internet, not only web. TBC Weblab



idem TBC Weblab / ICT



In order to really connect with a group of people, travelling is still

needed; time/energy/cost consuming. Online, quality of group

connecting is actually poor - and livemeeting is not well known. TBC Weblab / ICT

Internally or externally, working on a single file (like this one)

creates a lot of emails exchanges + needs merging all inputs on New ERP

a single doc TBC system?

Idem + we do not enroll clients in the creation of new products -

this is a mistake since 1/ they could tell us what are their needs New ERP

2/ it would be free D&T work for us TBC system?



5 days CPI

ALO. 1 day SG

DI CPI each

(10 news

each). 1 day

GGA (design

Online networking activity of our consultants is generally low of PLC). No

(with some exceptions) vs growing presence of clients and TPs budget

there. Corporate accounts on L'in and FB are under-exploited (existing

(different languages, heterogeneous news, even owner content

unclear). 0€ leveraged).

Working Communicating

on MR on CSR

initiatives is

insufficient: one-

way, repetitive,

uncomplete

(sometimes

slides are

deleted by the

OL).

Selling Create Social

Media

Newsroom, with

content linked

form Social

Media Networks

as LinkedIn,

Facebook, etc..

This requires an

Intranet site

(cheap), where

we share

articles and

concepts

(through

shareslide),

show videos's

(Youtube) and

create an online

discussion

forum.

Delivery Timing CPI Owner CPI

ERP system that ensure accurate management 2012 Q1 DI

information, client relations, HR data, link to Finance and

easy to build Portals.

Training, workshops held by HR. At the end, a NWW, 2011 Q4 CN + HR rep

eg not only new processes, but also new behaviours.

Probably need to follow a NWW workshop.

Comfortable, easy to reach, inspiring meeting place 2011 Q3 CN









A fit to purpose, so evolving, broadband that will enable 2011 Q2 JFJ

further dvpts to be used on a daily basis by clients and

employees.

TBC 2010 Q4 JFJ

Space for tool training in both general and induction 2011 Q3 GR MW

programme. Working / creative sessions to prepare

dvpts. E-classes.









as everybody goes mobile, the A&E sheet will be 2014 Q3 PRA

available on-line or on the smartphone of the TP via a

krauthammer app that TP will have downloaded first - at

the end of a training day, 5 minutes is devoted to filling in

like today with paper









TC will be given an electronic pad on which the list of 2014 Q3 PRA

TPs will be available, each TP electronically sign with a

stylet to prove he attended the course

New training material list, now 3 years after the launch of 2011 Q1 CN

the new materials. Decide upon which materials to keep,

to make available electronically and which ones as paper

version; and per language group.

intake sessions with various deps and partners and work 2011 Q1 CN

out a proposal about the ordering/storage process and

pricing.









Final project plan to be realised with internal and external 2011 Q2 CN

partners. Internal announcement.









Execution by external partners + project follow up by 2011 Q3 CN

P&L. Pricelist.









Launch new sales process = internal communication + 2012 Q1 CN

internal training of all employees



Transfer HR regular material to electronic files (pay 2011 Q3 HR rep

sheet, evo sessions, target setting)

E-invoicing. 2011 Q2 GVG









Transfer client regular mail to electronic files (commercial 2012 Q1 DI as ERP

letters, preparation letter)







Transfer contractual material (HR contract, client 2013 Q1 RI

contract, convention in FR, e-bookings)



all Krauthammer specific content available online (course 2012 Q1 CN

material, videos…) in secure areas

Contract template with a commission system, 1 internal 2011 Q4 DI as D&T

guidelines to select a module/partner, 1 initial list of

providers/modules recommended with pricing grid, 1

process to "stick" and keep on delivering autonomously.









10 videos shot 2011 Q3 CPI JCH









The collaborative place to find all meeting, sharing,

communicating tools, with the "leaves" and their archives

- allowing all K clients to work together remotely and

keep contact with each other. 2012 Q2 ALO - BL

The collaborative place to find all meeting, sharing,

communicating tools, with the "leaves" and their archives

(NWW) - allowing all K people to work together remotely ALO - DI as

and keep contact with each other. 2012 Q1 ERP









The facility for TPs/Alumnis can ask for an appointment

and have a 1h session with a TC by video. Its

consequences in terms of production and planning. 2013 Q2 ALO





Apps to access the on-line surveys, e-bookings, … 2014 Q3 ALO

Offering video conferencing with external partners,

professionaly equipped. 2012 Q2 JFJ





Offering video conferencing with internal partners,

professionaly equipped. 2011 Q3 JFJ



People working on a single document can edit it from

one single place (ex: wiki, Google Sites) 2012 Q1 ALO

External release. A virtual platform used for interaction

with clients (co-creation, sharing of resources…) 2012 Q3 ALO









PLC "Grow your impact on Linkedin". Social media User

Guide (in EN). Internal flagship account on L'in. Network

of e-contributors on the 2 corporate accounts (FB -

Linkedin). 30 news posted by BL's on these social

accounts in EN. Recommendation on next years (local?

content?)… 2011 Q2 CPI ALO

2 days CPI. No budget. ANECDOTICALSKIP

Expected cost to create the newsroom 10K; Time to SKIP

POSSIBLE EVOLUTIONS IN THE FUTURE OF THIS +

regularly create content, make an editorial plan etc. First

estimate 6 x 20 days per year.

ROI (time - money)

Less risk, less time consuming for TC's and CA's.





Employee satisfaction AND early adoption /

adaptation of the above.





Less square meters, less travel, more frequent

contact, and more regular quality time









Permanent access to tools, whenever and wherever

you want



TBC

Employee satisfaction, Development of competences,

Savings in budget and time (what do we stop doing?),

Tests of future client services









no manual step anymore. Once send button hit, data

directly stored in DB & automatic scoring for TC +

available for benchmark and a copy available on

extranet so that TP can find back and keep track of

his/her things to do









time/cost/paper saving







Higher flexibility towards our clients, savings on

warehousing costs, IP revenue generated (paper,

online, blended versions are priced), CSR gains.

see electronic material 1









see electronic material 1









Revenue generated, cost savings, CSR gains.









Cost saving, CSR & image gains









Permanent access to knowledge, whenever and

wherever you want

Commission based revenue generated, number of

blended big shots.









Increase mkg impact, having a viral effect (KPI could

be nber of times shared on social medias / clicked

from the e-newsletter for example)







Revenue generated, increased value for money, cost

savings in commercial travels and administrative

work.



Increased efficiency, faster deliveries, broader

expertise sharing, cost savings in internal travels and

administrative work.









no travel fees, time saving, TPs/Almunis can be

answered by any TC available

easy and quick access to K virtual offerings -

"wherever you are / whenever and whatever you do,

Krauthammer is always there with you"









Lower travel costs/Top quality/ Top efficiency/Top

flexibility/ high impact/high engagement/High CSR

and all this on sales, delivery and working level.

NWW using internet instead of messy documents

spread everywhere on people hard drives - saves time

& increase efficency/security

idem









Increased audience to Mkg tools (ex: inspiration e-

newsletter go from 10000 clickers to 20000 clickers

on L'in). Bigger and more intense networks for our

Consultants (from X to Y ARs online). ROI needed

and still not clear.

2011

end 2011

Selling 2011

Delivering 2015

Working 2020

Enlarged team

Objectives

Engaging people, securing enablers, preparing & testing delivery, getting process for

content delivery (ex: editorial policy for ex. for social medias). From July on, every

quarter we launch at least 1 deliverable, we ensure KU gives time available for

2011 everyone to learn, we evaluate in the next quarter.

Q3 2011-2014 Delivering sub-projects (training - using - evaluating - adjusting)

2015 Evaluating meta-project impact and adjusting

Planning of releases Delivery

Initiatives 2010 Q4 2011 Q2 2011 Q3 2011 Q4

A&E sheet on-line

attendance sheets (attestation présence France)

Client portal

Electronic training materials 5 (release)

Employee portal

ERP

Full paperless support 1 (HR) 1

Full paperless support 2 (finance) 1

Full paperless support 3 (commercial and administrative)

Full paperless support 4 (contracts)

Hi-speed mobile connections 1

HR and New Way of Working (NWW)

Interactive coach

IT Vision 2015 1

K Apps for smartphones

KM4U broadened to a Virtual library

KU online 1

Livemeeting facility (external)

Livemeeting facility (internal) 1

Recommended providers 1

Shared working documents 1 (Internal)

Shared working documents 2 (External)

Shooting videos 1

Social medias 1

Working space of the future 1

Grand Total 1 3 5 1

2012 Q1 2012 Q2 2012 Q3 2012 Q4 2013 Q1 2013 Q2 2014 Q3 Grand Total Project

1 1 LEAVES

1 1 LEAVES

1 1 TREE

1 1 LEAVES

1 1 TREE

1 1 ERP

1 LEAVES

1 LEAVES

1 1 LEAVES

1 1 LEAVES

1 ICT

1 1 HR

1 1 TREE

1 ICT

1 1 TREE

1 1 LEAVES

1 KU

1 1 TREE

1 TREE

1 LEAVES

1 1 TREE

1 1 TREE

1 LEAVES

1 TREE

1 HR

6 2 1 1 1 1 3 25



Related docs
Other docs by xiuliliaofz
Dreaming
Views: 2  |  Downloads: 0
Maurice White BDSc Melb
Views: 0  |  Downloads: 0
article-7901
Views: 0  |  Downloads: 0
Application - City of Laramie
Views: 0  |  Downloads: 0
Project Outline - TeacherWeb
Views: 0  |  Downloads: 0
NSSE EDUCATION
Views: 0  |  Downloads: 0
me344_f03
Views: 0  |  Downloads: 0
Experiment_11a
Views: 0  |  Downloads: 0
CHAPTER 16
Views: 0  |  Downloads: 0
Distributed Data Base Systems
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!