Docstoc

Rally Guide Rally of Maharashtra 2011

Document Sample
Rally Guide Rally of Maharashtra 2011 Powered By Docstoc
					             Rally Guide
 Rally of Maharashtra
   Round 1 of FMSCI’s Indian National Rally Championship 2011


THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY
Rally of Maharashtra 2011                    www.wisa.org.in             Rallly Guid e (W eb Vers on)
                                                                         Rallly Guiide ((Web Versiiion))
                                                                         Ra y Gu de Web Vers on


1.    INTRODUCTION AND WELCOME

Dear Rally Enthusiast

“Rally of Maharashtra" continues its running in 11th year of Indian National Rally Championship.
 R

Any rally visitor anywhere in Nashik will find their spare time rewarded with the hills of
Sahyadri, holiness of Nashik, nice restaurants and endless choice of things to see and do.

Nashik is proud to host the opening round of Speed INRC 2011. If we have few of pre monsoon
showers before event it will bring soothing climate but will cause hindrance of the liason section
between 2nd and 3rd stage. The route remains same as last three years except the location of Service
Park. The old pace notes will be useful.

I appreciate the hard work put in by the Chairman of Rally commission and his team. The requests
by many concerned were attended to and the highlights are mentioned in this guide.

I must thank the Mayor of Nashik, Commissioner of Nashik Municipal Corporation, Commissioner
of Nashik Police and Superintendent of Police from Nashik & Thane district for their continued
support over last decade.

The Friday, June 03 will be most busy day for all crews, service teams and organisers. This will be
first time we will run event for 3 days instead of 4. So maintaining the given schedule by
organisers is key factor to remain stress free on Day 1 of the event. The evening of Day 1 will be the
start of action with SSS. Some cars will run after sunset so I strongly recommend carrying extra
lights for rally cars. It will offer great thrilling experience to spectators.

Hotel GATEWAY is once again Host hotel of the event. This venue will host Rally head quarters,
official accommodation, Media center, overnight Park Ferme and Champaign shower ceremony. I
must mention special thanks to Mr. Ahemar Siddiqui, General Manager of the GATEWAY, for
supporting and encouraging this event.

We thank Bharat Petroleum Corporation Ltd., the title sponsors of the INRC. Their continued
support will motivate promoters and organizers to run better and better event in 2011.

Promoters PSP & IMG sports have delivered more than what they had promised in 2010. I am sure
with experience of two years they will promote the events to higher standards. It is great
achievement for Indian motor sports to have an Indian in F1 grid.

Western India Sports Association, organizer of the event is proud of its strength of disciplined
volunteers. I take this opportunity to thank each and every volunteer whose perpetual support
ensures the smooth running of the event. Local Media whose, overwhelming support encourages
motor sport to keep alive in Nashik. I would strongly recommend visiting www.wisa.org,in to get
the updates about the event.

I look forward to catching up with you during the event.



Yours in Rallying
PANDIT Ashwin
Clerk of Course




 (THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                     2
Rally of Maharashtra 2011                   www.wisa.org.in             Rallly Guid e (W eb Vers on)
                                                                        Rallly Guiide ((Web Versiiion))
                                                                        Ra y Gu de Web Vers on




Dear Rally Guest

The Gateway Hotel Nashik would like to welcome all participants of WISA rally 2011. The
Gateway Hotel has been hospitality partners of WISA since 2001 and it has always been a
pleasure to be a part of it.

The Gateway Hotel and Resorts is a pan-India network of hotels and resorts designed for
the modern nomad. At The Gateway Hotel, we believe in keeping things simple. This is
why; our hotels are divided into 7 simple zones- Stay, Hangout, Meet, Work, Workout,
Unwind and Explore. As travel often means more hassle than harmony, more stress than
satisfaction, modern travelers are looking for smarter choices. Driven by our passion for
perfection, we welcome our customers to a refreshingly enjoyable and hassle-free
experience, anytime, everywhere. Offering the highest consistency in quality, service and
style we set new standards and take the unwanted surprises out of traveling. Our warm
welcome makes our guests feel at home, away from home and our crisp and courteous
service empowers them to get more done with greater effectiveness and control. And
through our unrivalled network we provide service that is effortless, simple, never
overwhelming and always warm.

Also we request all WISA participants to check for the room package exclusively designed
for you at the hotel and wish you all the best.

Regards
Ahmar Siddiqui
General Manager




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                     3
Rally of Maharashtra 2011                       www.wisa.org.in                  Rallly Guid e (W eb Vers on)
                                                                                 Rallly Guiide ((Web Versiiion))
                                                                                 Ra y Gu de Web Vers on


2.      EVENT HISTORY
  2.1    Brief History Of Nashik Motor Sports
         Nashik has been associated with motor sports for many years. The city has hosted the Indian Rally
         Championship for more than ten years. Ashwin Pandit, Shrirang Macche , Shreyas Yande , Jatin
         Thakkar , Sanjay Khatri, Yuvraj Pawar, Pritosh Kohok, Nitin Bhamrey, Kaustubh Macche, Shamim
         Khan are some of the names with the glitter in the history of Nashik’s motor sports at National level.
  2.2 Previous Winners of WISA’s INRC rounds
           Year               Driver / Co-Driver                     Vehicle                 Team
           2001      Vikram Mathais / Sujith Kumar                Maruti Esteem               MRF
           2002      Naren Kumar / D. Ram Kumar                     Honda City                MRF
           2003      Naren Kumar / Moosa Sherif                     Honda City                MRF
           2004      Phillippos Mathai / Ashwin Naik              Maruti Esteem             Privateer
           2006      Naren Kumar / D. Ram Kumar                   Mistubishi Cedia         JK TYRES
           2007      Gaurav Gill / Moosa Sharif                   Mistubishi Cedia            MRF
           2008      Vikram Mathais / P.V.S. Murthy            Mistubushi Cedia           Red Rooster
           2009      Vikram Mathais / P.V.S. Murthy            Mistubushi Cedia           Red Rooster
           2010      Gaurav Gill / Moosa Sherif                   Mistubishi Cedia            MRF


  2.3 History of WISA
         The Western India Sports Association was formed in 2000 by motor sport lovers. This voluntary
         organization has established yardsticks for the INRC rounds since 2001. The Nashik rallies have
         been one of the best organized events since 2001. WISA was awarded the “Event of The Year” in
         2002, 2004, 2006, 2007. The strongest point of WISA is the large number of dedicated volunteers
         involved in running of the event.
3.      CURRENT YEAR EVENT OVERVIEW
The city will get set for the action, which begins with various teams and competitors arriving on Thursday of
the rally week. They will complete the collection of material like Road Book, Route map etc. & registration of
service & reconnaissance vehicle on Thursday.
The Pre-Event Scrutiny of vehicles, documentation & reconnaissance will take place on Friday morning. Pre
rally Competitors Press conference will be held on Friday afternoon.
Friday evening’s Super Special stage – the curtain raiser of the event - will be heart racing experience for the
speed lovers. This is an opportunity for everyone to feel the speed from close. The added attraction this time
will be watching cars with flood lights after sunset.
Section 2 of Day 1 of the event will start on Saturday morning.
Early morning of Sunday will have an attraction of Day 2 and followed by the Podium Finish & Champaign
shower ceremony in the afternoon. The post event scrutiny of the event will end the sporting aspect of the
event.
The National Prize distribution ceremony of 2010 will be held in Nashik on Sunday, 05 June 2011.




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                              4
Rally of Maharashtra 2011                       www.wisa.org.in           Rallly Guid e (W eb Vers on)
                                                                          Rallly Guiide ((Web Versiiion))
                                                                          Ra y Gu de Web Vers on


4.    ORGANISATIONAL DETAILS
4.1   Permanent Contact Details
      Western Indian Sports Association
      Shop 2,3, Galaxy Apartment, Opp. Tirupati town, Nashik 422 013
      Tel: 0253-2316067 Fax: 91-253-2316397. wisa.ind@gamil.com           website www.wisa.org.in
4.2 Rally HQ
      Up to Wednesday, June 23, 2011 at WISA’s Permanent Secretariat
      Will be located as per detailed in Art 4.1 above.
      From Thursday, June 24, 2011 8.00Hrs till Monday, June 6, 2011 12.00 Hrs at
      THE GATEWAY HOTEL, MIDC, Ambad, Mumbai Agra Road, Near Pathardi Phata, Nashik.
4.3 Key Officials with contact details
      C.O.C.                      PANDIT Ashwin            9623448501    appandit@gmail.com
      Dy. C.O.C                   YANDE Shreyas            9890124388    shreyas61@gmail.com
                                  DIXIT Neelesh            9823084085    neeleshdixit@gmail.com
      Event Secretary             BURKULE Sameer           9822604882    sameerburkule@gmail.com
      C.R.O.                      MACHHE Shrirang          9373907558    shrirang.machhe@gmail.com
      Chief Medical Officer       Dr. JAIN Kiran (M.S.)    9422726760    ptjain@hotmail.com
      Chief Safety Officer        DEOSTHALI Girish         9823168530    gldeosthali@gmail.com
      Chief Scrutineer            WAGHCHAURE Ravi          9822408288    ravimotochamp@gmail.com
      A.C.O.C.
      Team Alpha SS 2/5/8         BHAMREY Nitin            9823049415
      Team Beta SS3/6/9           AHIRE Ajay               9822519127
      Team Gamma SS4/7/10         GUJAR Anil               9422284786
      Communication               JOSHI Manoj              9422758474
      Ceremonies manager          HINGAMIRE Nitin          9420002244


      Media Manager               PANDIT Swati             9623448502
      Service Park Team           AGHARKAR Suhas           9850810977
      Chief Time Keeper           PATANI Nilesh            9822532604


      Stage Commanders
      Alpha SS 2/5/8              KHATRI Sanjay            9373918946
      Beta SS 3/6/9               DESHPANDE Chinmay        9422272181
      Gamma SS 4/7/10             NIKAM Rishi              9967025715
      Dy. Stage Commanders
      Gamma SS 4/7/10             MACCHE Kaustubh          9960001955
      Stage Safety Officers
      Alpha SS 2/5/8              KULKARNI Sanjay          9422245520
      Beta SS 3/6/9               PATHAK Sanket            9373922750
      Gamma SS 4/7/10             KANADE Hemant
(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                       5
Rally of Maharashtra 2011                      www.wisa.org.in               Rallly Guid e (W eb Vers on)
                                                                             Rallly Guiide ((Web Versiiion))
                                                                             Ra y Gu de Web Vers on
FMSCI Officials
     Chief Steward                 KHAN Zayn                                 See Note below
     FMSCI Steward                 T. B. A                                   See note below
     FMSCI Steward                 T. B. A                                   See note below
     Observer                      SHIVAPPA Shivu                            See note below
     Technical Delegate            T. B. A
Note: Contact with stewards shall be made through Competitors Relation officer only. Contact with other
      FMSCI officials should normally be made through Competitors Relation Officer except in extreme
      emergency.
       Competitors Relation officer and Event secretary will be happy to answer your enquiries during the
       four weeks before the event. It is better to contact them and clarify any issues rather than arrive at
       the event with incomplete preparation.
4.4 Media Contact Details
     Media Relation Officer     PANDIT Swati              9623448502         sappandit@gmail.com
5.   PROGRAMME & CRITICAL DEADLINES
A detailed event Programme is listed in Supplementary Regulations on page 6 to 8.
Entries Close                                                        Sunday, May 22, 2011, 20.00 Hrs
Co-Drivers Details Close                                             Sunday, May 22, 2011, 20.00 Hrs
Registration of Reconnaissance vehicle, Service Vehicle              Thursday, June 02, 2011, 22.00 Hrs
Reconnaissance Starts at SS 2                                        Friday, June 03, 2011, 06.00 Hrs
Document Verification                                                Friday, June 03, 2011, 12.45 Hrs
Crews Briefing                                                       Friday, June 03, 2011, 14.30 Hrs
Pre Event Press Conference                                           Friday, June 03, 2011 15.00 Hrs
Reconnaissance Finishes (Last car expected in Nashik)                Friday, June 03, 2011, 13.00 Hrs
Start Park Ferme opens                                               Friday, June 03, 2011, 15.00 Hrs
Park Ferme closes for Day1 Sec 1                                     Friday, June 03, 2011, 16.00 Hrs
First Car Day 1 Section 1                                            Friday, June 03, 2011, 16.40 Hrs
First Car Day 1 Section 2                                            Saturday, June 04, 2011, 07.00 Hrs
First Car Day 1 Section 3                                            Saturday, June 04, 2011, 11.06 Hrs
First Car Day1 Section 4                                             Saturday, June 04, 2011, 15.32 Hrs
Latest entry to Saturday Night Park ferme                            Saturday, June 04, 2011, 00.00 Hrs
First Car Day 2 Section 5                                            Sunday, June 05, 2011, 06.00 Hrs
First Car Day 2 Section 6                                            Sunday, June 05, 2011, 09.51 Hrs
First Car in End of Rally Park Ferme                                 Sunday, June 05, 2011, 11.36 Hrs
Podium Finish and Champaign shower ceremony                          Sunday, June 05, 2011, 14.00 Hrs
Post Event Press Conference                                          Sunday, June 05, 2011, 15.00 Hrs
Publication of Provisional Final Results                             Sunday, June 05, 2011, 18.00 Hrs
Removal of Car from Event Finish Park Ferme                          Sunday, June 05, 2011, 19.30 Hrs
Rally Head Quarters Closes                                           Sunday, June 05, 2011, 21.00 Hrs




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                          6
Rally of Maharashtra 2011                   www.wisa.org.in                Rallly Guid e (W eb Vers on)
                                                                           Rallly Guiide ((Web Versiiion))
                                                                           Ra y Gu de Web Vers on


6.    ENTRY DETAILS
6.1   FMSCI Titles for which rally counts.
      Overall Champion Team
      FMSCI Indian National Rally Championship for Team 2011
      Overall Champion Driver
      FMSCI Indian National Rally Champion for Driver 2011
      Overall Champion Co-Driver
      FMSCI Indian National Rally Champion for Co-Driver 2011
      2000 cc Champion Driver- N
      FMSCI Indian National Rally Champion for Driver 2011- 1601-2000 cc
      2000 cc Champion Co-Driver- N
      FMSCI Indian National Rally Champion for Co-Driver 2011- 1601-2000 cc
      1600 cc Champion Driver- N
      FMSCI Indian National Rally Champion for Driver 2011- 1401-1600 cc
      1600 cc Champion Co-Driver- N
      FMSCI Indian National Rally Champion for Co-Driver 2011- 1401-1600 cc
6.2 Other Support events
      1400 Star Cup Winner Driver
      FMSCI 1400 Star Cup Driver 2011
      1400 Star Cup Winner Co-Driver
      FMSCI 1400 Star Cup Co-Driver 2011
      Gypsy Cup Winner Driver
      FMSCI Gypsy Cup Driver 2011
      Gypsy Cup Winner Co-Driver
      FMSCI Gypsy Cup Co-Driver 2011




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                        7
Rally of Maharashtra 2011                      www.wisa.org.in                  Rallly Guid e (W eb Vers on)
                                                                                Rallly Guiide ((Web Versiiion))
                                                                                Ra y Gu de Web Vers on


6.3 Entry Fees
     Entries Received before Monday, May 22, 2011

                                                           Maximum entry            Maximum Entry
      Sr                                                     Fee With                Fee Without
                                Class
      No                                                     Optional                  Optional
                                                            Advertising              Advertising

       1.                               National Championship Classes

       I      When entrant & Driver are same                     Rs. 15,000/-           Rs. 30,000/-

       II     When Entrant is a Team                             Rs. 35,000/-           Rs. 45,000/-

              First Time Privateer                                Less 30%                Less 30%

       2.                                       Support Classes

       A      1400 Star Cup                                      Rs. 12,500/-           Rs. 17,500/-

              When Entrant is a Team                             Rs. 15,000/-           Rs. 30,000/-

       B      Gypsy Cup                                          Rs. 7,500/-            Rs. 12,500/-

       C      Open Class Cup                                     Rs. 10,000/-           Rs. 15,000/-


First Time Privateer: Those who have not entered a round of the INRC or Rally Star Cup in any previous
     year are entitled for a discount of 30% of the entry fee for all rounds of the 2011.


6.4 Payment details
     The entry fees can be paid either by Demand Draft in favor of “Western India Sports Association”
     payable at Nashik OR by Cash.
     Bank                               Thane Janata Sahakari Bank Ltd.
     ISFC Code of Bank                  TJSB0000001
     Branch                             21
     Current A/c No.           69




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                             8
Rally of Maharashtra 2011                       www.wisa.org.in              Rallly Guid e (W eb Vers on)
                                                                             Rallly Guiide ((Web Versiiion))
                                                                             Ra y Gu de Web Vers on


6.5 Entry Package
      All entry and other fees are inclusive of Taxes applicable in India.
      The Entry fees specified include the following:


                                        Item                                   Entrant

                                Service Vehicle Plates                             2

                             Supplementary Regulations                             1

                                    Road Book / s                                  1

                                    Service Manual                                 1

                                      Route map                                    1

                                     Team passes                                   6

                                Guest Passes for SSS                               2

                                   Service park Area                           24 Sqm

                  Service park Cafeteria entry passes for Day 1 & 2                2


6.6 Vehicle eligibility – National Championship / Support events.
      Production cars (Group N+)
      Cylinder Capacity Classes:
      • From 1601 cc up to & including 2000 cc
      Production cars (Group N)
      Cylinder Capacity Classes:
      • From 1401 cc up to & including 1600 cc
      • From 1601 cc up to & including 2000 cc
      1400 Star Cup
      Cars as per regulations of 2011 FMSCI 1400 Star Cup
      Gypsy Cup
      1000 cc and 1300cc (T1 & T2)
      Open Class Cup
      Cars as per regulations of 2011 FMSCI Open Class Cup
7.    SERVICE PARK
7.1   There are three service parks in this event.
 i)    Hotel GATEWAY service park is used only once for 20 minutes on Friday, June 03, 2011, after Super
      Special Stage. This service park will have bare minimum facilities and will not have any provision of
      shelter for service bays. Auxiliary Service cars are NOT permitted in this Service Park.
 ii) HARSUL Service Park at Hire College, Harsul, where only “TYPE II” service is permitted. The refuel
     zone is established outside this Service Park. This is situated before SS 2, 5 of Day 1 & SS 8 of Day 2.
 iii) The Main service Park to be used in the entire event is JAWHAR Service Park at Bharti Vidyapeeth
      Sankul, Jawhar.
(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                          9
Rally of Maharashtra 2011                            www.wisa.org.in                 Rallly Guid e (W eb Vers on)
                                                                                     Rallly Guiide ((Web Versiiion))
                                                                                     Ra y Gu de Web Vers on
           Competitors shall get acquainted with Service Park layout/s published by 20th April 2011 on website
           www.wisa.org.in
JAWHAR SERVICE PARK
Teams will be allocated designated area. All other competitors will be allocated a service bay. Competitors,
who wish to share facilities or require adjacent bays, must submit their request in Service Park requirement
form with the entry documents.
Service Park has Gravel surface and has following facilities.
  -        Water Supply
  -        Toilets
  -        Catering
Service Crews shall use following route chart to travel to and fro from Service Park.
  0.0            Cross the Service Road outside Hotel GATEWAY and turn RIGHT
  0.85           Turn RIGHT at the GARWARE Junction. Road leads to Ambad MIDC.
  1.90           Turn LEFT at T Junction over an Island. On right “Hardy Spicers”
  3.02           Turn LEFT at “Papaya Island” Joining Trimbak Road. Proceed towards Trimbakeshwar
  31.20          Turn RIGHT towards JAWHAR. Just before entry toll booth of Trimbakeshwar
  40.30          Amboli Junction Continue Straight.
  48.57          Continue STRAIGHT. Mokhada Junction
  78.30          Turn LEFT.
  78.87          Entre Service Park – Bharati Vidyapeeth Sankul, Jawhar.
The Service Schedule and distance traveled from the previous service are listed below. These times refer to
First Competitor.
                                    Service              From Previous Service                 To Next Service
           Service Park
                              Sr/ Time        Type     Liaison    Stage     Total      Liaison       Stage       Total

      The GATEWAY Hotel       A     20         I         --            --     --        52.95          --        52.95

      Hire College Harsul     B     10         II       52.95          -    52.95       42.35        36.16       78.51

       Bharti Vidyapeeth
                              C     20         I        42.35     36.16     78.51       64.06          --        64.06
        Sankul, Jawhar

      Hire College Harsul     D     10         II       64.06          --   64.06       42.35        36.16       78.51

       Bharti Vidyapeeth
                              E     45         I        42.35     36.16     78.51       130.14         --        130.14
        Sankul, Jawhar

      Hire College Harsul     F     10         II      130.14          --   130.14      42.35        36.16       78.51

       Bharti Vidyapeeth
                              G     20         I        42.35     36.16     78.51         --           --          --
        Sankul, Jawhar



Vehicle access to Service Park will be restricted to competing cars, Registered Service vehicles with current
sticker, vehicles used by key officials (Car 000 etc.), FMSCI Delegates, Vehicles with (ALL Area sticker
issued by organizers).
Competitors Relation officer will be located near area of Pre Service Park Ferme or at Exit of Regroup
Control.
There are two speed limits in Service Park.
       -     30 Km/H within the general area of Service Park which commences from Service IN Time control
             and extends till Service OUT time control.

(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                                     10
Rally of Maharashtra 2011                           www.wisa.org.in            Rallly Guid e (W eb Vers on)
                                                                               Rallly Guiide ((Web Versiiion))
                                                                               Ra y Gu de Web Vers on
      -    5 Km/H within the refuel zone at exit of Service Park. The refuel zone commences from Refuel
           control sign and extends till Fuel sign with three crossed transverse stripes.
There will be one-way traffic (Clockwise) in Service Park. This will be signposted and are to be observed for
safety of competitors, official’s, spectators.
Oil Disposals, rubbish bins for general waste will be provided in Service Park for use of competitors. Oil
drums will be removed at the end rally but rubbish bins will be emptied on Saturday night. Competitors are
asked to consider disposing of large or dangerous parts like wind shield in industrial facilities rather than
using general waste bins.
Weighing of car will be done before checking IN time control of Service Park. Time has been
allowed in regroup section for this activity to occur.
Overnight security guards will be in place at Service Park on Saturday Night. Teams are asked to assist this
security activity by properly securing any equipment or vehicles left at JAWHAR Service Park.
Recovery of Vehicle
Tow truck will be located between STOP control of SS 3/6/9 & Time control of SS 4/7/10. Any crews wishing
to recover the vehicle shall speak to the stage safety officer of the stage and can seek the Tow truck. The tow
truck will cost Rs. 50/Km from the start location of tow truck till the location of vehicle to be dropped.
8.        HOSPITALITY ARRANGEMENT

  Sr
                  Restaurant Cuisine / Specialty                Locality      Bar          Booking Contact
  No

     1       Coffee Shop All / Continental                      Rally HQ       Yes            0253-6604499

     2       Pancharatna Indian/ Chinese                        Rally HQ       Yes            0253-6603366

     3       Main Land China Chinese / Buffet Lunch           Mumbai Naka      Yes          0253-6619995, 96

     4       Machan Barbeque Buffet Dinner                    Mumbai Naka      Yes          0253-6619995, 96

     5       White Lily Indian                                 Rane Nagar      Yes            0253-2378383

     6       Emerald Park Continental / Sizzlers               Trimbak Rd      No             Not Required

                                                                              Wine
     7       YORK Winery Snacks                                Govardhan                      Not Required
                                                                              Bar

                                                                              Wine
     8       Little Italy Vegetarian Italian Food              Govardhan                      Not Required
                                                                              Bar

     9       Kaka ka Dhaba Punjabi /Spicy Non-veg             Gangapur Rd      Yes            Not Required

     10      Divya Abhilasha Maharashtrian / Non veg          Mum-Agra Rd      No             Not Required

     11      Mc Donald Fast Food                               Collage Rd      N0             Not Required

     12      Panchavati Gujrathi Thali                         Vakil Wadi      N0             Not Required

     13      That Bat Rajasthani Thali                         College Rd      No             Not Required




 (THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                           11
Rally of Maharashtra 2011                          www.wisa.org.in                  Rallly Guid e (W eb Vers on)
                                                                                    Rallly Guiide ((Web Versiiion))
                                                                                    Ra y Gu de Web Vers on


  Sr
                  Restaurant Cuisine / Specialty               Locality             Bar         Booking Contact
  No

            Modern Café
     14                                                      Gangapur Rd            No             Not Required
            Maharashtrian Veg

     15     Puffs & Rolls Bakery                             Mahatma Ngr            No             Not Required

     16     Bhagwati Chat                                    Pandit Colony          No                No Sitting

     17     Toccata Chocolates & pastries                    Mumbai Naka            No                No Sitting

                                                                                    Wine
     18     Tiger Hills Continental Snacks                   Mum–Agra Rd                           Not Required
                                                                                    Bar


9.        HOTEL ACCOMMODATION
The Tariff mentioned below is for Standard AC Double Room. Taxes extra unless & until specified.

                                                                                                                Dist
     Sr
                        Hotel Address & Contact                 Tariff & Discount            Inclusive         from
     No
                                                                                                                HQ

                                                                Rs. 4200/- Single          Breakfast &
            THE GATEWAY HOTEL, Mumbai Agra Road,                                             Dinner 2
                                                                Rs. 5200/- Double            nights if
     1      0253-6604499, 3366                                                                                 0.00
                                                                                           stay is more
            .www.tajhotels.com/gateway                            (Almost 40%                 than 4
                                                                discounted price)             nights

            Hotel Jupiter, Pathardi Junction, Mumbai agra
     2                                                          Rs. 4500/- Less 20%          Breakfast          1.00
            Road, 0253-2392425, 2300 www.jupiternashik.com

            Hotel Seven Heaven
                                                                     Rs. 2800/-
     3      Pathardi Junction, Mumbai Agra Road                                              Breakfast          1.25
                                                                      Less 20%
           0253-2390044

            Hotel Grand Ashwin NX,
     4                                                          Rs. 1600/- Less 20%             NIL             1.25
            Mumbai Agra Road0253-2376345, 8183

            Hotel Sumanchandra,
            Near Phalke Smarak, Mumbai Agra Road                      Rs. 1800/-
     5                                                                                          NIL             1.30
            0253-2380248, 348                                         Less 20%
            www.sumanchandrahospitality.com

            Hotel Tapovan, Near Phalke Smarak, Mumbai Agra
     6      Road, 0253-2383970                                  Rs. 1400/- Less 10%             NIL             1.50
            www.hoteltapovan.com

                                                                     Rs. 4000/-
            Hotel Lily Sarovar Portico
                                                                     Less 20% for
     7      Mumbai agra Road, 0253-2378383                                                   Breakfast          3.00
                                                                      Corporate
            www.sarovarhotels.com
                                                                 Less 15% for Others

            Hotel Sai Palace, Mumbai Agra Road                  Rs. 2000/- Less 20%
     8                                                                                       Breakfast          3.00
            0253-2391501,2,3, www.saipalace.com                  Only for Corporate




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                                  12
Rally of Maharashtra 2011                             www.wisa.org.in                Rallly Guid e (W eb Vers on)
                                                                                     Rallly Guiide ((Web Versiiion))
                                                                                     Ra y Gu de Web Vers on


                                                                                                                 Dist
  Sr.
                        Hotel Address & Contact                    Tariff & Discount          Inclusive         from
  No.
                                                                                                                 HQ

             Hotel Surya Renaissance
                                                                        Rs. 1890/-
      9      Mumbai Agra Road, 0253-2326000                                                   Breakfast          3.50
                                                                        Less 10%
             www.suryarenaissance.com

             Hotel Sai Saya, Mumbai Agra Road                           Rs. 1500/-
   10                                                                                         Breakfast          3.50
             0253-2322521, 22, www.hotelsaisaya.com                     Less 10%

             Hotel Sai Basera, Bhujbal Farm road
      11                                                                Rs. 945/-                NIL             3.75
             0253-2392002



10. RECONNAISSANCE
Please refer Article 9 of Supplementary Regulations. Reconnaissance is to be carried out only on Friday,
June 03, 2011. It is reminded that the Speed limit in Special stages is 60 Km/h.
Officials will be monitoring the speed limits throughout the reconnaissance. Note that the traffic by other
road users will be on. During reconnaissance competitors must give right way to other road users.
Competitors are advised that they shall switch on the head lights of reconnaissance vehicle through out the
special stages.
Details regarding reconnaissance vehicle must be submitted to event secretary before Thursday, June 02,
2011.
Any accident or emergency occurs during reconnaissance competitor must contact Competitors Relation
Officer or Dy. Clerk of Course.
Waking pass reconnaissance of SS1, will be done on Friday as per schedule given in Supplementary
Regulation.
11.        PRE EVENT SCRUTINEERING / SEALING / MARKING
Competitors shall also refer Supplementary regulations Article 11.
All scrutiny will be carried out at Jitendra Motors, Adjecent to Rally HQ - The GATEWAY HOTEL.
All competitors will be allocated a specific time for scrutiny. These times are displayed in Article 11.1 of
Supplementary Regulations. All signage and numbers must be in place before Scrutiny.
It is necessary to have DOCUMENT “OK” pass before attending scrutiny. Document scrutiny will be done in
Rally Head Quarter on Friday, June 03, 2011. The competitors wishing to complete their documentation
shall contact event secretary on Thursday June 02, 2011 at Rally HQ.
Post event scrutiny will be carried out at Jitendra Motors on Sunday, June 05, 2011. The list of cars to take
for scrutiny will be displayed on Official notice board after Champaign shower ceremony.
12.        RALLY START PROCEDURE
Start Procedures
The Rally will start at Super Special Stage. Super-special stage will run on Asphalt surface in Dadasaheb
Phalke Smarak, Mumbai Agra road, Nashik. Cars will start in Reverse order in Super Special stage with
time interval of 3 minutes between two cars.
It is strongly recommended to carry extra lights for the cars as some car may run after
sunset.




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                                   13
Rally of Maharashtra 2011                         www.wisa.org.in               Rallly Guid e (W eb Vers on)
                                                                                Rallly Guiide ((Web Versiiion))
                                                                                Ra y Gu de Web Vers on


13.    RALLY FINISH PROCEDURE
13.1 Finish Procedure
       Rally will finish at TC 10F. Thereafter crews must follow the instructions of officials during the podium
       finish ceremony. From podium, selected cars are obliged to follow the route described in Informative
       road book to Final Scrutineering. Rest of the cars will report to Finish Park Ferme and remain there till
       Official final classification or instruction by Stewards of the meet.
       While the cars are between Podium Finish to Final Scrutineering location they will travel under Park
       Ferme regulations and will be observed by marshals.
13.2 Permitted early check in
 13.2.1      Crews may check in early without incurring any penalty at following controls
             1D (End of Day 1, Section 1)
             7E (End of Day 1, Section 4)
             10E (End of Day 2)
 13.2.2      Time cards will be changed during the rally and will be issued at following controls
             1,1E, 4D, 7D, 7F, 10D
14.    PR ACTIVITIES
Pre event Press releases will be flying time to time promoting the event and participants of the event. It is
strongly recommended that competitors fill up the media information form and submit it at the earliest. The
participating teams can give their press release which can be circulated to media personnel registered for the
event.
15.    MEDIA
15.1 Media Contact before and After Event
       There are one media officer of this event, who will be available in Media Center at Rally Head Quarters,
       and at the various ceremonies and in the special stages.
       For further details contact the press relation officer
       - PANDIT Swati             sapandit@gmail.com            9623448502
15.2 Accreditations
       Official media persons will be identified by florescent poncho “Official Field Media” printed on it. This
       will be issued to them after completing accreditation procedures. For accreditation contact the press
       relation officer.
       At all the times media representatives must obey the instructions of rally officials while in the vicinity
       of the stages.
15.3 Press Conferences
       Pre event press conferences will take place in Nashik. One to One talk by media to invited competitors
       will take place on Friday afternoon in Ball Room, Hotel Gateway.
       Post event press conference will take place on Sunday after noon at Media Centre where media will get
       opportunity to have conversation with the winners of various classes in the Rally.
16.    MEDICAL AND SAFETY SERVICES
16.1     HOSPITALS
         Civil Hospital                                         +91-253-257 2038
         Wockhardt Hospitals, Nashik                            +91-253-662 4444
         Suyash Hospital                                        +91-253-2318990 /991/992/993
         Sahyadri Speciality Hospital                           +91-253-2502164 /2597904/05

(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                             14
Rally of Maharashtra 2011                     www.wisa.org.in                Rallly Guid e (W eb Vers on)
                                                                             Rallly Guiide ((Web Versiiion))
                                                                             Ra y Gu de Web Vers on
        Rajebahadur Hospital and Research Centre             +91-253-250 3201
        Cottage Hospital, Jawhar                             +91-2520-222407
        Harsul Hospital                                      +91-2558-227244
16.2    FIRE BRIGADE
        Nashik                                               101/ +91-253-259 0871
16.3    POLICE STATIONS
        Control Room – Nashik                                Tel No +91-253-257 1333
        Commissioner of Police, Nashik                       Tel No + 91-253-230 5200
        Superintendent of Police, Nashik                     Tel No + 91-253-230 9700
        Ambad Police Station                                 Tel No +91-253-239 2233
        Trimbak Police Station                               Tel No +91-2594-23 3133
        Jawhar Police Station                                Tel No +91-2520-22 2433
        Harsul Police Station                                Tel No +91-2558-22 7233
16.4    OTHER EMERGANCY SERVICES
 16.4.1 Blood Banks
        Janakalyan Blood Bank                                +91-253-257 3493, 257 5249
        Arpan Blood Bank                                     +91-253-257 6058, 231 1358
 16.4.2 Medical Shops (24 Hour)
        Apollo Pharmacy                                      +91-253-231 7049
        Rajebahadur Hospital and Research Centre             +91-253-250 3201
 16.4.3 Towing Vans and Rescue Services
        United Crane Services, Nashik                        +91-9890040148
        Gani Crane Service, Jawhar                           +91-9226295074
 16.4.4 Indian RED CROSS                                     +91-253-250 3092


17.    USEFUL FACTS & INFORMATION
17.1    Weather
        Dry Weather with temperature approx. 27 o to 33o
17.2    Hire Car Companies
        Most of the hotels including Rally HQ hotel have facility of travel desk.
        Laxmi Travels                         +91-253-2573289, 9373902323
        Pushpanjali Travels                   +91-253-2329778
17.3    Airline Companies and Airports
        Nearest Airport available is Ozar, which is 25 Kms from The Rally HQ. It is connected to only
        Mumbai airport by single flight.
        Airline Enquiries:
        We have a office of Makemytrip.com .
        Address : 2. Tushar Ground Floor, Sharanpur road , New Pandit Colony, Nashik - 422002
        Phone No: +91 253 6618 687



(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                          15
Rally of Maharashtra 2011                   www.wisa.org.in                  Rallly Guid e (W eb Vers on)
                                                                             Rallly Guiide ((Web Versiiion))
                                                                             Ra y Gu de Web Vers on

       Railway
       Nearest    Railway    Station    is    Nashik    Road            12       KMS        from        Nashik.
       Phone No. Enq- 0253-2572715, Reservation-0253-2563625,
       Bus (State Transport)
       State Transport bus service for all over Maharashtra , Gujarat, Karnataka.
       Also private services like Neeta Volvo, Konduskar are also available.
       Booking at Baba Travels (0253-2341881)
17.4   Mobile Phones & Telephone Services
       BSNL is a main service provider in Nashik. Also all major mobile phone service providers like
       IDEA, Vodaphone, Airtel, Aircell, TATA Indicaom, Relince etc are available in Nashik.
17.5   Sight seeing and touring:
       Nashik is a Holy city and we recommend to visit Shirdi (80 Km), Triambakeshwar (30
       Km), Someshwar (12 Km), Anjaneri (The birth place of Hanumanji) (16 Km), Pandav caves (2 Km),
       Chamhar Caves (22 Km)
17.6   General Banking Hours
       General Banking Hours are from 11.00 to 16.00 hrs.          Almost all Nationalized, Scheduled
       cooperative and Private bank branches are in Nashik.




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                          16
 Rally of Maharashtra 2011                             www.wisa.org.in                 Rallly Guid e (W eb Vers on)
                                                                                       Rallly Guiide ((Web Versiiion))
                                                                                       Ra y Gu de Web Vers on


        APPENDIX 1                                                                              RALLY ITINERARY



DAY 1                                                                                            Friday 03 June 2011

 TC                                                                   Liaison                Target    Av.     1st Car
                           Location                         SS Dist             Total Dist
 /SS                                                                    Dist                  Time    Speed     Due
  1    Dadasaheb Phalke Smarak                                                                                  16:40
SS1    SSS                                                   2.13                                               16:43
 1A    Holding zone IN : The Gateway Hotels                               2.11     4.24     0:10    25.44        16:53




                                                                                                                         Sec 1
 1B    Holding zone OUT & Service A In                               20min max for any car                       16:53
         Service A - The Gateway Hotel Nashik                  2.13       2.11    4.24      0:20
  1C Service A Exit                                              -          -        -        -              17:13
 RZ1 Refuel- All competitors Distance to Next Refuel                    (52.95)  (52.95)
 1D Post service Regroup IN                                                                 0:05             17:18
Restart DAY 1                                                                                Saturday 04 June 2011
  1E Hotel Gateway Pakferme                                                                                  7:00
  1F Harsul Service B In (Type II & Refuel)                              52.95    52.95     1:10    45.39    8:10
      Tyre Zone: Service B - Hire Collage, Harsul                      (52.95)  (52.95)     0:10
  1G Service B Exit                                                         -        -                       8:20
RZ2 Refuel- All competitors Distance to Next Refuel          (36.16)    (42.35)  (78.51)
   2 Thanepada                                                            8.68    8.68      0:12    43.40    8:32
SS2 Thanepada 1                                              12.33                                          8:35




                                                                                                                         Sec 2
   3   Khadakohol 1                                                       2.67    15.00     0:20    45.00    8:55
SS3 Khadak Ohol                                               7.69                                          8:58
   4 Ozarkhed 1                                                           6.68    14.37     0:30    43.11    9:28
SS4 Ozarkhed 1                                               16.14                                           9:31
 4A Holding zone IN : Bharati Vidyapith Sankul                           24.32    40.46     0:55    44.14   10:26
 4B Holding zone OUT & Service C In                                  20min max for any car                  10:26
     Service C - Bharati Vidyapith Sankul, Jawhar           (36.16)    (42.35)  (78.51)     0:20
 4C Service C Exit / Post Service Regroup IN                     -          -        -        -             10:46
Restart DAY 1                                                                                Saturday 04 June 2011
 4D Regroup OUT                                                                             0:20             11:06
RZ3 Refuel- All competitors Distance to Next Refuel                     (64.16)  (64.16)
 4E Harsul Service D In (Tyre & Refuel)                                  64.06    64.06     1:20    48.05   12:26
      Tyre Zone: Service D - Hire Collage, Harsul                      (64.06)  (64.06)     0:10
 4F Service D Exit                                                                                          12:36
RZ4 Refuel- All competitors Distance to Next Refuel          (36.16)    (42.35)  (78.51)
   5   Thanepada 2                                                        8.68    8.68      0:12    43.40   12:48




                                                                                                                         Sec 3
SS5 Thanepada 2                                              12.33                                          12:51
   6 Khadak Ohol 2                                                        2.67    15.00     0:20    45.00    13:11
SS6 Khadak Ohol 2                                             7.69                                          13:14
   7   Ozarkhed 2                                                         6.68    14.37     0:30    43.11   13:44
SS7 Ozarkhed 2                                               16.14                                          13:47
 7A Holding zone IN : Bharati Vidyapith Sankul                           24.32    40.46     0:55    44.14   14:42
  7B Holding zone OUT & Service E In                               Maximum 45 min for any car               14:42
     Service E - Bharati Vidyapith Sankul, Jawhar           (36.16)    (42.35)  (78.51)     0:45
  7C Service E Exit / Post Service Regroup IN                    -          -        -        -              15:27
Restart DAY 1                                                                                Saturday 04 June 2011
 7D Regroup OUT                                                                             0:05             15:32
                                                                                                                         Sec 4



RZ5 Refuel- All competitors Distance to Next Refuel                    (130.14) (130.14)
  7E Overnight Parc Ferme The Gateway IN                                 77.19    77.19     1:45    44.11    17:12
Day 1 Totals                                                  72.32    278.90    351.22




  (THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                                  17
Rally of Maharashtra 2011                                 www.wisa.org.in                       Rallly Guid e (W eb Vers on)
                                                                                                Rallly Guiide ((Web Versiiion))
                                                                                                Ra y Gu de Web Vers on


       APPENDIX 1                                                                               RALLY ITINERARY


                           DAY 2                                                                        Sunday 05 June 2011

 TC                                                                       Liaison                   Target     Av.     1st Car
                             Location                           SS Dist              Total Dist
 /SS                                                                        Dist                     Time     Speed     Due
 7F    Hotel Gateway Pakferme                                                                                            6:00
 7G    Harsul Service F In (Type II & Refuel)                               52.95      52.95         1:10      45.39     7:10
       Tyre Zone: Service F - Hire Collage, Harsul                        (130.14)   (130.14)        0:10
  7H   Service F Exit                                                                                                    7:20
RZ6    Refuel- All competitors Distance to Next Refuel          (36.16)    (42.35)    (78.51)
   8   Thanepada - 3                                                        8.68       8.68          0:12      43.40    7:32
SS8    Thanepada 3                                               12.33                                                  7:35




                                                                                                                                  Sec 5
   9   Khadak Ohol 3                                                        2.67       15.00         0:20      45.00    7:55
SS9    Khadak Ohol 3                                             7.69                                                   7:58
  10   Ozarkhed 3                                                           6.68       14.37         0:30      43.11    8:28
 SS
      Ozarkhed 3                                                 16.14                                                  8:31
 10
 10A Holding zone IN : Bharati Vidyapith Sankul                           24.32    40.46      0:55    44.14    9:26
 10B Holding zone OUT & Service G In                                 Maximum 20 min for any car                9:26
     Service G - Bharati Vidyapith Sankul, Jawhar               (36.16)  (42.35)  (78.51)     0:20
 10C Service G Out / Post Service Regroup In                       -        -        -                         9:46
Restart DAY 2                                                                                    Sunday 05 June 2011




                                                                                                                                  Sec 6
 10D Regroup OUT                                                                              0:05             9:51
 RZ7 Refuel- All competitors
 10E Regroup In Hotel Gateway                                              77.19       77.19         1:45      44.11    11:36
Day 2 Total                                                      38.29    174.60      212.89

                                                         Total of Rally
                                                                   SS     LIASON      TOTAL          #%         *%
                           DAY 1 - 6 SS                           72.32    278.90      351.22       25.93%    20.59%
                           DAY 2 - 4 SS                           38.29    174.60     212.89        21.93%    17.99%

                          TOTAL - 10 SS                         110.61     453.50        564.11      24.39% 19.61%
                                                           # % The percentage of Day's distance of special stage
                                                           * % The percentage of total distance of special stage




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                                                18
Rally of Maharashtra 2011                   www.wisa.org.in             Rallly Guid e (W eb Vers on)
                                                                        Rallly Guiide ((Web Versiiion))
                                                                        Ra y Gu de Web Vers on


APPENDIX 2                                                                       OVERVIEW MAP




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                     19
Rally of Maharashtra 2011                   www.wisa.org.in             Rallly Guid e (W eb Vers on)
                                                                        Rallly Guiide ((Web Versiiion))
                                                                        Ra y Gu de Web Vers on


APPENDIX 3                                                                       STAGES MAP




(THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                     20
Rally of Maharashtra 2011                        www.wisa.org.in                 Rallly Guid e (W eb Vers on)
                                                                                 Rallly Guiide ((Web Versiiion))
                                                                                 Ra y Gu de Web Vers on


APPENDIX 4                               IMPORTANT CHANGES IN INRC REGULATIONS TO NOTE
1.    Rally will run in 3 days. c.
      • Day 1 – Scrutiny, Reconnaissance, Drivers Briefing, Pre-event press conference (Only for Invitees),
          Ceremonial start etc.
      • Day 2 – 60-70% of Stages
      • Day 3 – Balance 40-30% pf stages & SSS, Podium finish, Post events scrutiny
2.    Entries will close 12 days before Day 1. All forms published by organisers with SR must be sent by fax or
      by email 12 days before the event.
3.    Entry list will be published 10 days before the event.
4.    Points per event will be as per FIA 25, 18, … up to 1 for 1st , 2nd … up to 10th Position overall and class
      wise.
5.    Cash prize of INRC is increased by almost 30%
6.    National Champions will also get Cash Prize in Annual Prize giving function of FMSCI.
7.    Support Classes to INRC (They will not compete with INRC cars)
      • RSC is removed and 1400 Star Cup is introduced. Any car (MPFI & Carbureted) being homologated
          or having TDF form of FMSCI can participate in this class.
      • Gypsy Cup: - Apart from existing Gypsy class even T1 & T2 both can compete in this same class.
      • Open Class: (No Points will be awarded. This will be class pertaining to that event)
          o Diesel Class
          o Petrol Class
8.    2000 N+ will need use Hans for both crew members.
9.    Pre-event Press conference is mandatory to only competitors as listed by Organisers. Others can skip it if
      they wish to.
10.   Super Special stage surface can be changed from the rest of stages.




 (THIS DOCUMENT HAS NO REGULATORY POWER AND IS ISSUED AS A GUIDE ONLY)                                             21

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:12
posted:10/30/2011
language:English
pages:21