LIST OF DELAYED CONTRIBUTIONS OF ITU-T STUDY GROUP 13
Delayed Submitted by Title Questions
D.1 (WP 1/13) Ministry of Posts and Proposed generic network structure Q.25/13
Telecommunications on GII
of China
D.2 (WP 4/13) Ministry of Posts and Source clock address information Q.18/13
Telecommunications
of China
D.3 (WP 2/13) Australia Proposed replacement text for Q.10/13
Section 7 of I.555, Interworking
between FRBS and B-ISDN
D.4 (WP 4/13) Australia Effects of physical layer random Q.14/13
and burst errors on ATM cell loss
Ratio
D.5 (WP 4/13) Australia Considerations in the measurement Q.16/13
of Rec. G.826 error performance
D.6 (WP 2/13) Australia Revision of Australian proposal for Q.7/13
controlled cell transfer capability
D.7 (WP 2/13) Australia ATM transfer capability of the Q.7/13
virtual path
D.8 (WP 2/13) Australia Performance of ATM layer transfer Q.7/13
capabilities for computer
communications
D.9 (WP 3/13) ASCOM AG Fault management segment flow Q.6/13
specification for I.610
D.10 (WP 3/13) ASCOM AG Comment on proposal for Q.19/13
enhancement of G.805 Section
5.3.4
D.11 (WP 2/13) KDD, Japan Proposal of work plan for Q.27 Q.27/13
D.12 (WP 3/13) KDD, Japan Consideration of coding within Q.6/13
defect location of AIS/RDI cell
D.13 (WP 4/13) KDD, Japan Basic principles for Cell Transfer Q.13/13
Delay (CTD) negotiation methods
and its application to QoS Class 1
D.14 (WP 3/13) Canada: Nortel Work plan for inverse multiplexing Q.6/13, 11/13
Technology for ATM (IMA) sublayer definition
and definition of a new physical
layer OAM cell for IMA
Delayed.doc
–2–
Delayed Submitted by Title Questions
D.15 (WP 2/13) Canada Rationale for not defining Q.7/13
Controlled Dynamic Transfer as a
new Transfer Capability
D.16 (WP 2/13) Canada Supplemented data descriptions to Q.5/13
SDL diagrams of I.363.2
D.17 (WP 2/13) Canada The option of correct mode for Q.5/13
CPS_Packet Header Retrieving
D.18 (WP 3/13) Canada VB5 Access node to service node Q.12/13
TMN NE to NE Management
interfaces
D.19 (WP 3/13) Canada: Nortel Clarifications and modifications to Q.6/13
Technology I.610 and Living List
D.20 (WP 3/13) BT Proposed enhancements to the 25 Q.11/13
600 kbit/s UNI for a future revision
of I.432.5
D.21 (WP 4/13) BT Real time information in SDH Q.18/13
systems
D.22 (WP 3/13) BT Modelling of Optical Time Q.19/13
Division Multiplexing
D.23 (WP 3/13) BT Modelling of optical supervisory Q.19/13
capabilities
D.24 (WP 3/13) BT Modelling of 2-R and 3-R Q.19/13
regeneration in G.otn
D.25 (WP 2/13) United States of AAL-2 negotiation procedures Q.5/13
America user-user field length
D.26 (WP 2/13) United States of AAL type 2, SSCS requirements Q.5/13
America for the support of wireline trunking
D.27 (WP 2/13) ASCOM Tech AG Updates to I.371 Living List Item Q.7/13
11, on Controlled Dynamic
Transfer
D.28 (WP 2/13) Swiss Telecom PTT Editorial modifications to the Q.5/13
procedures of the draft AAL Type 2
D.29 (WP 2/13) Swiss Telecom PTT Rational for the modification of the Q.5/13
SDL Diagrams
D.30 (WP 2/13) Swiss Telecom PTT Editorial modifications to Appendix Q.5/13
I of the draft AAL Type 2
D.31 (PLEN) Switzerland Editorial modifications to the draft Q.5/13
ITU-T Recommendation I.362
Delayed.doc
–3–
Delayed Submitted by Title Questions
D.32 (WP 2/13) Swiss Telecom PTT Modifications to the draft ITU-T Q.5/13
Recommendation I.363.2
D.33 (WP 2/13) ALCATEL On the multiplexing of VCCs into a Q.7/13
VPC
D.34 (WP 2/13) ALCATEL Introduction of new ATM transfer Q.7/13
capabilities in I.371
D.35 (WP 2/13) ALCATEL Removal of I.371 Living List Items Q.7/13
Six and Nine
D.36 (WP 1/13) NTT Proposed functional description of Q.3/13
access functions of I.375.x (ex 3/13)
D.37 (WP 2/13) Japan A proposal for limiting an AAL Q.5/13
type 2 padding procedure (ex 6/13)
D.38 (WP 2/13) Japan Comments on the remaining Q.5/13
technical subjects for AAL type 2 (ex 6/13)
D.39 (WP 2/13) Japan Proposal of amended SDL for AAL Q.5/13
type 2 (ex 6/13)
D.40 (WP 3/13) NTT Proposed transmission method of Q.6/13
protection switching control (ex 7/13)
information
D.41 (WP 3/13) NTT Proposal of defining the trigger cell Q.6/13
for protection switching (ex 7/13)
D.42 (WP 3/13) NTT Proposal of cells for transmission of Q.6/13
protection switching control (ex 7/13)
information
D.43 (WP 3/13) NTT Proposed VP/VC protection Q.6/13
switching method (ex 7/13)
D.44 (WP 3/13) NTT Comments on the extent of the Q.6/13
protected domain (ex 7/13)
D.45 (WP 2/13) NTT Clarification of the superposition of Q.7/13
two traffic contracts (ex 8/13)
D.46 (WP 2/13) NTT Clarification of the need of Q.7/13
emulation of an ATC using another (ex 8/13)
ATC
D.47 (WP 2/13) NTT Proposed support of real time VBR Q.7/13
application by an existing ATC (ex 8/13)
D.48 (WP 2/13) NTT Proposed study items for B-ISDN Q.8/13
to B-ISDN interworking
D.49 (WP 2/13) NTT Proposed amendments on the Q.10/13
interworking between FMBS and (ex 11/13)
X.25 in I.555
Delayed.doc
–4–
Delayed Submitted by Title Questions
D.50 (WP 2/13) NTT Proposed editorial amendments on Q.10/13
the C-Plane interworking between (ex 11/13)
FRBS and B-ISDN
D.51 (PLEN) NTT Proposed editorial correction of Q.11/13
I.432.5 for clarification
D.52 (WP 3/13) NTT Proposal of optional degree of Q.12/13
compliance regarding RTMC
specification in VB5.1
D.53 (WP 3/13) NTT Proposed requirement for the study Q.12/13
of the VB5.2 interface (ex 14/13)
D.54 (WP 4/13) NTT Proposal on network performance Q.13/13
study items for IP networks (ex 16/13)
D.55 (WP 4/13) NTT Comments on connection and party Q.17/13
release performance parameters in (ex 20/13)
B-ISDN
D.56 (WP 4/13) NTT Proposed framework for new Q.18/13
Recommendation on time (ex 21/13)
information distribution
D.57 (WP 4/13) NTT Clarification of clock distribution Q.18/13
architecture and verification of
clock distribution flow
D.58 (WP 3/13) NTT Proposed application examples of Q.19/13
optical transport networks in draft
Rec. G.otn
D.59 (WP 3/13) NTT Signal transmission format in Q.19/13
optical transport networks
D.60 (WP 3/13) NTT Proposal of the optical contained Q.19/13
for the optical channel layer format
D.61 (WP 1/13) Japan Proposed revision of terms and Q.25/13
definitions on GII
D.62 (WP 1/13) Japan Proposed enhancements of the Q.25/13
generic model in “scenario example
of use”
D.63 (WP 2/13) United States of Proposed definition of UBR as a Q.7/13
America new ATC
D.64 (WP 2/13) Telecom Finland Ltd. UB+ATM Transfer Capability Q.7/13
definition
D.65 (WP 4/13) United States of An approach for the performance Q.14/13 and
America description of ATM Adaptation Q.5/13
Layer (AAL) processes
Delayed.doc
–5–
Delayed Submitted by Title Questions
D.66 (WP 3/13) United States of F4 flow transparency Q.4/13
America
D.67 (WP 3/13) United States of ATM network survivability Q.6/13
America temporal model
D.68 (WP 3/13) United States of Optical transport layer network Q.19/13
America supervision
D.69 (WP 3/13) United States of ATM virtual path group protection Q.6/13
America switching revised proposal
D.70 (WP 4/13) United States of Proposed text for Liaison to SG 15 Q.18/13
America on current status of
mapping/demapping jitter and
wander performance requirements
for CBR signals carried by AAL
Type 1 and possible impact on
ATM NE timing and
synchronization requirements
D.71 (WP 4/13) United States of Basis and network need for clock Q.18/13
America Types II, III and in new revised
draft ITU-T Recommendation
G.812
D.72 (WP 4/13) United States of Proposal for clock Types II, III and Q.18/13
America IV for new revised draft ITU-T
Recommendation G.812
D.73 (WP 2/13) United States of Suggested editorial changes to draft Q.5/13
America new I.363.2, formerly AAL-CU
D.74 (WP 3/13) United States of Network need for SDH interfaces Q.19/13
America below STM-1
D.75 (WP 3/13) United States of Proposal for Sub-STM-1 interface Q.19/13
America
D.76 (WP 2/13) United States of Draft PICS Pro forma for I.363.2 Q.5/13
America
D.77 (WP 2/13) United States of Clarification of maximum length of Q.5/13
America AAL type 2 packet
D.78 (WP 2/13) AT&T, General Modification of ANP for improved Q.5/13
DataComm, Nortel robustness
Inc.
D.79 (WP 2/13) United States of Proposed single 5-bit UUI field for Q.5/13
America AAL2 packet header
D.80 (WP 4/13) United States of Proposed text for a liaison in Q.15, 16/13
America response to SG 15 liaison on ESA,
ESB and failure counts
Delayed.doc
–6–
Delayed Submitted by Title Questions
D.81 (GEN) United States of OAM for AAL type 2 Q.5, 6/13
(2, 3/13) America
D.82 (WP 3/13) Lucent Technologies Proposed clarification of the API Q.19/13
Network Systems syntax in G.831
Nederland BV
D.83 (PLEN) Lucent Technologies Editorial comments on G.803 Q.19/13
Network Systems
Nederland BV
D.84 (WP 4/13) Lucent Technologies Error in Figure I.1 in Annex I to Q.16/13
Network Systems G.826 - For action
Nederland BV
D.85 (WP 4/13) Lucent Technologies Relation between processing of Q.16/13
Network Systems far-end performance monitoring
Nederland information during the occurrence
of a near-end defect and SES
D.86 (WP 4/13) Lucent Technologies Network rationale for G.812 clocks Q.18/13
Network Systems specifications
Nederland BV
D.87 (WP 3/13) Lucent Technologies G.805: incorrectness in monitoring Q.19/13
Network Systems of unused connections
Nederland BV
D.88 (WP 3/13) Lucent Technologies Layers and transport assemblies in Q.19/13
Network Systems G.805
Nederland BV
D.89 (WP 3/13) Lucent Technologies Requirements for virtual Q.19/13 &
Network Systems concatenated transport entities 11/13
Nederland BV
D.90 (WP 3/13) Lucent Technologies ATM connection scenarios and Q.6/13
Network Systems network survivability
Nederland BV
D.91 (WP 3/13) Lucent Technologies ATM Access network availability Q.6/13
Network Systems enhancements techniques
Nederland BV
D.92 (WP 2/13) Nortel Limited AN AAL Type 2 SSCS proposal Q.5/13
for the support of synchronous low
bit rate services
D.93 (WP 2/13) Nortel Limited Holdover time as an AAL Type 2 Q.5/13
SSCS parameter
D.94 (WP 2/13) Nortel Limited Additional requirements for the Q.5/13
AAL Type 2 negotiation
procedures (ANP)
Delayed.doc
–7–
Delayed Submitted by Title Questions
D.95 (WP 3/13) Federal Republic of Functional modelling of ATM Q.6/13
Germany VP/VC 1+1/1:n Linear NCP/SNCP
protection architectures
D.96 (WP 3/13) Federal Republic of ATM VP/VC 1+1:n Linear Q.6/13
Germany Protection: Comparison of
NCP/SNCP with Trail protection
architectures
D.97 (WP 3/13) Federal Republic of Functional modelling of ATM Q.6/13
Germany VP/VC 1+1/1:n linear trail
protection architectures
D.98 (WP 3/13) Federal Republic of Application of ATM VP/VC 1:1 Q.6/13
Germany linear protection switching
protocols in ATM ring network
architectures with shared protection
D.99 (WP 3/13) Federal Republic of Application of ATM VP/VC Q.6/13
Germany 1+1/1:1 linear protection switching
protocols in ATM ring network
architectures with dedicated
protection
D.100 (WP 3/13) Deutsche Telekom Proposal for types of transport Q.11/13
paths presented at B-UNI of
STM-N type
D.101 (WP 3/13) Germany Enhancement of fault conditions in Q.11/13
I.432.2
D.102 (WP 1/13) Germany Allocation of GII projects to SG 13 Q.24/13
Questions
D.103 (WP 1/13) Germany Study items of GII standardization Q.24/13
project N.5
D.104 (PLEN) Germany Amendments to study Questions 8, Q.8, 9, 20,
9, 20, 27/13 - Interworking and 24, 27/13
access cases and aspects
D.105 (WP 1/13) Germany Future work on multimedia Q.3/13
D.106 (WP 2/13) Germany Avoidance of extra traffic Q.5/13
management in AAL2
D.107 (WP 2/13) Germany Network capabilities to support Q.2/13
distributed B-TV
D.108 (WP 2/13) Germany Control capabilities to support Q.2/13
distributed B-TV
D.109 (WP 1/13) Germany Service Data Functions (SDF) in Q.3/13
the IN reference configuration
Delayed.doc
–8–
Delayed Submitted by Title Questions
D.110 (WP 2/13) Germany ABR transfer capability based on Q.7/13
EFCI marking
D.111 (WP 2/13) Germany ATM transfer capability for Q.2/13
signalling virtual channels
D.112 (WP 2/13) Germany Light weight signalling protocol Q.2/13
D.113 (WP 3/13) Germany Management mechanisms based on Q.6/13
OAM function
D.114 (WP 3/13) Germany Need for fast ATM layer protection Q.6/13
switching
D.115 (WP 2/13) Germany Enhancements for Table 1/I.363.2 Q.5/13
D.116 (WP 2/13) Germany Enhancements and corrections for Q.5/13
the AAL Type 2 CPS transmitter
procedures
D.117 (WP 3/13) Germany Persistence times for LCD and Q.11/13
OCD related to B-ISDN physical
layer UNI for 2 Mbit/s ATM
signals (ITU-T Recommendation
I.432.3)
D.118 (WP 4/13) Germany Proposal to omit the type V and Q.18/13
type VI clocks in the current draft
revised Recommendation G.812
D.119 (WP 4/13) Germany Proposed values for some of the Q.18/13
TBDs (to be defined) in the draft
revised Recommendation G.812
(Rome, November 1996) and
proposed corrections of the current
draft
D.120 (WP 3/13) Deutsche Telekom Differential delay of virtual Q.19/13
concatenated VC-4s
D.121 (PLEN) Federal Republic of ABR RM cells with wrong CRC-10 Q.7/13
Germany in the EDC field
D.122 (WP 3/13) Deutsche Telekom Enhancements to G.964/G.965 to Q.12/13
cover SDH-based V5 interfaces
D.123 (WP 3/13) Deutsche Telekom Draft Recommendation G.96x on Q.12/13
access digital section for B-ISDN
D.124 (WP 3/13) Deutsche Telekom Living list on draft G.96x with Q.12/13
proposal for future actions
D.125 (WP 3/13) Deutsche Telekom Input material for continuation of Q.12/13
work on draft Rec. G.VB51
D.126 (WP 3/13) Deutsche Telekom Proposal for structure and outline of Q.12/13
draft new Rec. HG.VB52
Delayed.doc
–9–
Delayed Submitted by Title Questions
D.127 (WP 3/13) Siemens Optional channels carry path trace Q.19/13
identifier via extra modulation
D.128 (WP 3/13) Siemens Optical layer adaptation and Q.19/13
termination functions
D.129 (WP 3/13) Deutsche Telekom Clarifications for Rec. I.610 Q.6/13
D.130 (WP 4/13) Italian Administration Jitter accumulation for DSI and E1 Q.18/13
services carried over cascaded
ATM islands via AAL1 using
SRTS clock recovery scheme
D.131 (WP 3/13) CSELT - Italy About definition in baseline Q.6/13
document on P-to-M connections
D.132 (WP 3/13) CSELT - Italy Proposal for clarification in Section Q.6/13
4.2.1/4.2.2 of Rec. I.610
D.133 (WP 3/13) CSELT - Italy Material for Section 6.1.2 of Q.6/13
baseline document on AAL
Management
D.134 (WP 4/13) CSELT Definition of block structure and Q.16/13
error performance events for SDH
regenerator section
D.135 (WP 4/13) CSELT/TELECOM Definition of error performance Q.16/13
ITALIA/ITALTEL events for SDH regenerator section
D.136 (WP 4/13) CSELT/TELECOM Threshold definition for SES Q.16/13
ITALIA/ITALTEL parameter for SDH multiplex
section
D.137 (WP 4/13) CSELT/TELECOM Consideration on unavailability on Q.15/13
ITALIA/ITALTEL digital radio-relay systems due to
propagation phenomena
D.138 (WP 4/13) United States of Proposed modification to Section 1 Q.18/13
America of ITU-T draft Recommendation
G.812
D.139 (WP 4/13) SymmetricCom Results from a field trial of Q.18/13
synchronization status messaging
D.140 (WP 4/13) SymmetricCom Long-term phase transient response Q.18/13
during holdover operation of G.812
clocks. (Proposed text for new draft
revised Rec. G.812)
D.141 (WP 2/13) Korea (Republic of) Information for network Q.2/13
capabilities to support connection
oriented and connectionless
communications
Delayed.doc
– 10 –
Delayed Submitted by Title Questions
D.142 (WP 2/13) Korea (Republic of) Considerations of network Q.2/13
capabilities for customer-oriented
B-ISDN
D.143 (WP 2/13) Korea (Republic of) Suggestions of Living Lists of Q.2/13
Question 2/13
D.144 (WP 3/13) Korea (Republic of) Considerations for ATM layer Q.4/13
capability to support multicast
services
D.145 (WP 3/13) Korea (Republic of) B-ISDN user-network interface Q.11/13
physical layer for fiber channel
(1.06 Gbits)
D.146 (WP 3/13) Korea (Republic of) About the loss of ATM protection Q.6/13
switching trigger cell
D.147 (WP 2/13) Korea (Republic of) Multiplexing of VCCs into a VPC Q.7/13
D.148 (WP 2/13) Korea (Republic of) Proposal for assigning New PTI Q.1/13
value for charging
D.149 (GEN) Korea (Republic of) Classification of OAM Cells into Q.6/13
(2, 3/13) mandatory and Optional OAM cells (7/13)
and its rate
D.150 (GEN) Korea (Republic of) A problem of aggregate Q.7/13, 6/13
(2, 3/13) conformance (for info.)
D.151 (GEN) Korea (Republic of) Alignment of UNI reference Q.3/13, 12/13
(3/13) configuration in ITU-T, DAVIC
and ATM-Forum
D.152 (WP 2/13) Korea (Republic of) Considerations for interworking Q.8/13
B-ISDN with private network
D.153 (WP 2/13) Korea (Republic of) Supporting Group Address for Q.2/13
interworking private network with
the public network
D.154 (WP 2/13) Korea (Republic of) Considerations for simple frame Q.5/13
mode AAL types
D.155 (WP 2/13) Korea (Republic of) Proposed study items for B-ISDN Q.8/13
interworking with other network at
service level
D.156 (WP 1/13) Korea (Republic of) Proposed amendments on the GII Q.25/13
scenario methodology - Example
use
D.157 (WP 2/13) Korea (Republic of) Emulation of an ATC using another Q.7/13
ATC
Delayed.doc
– 11 –
Delayed Submitted by Title Questions
D.158 (WP 3/13) Korea (Republic of) Proposed OAM flows for P-to-M Q.6/13
connections in consideration of
TMN
D.159 (WP 3/13) Korea (Republic of) Consideration on OAM flows for Q.6/13
P-to-M connections
D.160 (WP 3/13) Korea (Republic of) GFC Mechanism at the Q.4/13
multi-access user-network interface
D.161 (WP 3/13) Korea (Republic of) Management primitives exchanged Q.4/13
with ATMM entity to support the
GFC
D.162 (WP 3/13) Korea (Republic of) Consideration of cell-based Q.11/13
physical layer specification for 155
520 kbit/s and 622 080 kbit/s
D.163 (WP 3/13) Korea (Republic of) Frame delineation method for two Q.11/13
dimensional cell-based physical
layer
D.164 (WP 2/13) Korea (Republic of) Considerations for the Interface Q.8/13
Requirements Mapping between the
Network Management Layer and
Service Management Layer in the
B-ISDN to B-ISDN Interworking
D.165 (WP 1/13) Korea (Republic of) Proposal to add switched digital Q.3/13
broadcasting service in Section
3.3.1 of I.375
D.166 (WP 1/13) Korea Telecom (Rep. Basic requirements of GII Q.25/13
of Korea ) framework architecture
D.167 (WP 1/13) Korea Telecom (Rep. Questions relate to the new sections Q.25/13
of Korea) 6 and 7 of I.GII_PFA
D.168 (WP 2/13) Korea Telecom (Rep. Considerations for network and Q.8/13
of Korea) terminal compatibility
D.169 (WP 2/13) Korea Telecom (Rep. Directions to study ATM/B-ISDN Q.8/13
of Korea) interworking
D.170 (WP 4/13) Alcatel Telecom Synchronisation layer functions Q.18/13
D.171 (WP 2/13) Telefónica de España Baseline document on parameters Q.2/13
and network requirements for
charging in B-ISDN
D.172 ((WP 4/13) Russia Availability performance Q.15/13
parameters and objectives for
end-to-end international constant
bit rate digital paths at or above the
primary rate
Delayed.doc
– 12 –
Delayed Submitted by Title Questions
D.173 (WP 3/13) Alcatel Proposal for alternative approach to Q.6/13
network survivability issues
D.174 (WP 3/13) Alcatel Comments to draft Baseline Q.6/13
document on ATM network
survivability architectures and
mechanisms
D.175 (WP 4/13) Alcatel Telecom Comments on the proposal for time Q.18/3
information distribution
D.176 (WP 3/13) Tektronix Alignment of I.432.2 with revised Q.11/13
Recommendation G.707
D.177 (WP 4/13) Tektronix Specification of anti-alia filter used Q.18/13
for the measurement of MTIE and
TDEV wander parameters
D.178 (WP 4/13) Tektronix Requirements for additional Q.18/13
jitter/wander performance
specification at network interfaces
and equipment functions
D.179 (WP 2/13) LM Ericsson, Sweden Segmentation proposal for AAL2 Q.5/13
SSCS
D.180 (WP 2/13) LM Ericsson, Sweden Amendments and modifications to Q.5/13
AAL type 2 negotiation procedures
D.181 (WP 4/13) LM Ericsson, Sweden Scope of G.812 Q.18/13
D.182 (WP 4/13) LM Ericsson, Sweden Timing in ATM networks Q.18/13
D.183 (WP 4/13) LM Ericsson, Sweden Preferences of G.812 clock types Q.18/13
D.184 (WP 3/13) BT Requirement for VC-12-nc Q.19/13
functionality
D.185 (WP 4/13) BT Inclusion of CSES parameter in Q.16/13
Recommendation G.826
D.186 (GEN) BT The need for a minimum of one PM Q.6, 14 &
(3, 4/13) cell per second on ATM 15/13
connections to enable performance
monitoring
D.187 (WP 4/13) BT Inclusion of additional parameters Q.16, 15/13
ESA, ESB and FC in
Recommendation G.826
D.188 (WP 2/13) BT Simulation of ABR policers - Q.7/13
observations for poor performance
D.189 (WP 3/13) BT The support of concatenated VC-4s Q.19/13
in SDH networks
Delayed.doc
– 13 –
Delayed Submitted by Title Questions
D.190 (WP 4/13) France Télécom About the premature release event Q.13, 15,
and related performance parameters 17/13
D.191 (WP 4/13) France Télécom On performance objectives for call Q.17/13
processing delay
D.192 (GEN) France Télécom Simplified performance Q.6, 14,
(4, 3/13) management process 15/13
D.193 (GEN) France Télécom Draft baseline document for Q.6, 14,
4, 3/13) in-service performance 15/13
measurement
D.194 (WP 4/13) France Télécom Proposed baseline text for Q. 13, 15/13
retainability performance
specification
D.195 (GEN) France Télécom Monitoring the performance of Q.6, 7, 14/13
(4, 2, 3/13) I.356 connection portions
D.196 (GEN) France Télécom Definition of frame based QoS Q.7, 14/13
(4, 2/13) guarantees in ATM networks
D.197 (WP 2/13) France Télécom Requirements for defining new Q.7/13
ATCs in I.371
D.198 (GEN) France Télécom Cell based physical layer. Proposed Q.16, 11/13
(3, 4/13) modifications to Recommendation
I.432.4
D.199 (GEN) France Télécom Cell based physical layer. Proposed Q.11, 16/13
(3, 4/13) modifications to Recommendation
I.432.2
D.200 (WP 3/13) France Télécom Cell based physical layer, Proposed Q.11/13
modifications to Recommendation
I.432.1
D.201 (WP 4/13) France Télécom Application of Recommendation Q.16/13
G.826 to the leased lines
connections
D.202 (WP 4/13) France Télécom Improvement of Figure I.1 of the Q.16/13
Recommendation G.826
D.203 (WP 4/13) France Télécom Proposal for an SSU type based on Q.18/13
an analysis of G.822
D.204 (WP 3/13) France Télécom Recommendation I.361 - Q.4/13
improvements to Table 2
D.205 (WP 2/13) Federal Republic of Traffic control in the ATM layer Q.5/13
Germany rather than in AAL2
D.206 (WP 3/13) France Télécom New block sizes for performance Q.6/13
monitoring
Delayed.doc
– 14 –
Delayed Submitted by Title Questions
D.207 (WP 3/13) France Télécom Further clarification of Annex Q.6/13
C/I.610
D.208 (WP 3/13) France Télécom Proposed suppression of the Q.6/13
analysis of the “Source ID” field at
the loopback source point
D.209 (WP 3/13) France Télécom About the baseline document on Q.6/13
performance and fault management
requirements
D.210 (WP 3/13) France Télécom Enhancement of performance Q.6/13
reporting capabilities for BR OAM
cells
D.211 (WP 3/13) France Télécom Insertion process for forward Q.6, 7, 14,
monitoring OAM cells 15/13
D.212 (WP 3/13) France Télécom Coding of location identifier fields Q.6/13
in fault management cells (19/13)
D.213 (WP 3/13) France Télécom Clarification on non-intrusive Q.6/13
function in I.610 text
D.214 (WP 3/13) France Télécom Origin of AIS cells with respect to Q.6/13
the span of maintenance entities
D.215 (WP 3/13) France Télécom AIS/RDI facilities at the segment Q.6/13
level
D.216 (WP 3/13) France Télécom Coding of defect type field in AIS Q.6/13
RDI cells
D.217 (WP 3/13) France Télécom Consideration on protection Q.6/13
switching triggering conditions
D.218 (PLEN) United States of Recommended editorial changes to Q.11/13
America I.432.5 prior to approval
Delayed.doc