Critical path analysis

This is the type of

diagram you are aiming

to draw

Network/critical path analysis

 A decision making tool, used to plan

work flows

 A complex tool, which organises work

to establish:

 earliest start times

 latest finishing times

 the critical path

 the float.

Aims of critical path analysis

 To plan complex  To identify critical

operations. activities – which

 To identify when a are those activities

project must which must be

commence. completed.

 To illustrate the  To identify the float.

order of activities.

Nodes and activities



Activity



EST paint wall

EST

1 2

LFT Time LFT



3 hrs The arrow shows us

The node shows the

physical start and the actual task

which is being

finish of an activity

undertaken

Constructing the network

2 The

first job





1 2 4 Start the next activities





1 Start 3 Finish

the the job

project

Building a network





3



6 Start the next

1 2 5 Complete activity once

tasks 3 &4 both 3 & 4 are

complete

4

The completed diagram



7 Finish the job

3





1 2 5 6





4 Give each node a

number

Adding the information

Add the activities

and times

3

b c

a

3 hrs 7 hrs f

1 2 5 6

24 d e 3 hrs

hrs

3 hrs 4 2 hrs

The earliest start times

Add the earliest

start times

3 27

b c

a

f

1 0 2 24 3 hrs 7 hrs

5 34 6 37

24 d e 3 hrs

hrs

3 hrs 4 27 2 hrs

The latest finishing times



3 27

b 27 c

a

0 f

1 2 24 3 hrs 7 hrs

5 34 6 37

0 24 34 37

24 d e 3 hrs

hrs

3 hrs 4 27 2 hrs

32 Add the latest

finishing times

The critical path



*

* * 3 27

a

b 27 c

*

3 hrs 7 hrs f

1 0 2 24 5 34 37

0 24 34 6 37

24 d e 3 hrs

hrs

3 hrs 4 27 2 hrs Critical

32 activities are

a, b, c, f.

The float

 With the network complete, you can now

identify any idle time.

 This spare time is known as the float.

 Resources can be allocated to other duties

during the float time.

 In this activity there is only one critical time -

between tasks d and e, where there are 5

floating hours.

 Float is calculated in a table of calculations.

The float table

Formula LFT – (EST - Duration)

Activity LFT EST Duration Float

What you will need

To undertake the analysis you will

need:

 a list of activities



 information on the order of tasks to be

completed

 the time it takes to complete each task



 any constraints on completing.

Starting the network

Before you can start the network,

you must create a table (task 4)

containing the following:

 the activities in order



 the time it takes to carry out



 a letter for each activity.



You can then draw the network.



Related docs
Other docs by qinmei liao
Q CMA ExperienceRequirement
Views: 0  |  Downloads: 0
Lipid Learning Activity
Views: 0  |  Downloads: 0
MATERIAL SAFETY AND DATA SHEETS
Views: 2  |  Downloads: 0
Financial Planning The Ties That Bind
Views: 0  |  Downloads: 0
Inflammatory Pain
Views: 4  |  Downloads: 0
Group goal setting workshop
Views: 0  |  Downloads: 0
MEETINGS REPORT ACTION SHEET
Views: 1  |  Downloads: 0
LYMPHOMA RESEARCH FOUNDATION
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!