Document

Document Sample
Document
LIST OF DELAYED CONTRIBUTIONS OF ITU-T STUDY GROUP 13





Delayed Submitted by Title Questions

D.1 (WP 1/13) Ministry of Posts and Proposed generic network structure Q.25/13

Telecommunications on GII

of China

D.2 (WP 4/13) Ministry of Posts and Source clock address information Q.18/13

Telecommunications

of China

D.3 (WP 2/13) Australia Proposed replacement text for Q.10/13

Section 7 of I.555, Interworking

between FRBS and B-ISDN

D.4 (WP 4/13) Australia Effects of physical layer random Q.14/13

and burst errors on ATM cell loss

Ratio

D.5 (WP 4/13) Australia Considerations in the measurement Q.16/13

of Rec. G.826 error performance

D.6 (WP 2/13) Australia Revision of Australian proposal for Q.7/13

controlled cell transfer capability

D.7 (WP 2/13) Australia ATM transfer capability of the Q.7/13

virtual path

D.8 (WP 2/13) Australia Performance of ATM layer transfer Q.7/13

capabilities for computer

communications

D.9 (WP 3/13) ASCOM AG Fault management segment flow Q.6/13

specification for I.610

D.10 (WP 3/13) ASCOM AG Comment on proposal for Q.19/13

enhancement of G.805 Section

5.3.4

D.11 (WP 2/13) KDD, Japan Proposal of work plan for Q.27 Q.27/13

D.12 (WP 3/13) KDD, Japan Consideration of coding within Q.6/13

defect location of AIS/RDI cell

D.13 (WP 4/13) KDD, Japan Basic principles for Cell Transfer Q.13/13

Delay (CTD) negotiation methods

and its application to QoS Class 1

D.14 (WP 3/13) Canada: Nortel Work plan for inverse multiplexing Q.6/13, 11/13

Technology for ATM (IMA) sublayer definition

and definition of a new physical

layer OAM cell for IMA









Delayed.doc

–2–









Delayed Submitted by Title Questions

D.15 (WP 2/13) Canada Rationale for not defining Q.7/13

Controlled Dynamic Transfer as a

new Transfer Capability

D.16 (WP 2/13) Canada Supplemented data descriptions to Q.5/13

SDL diagrams of I.363.2

D.17 (WP 2/13) Canada The option of correct mode for Q.5/13

CPS_Packet Header Retrieving

D.18 (WP 3/13) Canada VB5 Access node to service node Q.12/13

TMN NE to NE Management

interfaces

D.19 (WP 3/13) Canada: Nortel Clarifications and modifications to Q.6/13

Technology I.610 and Living List

D.20 (WP 3/13) BT Proposed enhancements to the 25 Q.11/13

600 kbit/s UNI for a future revision

of I.432.5

D.21 (WP 4/13) BT Real time information in SDH Q.18/13

systems

D.22 (WP 3/13) BT Modelling of Optical Time Q.19/13

Division Multiplexing

D.23 (WP 3/13) BT Modelling of optical supervisory Q.19/13

capabilities

D.24 (WP 3/13) BT Modelling of 2-R and 3-R Q.19/13

regeneration in G.otn

D.25 (WP 2/13) United States of AAL-2 negotiation procedures Q.5/13

America user-user field length

D.26 (WP 2/13) United States of AAL type 2, SSCS requirements Q.5/13

America for the support of wireline trunking

D.27 (WP 2/13) ASCOM Tech AG Updates to I.371 Living List Item Q.7/13

11, on Controlled Dynamic

Transfer

D.28 (WP 2/13) Swiss Telecom PTT Editorial modifications to the Q.5/13

procedures of the draft AAL Type 2

D.29 (WP 2/13) Swiss Telecom PTT Rational for the modification of the Q.5/13

SDL Diagrams

D.30 (WP 2/13) Swiss Telecom PTT Editorial modifications to Appendix Q.5/13

I of the draft AAL Type 2

D.31 (PLEN) Switzerland Editorial modifications to the draft Q.5/13

ITU-T Recommendation I.362









Delayed.doc

–3–









Delayed Submitted by Title Questions

D.32 (WP 2/13) Swiss Telecom PTT Modifications to the draft ITU-T Q.5/13

Recommendation I.363.2

D.33 (WP 2/13) ALCATEL On the multiplexing of VCCs into a Q.7/13

VPC

D.34 (WP 2/13) ALCATEL Introduction of new ATM transfer Q.7/13

capabilities in I.371

D.35 (WP 2/13) ALCATEL Removal of I.371 Living List Items Q.7/13

Six and Nine

D.36 (WP 1/13) NTT Proposed functional description of Q.3/13

access functions of I.375.x (ex 3/13)

D.37 (WP 2/13) Japan A proposal for limiting an AAL Q.5/13

type 2 padding procedure (ex 6/13)

D.38 (WP 2/13) Japan Comments on the remaining Q.5/13

technical subjects for AAL type 2 (ex 6/13)

D.39 (WP 2/13) Japan Proposal of amended SDL for AAL Q.5/13

type 2 (ex 6/13)

D.40 (WP 3/13) NTT Proposed transmission method of Q.6/13

protection switching control (ex 7/13)

information

D.41 (WP 3/13) NTT Proposal of defining the trigger cell Q.6/13

for protection switching (ex 7/13)

D.42 (WP 3/13) NTT Proposal of cells for transmission of Q.6/13

protection switching control (ex 7/13)

information

D.43 (WP 3/13) NTT Proposed VP/VC protection Q.6/13

switching method (ex 7/13)

D.44 (WP 3/13) NTT Comments on the extent of the Q.6/13

protected domain (ex 7/13)

D.45 (WP 2/13) NTT Clarification of the superposition of Q.7/13

two traffic contracts (ex 8/13)

D.46 (WP 2/13) NTT Clarification of the need of Q.7/13

emulation of an ATC using another (ex 8/13)

ATC

D.47 (WP 2/13) NTT Proposed support of real time VBR Q.7/13

application by an existing ATC (ex 8/13)

D.48 (WP 2/13) NTT Proposed study items for B-ISDN Q.8/13

to B-ISDN interworking

D.49 (WP 2/13) NTT Proposed amendments on the Q.10/13

interworking between FMBS and (ex 11/13)

X.25 in I.555









Delayed.doc

–4–









Delayed Submitted by Title Questions

D.50 (WP 2/13) NTT Proposed editorial amendments on Q.10/13

the C-Plane interworking between (ex 11/13)

FRBS and B-ISDN

D.51 (PLEN) NTT Proposed editorial correction of Q.11/13

I.432.5 for clarification

D.52 (WP 3/13) NTT Proposal of optional degree of Q.12/13

compliance regarding RTMC

specification in VB5.1

D.53 (WP 3/13) NTT Proposed requirement for the study Q.12/13

of the VB5.2 interface (ex 14/13)

D.54 (WP 4/13) NTT Proposal on network performance Q.13/13

study items for IP networks (ex 16/13)

D.55 (WP 4/13) NTT Comments on connection and party Q.17/13

release performance parameters in (ex 20/13)

B-ISDN

D.56 (WP 4/13) NTT Proposed framework for new Q.18/13

Recommendation on time (ex 21/13)

information distribution

D.57 (WP 4/13) NTT Clarification of clock distribution Q.18/13

architecture and verification of

clock distribution flow

D.58 (WP 3/13) NTT Proposed application examples of Q.19/13

optical transport networks in draft

Rec. G.otn

D.59 (WP 3/13) NTT Signal transmission format in Q.19/13

optical transport networks

D.60 (WP 3/13) NTT Proposal of the optical contained Q.19/13

for the optical channel layer format

D.61 (WP 1/13) Japan Proposed revision of terms and Q.25/13

definitions on GII

D.62 (WP 1/13) Japan Proposed enhancements of the Q.25/13

generic model in “scenario example

of use”

D.63 (WP 2/13) United States of Proposed definition of UBR as a Q.7/13

America new ATC

D.64 (WP 2/13) Telecom Finland Ltd. UB+ATM Transfer Capability Q.7/13

definition

D.65 (WP 4/13) United States of An approach for the performance Q.14/13 and

America description of ATM Adaptation Q.5/13

Layer (AAL) processes









Delayed.doc

–5–









Delayed Submitted by Title Questions

D.66 (WP 3/13) United States of F4 flow transparency Q.4/13

America

D.67 (WP 3/13) United States of ATM network survivability Q.6/13

America temporal model

D.68 (WP 3/13) United States of Optical transport layer network Q.19/13

America supervision

D.69 (WP 3/13) United States of ATM virtual path group protection Q.6/13

America switching revised proposal

D.70 (WP 4/13) United States of Proposed text for Liaison to SG 15 Q.18/13

America on current status of

mapping/demapping jitter and

wander performance requirements

for CBR signals carried by AAL

Type 1 and possible impact on

ATM NE timing and

synchronization requirements

D.71 (WP 4/13) United States of Basis and network need for clock Q.18/13

America Types II, III and in new revised

draft ITU-T Recommendation

G.812

D.72 (WP 4/13) United States of Proposal for clock Types II, III and Q.18/13

America IV for new revised draft ITU-T

Recommendation G.812

D.73 (WP 2/13) United States of Suggested editorial changes to draft Q.5/13

America new I.363.2, formerly AAL-CU

D.74 (WP 3/13) United States of Network need for SDH interfaces Q.19/13

America below STM-1

D.75 (WP 3/13) United States of Proposal for Sub-STM-1 interface Q.19/13

America

D.76 (WP 2/13) United States of Draft PICS Pro forma for I.363.2 Q.5/13

America

D.77 (WP 2/13) United States of Clarification of maximum length of Q.5/13

America AAL type 2 packet

D.78 (WP 2/13) AT&T, General Modification of ANP for improved Q.5/13

DataComm, Nortel robustness

Inc.

D.79 (WP 2/13) United States of Proposed single 5-bit UUI field for Q.5/13

America AAL2 packet header

D.80 (WP 4/13) United States of Proposed text for a liaison in Q.15, 16/13

America response to SG 15 liaison on ESA,

ESB and failure counts









Delayed.doc

–6–









Delayed Submitted by Title Questions

D.81 (GEN) United States of OAM for AAL type 2 Q.5, 6/13

(2, 3/13) America

D.82 (WP 3/13) Lucent Technologies Proposed clarification of the API Q.19/13

Network Systems syntax in G.831

Nederland BV

D.83 (PLEN) Lucent Technologies Editorial comments on G.803 Q.19/13

Network Systems

Nederland BV

D.84 (WP 4/13) Lucent Technologies Error in Figure I.1 in Annex I to Q.16/13

Network Systems G.826 - For action

Nederland BV

D.85 (WP 4/13) Lucent Technologies Relation between processing of Q.16/13

Network Systems far-end performance monitoring

Nederland information during the occurrence

of a near-end defect and SES

D.86 (WP 4/13) Lucent Technologies Network rationale for G.812 clocks Q.18/13

Network Systems specifications

Nederland BV

D.87 (WP 3/13) Lucent Technologies G.805: incorrectness in monitoring Q.19/13

Network Systems of unused connections

Nederland BV

D.88 (WP 3/13) Lucent Technologies Layers and transport assemblies in Q.19/13

Network Systems G.805

Nederland BV

D.89 (WP 3/13) Lucent Technologies Requirements for virtual Q.19/13 &

Network Systems concatenated transport entities 11/13

Nederland BV

D.90 (WP 3/13) Lucent Technologies ATM connection scenarios and Q.6/13

Network Systems network survivability

Nederland BV

D.91 (WP 3/13) Lucent Technologies ATM Access network availability Q.6/13

Network Systems enhancements techniques

Nederland BV

D.92 (WP 2/13) Nortel Limited AN AAL Type 2 SSCS proposal Q.5/13

for the support of synchronous low

bit rate services

D.93 (WP 2/13) Nortel Limited Holdover time as an AAL Type 2 Q.5/13

SSCS parameter

D.94 (WP 2/13) Nortel Limited Additional requirements for the Q.5/13

AAL Type 2 negotiation

procedures (ANP)









Delayed.doc

–7–









Delayed Submitted by Title Questions

D.95 (WP 3/13) Federal Republic of Functional modelling of ATM Q.6/13

Germany VP/VC 1+1/1:n Linear NCP/SNCP

protection architectures

D.96 (WP 3/13) Federal Republic of ATM VP/VC 1+1:n Linear Q.6/13

Germany Protection: Comparison of

NCP/SNCP with Trail protection

architectures

D.97 (WP 3/13) Federal Republic of Functional modelling of ATM Q.6/13

Germany VP/VC 1+1/1:n linear trail

protection architectures

D.98 (WP 3/13) Federal Republic of Application of ATM VP/VC 1:1 Q.6/13

Germany linear protection switching

protocols in ATM ring network

architectures with shared protection

D.99 (WP 3/13) Federal Republic of Application of ATM VP/VC Q.6/13

Germany 1+1/1:1 linear protection switching

protocols in ATM ring network

architectures with dedicated

protection

D.100 (WP 3/13) Deutsche Telekom Proposal for types of transport Q.11/13

paths presented at B-UNI of

STM-N type

D.101 (WP 3/13) Germany Enhancement of fault conditions in Q.11/13

I.432.2

D.102 (WP 1/13) Germany Allocation of GII projects to SG 13 Q.24/13

Questions

D.103 (WP 1/13) Germany Study items of GII standardization Q.24/13

project N.5

D.104 (PLEN) Germany Amendments to study Questions 8, Q.8, 9, 20,

9, 20, 27/13 - Interworking and 24, 27/13

access cases and aspects

D.105 (WP 1/13) Germany Future work on multimedia Q.3/13

D.106 (WP 2/13) Germany Avoidance of extra traffic Q.5/13

management in AAL2

D.107 (WP 2/13) Germany Network capabilities to support Q.2/13

distributed B-TV

D.108 (WP 2/13) Germany Control capabilities to support Q.2/13

distributed B-TV

D.109 (WP 1/13) Germany Service Data Functions (SDF) in Q.3/13

the IN reference configuration









Delayed.doc

–8–









Delayed Submitted by Title Questions

D.110 (WP 2/13) Germany ABR transfer capability based on Q.7/13

EFCI marking

D.111 (WP 2/13) Germany ATM transfer capability for Q.2/13

signalling virtual channels

D.112 (WP 2/13) Germany Light weight signalling protocol Q.2/13

D.113 (WP 3/13) Germany Management mechanisms based on Q.6/13

OAM function

D.114 (WP 3/13) Germany Need for fast ATM layer protection Q.6/13

switching

D.115 (WP 2/13) Germany Enhancements for Table 1/I.363.2 Q.5/13

D.116 (WP 2/13) Germany Enhancements and corrections for Q.5/13

the AAL Type 2 CPS transmitter

procedures

D.117 (WP 3/13) Germany Persistence times for LCD and Q.11/13

OCD related to B-ISDN physical

layer UNI for 2 Mbit/s ATM

signals (ITU-T Recommendation

I.432.3)

D.118 (WP 4/13) Germany Proposal to omit the type V and Q.18/13

type VI clocks in the current draft

revised Recommendation G.812

D.119 (WP 4/13) Germany Proposed values for some of the Q.18/13

TBDs (to be defined) in the draft

revised Recommendation G.812

(Rome, November 1996) and

proposed corrections of the current

draft

D.120 (WP 3/13) Deutsche Telekom Differential delay of virtual Q.19/13

concatenated VC-4s

D.121 (PLEN) Federal Republic of ABR RM cells with wrong CRC-10 Q.7/13

Germany in the EDC field

D.122 (WP 3/13) Deutsche Telekom Enhancements to G.964/G.965 to Q.12/13

cover SDH-based V5 interfaces

D.123 (WP 3/13) Deutsche Telekom Draft Recommendation G.96x on Q.12/13

access digital section for B-ISDN

D.124 (WP 3/13) Deutsche Telekom Living list on draft G.96x with Q.12/13

proposal for future actions

D.125 (WP 3/13) Deutsche Telekom Input material for continuation of Q.12/13

work on draft Rec. G.VB51

D.126 (WP 3/13) Deutsche Telekom Proposal for structure and outline of Q.12/13

draft new Rec. HG.VB52









Delayed.doc

–9–









Delayed Submitted by Title Questions

D.127 (WP 3/13) Siemens Optional channels carry path trace Q.19/13

identifier via extra modulation

D.128 (WP 3/13) Siemens Optical layer adaptation and Q.19/13

termination functions

D.129 (WP 3/13) Deutsche Telekom Clarifications for Rec. I.610 Q.6/13

D.130 (WP 4/13) Italian Administration Jitter accumulation for DSI and E1 Q.18/13

services carried over cascaded

ATM islands via AAL1 using

SRTS clock recovery scheme

D.131 (WP 3/13) CSELT - Italy About definition in baseline Q.6/13

document on P-to-M connections

D.132 (WP 3/13) CSELT - Italy Proposal for clarification in Section Q.6/13

4.2.1/4.2.2 of Rec. I.610

D.133 (WP 3/13) CSELT - Italy Material for Section 6.1.2 of Q.6/13

baseline document on AAL

Management

D.134 (WP 4/13) CSELT Definition of block structure and Q.16/13

error performance events for SDH

regenerator section

D.135 (WP 4/13) CSELT/TELECOM Definition of error performance Q.16/13

ITALIA/ITALTEL events for SDH regenerator section

D.136 (WP 4/13) CSELT/TELECOM Threshold definition for SES Q.16/13

ITALIA/ITALTEL parameter for SDH multiplex

section

D.137 (WP 4/13) CSELT/TELECOM Consideration on unavailability on Q.15/13

ITALIA/ITALTEL digital radio-relay systems due to

propagation phenomena

D.138 (WP 4/13) United States of Proposed modification to Section 1 Q.18/13

America of ITU-T draft Recommendation

G.812

D.139 (WP 4/13) SymmetricCom Results from a field trial of Q.18/13

synchronization status messaging

D.140 (WP 4/13) SymmetricCom Long-term phase transient response Q.18/13

during holdover operation of G.812

clocks. (Proposed text for new draft

revised Rec. G.812)

D.141 (WP 2/13) Korea (Republic of) Information for network Q.2/13

capabilities to support connection

oriented and connectionless

communications









Delayed.doc

– 10 –









Delayed Submitted by Title Questions

D.142 (WP 2/13) Korea (Republic of) Considerations of network Q.2/13

capabilities for customer-oriented

B-ISDN

D.143 (WP 2/13) Korea (Republic of) Suggestions of Living Lists of Q.2/13

Question 2/13

D.144 (WP 3/13) Korea (Republic of) Considerations for ATM layer Q.4/13

capability to support multicast

services

D.145 (WP 3/13) Korea (Republic of) B-ISDN user-network interface Q.11/13

physical layer for fiber channel

(1.06 Gbits)

D.146 (WP 3/13) Korea (Republic of) About the loss of ATM protection Q.6/13

switching trigger cell

D.147 (WP 2/13) Korea (Republic of) Multiplexing of VCCs into a VPC Q.7/13

D.148 (WP 2/13) Korea (Republic of) Proposal for assigning New PTI Q.1/13

value for charging

D.149 (GEN) Korea (Republic of) Classification of OAM Cells into Q.6/13

(2, 3/13) mandatory and Optional OAM cells (7/13)

and its rate

D.150 (GEN) Korea (Republic of) A problem of aggregate Q.7/13, 6/13

(2, 3/13) conformance (for info.)

D.151 (GEN) Korea (Republic of) Alignment of UNI reference Q.3/13, 12/13

(3/13) configuration in ITU-T, DAVIC

and ATM-Forum

D.152 (WP 2/13) Korea (Republic of) Considerations for interworking Q.8/13

B-ISDN with private network

D.153 (WP 2/13) Korea (Republic of) Supporting Group Address for Q.2/13

interworking private network with

the public network

D.154 (WP 2/13) Korea (Republic of) Considerations for simple frame Q.5/13

mode AAL types

D.155 (WP 2/13) Korea (Republic of) Proposed study items for B-ISDN Q.8/13

interworking with other network at

service level

D.156 (WP 1/13) Korea (Republic of) Proposed amendments on the GII Q.25/13

scenario methodology - Example

use

D.157 (WP 2/13) Korea (Republic of) Emulation of an ATC using another Q.7/13

ATC









Delayed.doc

– 11 –









Delayed Submitted by Title Questions

D.158 (WP 3/13) Korea (Republic of) Proposed OAM flows for P-to-M Q.6/13

connections in consideration of

TMN

D.159 (WP 3/13) Korea (Republic of) Consideration on OAM flows for Q.6/13

P-to-M connections

D.160 (WP 3/13) Korea (Republic of) GFC Mechanism at the Q.4/13

multi-access user-network interface

D.161 (WP 3/13) Korea (Republic of) Management primitives exchanged Q.4/13

with ATMM entity to support the

GFC

D.162 (WP 3/13) Korea (Republic of) Consideration of cell-based Q.11/13

physical layer specification for 155

520 kbit/s and 622 080 kbit/s

D.163 (WP 3/13) Korea (Republic of) Frame delineation method for two Q.11/13

dimensional cell-based physical

layer

D.164 (WP 2/13) Korea (Republic of) Considerations for the Interface Q.8/13

Requirements Mapping between the

Network Management Layer and

Service Management Layer in the

B-ISDN to B-ISDN Interworking

D.165 (WP 1/13) Korea (Republic of) Proposal to add switched digital Q.3/13

broadcasting service in Section

3.3.1 of I.375

D.166 (WP 1/13) Korea Telecom (Rep. Basic requirements of GII Q.25/13

of Korea ) framework architecture

D.167 (WP 1/13) Korea Telecom (Rep. Questions relate to the new sections Q.25/13

of Korea) 6 and 7 of I.GII_PFA

D.168 (WP 2/13) Korea Telecom (Rep. Considerations for network and Q.8/13

of Korea) terminal compatibility

D.169 (WP 2/13) Korea Telecom (Rep. Directions to study ATM/B-ISDN Q.8/13

of Korea) interworking

D.170 (WP 4/13) Alcatel Telecom Synchronisation layer functions Q.18/13

D.171 (WP 2/13) Telefónica de España Baseline document on parameters Q.2/13

and network requirements for

charging in B-ISDN

D.172 ((WP 4/13) Russia Availability performance Q.15/13

parameters and objectives for

end-to-end international constant

bit rate digital paths at or above the

primary rate









Delayed.doc

– 12 –









Delayed Submitted by Title Questions

D.173 (WP 3/13) Alcatel Proposal for alternative approach to Q.6/13

network survivability issues

D.174 (WP 3/13) Alcatel Comments to draft Baseline Q.6/13

document on ATM network

survivability architectures and

mechanisms

D.175 (WP 4/13) Alcatel Telecom Comments on the proposal for time Q.18/3

information distribution

D.176 (WP 3/13) Tektronix Alignment of I.432.2 with revised Q.11/13

Recommendation G.707

D.177 (WP 4/13) Tektronix Specification of anti-alia filter used Q.18/13

for the measurement of MTIE and

TDEV wander parameters

D.178 (WP 4/13) Tektronix Requirements for additional Q.18/13

jitter/wander performance

specification at network interfaces

and equipment functions

D.179 (WP 2/13) LM Ericsson, Sweden Segmentation proposal for AAL2 Q.5/13

SSCS

D.180 (WP 2/13) LM Ericsson, Sweden Amendments and modifications to Q.5/13

AAL type 2 negotiation procedures

D.181 (WP 4/13) LM Ericsson, Sweden Scope of G.812 Q.18/13

D.182 (WP 4/13) LM Ericsson, Sweden Timing in ATM networks Q.18/13

D.183 (WP 4/13) LM Ericsson, Sweden Preferences of G.812 clock types Q.18/13

D.184 (WP 3/13) BT Requirement for VC-12-nc Q.19/13

functionality

D.185 (WP 4/13) BT Inclusion of CSES parameter in Q.16/13

Recommendation G.826

D.186 (GEN) BT The need for a minimum of one PM Q.6, 14 &

(3, 4/13) cell per second on ATM 15/13

connections to enable performance

monitoring

D.187 (WP 4/13) BT Inclusion of additional parameters Q.16, 15/13

ESA, ESB and FC in

Recommendation G.826

D.188 (WP 2/13) BT Simulation of ABR policers - Q.7/13

observations for poor performance

D.189 (WP 3/13) BT The support of concatenated VC-4s Q.19/13

in SDH networks









Delayed.doc

– 13 –









Delayed Submitted by Title Questions

D.190 (WP 4/13) France Télécom About the premature release event Q.13, 15,

and related performance parameters 17/13

D.191 (WP 4/13) France Télécom On performance objectives for call Q.17/13

processing delay

D.192 (GEN) France Télécom Simplified performance Q.6, 14,

(4, 3/13) management process 15/13

D.193 (GEN) France Télécom Draft baseline document for Q.6, 14,

4, 3/13) in-service performance 15/13

measurement

D.194 (WP 4/13) France Télécom Proposed baseline text for Q. 13, 15/13

retainability performance

specification

D.195 (GEN) France Télécom Monitoring the performance of Q.6, 7, 14/13

(4, 2, 3/13) I.356 connection portions

D.196 (GEN) France Télécom Definition of frame based QoS Q.7, 14/13

(4, 2/13) guarantees in ATM networks

D.197 (WP 2/13) France Télécom Requirements for defining new Q.7/13

ATCs in I.371

D.198 (GEN) France Télécom Cell based physical layer. Proposed Q.16, 11/13

(3, 4/13) modifications to Recommendation

I.432.4

D.199 (GEN) France Télécom Cell based physical layer. Proposed Q.11, 16/13

(3, 4/13) modifications to Recommendation

I.432.2

D.200 (WP 3/13) France Télécom Cell based physical layer, Proposed Q.11/13

modifications to Recommendation

I.432.1

D.201 (WP 4/13) France Télécom Application of Recommendation Q.16/13

G.826 to the leased lines

connections

D.202 (WP 4/13) France Télécom Improvement of Figure I.1 of the Q.16/13

Recommendation G.826

D.203 (WP 4/13) France Télécom Proposal for an SSU type based on Q.18/13

an analysis of G.822

D.204 (WP 3/13) France Télécom Recommendation I.361 - Q.4/13

improvements to Table 2

D.205 (WP 2/13) Federal Republic of Traffic control in the ATM layer Q.5/13

Germany rather than in AAL2

D.206 (WP 3/13) France Télécom New block sizes for performance Q.6/13

monitoring









Delayed.doc

– 14 –









Delayed Submitted by Title Questions

D.207 (WP 3/13) France Télécom Further clarification of Annex Q.6/13

C/I.610

D.208 (WP 3/13) France Télécom Proposed suppression of the Q.6/13

analysis of the “Source ID” field at

the loopback source point

D.209 (WP 3/13) France Télécom About the baseline document on Q.6/13

performance and fault management

requirements

D.210 (WP 3/13) France Télécom Enhancement of performance Q.6/13

reporting capabilities for BR OAM

cells

D.211 (WP 3/13) France Télécom Insertion process for forward Q.6, 7, 14,

monitoring OAM cells 15/13

D.212 (WP 3/13) France Télécom Coding of location identifier fields Q.6/13

in fault management cells (19/13)

D.213 (WP 3/13) France Télécom Clarification on non-intrusive Q.6/13

function in I.610 text

D.214 (WP 3/13) France Télécom Origin of AIS cells with respect to Q.6/13

the span of maintenance entities

D.215 (WP 3/13) France Télécom AIS/RDI facilities at the segment Q.6/13

level

D.216 (WP 3/13) France Télécom Coding of defect type field in AIS Q.6/13

RDI cells

D.217 (WP 3/13) France Télécom Consideration on protection Q.6/13

switching triggering conditions

D.218 (PLEN) United States of Recommended editorial changes to Q.11/13

America I.432.5 prior to approval









Delayed.doc


Share This Document


Related docs
Other docs by garrickWilliam...
NION NTERNACIONAL DE ELECOMUNICACIONES
Views: 3  |  Downloads: 0
WATER AND WASTEWATER TREATMENT
Views: 279  |  Downloads: 8
Exchange Rates
Views: 276  |  Downloads: 6
ITU-T Study Group 12
Views: 19  |  Downloads: 1
COMPENSATORY EDUCATION PROGRAM
Views: 12  |  Downloads: 0
Plan A
Views: 9  |  Downloads: 2
Renovation and Repair (RR) Needs Survey
Views: 6  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!