Embed
Email

Pop Levi Technical Rider

Document Sample

Categories
Tags
Stats
views:
0
posted:
11/3/2011
language:
English
pages:
2
Pop Levi Technical Rider.

UK September 2006 Tour.

Page 1 of 2

The Artist.



Pop Levi is the Lead Guitarist / Vocalist and is backed by 3 other musicians. (Drums,

Bass, Guitar) The Artist must be referred to as ‘Pop Levi’ in all Advertising and

communications related to the concert.



Technical.



A Stage Plot and Channel List are attached. Any problems with these requirements

must be addressed to the Tour Manager (Tristan Bryant +44 7775 580418) asap. We

are a friendly bunch and where possible will endeavour to come to a solution that will

work for all of us!



The PA must be fully working and come with a house technician, we require for this

tour the House Engineer to mix the band as we aren’t touring an engineer.



Where possible a lighting engineer with knowledge of the venues lighting system

should also be supplied.



We will be touring our own backline. As a rule we don’t share our equipment, but

again this can be discussed.



We (if headline) should be the first band to sound check. Whilst we will try and be as

quick as possible we would appreciate 1hour to be allowed.



Dressing Rooms / Production office.



The band requires 1 LOCKABLE dressing room and a private toilet facility that are

close to the stage. This will also double up as the production office if a separate room

is not available. An internet connection preferably wifi should be available to the

party from arrival.



Rider and Catering.



The Pop Levi rider is simple, so please try and get it right!



16 bottles of still water

4 towels

1 bottle of name brand Scotch (not bourbon) (Dewar's, J&B, Johnnie Walker,

Glen Fiddich etc)



Catering is for 5 people. (The Band and Tour Manager)

We are 3 Vegetarians (no fish, but dairy is ok) and 2 Carnivores.

A wholesome meal including salad is required before each gig (after soundcheck), If

catering facilities are not available at the venue then a buy-out should be arranged.

Pop Levi Technical Rider.

UK September 2006 Tour.

Page 2 of 2



Loading, Access & Parking.



We travel in a Splitter bus. Where possible we would be grateful if a parking space by

the venues access could be reserved for load-in and load-out time (and preferably for

the duration of our stay.) We appreciate that in many towns this is not possible due to

regulations from ‘those above.’ Therefore any advice regarding free, safe parking

nearby would be welcomed.



If there are stairs, lifts or any other ‘anomalies’ regarding access, then please advise as

soon as possible.



Payment.



Is to be as arranged in advance. We tour 2 large German Shepherd dogs just in case.

You have been warned!



Merchandise.



We are touring a basic selection of merchandise. We provide our own seller.



Guest list.



The Tour Manager will advise the relevant person on the day of the Guest list names.



Related docs
Other docs by Stariya Js @ B...
Info pack - Level 1
Views: 0  |  Downloads: 0
f1098746053
Views: 0  |  Downloads: 0
file_116
Views: 3  |  Downloads: 0
Trade
Views: 0  |  Downloads: 0
McKenzie_Law.April
Views: 0  |  Downloads: 0
110208attachmentEndingtheUseofCoalCampaign
Views: 0  |  Downloads: 0
Titration Curve _CBL_ _AP_
Views: 0  |  Downloads: 0
FSSC cover note
Views: 0  |  Downloads: 0
link_130115
Views: 0  |  Downloads: 0
Index_of_Supplementary_Tables_and_Dataset
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!