Instrument Lab

Lamont-Doherty Earth Observatory of Columbia University

61 Route 9W

Palisades, NY 10964

Subject: HIRO failures on June 25th, and 26th

Project: HIRO

Created: July 2, 2002

Updated: July 3, 2002

Engineer: Dale, Dan, Val

Doc No.: N/A

Revision: 0.1



Two, apparently independent failures occurred in the HIRO system last week. One

happened at the Piermont Pier and one at Oceanography. A summary and table of

events follow:



1. Something (perhaps a lightning storm) took out power to the Pier building on

Tuesday afternoon:

 The UPS failed at 15:17:33 (UTC). Power was restored and the computer

came back and re-started the loggers at 15:31 (UTC).

 The wind speed sensor was apparently damaged and emitted erroneous

data from the resumption of logging at 15:31(UTC) Jun 25, and ending at

11:30 (UTC) July 3, 2002.

 The failed UPS was removed for repair/replacement at 15:30:35 (UTC)

Jun 25.

2. There was a lightning strike near IRI building on Wednesday afternoon that reset

the BIOS of the Ocean Roof node.

 The network connection and logger went down at 17:40 (UTC) Jun 27.

 Attempts to access the Ocean Roof node remotely and locally failed. The

machine had to be power cycled in order to re-gain access.

 The network connection and RF link to the Pier was reestablished at 17:40

(UTC) Jun 27.

 The Ocean Roof RM-Young started logging again on the Ocean roof

computer at 17:51(UTC) July 1.

3. A functional wind sensor was installed and tested on the Pier at 11:30 (UTC) July

3.



Date Time (UTC) Source Comment

Tue, Jun 25 (176) 1500 Pier Begin system rsync to U2







Page 1 of 2 October 31, 2011

15:17:33 Pier Pier RM Young data stops

1517 Pier TSG data stops

1517 Pier Pump data stops

1519 Pier Pump data re-starts

1519:34 Pier Odd kernel messages in log Ref

“Mgetty”

15:30:35 Pier Pier reboots, Removal of failed UPS +

plug into alternate UPS

15:31 Pier Tsg file shows request for setup

15:31 Pier RM Young data restarts.



Wed, June 26 (177) 2120 Or RSYNC stop

2120 Or RSYNC fail

2140 Or Mgetty error



Thu, June 27 (178) 1740 Or Date error (BIOS)



Mon, July 1 (181) 1751 Or RM Young data starts

Mon, July 1 (181) 1530 Pier Removal of Wind Sensor



Wed, July 3 (183) 1130 Pier Install functional wind sensor.









Page 2 of 2 October 31, 2011



Related docs
Other docs by cuiliqing
7 Recipes from Joe A.
Views: 2  |  Downloads: 0
Re-installingXPMode
Views: 3  |  Downloads: 0
telefonica_en
Views: 4  |  Downloads: 0
3220 Chap 6 demos
Views: 2  |  Downloads: 0
chap history.docx
Views: 3  |  Downloads: 0
Subcontractor Bid Form - The Fountains
Views: 1  |  Downloads: 0
English
Views: 1  |  Downloads: 0
DESIGNER'S SCHEDULE USE
Views: 1  |  Downloads: 0