Embed
Email

PRA08-0204 Hurrican Stricture - WCDP

Document Sample

Shared by: cuiliqing
Categories
Tags
Stats
views:
0
posted:
10/31/2011
language:
English
pages:
1
PASCO COUNTY, FLORIDA

INTEROFFICE MEMORANDUM



__________________________________________________________________________________



TO: Honorable Chairman and DATE: 1/4/08 FILE: PRA08-0204

Members of the Board of

County Commissioners





THRU: Daniel R. Johnson SUBJECT: Cancellation of State Funding for the

Assistant County Administrator Wesley Chapel District Park -

(Public Services) Recreation Building - Hurricane

Structure Enhancement



FROM: Frederick J. Buckman, CPRP REFERENCES: Comm. Dist. 1

Parks and Recreation Director

__________________________________________________________________________________





It is recommended that the data herein presented be given formal consideration by the Board of County

Commissioners (BCC).



DESCRIPTION AND CONDITIONS:



On March 13, 2007, the BCC approved acceptance of $300,000.00 in Hazard Mitigation Program Grant

(HMPG) funding to construct the Wesley Chapel District Park Recreation Building to meet hurricane

standards. The application was submitted on April 20, 2007. At the time, the wind requirement was

160 miles per hour hurricane wind resistance, and consequently, the recreation building has been

designed to withstand such an event.



Recently, FEMA 361 was introduced requiring HMPG-funded buildings to withstand winds up to 200

miles per hour and to provide for pressurization changes associated with a tornado, among other

criteria. As indicated by the design firm contracted for this project, Wannamacher Russell Architects,

Inc., this would mean a total redesign of the building. Redesign and construction costs associated with

this change will more than offset the value of the $300,000.00 Federal dollars available.



In order to meet FEMA 361, the cost of hardening may be in the $2 million range with no guarantee or

indication of additional Federal dollars over and above the approved $300,000.00 grant, and likewise,

the structural design and functionality of the building would not be conducive to the traditional

recreational structure. It is, therefore, the Parks and Recreation Department’s recommendation that the

BCC approve cancellation of the grant application and allow the Wesley Chapel District Park

Recreation Building design to meet the current 160 mile per hour hurricane winds’ requirement.



ALTERNATIVES AND ANALYSIS:



1. Approve cancellation of the HMPG application.



2. Deny cancellation of the HMPG application.



3. Direct staff to other alternatives.



RECOMMENDATION AND FUNDING:



The Parks and Recreation Department recommends that the BCC accept Alternative No. 1 and cancel

the HMPG application for Federal funds for the Wesley Chapel District Park Recreation Building

hurricane hardening.



County funding is not required for this action.







FJB/MSC/ai/ppra080204



Other docs by cuiliqing
7 Recipes from Joe A.
Views: 2  |  Downloads: 0
Re-installingXPMode
Views: 3  |  Downloads: 0
telefonica_en
Views: 4  |  Downloads: 0
3220 Chap 6 demos
Views: 2  |  Downloads: 0
chap history.docx
Views: 3  |  Downloads: 0
Subcontractor Bid Form - The Fountains
Views: 1  |  Downloads: 0
English
Views: 1  |  Downloads: 0
DESIGNER'S SCHEDULE USE
Views: 1  |  Downloads: 0
Security Service Providers
Views: 45  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!